This document will assist you in determining how documents are to be up

(DocSubType), etc. are associated to ensure the document is

DocType DocSubType DocType : DocSubType

Procurement Proposal Procurement : Proposal

Design Drawing / Plan Design : Drawing / Plan

Design Report Design : Report

Design Report Design : Report

N/A

Correspondence :
Correspondence Request for Information Request for Information

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

N/A
N/A

Correspondence :
Correspondence Memo Memo

Procurement Proposal Procurement : Proposal

Concept Development :
Concept Development Image / Video Image / Video

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Procurement Proposal Procurement : Proposal


Guidance
Procurement Proposal Procurement : Proposal

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Planning Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement Proposal Procurement : Proposal


Planning Report Planning : Report

N/A

Concept Development :
Concept Development Report Report

Design Report Design : Report

Concept Development :
Concept Development Report Report
Design Report Design : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Planning : Problem
Planning Problem Statement Statement

Design Permit Design : Permit

Design Permit Design : Permit

N/A
Design Report Design : Report
Financial Estimate Financial : Estimate
Financial Budget Financial : Budget

Design Report Design : Report

Procurement Proposal Procurement : Proposal

Design Report Design : Report

Procurement Proposal Procurement : Proposal

Procurement Proposal Procurement : Proposal

Procurement Proposal Procurement : Proposal

Design Report Design : Report

Construction :
Construction Drawing / Plan Drawing / Plan
Concept Development :
Concept Development Drawing / Plan Drawing / Plan

Construction :
Construction Drawing / Plan Drawing / Plan

Planning : Drawing /
Planning Drawing / Plan Plan

Construction :
Construction Drawing / Plan Drawing / Plan

Financial Budget Financial : Budget

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Procurement Proposal Procurement : Proposal

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Meeting Minutes Meeting Minutes
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Procurement :
Procurement Agreement Agreement

Design Map Design : Map

Construction Report Construction : Report

Correspondence :
Correspondence Department Action Department Action
Correspondence :
Correspondence Department Action Department Action
Correspondence :
Correspondence Department Action Department Action
Correspondence :
Correspondence Department Action Department Action
Correspondence :
Correspondence Department Action Department Action
Correspondence :
Correspondence Department Action Department Action
Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action
Correspondence :
Correspondence Department Action Department Action

N/A

N/A
N/A
N/A
Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Procurement Proposal Procurement : Proposal


N/A

Procurement Proposal Procurement : Proposal

N/A

N/A

Construction Report Construction : Report

Construction Report Construction : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report


Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report


Design Report Design : Report
Concept Development :
Concept Development Report Report
Correspondence :
Correspondence Recommendation Recommendation

N/A
Financial Billing Financial : Billing

Correspondence :
Correspondence Certification Certification

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Design Permit Design : Permit

Planning Report Planning : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Meeting Minutes Meeting Minutes
Correspondence :
Correspondence Memo Memo

Correspondence :
Correspondence Recommendation Recommendation

Design Report Design : Report

Design Report Design : Report

Procurement Proposal Procurement : Proposal

Concept Development :
Concept Development Map Map

Concept Development :
Concept Development Report Report

Financial Estimate Financial : Estimate

Concept Development :
Concept Development Report Report
Concept Development :
Concept Development Report Report

Concept Development :
Concept Development Report Report

Financial : Scope
Financial Scope Statement Statement

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Funding (includes job Financial : Funding


Financial number) (includes job number)

Funding (includes job Financial : Funding


Financial number) (includes job number)

Correspondence :
Correspondence Certification Certification

Correspondence :
Correspondence Certification Certification
Correspondence :
Correspondence Certification Certification
Correspondence :
Correspondence Certification Certification
Correspondence :
Correspondence Certification Certification
Correspondence :
Correspondence Certification Certification
Correspondence :
Correspondence Certification Certification

Construction Report Construction : Report

Design Report Design : Report

Design Drawing / Plan Design : Drawing / Plan

Procurement Proposal Procurement : Proposal

Construction Report Construction : Report

Construction Report Construction : Report

Procurement Proposal Procurement : Proposal


Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Request for Action Request for Action

Procurement Proposal Procurement : Proposal


Financial Claim Financial : Claim
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

N/A

N/A

N/A

N/A

Concept Development :
Concept Development Report Report

N/A
Correspondence :
Correspondence Request for Action Request for Action

Concept Development :
Concept Development Report Report

Design Report Design : Report

Financial : Report
Financial Report (includes STIP, etc.)

N/A
N/A

Correspondence :
Correspondence Memo Memo

Concept Development :
Concept Development Report Report

Concept Development :
Concept Development Report Report

Design Drawing / Plan Design : Drawing / Plan

Design Report Design : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Memo Memo

Correspondence :
Correspondence Recommendation Recommendation
Concept Development :
Concept Development Report Report
Procurement :
Procurement Agreement Agreement

Concept Development :
Concept Development Report Report

Concept Development :
Concept Development Report Report

N/A

Construction Report Construction : Report

Construction Report Construction : Report

N/A

Construction Report Construction : Report

Financial Estimate Financial : Estimate

Financial Estimate Financial : Estimate


Financial Estimate Financial : Estimate

Construction Report Construction : Report

N/A

Construction Report Construction : Report

Construction Report Construction : Report

Construction Report Construction : Report

N/A

Construction Report Construction : Report

Construction Report Construction : Report

Procurement :
Procurement Agreement Agreement
Procurement :
Procurement Agreement Agreement

Procurement Proposal Procurement : Proposal

N/A

N/A

Procurement Proposal Procurement : Proposal

Concept Development :
Concept Development Report Report
N/A
Procurement :
Procurement Agreement Agreement
Procurement :
Procurement Agreement Agreement

N/A

Procurement :
Procurement Agreement Agreement

Correspondence :
Correspondence Recommendation Recommendation

Correspondence :
Correspondence Certification Certification

Correspondence :
Correspondence Certification Certification
Construction Report Construction : Report

Correspondence :
Correspondence Certification Certification

Correspondence :
Correspondence Certification Certification

N/A

N/A

N/A

Procurement Proposal Procurement : Proposal

Design Report Design : Report

N/A

N/A

N/A
Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Design Report Design : Report


Procurement Proposal Procurement : Proposal

Procurement Proposal Procurement : Proposal

Procurement :
Procurement Agreement Agreement
Correspondence :
Correspondence Memo Memo

N/A

Procurement Proposal Procurement : Proposal

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Correspondence :
Correspondence Recommendation Recommendation

Financial Expense Financial : Expense


Guidance
N/A

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
Correspondence Memo Memo

Concept Development :
Concept Development Report Report

Concept Development :
Concept Development Report Report

Planning Report Planning : Report


Concept Development :
Concept Development Drawing / Plan Drawing / Plan

Design Report Design : Report

Design Report Design : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Construction Report Construction : Report

Design Report Design : Report

Construction Report Construction : Report


Construction Report Construction : Report

N/A

N/A

N/A

Design Report Design : Report

Correspondence :
Correspondence Request for Information Request for Information

Correspondence :
Correspondence Request for Action Request for Action
Procurement Proposal Procurement : Proposal

Procurement Proposal Procurement : Proposal

Design Permit Design : Permit

Design Permit Design : Permit

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action
Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Construction :
Construction Drawing / Plan Drawing / Plan
Concept Development :
Concept Development Report Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Financial Estimate Financial : Estimate

Design Report Design : Report

Correspondence :
Correspondence Recommendation Recommendation
Procurement Proposal Procurement : Proposal

Financial Invoice Financial : Invoice

Correspondence :
Correspondence Memo Memo

N/A
N/A
Procurement :
Procurement Agreement Agreement
Procurement :
Procurement Agreement Agreement

Procurement Proposal Procurement : Proposal

Procurement :
Procurement Agreement Agreement

Financial Invoice Financial : Invoice

Design Report Design : Report

Concept Development :
Concept Development Map Map

Concept Development :
Concept Development Report Report

Planning Report Planning : Report

Design Report Design : Report


Design Report Design : Report
Design Report Design : Report

Design Report Design : Report

Construction Report Construction : Report

Construction Report Construction : Report

Construction Report Construction : Report

Construction Report Construction : Report

Construction Report Construction : Report

Construction Report Construction : Report

Construction Report Construction : Report

Guidance

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Guidance

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Financial Estimate Financial : Estimate

Correspondence :
Correspondence Certification Certification

Financial Estimate Financial : Estimate

Correspondence :
Correspondence Certification Certification
Design Map Design : Map

Design Report Design : Report

Design Drawing / Plan Design : Drawing / Plan

Concept Development :
Concept Development Report Report

N/A

N/A
Design Report Design : Report

Planning Report Planning : Report

Construction Permit Construction : Permit

N/A

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report


Design Report Design : Report

Concept Development :
Concept Development Report Report

Correspondence :
Correspondence Memo Memo

Design Report Design : Report

Guidance

Correspondence :
Correspondence Memo Memo
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Concept Development :
Concept Development Report Report
Design Report Design : Report

Financial Expense Financial : Expense

Planning Report Planning : Report

Concept Development :
Concept Development Report Report

N/A
Correspondence :
Correspondence Department Action Department Action

Financial Expense Financial : Expense

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Certification Certification
N/A

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Concept Development :
Concept Development Report Report

Correspondence :
Correspondence Request for Action Request for Action

Correspondence :
Correspondence Request for Action Request for Action
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Construction Report Construction : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Financial Audit Financial : Audit

Financial Estimate Financial : Estimate

Construction Report Construction : Report

Design Report Design : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Financial Budget Financial : Budget

Procurement Proposal Procurement : Proposal

Financial Estimate Financial : Estimate


N/A

Design Report Design : Report

Design Report Design : Report

Financial : Scope
Financial Scope Statement Statement

Design Drawing / Plan Design : Drawing / Plan

Correspondence :
Correspondence Certification Certification

Correspondence :
Correspondence Memo Memo
Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Drawing / Plan Design : Drawing / Plan

