1.

Briefing conduct by project manager about;


i. Soil nailing = talk abo the progress of soil nailing.
ii. Filling = ask the progress of filling.
iii. Concrete culvert = ask the condition of all concrete culvert.
2. Company provide me new PPE like safety shoes, safety vest, safety helmet and
fabric glove.
3. Get knowledge about what this company do.;
i. Civil construction.
4. Learn about type of traffic barricades and the function like;
i. Barricade flashers (to insure public car see the jersey barrier and the side construction
at night)
ii. Jersey barriers (it is utilized to safeguard street-side construction sites
and block off roads during resurfacing)
iii. Reflective rope (to insure public car see the jersey barrier and the
side construction at night)
5. Drive to Cukai Terengganu to see new site.

1. Follow Traffic Management Office (TMO) to observe, inspect and maintain


the barriers.
i. Ask workers to arrange back barriers that fall down
2. All workers use right PPE like fabric gloves, safety vest, safety rain boots.
3. Place new barriers at new potential hazard road.
4. Traffic management officer ask me to give order to worker for plant new signboard at
construction side base on drawing.
i. Type signboard; (KESABARAN ANDA AMAT DIHARGAI, PEMBINAAN TAMAT,
KERJASAMA ANDA AMAT DIHARGAI, HARAP MAAF KESULITAN AMAT DIKESALI,
ARROW SIGN, CONSTRUCTION SIGN, AWAS KURANGKAN LAJU, PENGAWAL BENDERA
DIHADAPAN ___m, AWAS PEMBINAAN DI HADAPAN ___m, AWAS
KERJA__DIHADAPAN___m)

. . .

. .
1. briefing conduct by project manager about;
i. Preparation of floods to avoid landslide at hill construction site-the precaution is
to make drain, plant grass at side of hill, and faster the process of work before
rainy season.
2. Supervise worker that herbicides at barriers area to maintain the barriers.
3. Maintain reflective rope barriers and substitute old reflective rope barriers.
4. Observe excavator making a drain at side of construction to avoid overflow water to the
road.
5. Located new jersey barriers and reflective rope at dangerous corner.

1. Follow traffic management officer flying drone to see and record video at new location.
2. Observing and maintaining barriers that fall down.
3. Observing and maintaining reflective rope that slack
4. Place barrier at dangerous corner to avoid accident happens.
5. Observe excavator digging a drain.
6. Break for jumaat pray.
7. Help SHO failing a report.

1. Observing and Maintaining barriers that fall.


2. Observing and maintaining reflective rope that slack.
3. Ask worker to sweep and remove sand and soil from construction road because in afternoon
the road will open for test.
4. Trial open road for public car to test;
i. 2 workers be a signal man to control public car.
ii. Other workers push the barriers to make divider for left and right road.
iii. Observe the road tar or bitumen while public cars use the road in 2 hours to see silt.
5. Close the road back;
i. 2 signal man that use red flat to control public car
ii. Other close the barriers back at the place.
 All worker being provide PPE like safety vest, fabric glove and rain boots.
 Walkie-talkie being provide to the signal man and supervisor to communicate.
6. Ask worker to close hole at main road use tar because the hole to deep.

1. Observing and maintaining barriers and reflective rope that fall and slack.
2. Supervise worker that herbicides grass at barriers.
3. Ask worker to spray barriers with company name to avoid stealing barriers.
1. Observing and maintaining barriers that fall and reflective rope that slack.
2. Follow traffic management officer flying drone to see new area.
3. Ask worker to herbicides grass at jersey barriers to maintaining the barriers.
4. Supervise worker spray company name at barriers to avoid stealing barriers.

1. Briefing conduct by project manager about;


i. Faster the process of making a drain to avoid soil filling slide down.
ii. Ask about the process of utility clearing.
iii. Ask the process of platform.
2. Supervise sub-contractor making 200m double line road marking and control 2 flat
man to insure public car move carefully and avoid an accident. In this work-process
be hard went emergency car like ambulance have to go faster. This make the flat man
have to control public car more carefully from both side of the road.
3. Spray company name at barrier to avoid stealing barrier.

1. Observing and maintaining barriers that fall and the reflective rope that slack.
2. Supervise 700m double line road marking by sub-contractor.
i. This area is the hardest because have many corner and the road on the hill.
ii. I have to use 4 flat man to control public car.
iii. Emergency transport like ambulance make the flat man have to insure the
ambulance can move faster.
3. Help SHO failing new format of checklist and permit to work.

1. Observing and maintaining barriers that fall and reflective rope that slack.
2. Toolbox meeting to worker conduct by SHO and SSS.
3. Senior site supervisor giving me a task that to insure all flat man at borrow pit at the place
where lorries out and in
4. Supervise worker spray company name at barriers.

1. Observing and maintaining barriers that fall and reflective rope that slack.
2. Senior site supervisor giving me a task that to insure all flat man at borrow pit at the
place where lorries out and in
3. Supervise sub-contractor installing road guard rail.
4. Supervise worker spray company name at barriers to avoid stealing barriers.