EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0B
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, 0A

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED

OPERATIONS
ISSUED FOR APPROVAL

CONSTRUCTION
(DCC) NO. _____________________ 00 09Apr17 BI-10-01545
DATE:

pr
Procedure for Typical Dewatering Works

Ju’aymah, Saudi Arabia


Upgrade Ju’aymah Shops Maintenance Shops Northern Area
DOC
6600036980

PREPARED BY:
BI-10-01545

EASTERN TRADING & CONST. EST.

N26
RJO / EWO:
PROCEDURE FOR

E
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

UPGRADE JU’AYMAH SHOPS

BI-10-01545
DOCUMENT NO.
TYPICAL DEWATERING METHODS

UJS-CON-E-30042
MAINTENANCE SHOPS NORTHERN AREA

5
1
of
SHT.NO.

00
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0B
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, 0A

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED

OPERATIONS
ISSUED FOR APPROVAL

CONSTRUCTION
(DCC) NO. _____________________ 00 09Apr17 BI-10-01545
DATE:

pr
Procedure
B. SCOPE
3
A. PURPOSE 2

E. RESOURCES
C. REFERENCES

G. ATTACHMENTS 5
F. METHODOLOGY 4
3
3

for Typical Dewatering Works

Ju’aymah, Saudi Arabia


D. CONTRACTOR RESPONSIBILITIES
3

Upgrade Ju’aymah Shops Maintenance Shops Northern Area


DOC
TABLE OF CONTENTS

N26
RJO / EWO:
E
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

BI-10-01545
DOCUMENT NO.

UJS-CON-E-30042

5
2
of
SHT.NO.

00
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. PURPOSE
ENGG CERT

To define a procedure to execute a proper and efficient dewatering methods conforms within the
project requisites of design, quality and safety in accordance with the project specifications, Saudi
Aramco and other relevant industry codes & standards.

B. SCOPE

This covers the various activities associated with the typical dewatering works to be carried out by
the Contractor for the construction of several buildings and other related facilities in accordance
ISSUED FOR APPROVAL
DESCRIPTION

with the Project Scope of Works. This procedure shall be read in conjunction with the relevant
approved method statements, Construction Site Safety Plan (CSSP) and the Saudi Aramco
Construction Safety Manual (SACSM). In the event of conflict with the others, the most stringent
shall govern.

C. REFERENCES

SAES-A-114 Excavation & Backfill


SAES-Q-001 Criteria for Design & Construction of Concrete Structures
BI-10-01545
JO/EWO

SACSM Saudi Aramco Construction Safety Manual


CSSP Construction Site Safety Plan
09Apr17
DATE

GI-0002.100 Work Permit System


PIP CVS02100 Site Preparation, Excavation & Backfill Specification
NO.
REV

0A
0B

00

DISCIPLINE
ENGINEER D. CONTRACTOR RESPONSIBILITIES
DATE:
PROJECT
ENGINEER
Designation Responsibility
Responsible for organizing the project resources. Coordinate with the
DATE:
project key personnel to achieve target completion date for this item of
CERTIFIED Construction Manager
work. Developed plans and construction strategies for maximum output
efficiency of allocated resources.
DATE:
CONSTRUCTION
AGENCY
Ensure the execution of works shall be in accordance with the
requirement of the work scope and Company standards. Provide sound
DATE: technical solution to engineering problems that might be encountered
Civil Superintendent
OPERATIONS while the work is in-progress. Coordinates with the Construction
Manager and site personnel for the implementation of project
DATE: requirements.
CONTROL NUMBER

Responsible for monitoring and implementation of safety requirement.


VERIFICATION

Site Safety Supervisor/


Conduct safety meeting and tool box talks. Prepare safety reports and
EDSD

Officer
documentations. Ensure general safe working environment on site.
DATE:
BY:

Responsible for successfully executing the activities of dewatering


Site Engineer
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

works.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

pr
Procedure for Typical Dewatering Works DWG.TYPE PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
REVISION

DOC
UJS-CON-E-30042 3
N26 E
Upgrade Ju’aymah Shops Maintenance Shops Northern Area of 00
RJO / EWO: 5
Ju’aymah, Saudi Arabia BI-10-01545
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. RESOURCES
ENGG CERT

The Contractor shall deploy an adequate number of resources as per requirement and
quantum of work in compliance to work schedule and resource histograms.