Design Drawing / Plan Design : Drawing / Plan

Design Drawing / Plan Design : Drawing / Plan

Correspondence :
Correspondence Certification Certification

Design Drawing / Plan Design : Drawing / Plan

Financial Invoice Financial : Invoice

Financial Invoice Financial : Invoice


Design Drawing / Plan Design : Drawing / Plan

Design Drawing / Plan Design : Drawing / Plan

Design Report Design : Report

Design Report Design : Report

Financial Payment Financial : Payment

Design Drawing / Plan Design : Drawing / Plan

Design Report Design : Report

Concept Development :
Concept Development Report Report

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Financial Estimate Financial : Estimate


Design Report Design : Report

Design Drawing / Plan Design : Drawing / Plan

Design Report Design : Report

Design Report Design : Report

Design Drawing / Plan Design : Drawing / Plan

Design Drawing / Plan Design : Drawing / Plan

Financial : Report
Financial Report (includes STIP, etc.) (includes STIP, etc.)
Design Report Design : Report

Guidance

Procurement :
Procurement Agreement Agreement
Procurement :
Procurement Agreement Agreement
Procurement :
Procurement Agreement Agreement
Procurement :
Procurement Agreement Agreement

Design Permit Design : Permit

N/A
Correspondence :
Correspondence Request for Action Request for Action

Construction Report Construction : Report


Financial Expense Financial : Expense
Guidance

Design Map Design : Map

Correspondence :
Correspondence Request for Information Request for Information

Concept Development :
Concept Development Report Report
N/A

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Construction Report Construction : Report

N/A
N/A
Design Permit Design : Permit

Financial : Report
Financial Report (includes STIP, etc.)

Concept Development :
Concept Development Report Report

Design Report Design : Report


Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Permit Design : Permit

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Design Report Design : Report

Concept Development :
Concept Development Report Report

Planning Report Planning : Report

Financial Estimate Financial : Estimate


Financial Estimate Financial : Estimate

Design Map Design : Map

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Design Drawing / Plan Design : Drawing / Plan

Financial Payment Financial : Payment

Construction Report Construction : Report

Financial Estimate Financial : Estimate

Financial Invoice Financial : Invoice

Design Report Design : Report


Construction Report Construction : Report

Construction Report Construction : Report

Guidance

N/A

Concept Development :
Concept Development Report Report

Correspondence :
Correspondence Request for Action Request for Action

Design Report Design : Report

Correspondence :
Correspondence Department Action Department Action

Procurement :
Procurement Agreement Agreement
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Funding (includes job Financial : Funding
Financial number) (includes job number)

Design Map Design : Map

Construction Report Construction : Report

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Guidance
Correspondence :
Correspondence Request for Action Request for Action
Correspondence :
Correspondence Request for Action Request for Action
Correspondence :
Correspondence Request for Action Request for Action
Procurement :
Procurement Agreement Agreement

Design Report Design : Report

Concept Development :
Concept Development Report Report

Concept Development :
Concept Development Report Report

Concept Development :
Concept Development Report Report

Concept Development :
Concept Development Report Report

Construction Report Construction : Report


N/A
Concept Development :
Concept Development Report Report

N/A

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Design Report Design : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Planning Report Planning : Report


Concept Development :
Concept Development Report Report

Planning Report Planning : Report

N/A

N/A

N/A

Procurement :
Procurement Agreement Agreement
Correspondence :
Correspondence Request for Action Request for Action

Design Report Design : Report

Construction Report Construction : Report

Construction Report Construction : Report

Construction Report Construction : Report

Correspondence :
Correspondence Request for Information Request for Information
Design Report Design : Report

Construction Report Construction : Report

Guidance

Correspondence :
Correspondence Memo Memo

Correspondence :
Correspondence Memo Memo
Correspondence :
Correspondence Memo Memo

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Procurement Proposal Procurement : Proposal


Construction Report Construction : Report
Construction Report Construction : Report
Financial Estimate Financial : Estimate
Financial Estimate Financial : Estimate

Financial Billing Financial : Billing

Correspondence :
Correspondence Request for Action Request for Action
Correspondence :
Correspondence Request for Action Request for Action
Correspondence :
Correspondence Request for Action Request for Action
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Correspondence :
Correspondence Request for Information Request for Information

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Procurement Proposal Procurement : Proposal

Procurement :
Procurement Agreement Agreement
Financial Budget Financial : Budget

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Procurement :
Procurement Agreement Agreement

Design Permit Design : Permit

Design Report Design : Report

Correspondence :
Correspondence Request for Information Request for Information

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Certification Certification
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Design Permit Design : Permit

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Design Permit Design : Permit


Design Permit Design : Permit
Design Permit Design : Permit

Design Permit Design : Permit


Design Permit Design : Permit
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Design Permit Design : Permit


Design Permit Design : Permit
Design Permit Design : Permit
Design Permit Design : Permit
Design Permit Design : Permit
Design Permit Design : Permit

Design Permit Design : Permit

Financial Payment Financial : Payment

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Procurement :
Procurement Agreement Agreement
Correspondence :
Correspondence Request for Action Request for Action

Design Report Design : Report

Correspondence :
Correspondence Request for Action Request for Action

Correspondence :
Correspondence Request for Action Request for Action

Correspondence :
Correspondence Request for Action Request for Action

Correspondence :
Correspondence Request for Information Request for Information

Design Report Design : Report

Correspondence :
Correspondence Request for Information Request for Information

Design Report Design : Report

N/A

Correspondence :
Correspondence Request for Action Request for Action
Correspondence :
Correspondence Request for Action Request for Action
Correspondence :
Correspondence Request for Action Request for Action

Correspondence :
Correspondence Request for Action Request for Action

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
Correspondence Request for Action Request for Action
Procurement :
Procurement Agreement Agreement
Design Report Design : Report

Design Report Design : Report

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Correspondence :
Correspondence Request for Information Request for Information

Planning Report Planning : Report

Design Report Design : Report

N/A

Design Report Design : Report

N/A

Concept Development :
Concept Development Report Report

Design Report Design : Report

Financial Payment Financial : Payment


Financial Payment Financial : Payment
Construction Report Construction : Report

Concept Development :
Concept Development Report Report

Concept Development :
Concept Development Report Report

Correspondence :
Correspondence Certification Certification

N/A

Design Report Design : Report

Financial Payment Financial : Payment

Design Permit Design : Permit


Correspondence :
Correspondence Memo Memo

Correspondence :
Correspondence Meeting Minutes Meeting Minutes
Correspondence :
Correspondence Request for Action Request for Action
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
N/A
Design Permit Design : Permit

Procurement :
Procurement Agreement Agreement

Design Drawing / Plan Design : Drawing / Plan

Correspondence :
Correspondence Memo Memo
Correspondence :
Correspondence Memo Memo
Correspondence :
Correspondence Memo Memo
N/A
Design Report Design : Report
Construction Report Construction : Report

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Correspondence :
Correspondence Request for Information Request for Information

Design Report Design : Report


Design Report Design : Report

Concept Development :
Concept Development Drawing / Plan Drawing / Plan

Design Report Design : Report

Design Report Design : Report

Concept Development :
Concept Development Report Report

N/A

Design Report Design : Report

Concept Development :
Concept Development Report Report
Financial : Scope
Financial Scope Statement Statement

Design Report Design : Report

Design Drawing / Plan Design : Drawing / Plan

Concept Development :
Concept Development Report Report

Design Drawing / Plan Design : Drawing / Plan

N/A
Correspondence :
Correspondence Certification Certification

Procurement :
Procurement Agreement Agreement

Construction Report Construction : Report

Design Report Design : Report

Planning Report Planning : Report

N/A

Planning : Problem
Planning Problem Statement Statement

Planning : Problem
Planning Problem Statement Statement

Design Report Design : Report

Funding (includes job Financial : Funding


Financial number) (includes job number)
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Request for Information Request for Information

Design Drawing / Plan Design : Drawing / Plan

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

N/A
Design Report Design : Report

Concept Development :
Concept Development Report Report
Design Report Design : Report

Design Report Design : Report

Design Drawing / Plan Design : Drawing / Plan

Guidance

Construction Report Construction : Report

Correspondence :
Correspondence Certification Certification

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Request for Action Request for Action

Correspondence :
Correspondence Certification Certification

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Procurement Proposal Procurement : Proposal

Correspondence :
Correspondence Certification Certification
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Concept Development :
Concept Development Report Report

N/A

N/A
N/A

N/A

Correspondence :
Correspondence Certification Certification

Concept Development :
Concept Development Report Report

Concept Development :
Concept Development Report Report

Correspondence :
Correspondence Request for Action Request for Action
Design Report Design : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Request for Information Request for Information

Guidance

N/A

N/A

Procurement :
Procurement Agreement Agreement

Financial Adjustment Financial : Adjustment

Procurement :
Procurement Agreement Agreement

Correspondence :
Correspondence Memo Memo
Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement Proposal Procurement : Proposal

Procurement Proposal Procurement : Proposal

Concept Development :
Concept Development Report Report

Procurement :
Procurement Agreement Agreement

Design Report Design : Report

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Design Permit Design : Permit

N/A
N/A
Design Report Design : Report
Construction Report Construction : Report
Financial Audit Financial : Audit
Financial Audit Financial : Audit

Design Report Design : Report

Design Report Design : Report

Construction Report Construction : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report


Design Report Design : Report
Design Report Design : Report

Construction Report Construction : Report

Design Report Design : Report

Design Report Design : Report

Construction Report Construction : Report

Design Report Design : Report

Design Report Design : Report

Financial Billing Financial : Billing


Correspondence :
Correspondence Department Action Department Action

Construction Report Construction : Report

Construction Report Construction : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Request for Information Request for Information

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Procurement Agreement Procurement :


