The document outlines various fees for new water and sewer connections including availability fees, plan review fees, meter and installation fees. Availability fees are based on meter size and increase each year from 2015 to 2017. Plan review fees must be paid prior to approval and include a base fee plus a per linear foot charge. Property owners seeking new connections must submit development plans to the appropriate authority for review according to established standards.
The document outlines various fees for new water and sewer connections including availability fees, plan review fees, meter and installation fees. Availability fees are based on meter size and increase each year from 2015 to 2017. Plan review fees must be paid prior to approval and include a base fee plus a per linear foot charge. Property owners seeking new connections must submit development plans to the appropriate authority for review according to established standards.
The document outlines various fees for new water and sewer connections including availability fees, plan review fees, meter and installation fees. Availability fees are based on meter size and increase each year from 2015 to 2017. Plan review fees must be paid prior to approval and include a base fee plus a per linear foot charge. Property owners seeking new connections must submit development plans to the appropriate authority for review according to established standards.
Rates and Fees for New Connections (Developer Fees)
The following fee descriptions are in accordance with the Table VI: Availability Fees New Connection (Developer) Rates and Fees tables. Effective Date 1/1/2015 1/1/2016 1/1/2017 Meter A. Plan Review Fees ERUs Water Sewer Water Sewer Water Sewer Size All applicable Plan Review Fees must be paid to 3/4” 1 $4,600.00 $10,800.00 $4,600.00 $10,800.00 $4,600.00 $10,800.00 the Service Authority to cover the cost of reviewing 1” 4 $18,400.00 $43,200.00 $18,400.00 $43,200.00 $18,400.00 $43,200.00 submitted plans. Plan Review Fees are invoiced upon receipt of the first submittal of a development plan, 1 1/2” 7 $32,200.00 $75,600.00 $32,200.00 $75,600.00 $32,200.00 $75,600.00 whether it is a new plan or a plan revision. The fee covers all subsequent submittals that may be necessary 2” 12 $55,200.00 $129,600.00 $55,200.00 $129,600.00 $55,200.00 $129,600.00 to address review comments and the fees are due prior to Service Authority approval of the plan. There is a base 3” and Varies Availability Fees/ERU's shall be calculated on an individual basis for meter sizes 3” and Greater greater, and in cases where high demand on the water system may be anticipated. fee and per linear foot charge based upon the amount of water and sewer main submitted. 5HVLGHQWLDO&HUWLƓFDWLRQVDUHFKDUJHG(58SHUVLQJOHIDPLO\KRPHRUWRZQKRPH Property Owners/Developers seeking water and/or 0XOWLIDPLO\5HVLGHQWLDO&HUWLƓFDWLRQVDUHFKDUJHGRIWKH$YDLODELOLW\)HHIRU(58SHUGZHOOLQJXQLW sewer service for a location in which no prior service 6WXGHQW+RXVLQJ$YDLODELOLW\)HHV(58VVKDOOEHEDVHGRQWKHVSHFLƓFHVWLPDWHGSHDNPRQWKO\XVDJH has been established and for which new construction is planned shall submit a development or public improvement plan to Prince William County which Table VII: Meter and Meter Installation Fees will be routed to the Service Authority for review and Effective Date 1/1/2015 approval. Plans for properties located in the Town of Haymarket, Town of Occoquan and Dumfries must be Sub-Meter Service Meter Installation Meter Size Meter Fee submitted directly to the Service Authority. The water Fee Fee and sewer facilities will be reviewed in accordance 3/4” $460.00 $275.00 $50.00 with and for compliance with the Service Authority’s 1” $1,840.00 $350.00 $100.00 Utility Standards Manual (USM). Property Owners/ 1 1/2” $3,220.00 $675.00 $150.00 Developers seeking water and/or sewer service for a location which has an existing service and/or an existing 2” $5,520.00 $675.00 $150.00 building or home shall work with the Service Authority’s 3” and Greater Meter and Installation Fees vary based on size of meter. Engineering & Planning Division to sketch the desired service.