Equipments Manpower Safety Equipment


 Excavator or JCB  Construction Manager  Fire Extinguishers
 Dewatering Pumps  Civil Superintendent  Warning Signages & Devices
 Wellpoint System  Surveyor  Barricades/ Jersey
ISSUED FOR APPROVAL

 Water Tank/Truck  Safety Supervisor Barriers/Fences


DESCRIPTION

 Flexible hose/pipe  Flag man


 Other equipment/tools  Machinery Operators & Drivers
that might be essential to  Foreman
the job  Labour Crew

F.METHODOLOGY
BI-10-01545
JO/EWO

As it is required to excavate below the water table, dewatering should be adopted to temporarily
lower the water level during the construction period. Contractor proposes to utilize the Wellpoint
Dewatering System for this purpose and for any free or surface water encountered at the base of
09Apr17
DATE

excavation shall be dewatered using open sump method (collection pit system).

The water shall be pumped out to dry the subgrade level prior to concreting of foundations.
NO.
REV

0A
0B

00

DISCIPLINE Pumping shall carry out by placing a centrifugal pump in the excavation provided with a shallow
ENGINEER
well and installing it with an electro-submersible pump/generator. The Contractor shall employ
DATE:
temporary drainage measures during construction. Ponding of water on placed fill or within
PROJECT excavations shall not be allowed.
ENGINEER

F.1 Collection Pit System (Open Sump Method)


DATE:
CERTIFIED
For free or surface water, Contractor shall carry out an open sump in the lowermost portion of the
DATE:
excavation where these waters shall accumulate and facilitates for easy discharge. This method is
CONSTRUCTION typically suitable for the present site condition where the soil is classified to be silty sand.
AGENCY

For large excavation area, such as Admin Building, several sumps shall be installed along the
DATE:
OPERATIONS longer side or simply use a long narrow sump, i.e. ditch.

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

pr
Procedure for Typical Dewatering Works DWG.TYPE PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
REVISION

DOC
UJS-CON-E-30042 4
N26 E
Upgrade Ju’aymah Shops Maintenance Shops Northern Area of 00
RJO / EWO: 5
Ju’aymah, Saudi Arabia BI-10-01545
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
F.2 Wellpoint Method
ENGG CERT

1) A series of wells of required depth are created within the vicinity of the excavated area from
where the water has to be pumped out. The wells are arranged either in a line or a rectangular
form where the wellpoints are created at a distance of at least 2m from each other.

2) Riser pipes or dewatering pipes are then installed into those closely spaced wells which on the
surface are connected to a flexible swing pipe which is ultimately appended to a common
header pipe that is responsible for discharging the water away from the site. The purpose of
using a flexible swing pipe is just to provide a clear view of what is being pumped and the
ISSUED FOR APPROVAL
DESCRIPTION

purpose of header pipe is to create suction as well as discharge the water off the working area.

3) One end of the header pipe is connected to the dewatering pump which draws water through
notches in the wellpoint. The water then travels from the wellpoints through the flexible swing
pipe into the header pipe to the pump. It is then discharged away to the nearest temporary
collection pit/tank. From here, the water shall be collected by a dedicated water tank for
disposal outside the project site.

4) See below typical sketch for wellpoint system. Also, refer to attached dewatering layout plan.
BI-10-01545
JO/EWO

09Apr17
NO. DATE
REV

0A
0B

00

DISCIPLINE
ENGINEER

DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
G. ATTACHMENTS
CONTROL NUMBER
VERIFICATION

1. Typical Dewatering Details


EDSD

2. Dewatering Layout Plan


DATE:
BY:

2.1 Proposal 1 – Collection Pit System (Open Sump)


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

2.2 Proposal 2 – Wellpoint System


(DCC) NO. _____________________

pr
Procedure for Typical Dewatering Works DWG.TYPE PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
REVISION

DOC
UJS-CON-E-30042 5
N26 E
Upgrade Ju’aymah Shops Maintenance Shops Northern Area of 00
RJO / EWO: 5
Ju’aymah, Saudi Arabia BI-10-01545