Agreement

N/A
N/A

N/A

Design Drawing / Plan Design : Drawing / Plan

Design Drawing / Plan Design : Drawing / Plan

Design Report Design : Report

N/A

Design Permit Design : Permit

N/A

Design Report Design : Report


N/A

N/A

Design Report Design : Report

Design Report Design : Report

Correspondence :
Correspondence Department Action Department Action

Design Report Design : Report


Design Report Design : Report
Design Report Design : Report
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Design Report Design : Report


N/A
Design Report Design : Report
Construction Report Construction : Report

Construction Report Construction : Report

Correspondence :
Correspondence Meeting Minutes Meeting Minutes
N/A

Design Report Design : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Design Permit Design : Permit

Design Report Design : Report

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Design Drawing / Plan Design : Drawing / Plan


Design Report Design : Report

Procurement :
Procurement Agreement Agreement

Design Report Design : Report

Design Report Design : Report

Procurement Proposal Procurement : Proposal

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

Correspondence :
Correspondence Certification Certification

Design Drawing / Plan Design : Drawing / Plan

Design Report Design : Report

Design Report Design : Report


Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

N/A

N/A
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Guidance
Design Permit Design : Permit
Guidance
Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Correspondence :
Correspondence Meeting Minutes Meeting Minutes

N/A

Correspondence :
Correspondence Meeting Minutes Meeting Minutes

Procurement :
Procurement Agreement Agreement
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Design Permit Design : Permit


Guidance
Guidance
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Design Report Design : Report


Design Permit Design : Permit

Funding (includes job Financial : Funding


Financial number) (includes job number)

Procurement Proposal Procurement : Proposal

Procurement :
Procurement Agreement Agreement

Construction Report Construction : Report

Financial Expense Financial : Expense

Design Report Design : Report

N/A

N/A

Correspondence :
Correspondence Memo Memo

Procurement :
Procurement Agreement Agreement

Construction Report Construction : Report

Design Report Design : Report

Design Report Design : Report


Design Report Design : Report

Concept Development :
Concept Development Report Report

Financial : Report
Financial Report (includes STIP, etc.)

Procurement Proposal Procurement : Proposal

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence

Construction Report Construction : Report

Correspondence :
Correspondence Certification Certification
Financial : Report
Financial Report (includes STIP, etc.) (includes STIP, etc.)
Correspondence :
Correspondence Certification Certification

Financial Invoice Financial : Invoice

Design Drawing / Plan Design : Drawing / Plan

Concept Development :
Concept Development Report Report

Construction Report Construction : Report


N/A
Construction Report Construction : Report

Procurement Proposal Procurement : Proposal

Procurement Proposal Procurement : Proposal

Procurement Proposal Procurement : Proposal


Procurement :
Procurement Agreement Agreement
Procurement :
Procurement Agreement Agreement
Correspondence :
Correspondence Memo Memo

Procurement Proposal Procurement : Proposal

Design Report Design : Report

Concept Development :
Concept Development Report Report

Procurement Proposal Procurement : Proposal

Procurement Proposal Procurement : Proposal

Procurement Proposal Procurement : Proposal

Correspondence :
Correspondence Memo Memo

Design Permit Design : Permit

Correspondence :
Correspondence Memo Memo
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
Correspondence Memo Memo

Construction Report Construction : Report

Design Report Design : Report

Design Permit Design : Permit

N/A

N/A

Correspondence :
Correspondence Certification Certification

Correspondence :
Correspondence Request for Information Request for Information

Design Report Design : Report

Design Drawing / Plan Design : Drawing / Plan

Concept Development :
Concept Development Report Report

Design Drawing / Plan Design : Drawing / Plan


Concept Development :
Concept Development Report Report

N/A

N/A

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Design Report Design : Report

N/A
Funding (includes job Financial : Funding
Financial number) (includes job number)

Financial Budget Financial : Budget

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

N/A

N/A

Design Drawing / Plan Design : Drawing / Plan

N/A

Concept Development :
Concept Development Report Report

Procurement :
Procurement Agreement Agreement

Correspondence :
Correspondence Certification Certification

Design Permit Design : Permit

Design Report Design : Report


Planning Report Planning : Report

Design Report Design : Report

Design Report Design : Report

Design Report Design : Report

N/A
N/A

N/A

N/A

N/A

Design Report Design : Report


N/A

N/A
Design Permit Design : Permit

Design Permit Design : Permit

Design Permit Design : Permit

Design Permit Design : Permit

Procurement :
Procurement Agreement Agreement

Correspondence :
Correspondence Approval or Concurrence Approval or
Concurrence
Financial Invoice Financial : Invoice

Correspondence :
Correspondence Memo Memo

Correspondence :
Correspondence Memo Memo

Procurement :
Procurement Adjustment Agreement

Financial Adjustment Financial : Adjustment

Financial Adjustment Financial : Adjustment

Financial Adjustment Financial : Adjustment

Financial Adjustment Financial : Adjustment


Financial Adjustment Financial : Adjustment

Design Drawing / Plan Design : Drawing / Plan

Correspondence :
Correspondence Certification Certification

Design Drawing / Plan Design : Drawing / Plan

Procurement :
Procurement Agreement Agreement

Correspondence :
Correspondence Certification Certification
N/A
Correspondence :
Correspondence Memo Memo
Correspondence :
Correspondence Memo Memo

Correspondence :
Correspondence Request for Information Request for Information
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

N/A

N/A

Procurement :
Procurement Agreement Agreement
Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Procurement :
Procurement Agreement Agreement

Funding (includes job Financial : Funding


Financial number) (includes job number)
Design Report Design : Report

Planning Report Planning : Report

Design Report Design : Report

Financial Adjustment Financial : Adjustment

Financial Invoice Financial : Invoice

Funding (includes job Financial : Funding


Financial number) (includes job number)

Funding (includes job Financial : Funding


Financial number) (includes job number)

Procurement Proposal Procurement : Proposal

Design Report Design : Report

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
Correspondence Certification Certification
Correspondence :
Correspondence Department Action Department Action

Correspondence Department Action Correspondence :


Department Action

Correspondence :
Correspondence Department Action Department Action

Procurement :
Procurement Agreement Agreement

Correspondence :
Correspondence Department Action Department Action
Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action
Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Correspondence :
Correspondence Department Action Department Action

Concept Development :
Concept Development Drawing / Plan Drawing / Plan

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?
Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

N/A

Correspondence :
Correspondence Department Action Department Action

Concept Development :
Concept Development Report Report

Design Permit Design : Permit

Procurement :
Procurement Agreement Agreement
Procurement :
Procurement Agreement Agreement
Procurement :
Procurement Agreement Agreement

Construction Report Construction : Report

Correspondence :
General Project
Correspondence General Project
Correspondence? Correspondence?

Design Report Design : Report

Design Report Design : Report

Design Permit Design : Permit

N/A

Correspondence :
Correspondence Memo Memo

Construction Report Construction : Report

Construction :
Construction Drawing / Plan Drawing / Plan
ermining how documents are to be uploaded into PMRS and how the document typ
associated to ensure the document is filed into the correct folder and tagged with t

DocType : DocSubType : Doc Name Doc Name SME Area (metadata)

Procurement : Proposal : 2 Step Rating Procurement - Professional


2 Step Rating Program
Program Services

Design : Drawing / Plan : Access Cut-Outs Access Cut-Outs Access

Design : Report : Access Impact Assistance Access Impact Assistance Report Access
Report

Design : Report : Access Impact Summary Access Impact Summary Access

: Acquired Right of Way Acquired Right of Way Right of Way

Correspondence : Request for Information : Addenda (and Acknowledgement) Construction


Addenda (and Acknowledgement)

Correspondence : Approval or Concurrence : Adverse Effect Documentation Environmental


Adverse Effect Documentation

Correspondence : General Project Advertisement Construction


Correspondence? : Advertisement

: Advertisement and Bid Analysis Advertisement and Bid Analysis Construction


: Advertising Authorization Package Advertising Authorization Package Project Management

Correspondence : Memo : Advertising Memo Advertising Memo Construction

Procurement : Proposal : Aerial Photography Aerial Photography Surveys Procurement - Professional


Surveys Services

Concept Development : Image / Video : Aerial Photos Survey


Aerial Photos

Correspondence : General Project Aero Award letter Multimodal


Correspondence? : Aero Award letter

Procurement : Proposal : Aero Rating Sheets Aero Rating Sheets & Criteria Multimodal
& Criteria
: Aero Regulations Aero Regulations Multimodal
Procurement : Proposal : Agency Request for Agency Request for Proposal Procurement - Professional
Proposal Services
Procurement : Agreement : Agreement Procurement - Professional
Agreement Checklist
Checklist Services
Procurement : Agreement : Agreement Agreement Development Process Procurement - Professional
Development Process for Procurement of for Procurement of Professional Services
Professional Services (No. 328) Services (No. 328)
Procurement : Agreement : Agreement Agreement Execution Multimodal
Execution
Agreement
Procurement : Agreement : Agreement Modification/Addendum Form 4-1- Procurement - Professional
Modification/Addendum Form 4-1-11 Services
11
Procurement : Agreement : Agreement Agreement Transmittal Letter to Procurement - Professional
Transmittal Letter to Consultant Consultant Services
Procurement : Proposal : Air Quality Analyses Air Quality Analyses Requirements Procurement - Professional
Requirements Services
Planning : Report : Air Study Air Study Environmental

: Alternative Analysis Alternative Analysis Project Management

Concept Development : Report : Alternatives Alternatives Project Management

Design : Report : Alternatives Analysis Report Alternatives Analysis Report Project Management

Concept Development : Report : Alternatives Alternatives Matrix Project Management


Matrix
Design : Report : Alternatives of Alternatives of Accommodation Utilities
Accommodation Plan Plan

Correspondence : Approval or Concurrence : Amtrak-NJDOT Agreement Railroads


Amtrak-NJDOT Agreement

Design : Report : Analysis of Asphalt Cement Analysis of Asphalt Cement (LB-16) Construction
(LB-16)
Design : Report : Analysis of Asphaltic Oil (LB- Analysis of Asphaltic Oil (LB-17) Construction
17)
Design : Report : Analysis of Bituminous Analysis of Bituminous Concrete Construction
Concrete Pavement Mixture (LB-3) Pavement Mixture (LB-3)
Design : Report : Analysis of Concrete (Block) Analysis of Concrete (Block) (LB-65) Construction
(LB-65)
Design : Report : Analysis of Concrete Analysis of Concrete Cylinder (LB- Construction
Cylinder (LB-201) 201)
Design : Report : Analysis of Emulsified Analysis of Emulsified Asphalt (LB- Construction
Asphalt (LB-18) 18)
Design : Report : Analysis of Marshall Test Analysis of Marshall Test Specimens Construction
Specimens (LB-281) (LB-281)
Design : Report : Analysis of Miscellaneous Analysis of Miscellaneous Materials Construction
Materials (LB-14) (LB-14)
Design : Report : Analysis of Paint Materials Analysis of Paint Materials (LB-280) Construction
(LB-280)

Correspondence : General Project Announcement letter Local Aid


Correspondence? : Announcement letter

Planning : Problem Statement : Application Application Local Aid

Design : Permit : Application for Erection of Application for Erection of Pole (MT- Utilities
Pole (MT-33A) 33A)
Design : Permit : Application for Highway Application for Highway Occupancy Utilities
Occupancy (MT-120A) (MT-120A)
: Appointment of Agent By Non-Resident Appointment of Agent By Non- Construction
Contractors Resident Contractors
Design : Report : Appraisal Plan Appraisal Plan Right of Way
Financial : Estimate : Appraisal Review Order Appraisal Review Order Contract Right of Way
Contract
Financial : Budget : Approved Annual Approved Annual Financial Plan Construction
Financial Plan (Major Projects) (Major Projects)

Design : Report : Approved Project Plan Approved Project Plan Project Management

Procurement : Proposal : Archaeology Procurement - Professional


Archaeology Services
Services Services
Design : Report : Archeological Monitoring Archeological Monitoring Plan- Environmental
Plan-Cultural Resource Document Cultural Resource Document
Procurement : Proposal : Asbestos Rating Procurement - Professional
Asbestos Rating Criteria
Criteria Services
Procurement : Proposal : Asbestos Rating Asbestos Rating Form and Checklists Procurement - Professional
Form and Checklists Services
Procurement : Proposal : Asbestos Procurement - Professional
Asbestos Remediation
Remediation Services

Design : Report : Asbestos Survey Asbestos Survey Right of Way

Construction : Drawing / Plan : As-Built As-Built Database Input Form (DC- Construction
Database Input Form (DC-177) 177)
Concept Development : Drawing / Plan : As- As-Built Plans Project Management
Built Plans

Construction : Drawing / Plan : As-Built Plans As-Built Plans Construction

Planning : Drawing / Plan : As-Built Plans As-Built Plans Project Management

Construction : Drawing / Plan : As-Built As-Built Summary (DC-104) Construction


Summary (DC-104)

Financial : Budget : Asphalt Price Adjustment Asphalt Price Adjustment (T-MT-


(T-MT-1291(A)) 1291(A))

Correspondence : Approval or Concurrence : Atlantic City Electric Utilities


Atlantic City Electric

Correspondence : Approval or Concurrence : Authorization for a Field Change in


Authorization for a Field Change in Design Design (DC-150) Construction
(DC-150)
Correspondence : Approval or Concurrence : Authorization for Utility Field
Authorization for Utility Field Changes (DC- Changes (DC-150U) Utilities
150U)

Correspondence : Approval or Concurrence : Authorization to Advertise Project Management


Authorization to Advertise

Procurement - Professional
Procurement : Proposal : Aviation Services Aviation Services Services

Correspondence : Approval or Concurrence : Award Letter Project Management


Award Letter

Correspondence : Meeting Minutes : Award Award Recommendation Project Management


Recommendation (Announcement) (Announcement)
Correspondence : General Project Award Web Posting Construction
Correspondence? : Award Web Posting

Procurement : Agreement : Awarded Awarded Contract Construction


Contract

Design : Map : Base Maps Base Maps Survey

Construction : Report : Base Temperature Base Temperature Report (DC-176) Construction


Report (DC-176)
Correspondence : Department Action : Betterment Cost Sharing Agreement
Betterment Cost Sharing Agreement
Correspondence : Department Action : Betterment Definitions
Betterment Definitions
Correspondence : Department Action : Betterment Department Action Slip
Betterment Department Action Slip 1 1
Correspondence : Department Action : Betterment Department Action Slip
Betterment Department Action Slip 2 2
Correspondence : Department Action : Betterment Language
Betterment Language
Correspondence : Department Action : Betterment Letter
Betterment Letter
Correspondence : Department Action : Betterment Memorandum
Betterment Memorandum

Correspondence : Department Action : Betterment Memorandum


Betterment Memorandum Additional Funds Additional Funds

Correspondence : Department Action : Betterment Modification


Betterment Modification
Correspondence : Department Action : Betterment Responsibility
Betterment Responsibility

: Bid Analysis Bid Analysis

: Bid Bonds-Surepath Bid Bonds-Surepath Construction


: Bid Bonds-Surety 2000 Bid Bonds-Surety 2000 Construction
: Bid Express Bid Express Construction
Correspondence : Meeting Minutes : Bid Bid opening meeting Construction
opening meeting

Procurement : Proposal : Bid Proposal Bid Proposal Construction


: Bid Tabulation Bid Tabulation Construction

Procurement : Proposal : Bids Bids Construction

: BidX Posting BidX Posting Construction

: BidX Posting of Addenda BidX Posting of Addenda Construction

Construction : Report : Bituminous Concrete Bituminous Concrete Pavement -


Pavement - Location and Weight Record Location and Weight Record Report Construction
Report (DC-27) (DC-27)
Construction : Report : Bituminous Concrete Bituminous Concrete Test Results Construction
Test Results

Design : Report : Boring and In-Situ Testing Boring and In-Situ Testing Layout
Layout Plan Plan

Design : Report : Boring Contract Boring Contract Specifications


Specifications

Design : Report : Boring Data Submission Boring Data Submission

Design : Report : Bridge Design - Movable Bridge Design - Movable Structures Structures
Structures
Design : Report : Bridge Design - Non Bridge Design - Non Moveable Structures
Moveable Structures Structures
Design : Report : Bridge Inspection – Bridge Inspection – Complex Structures
Complex Bridges Bridges
Design : Report : Bridge Inspection – Bridge Inspection – Movable Structures
Movable Bridges Bridges
Design : Report : Bridge Inspection – Simple Bridge Inspection – Simple Bridges Structures
Bridges
Design : Report : Bridge Inspection Reports Bridge Inspection Reports Structures
Concept Development : Report : Bridge Mgt Bridge Mgt Sys Report Structures
Sys Report
Correspondence : Recommendation : Bridge Bridge Rating Form and Checklist Structures
Rating Form and Checklist

: Business Objects access Business Objects access Budget


Financial : Billing : Business Registration Business Registration Construction

Correspondence : Certification : Buy America Buy America Certificate of Utilities


Certificate of Compliance (DC-17U) Compliance (DC-17U)

Correspondence : Approval or Concurrence : Buy America Commitment Letter


Buy America Commitment Letter with Utilities
with Instructions
Instructions

Correspondence : Approval or Concurrence : Cablevision Utilities


Cablevision

Design : Permit : CAFRA CAFRA Environmental

Planning : Report : Capital Program Capital Program Committee (CPC)


Committee (CPC) Package Package

Correspondence : Approval or Concurrence : Capital Program Committee


Capital Program Committee Approval Approval

Correspondence : Approval or Concurrence : Capital Program Committee


Capital Program Committee Approval Approval

Correspondence : Meeting Minutes : Capital Capital Program Committee


Program Committee Meeting Minutes Meeting Minutes
Correspondence : Memo : Capital Program Capital Program Committee Memo
Committee Memo

Correspondence : Recommendation : Capital Capital Program Screening


Program Screening Committee Committee Recommendation
Recommendation

Design : Report : Castings Inspection Report Castings Inspection Report (LB-196) Construction
(LB-196)

Design : Report : Categorical Exclusion Categorical Exclusion Document Environmental


Document

Procurement : Proposal : CD Fee Proposal CD Fee Proposal

Concept Development : Map : CD Mapping CD Mapping

Concept Development : Report : CD PIAP CD PIAP

Financial : Estimate : CD ROW and Access CD ROW and Access Impacts Cost Access
Impacts Cost Estimate Estimate

Concept Development : Report : CD ROW CD ROW and Access Impacts Plan Access
and Access Impacts Plan
Concept Development : Report : CD ROW CD ROW and Access Plan and Access
and Access Plan and Matrix Matrix

Concept Development : Report : CD Schedule CD Schedule

Financial : Scope Statement : CD Scope CD Scope Statement


Statement

Correspondence : Approval or Concurrence : CenturyLink Utilities


CenturyLink

Financial : Funding (includes job number) : Certificate of Award-FHWA Funded


Certificate of Award-FHWA Funded Contract Contract

Financial : Funding (includes job number) : Certificate of Award-State Funded


Certificate of Award-State Funded Contract Contract

Correspondence : Certification : Certification Certification of Completion (DC-20) Construction


of Completion (DC-20)

Correspondence : Certification : Certification Certification of Inquiry Right of Way


of Inquiry
Correspondence : Certification : Certification Certification of Mailing Right of Way
of Mailing
Correspondence : Certification : Certification Certification of Personal Service Right of Way
of Personal Service
Correspondence : Certification : Certification (Legal Residency) Right of Way
Certification (Legal Residency)

Correspondence : Certification : Certifications Certifications Multimodal


Correspondence : Certification : Certifications Certifications and Clearances
and Clearances

Construction : Report : Certified Bids Certified Bids Construction

Design : Report : Certified Categorical Certified Categorical Exclusion Environmental


Exclusion Document Document

Design : Drawing / Plan : Certified Plans, Certified Plans, Specifications and


Specifications and Estimate Estimate

Procurement : Proposal : Change of Plan Change of Plan (COP)


(COP)

Construction : Report : Change Orders Change Orders Construction

Construction : Report : Changed Field Changed Field Conditions Construction


Conditions
Procurement - Professional
Procurement : Proposal : Check List Check List Services
Correspondence : Approval or Concurrence : Chief Financial Officer's Certification Construction
Chief Financial Officer's Certification

Correspondence : Request for Action : Claim Claim for Payment Right of Way
for Payment
Procurement : Proposal : Claim/Litigation Claim/Litigation Support/Scheduling Procurement - Professional
Support/Scheduling Services
Financial : Claim : Claims Claims

Correspondence : Approval or Concurrence : Comcast Utilities


Comcast

: Communications Communications

: Communications Communications

: Communications Communications

: Communications Communications

Concept Development : Report : Community Community Profile


Profile

: Community Relations Community Relations


Correspondence : Request for Action : Complaint Right of Way
Complaint

Concept Development : Report : Complete Complete Streets Checklist


Streets Checklist

Design : Report : Complete Streets Checklist Complete Streets Checklist

Financial : Report (includes STIP, etc.) : Computer Input Form Receiving


Computer Input Form Receiving Report Budget
Report General (PS-32)
General (PS-32)

: Concept Development Approvals Concept Development Approvals


: Concept Development Initiation Concept Development Initiation

Correspondence : Memo : Concept Concept Development Quality


Development Quality Management Management Certification
Certification

Concept Development : Report : Concept Concept Development Report


Development Report

Concept Development : Report : Concept of Concept of Operations Report Intelligent Transportation


Operations Report Systems

Design : Drawing / Plan : Conceptual Conceptual Wetlands Mitigation Environmental


Wetlands Mitigation Plans Plans

Design : Report : Concrete Batching Plan Concrete Batching Plan Inspection Construction
Inspection (LB-47) (LB-47)

Correspondence : Approval or Concurrence : Condemnation Assignment Right of Way


Condemnation Assignment

Correspondence : Memo : Condemnation Condemnation Memorandum Right of Way


Memorandum
Correspondence : Recommendation : Confidential Contractor's
Confidential Contractor's Performance Performance Report (DC-83)
Report (DC-83)
Concept Development : Report : Congestion Congestion Mgt Sys Report Roadway
Mgt Sys Report
Procurement : Agreement : Conservation Conservation Easement Environmental
Easement

Concept Development : Report :


Constructability and Maintenance Review Constructability and Maintenance Construction
Review Comments
Comments

Concept Development : Report : Constructability Review Comments Construction


Constructability Review Comments

: Construction Changes Construction Changes Construction

Construction : Report : Construction Construction Checklist and


Checklist and Inventory Form-Environmental Inventory Form-Environmental Environmental
Document Document
Construction : Report : Construction Closeout Construction Closeout Inspections- Environmental
Inspections-Inpection Inpection

: Construction Completion Construction Completion Construction

Construction : Report : Construction Construction Compliance Inspection Construction


Compliance Inspection Report-Inspection Report-Inspection

Financial : Estimate : Construction Cost Construction Cost Estimate


Estimate

Financial : Estimate : Construction Cost Construction Cost Estimate


Estimate
Financial : Estimate : Construction Cost Construction Cost Estimates
Estimates

Construction : Report : Construction Construction Environmental


Environmental Reevaluations –Environmental Reevaluations –Environmental Environmental
Document Document

: Construction Initiation Construction Initiation Construction

Construction : Report : Construction Construction Inspection Multimodal


Inspection
Construction : Report : Construction
Inspection - Intelligent Transportation System Construction Inspection - Intelligent Intelligent Transportation
Transportation System (ITS) Systems
(ITS)
Construction : Report : Construction Construction Inspection - Structures
Inspection - Roadyway/Bridge Roadyway/Bridge

: Construction Operations Construction Operations Construction

Construction : Report : Construction Orders Construction Orders Construction

Construction : Report : Construction Construction Schedule Construction


Schedule

Procurement : Agreement : Consultant Consultant Agreement Technical & Administrative


Agreement
Procurement : Agreement : Consultant Consultant Agreement Addendums
Agreement Addendums

Procurement : Proposal : Consultant Consultant Inspection


Inspection
Procurement - Professional
: Consultant Selection Committee Consultant Selection Committee Services
: Consultant Selection Committee Package Consultant Selection Committee Procurement - Professional
Requirements Package Requirements Services
Procurement : Proposal : Consultant Consultant Selection Process (No. Procurement - Professional
Selection Process (No. 312) 312) Services
Concept Development : Report : Procurement - Professional
Contamination Screenings
Contamination Screenings Services
: Continuation Continuation Right of Way
Procurement : Agreement : Contract and Contract and Bond Cover Sheet
Bond Cover Sheet
Procurement : Agreement : Contract Cost Procurement - Professional
Contract Cost Escalation
Escalation Services

: Contract Documents Contract Documents

Procurement : Agreement : Contract Page Contract Page Construction

Correspondence : Recommendation : Contractor Addenda Construction


Contractor Addenda Acknowledgement Acknowledgement

Correspondence : Certification : Contractor Contractor Award Notification Construction


Award Notification

Correspondence : Certification : Contractor Contractor Certification and


Disclosure of Political Contributions Procurement - Professional
Certification and Disclosure of Political Services
Contributions - Chapter 51 - Chapter 51
Construction : Report : Contractor Contractor Evaluations Construction
Evaluations

Correspondence : Certification : Contractor's Contractor's Final Certification of Construction


Final Certification of Compliance (DC-123) Compliance (DC-123)

Correspondence : Certification : Contractor's Contractor's Financial and


Financial and Equipment Statement Equipment Statement Experience Construction
Experience Questionnaire and Past Questionnaire and Past
Performance Record Performance Record

: Contracts Contracts

: Contracts Contracts

: Contracts Contracts

Procurement : Proposal : Contractural Notice Contractural Notice Form (DC-161)


Form (DC-161)

Design : Report : Control Survey Report Control Survey Report Survey

: Coordination with Internal / External Coordination with Internal /


Stakeholders External Stakeholders

: Coordination with Internal/External Coordination with Internal/External


Stakeholders Stakeholders

: Core Group Meeting Core Group Meeting


Correspondence : Meeting Minutes : Core Core Group Meeting Minutes
Group Meeting Minutes

Correspondence : Meeting Minutes : Core Core Group Meeting Minutes


Group Meeting Minutes

Design : Report : Coring Request Coring Request


Procurement : Proposal : Corporate Procurement - Professional
Corporate Reorganization Form
Reorganization Form Services
Procurement : Proposal : Corporate Corporate Reorganization of Construction
Reorganization of Contractors Contractors
Procurement : Agreement : Corporate Corporate Resolution Construction
Resolution
Correspondence : Memo : Corrective Action Corrective Action Memo - Environmental
Memo - Inspection Inspection

: Correspondance - Incoming (Includes Correspondance - Incoming


Correspondence Log) (Includes Correspondence Log)

Procurement : Proposal : Cost Basis Approval Cost Basis Approval ICQ Required Procurement - Professional
ICQ Required Documents for Approval and Documents for Approval and Services
Exhibits Exhibits
Procurement : Agreement : Cost Plus Fixed Cost Plus Fixed Fee Project Specific Procurement - Professional
Fee Project Specific Services

Procurement : Agreement : Cost Plus Fixed Cost Plus Fixed Fee Project Specific - Procurement - Professional
Fee Project Specific - Construction Inspection Construction Inspection Services

Procurement : Agreement : Cost Plus Fixed Cost Plus Fixed Fee Term Procurement - Professional
Fee Term Services
Procurement : Agreement : Cost Plus Fixed Cost Plus Fixed Fee Term Agreement Procurement - Professional
Fee Term Agreement - Construction - Construction Inspection Services
Inspection
Correspondence : Recommendation : County County Aid E-Resolution for SAGE Local Aid
Aid E-Resolution for SAGE
Financial : Expense : County Aid Expenditure County Aid Expenditure Report Local Aid
Report
: County Aid Regulations County Aid Regulations Local Aid
: County Minor Bridge Inspection System County Minor Bridge Inspection Structures
(CoMBIS) System (CoMBIS)
Correspondence : General Project Cover Letter For Agreement With
Correspondence? : Cover Letter For Utilities
Employment Revision
Agreement With Employment Revision
Correspondence : Memo : CPSC Package CPSC Package

Concept Development : Report : CPSC CPSC Recommendation


Recommendation

Concept Development : Report : Crash Data Crash Data

Planning : Report : Crash Data Crash Data


Concept Development : Drawing / Plan : Crash Diagram
Crash Diagram

Design : Report : Cultural Resources Cultural Resources Mitigation


Mitigation Report Report

Design : Report : Cultural Resources Study Cultural Resources Study Environmental

Correspondence : Approval or Concurrence : DAG Case Review Right of Way


DAG Case Review

Correspondence : Approval or Concurrence : DAG's Approval as to form Right of Way


DAG's Approval as to form

Construction : Report : Daily Blasting Report Daily Blasting Report (DC-102) Construction
(DC-102)
Design : Report : Daily Report (Asphalt Plant Daily Report (Asphalt Plant Construction
Inspection) (LB-64) Inspection) (LB-64)
Construction : Report : Daily Work Report Daily Work Report (DC-144) Construction
(DC-144)
Construction : Report : Daily/Weekly Reports Daily/Weekly Reports Construction

: Data Analysis Data Analysis

: Data Collection Data Collection

: Data Collection Data Collection

Design : Report : De Minimis Section 4(f) De Minimis Section 4(f) Evaluation Environmental
Evaluation

Correspondence : Request for Information : Debriefing


Debriefing

Correspondence : Request for Action : Declaration of Taking Right of Way


Declaration of Taking
Procurement : Proposal : Deed Bargain and Deed Bargain and Sale Right of Way
Sale (Corporate, Individual) (Corporate, Individual)
Procurement : Proposal : Deed Fee Deed Fee Covenant Easement
Covenant Easement (Corporate, Right of Way
(Corporate, Individual)
Individual)
Design : Permit : Delaware & Raritan Canal Delaware & Raritan Canal Environmental
Commission Commission
Design : Permit : Delaware River Basin Delaware River Basin Commission Environmental
Commission
Correspondence : Department Action : Delivery Tickets & Material
Delivery Tickets & Material Certificates Certificates

Correspondence : Department Action : Department Action (AD-12)


Department Action (AD-12)

Correspondence : Department Action : Department Action Slip Close (AD- Utilities


Department Action Slip Close (AD-12) 12)
Correspondence : Department Action : Department Action Slip Invoice (AD- Utilities
Department Action Slip Invoice (AD-12) 12)
Correspondence : Department Action :
Department Action Slip Railroad Agreement Department Action Slip Railroad
Agreement Modification Utilities
Modification Construction Autorization (AD- Construction Autorization (AD-12)
12)

Correspondence : Department Action : Department Action Slip Railroad


Department Action Slip Railroad Engineering Engineering Construction Utilities
Construction Agreement (AD-12) Agreement (AD-12)

Correspondence : Department Action :


Department Action Slip Utility Agreement Department Action Slip Utility
Modification Construction Authorization (AD- Construction Authorization (AD-12) Utilities
Agreement Modification
12)

Correspondence : Department Action : Department Action Slip Utility


Department Action Slip Utility Engineering Engineering Construction Utilities
Construction Agreement (AD-12) Agreement (AD-12)

Correspondence : Department Action : Department Certification


Department Certification

Correspondence : Department Action : Department Routing Slip


Department Routing Slip

Construction : Drawing / Plan : Design Design Changes Construction


Changes
Concept Development : Report : Design Design Communications Report
Communications Report

Design : Report : Design Communications Design Communications Report


Report

Design : Report : Design Communications Design Communications Report


Report

Design : Report : Design Communications Design Communications Report Construction


Report

Design : Report : Design Environmental Design Environmental Reevaluations Environmental


Reevaluations –Environmental Document –Environmental Document

Financial : Estimate : Design Estimate (DC- Design Estimate (DC-145)


145)

Design : Report : Design Exception Report Design Exception Report

Correspondence : Recommendation : Design Design Rating Form Procurement - Professional


Rating Form Services
Procurement : Proposal : Designer Fee Designer Fee Proposal
Proposal

Financial : Invoice : Designer Final Invoice Designer Final Invoice

Correspondence : Memo : Diagnostic Team Diagnostic Team Meeting Memo of


Meeting Memo of Record or Order Record or Order

: Digital ID's Digital ID's


: Digital Signature Digital Signature
Procurement : Agreement : Disclosure of Disclosure of Investigations and Procurement - Professional
Investigations and Actions Involving Bidder Actions Involving Bidder Services
Procurement : Agreement : Disclosure of Disclosure of Investment Activities Procurement - Professional
Investment Activities in Iran in Iran Services
Procurement : Proposal : Disclosure of Disclosure of Investment Activities
Investment Activities in Iran (Public Law in Iran (Public Law 2012, Chapter
2012, Chapter 25) 25)
Procurement : Agreement : Disposal Request Disposal Request (PS-4)
(PS-4)
Financial : Invoice : DOT/DMV Warehouse DOT/DMV Warehouse (W-1)
(W-1)
Design : Report : Draft Section 106 Draft Section 106 Memorandum of
Memorandum of Agreement-Cultural Agreement-Cultural Resource Environmental
Resource Document Document

Concept Development : Map : Drainage Area Drainage Area Maps


Maps

Concept Development : Report : Drainage Drainage Inventory


Inventory

Planning : Report : Drainage Inventory Drainage Inventory Drainage

Design : Report : Drainage Mgt Sys Report Drainage Mgt Sys Report
Design : Report : Dwelling Inspection Dwelling Inspection Right of Way
Design : Report : Earthwork Calculations (DC- Earthwork Calculations (DC-19)
19)

Design : Report : Ecology Study Ecology Study Environmental

Construction : Report : EEO Documents - EEO Documents - Payroll Construction


Payroll (Contractor, Sub-Contractor) (Contractor, Sub-Contractor)
Construction : Report : EEO Documents - EEO Documents - Trainee Reports Construction
Trainee Reports (CR-1409) (CR-1409)
Construction : Report : EEO Documents - EEO Documents - Trainee Reports Construction
Trainee Reports (CR-2) (CR-2)
Construction : Report : EEO Documents - EEO Documents - Trainee Reports Construction
Trainee Reports (CR-3) (CR-3)
Construction : Report : EEO Documents - EEO Documents - Utilization of Construction
Utilization of ESBE/DBE or SBE (CR-267) ESBE/DBE or SBE (CR-267)
Construction : Report : EEO Documents - EEO Documents - Utilization of Construction
Utilization of ESBE/DBE or SBE (CR-268) ESBE/DBE or SBE (CR-268)
Construction : Report : EEO Documents - EEO Documents - Utilization of Construction
Utilization of ESBE/DBE or SBE (Form A) ESBE/DBE or SBE (Form A)
Procurement - Professional
: Electrical Requirements Electrical Requirements Services

Correspondence : Approval or Concurrence : Elizabethtown Gas Utilities


Elizabethtown Gas

Procurement - Professional
: Emergency Management Planning Emergency Management Planning Services

Correspondence : Approval or Concurrence : End of Costruction Notification Construction


End of Costruction Notification

Financial : Estimate : Engineer’s Estimate Engineer’s Estimate Summary Sheet Construction


Summary Sheet
Correspondence : Certification : Engineer's Engineer's Design Certification
Design Certification

Financial : Estimate : Engineer's Estimate Engineer's Estimate Construction

Correspondence : Certification : Engineer's Engineer's Project Completion Construction


Project Completion Certification Certification
Design : Map : Entire Tract Map Entire Tract Map

Design : Report : Environmental Assessment Environmental Assessment Environmental

Design : Drawing / Plan : Environmental Environmental Commitments/Plan Environmental


Commitments/Plan Sheets Sheets

Concept Development : Report : Environmental Data Collection Environmental


Environmental Data Collection

: Environmental Documents Environmental Documents Environmental

: Environmental Documents Environmental Documents Environmental


Design : Report : Environmental Impact Environmental Impact Statement Environmental
Statement

Planning : Report : Environmental Inventory Environmental Inventory Environmental

Construction : Permit : Environmental Permit Environmental Permit Notifications Environmental


Notifications

: Environmental Permits and Licenses Environmental Permits and Licenses Environmental

Design : Report : Environmental Physical Site Environmental Physical Site Environmental


Investigation Investigation
Design : Report : Environmental Rating Environmental Rating Criteria Environmental
Criteria
Design : Report : Environmental Rating Form Environmental Rating Form and Environmental
and Checklists Checklists

Design : Report : Environmental Environmental Reevaluations Environmental


Reevaluations
Design : Report : Environmental Remedial Environmental Remedial Support Environmental
Support

Concept Development : Report : Environmental Screening Report Environmental


Environmental Screening Report

Correspondence : Memo : Environmental Environmental Summary Environmental


Summary Memorandum Memorandum

Design : Report : Estoppel Condemnation Estoppel Condemnation Documents Right of Way


Documents
Procurement - Professional
: Evaluation Criteria Manual Evaluation Criteria Manual Services
Correspondence : Memo : Excess Parcel Excess Parcel Review Memo Right of Way
Review Memo

Correspondence : Approval or Concurrence : Executed Agreement Letter To Utilities


Executed Agreement Letter To Owner Owner

Correspondence : Approval or Concurrence : Executed Task Order


Executed Task Order

Concept Development : Report : Executive Executive Decision Document


Decision Document
Design : Report : Executive Order 215 (E.O. Executive Order 215 (E.O. 215) Environmental
215) Document Document

Financial : Expense : Exhibit - Certified Payroll Exhibit - Certified Payroll Form (xls Procurement - Professional
Form (xls 24k) 24k) Services

Planning : Report : Existing Traffic Counts Existing Traffic Counts Traffic Operations

Concept Development : Report : Existing Existing Utilities Inventory


Utilities Inventory

: Expedite Bid Software Expedite Bid Software


Correspondence : Department Action : Expediting Slip
Expediting Slip
Financial : Expense : Expense Distribution Expense Distribution Form Right of Way
Form

Correspondence : Approval or Concurrence : FHWA Approval


FHWA Approval

Correspondence : Approval or Concurrence : FHWA Approval


FHWA Approval

Correspondence : Certification : FHWA FHWA Certification


Certification
: FHWA Required Documents FHWA Required Documents

Correspondence : Approval or Concurrence : Fibertech Utilities


Fibertech

Concept Development : Report : Field Field Inventory


Inventory

Correspondence : Request for Action : Field Field Investigation Request


Investigation Request

Correspondence : Request for Action : Field Field Orders


Orders
Correspondence : General Project
Correspondence? : Filing Letter (various Filing Letter (various varieties) Right of Way
varieties)

Construction : Report : Final Acceptance Final Acceptance Inspection Construction


Inspection

Correspondence : Approval or Concurrence :


Final Acceptance Letter (6 Months) To Owner Final Acceptance Letter (6 Months) Utilities
To Owner For Construction
For Construction

Correspondence : Approval or Concurrence : Final Acceptance Letter (6 Months)


Final Acceptance Letter (6 Months) To Owner To Owner for Preliminary Utilities
for Preliminary Engineering Costs Engineering Costs

Correspondence : Approval or Concurrence : Final Acceptance Letter (60 Days) To


Final Acceptance Letter (60 Days) To Owner Owner For Construction Utilities
For Construction
Correspondence : Approval or Concurrence : Final Acceptance Letter (60 days) To
Final Acceptance Letter (60 days) To Owner Owner For Preliminary Engineering Utilities
For Preliminary Engineering Costs Costs

Financial : Audit : Final Audit Final Audit

Financial : Estimate : Final Construction Cost Final Construction Cost Estimate Construction
Estimate

Construction : Report : Final Construction Final Construction Schedule Construction


Schedule

Design : Report : Final Design Addendum Final Design Addendum Project Management

Correspondence : Approval or Concurrence : Final Design Approvals Project Management


Final Design Approvals

Financial : Budget : Final Design Budget Final Design Budget Project Management

Procurement : Proposal : Final Design Final Design Designer Fee Proposal Project Management
Designer Fee Proposal

Financial : Estimate : Final Design Final Design Independent Cost Project Management
Independent Cost Estimate Estimate
: Final Design Initiation Final Design Initiation Project Management

Design : Report : Final Design Public Final Design Public Involvement Project Management
Involvement Action Plan Action Plan

Design : Report : Final Design Schedule Final Design Schedule Project Management

Financial : Scope Statement : Final Design Final Design Scope Statement Project Management
Scope Statement

Design : Drawing / Plan : Final Design Final Design Submission Project Management
Submission

Correspondence : Certification : Final Design Final Design Submission Quality


Submission Quality Management Project Management
Management Certification
Certification

Correspondence : Memo : Final Design Final Design Submission Review Project Management
Submission Review
Design : Report : Final Design Supplemental Final Design Supplemental Survey Project Management
Survey

Design : Report : Final Design Systems Final Design Systems Engineering Project Management
Engineering Review Form Review Form

Design : Report : Final Drainage Design Final Drainage Design Report Drainage
Report

Design : Drawing / Plan : Final Drainage Plans Final Drainage Plans Drainage

Design : Drawing / Plan : Final Environmental Final Environmental Plans Environmental


Plans

Design : Drawing / Plan : Final Final Horizontal/Vertical Geometry


Horizontal/Vertical Geometry

Correspondence : Certification : Final Final Inspection Construction


Inspection

Design : Drawing / Plan : Final Intelligent Final Intelligent Transportation


Transportation Systems Facilities Plans Systems Facilities Plans

Financial : Invoice : Final Invoice Final Invoice

Financial : Invoice : Final Invoice Final Invoice


Design : Drawing / Plan : Final Landscape Final Landscape Plans Environmental
Plans

Design : Drawing / Plan : Final Lighting Plans Final Lighting Plans Electrical

Design : Report : Final Materials Certificate Final Materials Certificate Maintenance & Operations

Design : Report : Final Noise Study Final Noise Study

Financial : Payment : Final Payment Voucher Final Payment Voucher

Design : Drawing / Plan : Final Project Plans Final Project Plans

Design : Report : Final Project Specifications Final Project Specifications

Concept Development : Report : Final Final Purpose and Need Statement


Purpose and Need Statement

Correspondence : General Project Final Release letter


Correspondence? : Final Release letter

Financial : Estimate : Final Right of Way Cost Final Right of Way Cost Estimate
Estimate
Design : Report : Final Right of Way Final Right of Way Submission
Submission

Design : Drawing / Plan : Final Roadway Plans Final Roadway Plans

Design : Report : Final Structure Appraisal Final Structure Appraisal and Design
and Design Report Report

Design : Report : Final Structures Documents Final Structures Documents

Design : Drawing / Plan : Final Traffic Signing, Final Traffic Signing, Striping and
Striping and Signal Plans Signal Plans

Design : Drawing / Plan : Final Wetlands Final Wetlands Mitigation Plans Environmental
Mitigation Plans

Financial : Report (includes STIP, etc.) : Financial Plan (Major Projects)


Financial Plan (Major Projects)
Design : Report : Finding of No Significant Finding of No Significant Impact Environmental
Impact (FONSI) (FONSI)

Procurement - Professional
: Fixed Fee Calculation Fixed Fee Calculation Services
Procurement : Agreement : Fixed Price Fixed Price Project Specific - Bridge Procurement - Professional
Project Specific - Bridge Inspection Inspection Services
Procurement : Agreement : Fixed Price Fixed Price Project Specific - Direct Procurement - Professional
Project Specific - Direct Expense Breakout Expense Breakout Services
Procurement : Agreement : Fixed Price Fixed Price Project Specific Procurement - Professional
Project Specific Agreement Agreement Services
Procurement - Professional
Procurement : Agreement : Fixed Price Term Fixed Price Term Services

Design : Permit : Flood Hazard Area Permit Flood Hazard Area Permit Environmental
Application Application

: FONSI Request Package FONSI Request Package Environmental


Correspondence : Request for Action : Formal Complaint Form (PB-36)
Formal Complaint Form (PB-36)
Construction : Report : Foundation Pile Foundation Pile Record (DC-97) Construction
Record (DC-97)
Financial : Expense : Fuel Price Adjustment Fuel Price Adjustment
Procurement - Professional
: General Guidelines General Guidelines Services

Design : Map : General Property Parcel Maps General Property Parcel Maps

Correspondence : Request for Information : General Requisition (P-2)


General Requisition (P-2)

Concept Development : Report : Geodetic Geodetic Survey Report Survey


Survey Report
Procurement - Professional
: Geographical Information Systems Geographical Information Systems Services
Procurement - Professional
Design : Report : Geotechnical Design Geotechnical Design Services

Design : Report : Geotechnical Foundation Geotechnical Foundation


Engineering Report Engineering Report

Design : Report : Geotechnical Roadway and Geotechnical Roadway and Rock


Rock Engineering Report Engineering Report

Procurement - Professional
Design : Report : Global Positioning Surveys Global Positioning Surveys Services

Construction : Report : Goals Goals Construction

: Good Neighbor-Program Good Neighbor-Program


Procurement - Professional
: Goods Movement Goods Movement Services
Design : Permit : Green Acres Application Green Acres Application Environmental

Financial : Report (includes STIP, etc.) : Green Green Acres Compensation Environmental
Acres Compensation Appraisal Appraisal

Concept Development : Report : Ground Ground Control and Field Survey Survey
Control and Field Survey

Design : Report : Hazardous Waste Remedial Hazardous Waste Remedial Action Environmental
Action Work plan Work plan
Design : Report : Hazardous Waste Site Hazardous Waste Site Investigation Environmental
Investigation (SI/RI) (SI/RI)

Design : Report : Hazardous Waste Study Hazardous Waste Study Environmental

Design : Report : Historic Architectural Historic Architectural Procurement - Professional


Survey/Mitigation Survey/Mitigation Services
Design : Permit : Historic Sites Council Historic Sites Council Application- Environmental
Application- Cultural Resource Document Cultural Resource Document

Correspondence : Approval or Concurrence : Historic Sites Council Concurrence


Historic Sites Council Concurrence

Design : Report : Hydrologic and Hydraulic Hydrologic and Hydraulic Stream Environmental
Stream Analysis Analysis

Concept Development : Report : Hydrology Hydrology and Hydraulic Analysis


and Hydraulic Analysis

Planning : Report : Identification of Design Identification of Design Deficiencies


Deficiencies

Financial : Estimate : Improvement Retention Improvement Retention Estimate Right of Way


Estimate
Financial : Estimate : Independent Cost Independent Cost Estimate
Estimate

Design : Map : Individual Parcel Maps Individual Parcel Maps

Correspondence : Approval or Concurrence : Individual Section 4(f) Evaluation Environmental


Individual Section 4(f) Evaluation

Design : Drawing / Plan : Initial Initial Deforestation/ Reforestation Environmental


Deforestation/ Reforestation Plan Plan

Financial : Payment : Initial Payment Voucher Initial Payment Voucher

Construction : Report : Initial Project Initial Project Workforce Report Construction


Workforce Report

Financial : Estimate : Initial Right of Way Initial Right of Way Estimate Right of Way
Estimate

Financial : Invoice : Inspection Consultant Inspection Consultant Final Invoice Construction


Final Invoice

Design : Report : Inspection Report of Inspection Report of Miscellaneous


Miscellaneous Materials (LB-150) Materials (LB-150)
Construction : Report : Inspections Inspections Construction

Construction : Report : Inspector's Daily Inspector's Daily Concrete Paving Construction


Concrete Paving Report (DC-10) Report (DC-10)
Procurement - Professional
: Instructions Instructions Services
: Intelligent Transportation System (ITS) Intelligent Transportation System Intelligent Transportation
Facilities (ITS) Facilities Systems

Concept Development : Report : Intelligent Intelligent Transportation Systems Intelligent Transportation


Transportation Systems Inventory Inventory Systems

Correspondence : Request for Action : Intent Intent to Condemn letter


to Condemn letter Right of Way

Design : Report : Interim Design Submission Interim Design Submission


(Optional) (Optional)

Correspondence : Department Action : IT -10 IT -10 Phone request Budget


Phone request

Procurement : Agreement : IT Procurement IT Procurement Approval Form (OIT-


Approval Form (OIT-0084) 0084)

Correspondence : Approval or Concurrence : JCP&L Utilities


JCP&L

Financial : Funding (includes job number) : Job Number Request Project Management
Job Number Request

Design : Map : Jurisdictional Limit Maps and Jurisdictional Limit Maps and Project Management
Agreement Agreement

Construction : Report : Key Contract Key Contract Personnel (DC-34) Construction


Personnel (DC-34)

Correspondence : General Project Procurement - Professional


Correspondence? : Key Staff Resume Form Key Staff Resume Form Services

Correspondence : Meeting Minutes : Kickoff Kickoff Meeting Minutes


Meeting Minutes

: Landscape Specifications Landscape Specifications Environmental


Correspondence : Request for Action : Lane Lane Closure Request (TO-100)
Closure Request (TO-100)
Correspondence : Request for Action : Lane Lane Closure Request (TO-101)
Closure Request (TO-101)
Correspondence : Request for Action : Lane Lane Closure Request (TO-103)
Closure Request (TO-103)

Procurement : Agreement : Lease Agreement Lease Agreement Right of Way

Design : Report : Lighting Warrant Analysis Lighting Warrant Analysis Report Electrical
Report

Concept Development : Report : Limited Limited Scope CD Bridge Checklist Project Management
Scope CD Bridge Checklist

Concept Development : Report : Limited Limited Scope CD Culvert Checklist Project Management
Scope CD Culvert Checklist

Concept Development : Report : Limited Limited Scope CD Pavement Project Management


Scope CD Pavement Checklist Checklist

Concept Development : Report : Limited Limited Scope CD Sign Structure Project Management
Scope CD Sign Structure Checklist Checklist

Construction : Report : Line Item Profile Line Item Profile Report Construction
Report
: Lis Pendens Lis Pendens Right of Way
Concept Development : Report : List of List of Substandard Design Elements
Substandard Design Elements

: Local Bridge Future Needs Structurally Local Bridge Future Needs


Deficient, Scour Critical Functionally Structurally Deficient, Scour Critical Local Aid
Obsolete List Functionally Obsolete List

Correspondence : Meeting Minutes : Local Local Officials Meeting Minutes Project Management
Officials Meeting Minutes

Correspondence : General Project


Correspondence? : Local Paper Local Paper Advertisement Project Management
Advertisement

Correspondence : Meeting Minutes : Local Local Stakeholder Meeting Minutes Project Management
Stakeholder Meeting Minutes

Design : Report : Logs Logs

Correspondence : Approval or Concurrence : Lot Owner Access Concurrence Right of Way


Lot Owner Access Concurrence

Procurement : Agreement : Lot Owner Lease Lot Owner Lease Agreement Right of Way
Agreement

Procurement : Agreement : MacBride MacBride Principles


Principles
Planning : Report : Maintenance Mgt Sys Maintenance Mgt Sys Report
Report
Concept Development : Report : Management System Input
Management System Input

Planning : Report : Management System Management System Input


Input

Marine Transportation System Procurement - Professional


: Marine Transportation System Planning Planning Services
Procurement - Professional
: Maritime Engineering Support Maritime Engineering Support Services
: Market & Customer Research – Market & Customer Research – Procurement - Professional
Transportation Transportation Services
Procurement : Agreement : Master Master Agreement Change Order Utilities
Agreement Change Order
Correspondence : Request for Action : Material Inspection Request
Material Inspection Request

Design : Report : Material Management Plan Material Management Plan

Construction : Report : Material Material Questionnaire Construction


Questionnaire
Construction : Report : Material Material Questionnaire - Road (DC- Construction
Questionnaire - Road (DC-2891) 2891)
Construction : Report : Material Material Questionnaire - Structures Construction
Questionnaire - Structures

Correspondence : Request for Information : Material Requistion (PS-31)


Material Requistion (PS-31)
Design : Report : Materials Certificate (LB- Materials Certificate (LB-95a)
95a)
Construction : Report : Materials Inspection Materials Inspection and Procurement - Professional
and Engineering Engineering Services

Materials Rating Form and Guidlines Procurement - Professional


: Materials Rating Form and Guidlines Services

Correspondence : Memo : Memo of Record Memo of Record

Correspondence : Memo : Memo to Memo to Commissioner's Office


Commissioner's Office
Correspondence : Memo : Memo to Memo to Commissioner's Office
Commissioner's Office (Annoucement) (Annoucement)

Correspondence : Meeting Minutes : Minutes


Minutes

Procurement : Proposal : Model Technical Procurement - Professional


Model Technical Proposal
Proposal Services
Construction : Report : Modification Modification Multimodal
Construction : Report : Monthly Detail Monthly Detail Statement Construction
Statement
Financial : Estimate : Monthly Estimate Monthly Estimate
Financial : Estimate : Monthly Progress Monthly Progress Estimates
Estimates
Financial : Billing : Monthly Summary of Monthly Summary of Contractor's Construction
Contractor's Payrolls (DC-127) Payrolls (DC-127)
Correspondence : Request for Action : Motion to Return Deposit (or part Right of Way
Motion to Return Deposit (or part of ) of )
Correspondence : Request for Action : Motions (sundry and various) Right of Way
Motions (sundry and various)
Correspondence : Request for Action : Motions (various) Right of Way
Motions (various)

Correspondence : General Project Mover Instructions Right of Way


Correspondence? : Mover Instructions

Correspondence : Request for Information : Movers and Contractors Estimate Right of Way
Movers and Contractors Estimate Affidavit Affidavit

Correspondence : Approval or Concurrence : Moving Cost Authorization (RE-170) Right of Way


Moving Cost Authorization (RE-170)

Procurement : Proposal : Multi Source Multi Source Contracts - Vendor


Contracts - Vendor Selection (MSC-VS) Selection (MSC-VS)
Procurement : Agreement : Municipal Aid E- Municipal Aid E-Resolution for SAGE
Resolution for SAGE
Financial : Budget : Municipal Aid Formula Municipal Aid Formula Breakdown
Breakdown Spreadsheet Spreadsheet
Correspondence : General Project
Correspondence? : Municipal Concurrence Municipal Concurrence Letter Utilities
Letter

Procurement : Agreement : Municipal Police Municipal Police Agreements


Agreements

Design : Permit : National (or State) Wild & National (or State) Wild & Scenic Environmental
Scenic Rivers -Permit Rivers -Permit
Design : Report : Natural Heritage Database Natural Heritage Database Search Environmental
Search

Correspondence : Request for Information : Negotiations Case Summary Right of Way


Negotiations Case Summary

Correspondence : Approval or Concurrence : Net Benefit Section 4(f) Evaluation Environmental


Net Benefit Section 4(f) Evaluation

Correspondence : Certification : New Jersey New Jersey Business Registration


Business Registration Certificate Certificate

Correspondence : Approval or Concurrence : New Jersey Natural Gas Utilities


New Jersey Natural Gas

Correspondence : Approval or Concurrence : NJ Hackensack Meadowlands Environmental


NJ Hackensack Meadowlands Commission Commission

Design : Permit : NJDEP Coastal Wetlands NJDEP Coastal Wetlands Environmental

Correspondence : Approval or Concurrence : NJDEP Commissioner Conditions


NJDEP Commissioner Conditions Acceptance Acceptance Letter- Cultural Environmental
Letter- Cultural Resource Document Resource Document

Design : Permit : NJDEP Dam Safety NJDEP Dam Safety Environmental


Design : Permit : NJDEP Flood Hazard Area NJDEP Flood Hazard Area Environmental
Design : Permit : NJDEP Freshwater Wetlands NJDEP Freshwater Wetlands Environmental

Design : Permit : NJDEP Freshwater Wetlands NJDEP Freshwater Wetlands Environmental


Transition Area Waiver Transition Area Waiver
Design : Permit : NJDEP Highlands NJDEP Highlands Environmental

Correspondence : Approval or Concurrence : NJDEP Letter of Interpretation Environmental


NJDEP Letter of Interpretation

Design : Permit : NJDEP NJPDES Stormwater NJDEP NJPDES Stormwater Environmental


Construction GP (RFA) Construction GP (RFA)
Design : Permit : NJDEP Pollutant Discharge NJDEP Pollutant Discharge Environmental
Design : Permit : NJDEP Riparian/Tidelands NJDEP Riparian/Tidelands Environmental
Design : Permit : NJDEP Sanitary Facilities NJDEP Sanitary Facilities Environmental
Design : Permit : NJDEP Water Lowering NJDEP Water Lowering Environmental
Design : Permit : NJDEP Water Quality NJDEP Water Quality Certificate Environmental
Certificate
Design : Permit : NJDEP Waterfront NJDEP Waterfront Development Environmental
Development
Financial : Payment : NJDOT Insurance NJDOT Insurance Certificate (DC- Construction
Certificate (DC-175) 175)
Design : Report : NMFS Essential Fish Habitat NMFS Essential Fish Habitat Study Environmental
Study
Design : Report : NMFS Section 7 NMFS Section 7 Consultation Environmental
Consultation

Design : Report : Noise Barrier Detail Plans Noise Barrier Detail Plans

Design : Report : Noise Measurement and Noise Measurement and Analysis Procurement - Professional
Analysis Services

Design : Report : Noise Mitigation Noise Mitigation Questionnaire


Questionnaire

Design : Report : Noise Study Noise Study Environmental

Design : Report : Non-Destructive Test Report Non-Destructive Test Report (LB-


(LB-278) 278)
Procurement : Agreement : Non-Disclosure Non-Disclosure Form Procurement - Professional
Form Services
Correspondence : Request for Action : Notice Notice of Authorization
of Authorization

Design : Report : Notice of Noncomplying Notice of Noncomplying Material


Material (LB-296) (LB-296)
Correspondence : Request for Action : Notice Notice of Settlement Right of Way
of Settlement

Correspondence : Request for Action : Notice Notice To Proceed


To Proceed

Correspondence : Request for Action : Notification of Approval to


Notification of Approval to Advertise Advertise

Correspondence : Request for Information : NRE Order Contract Right of Way


NRE Order Contract

Design : Report : Nuclear Density Moisture, Nuclear Density Moisture, Field Test
Field Test Data (LB-264) Data (LB-264)

Correspondence : Request for Information : Offer Letter (various options) Right of Way
Offer Letter (various options)

Design : Report : OIT Executive Summary OIT Executive Summary Technical & Administrative

: Oral Presentation Oral Presentation

Correspondence : Request for Action : Order Order For Judgment Right of Way
For Judgment
Correspondence : Request for Action : Order Order For Possession Right of Way
For Possession
Correspondence : Request for Action : Order Order to Show Cause (various Right of Way
to Show Cause (various types) types)

Correspondence : Request for Action : Order Order to Show Cause Supplemental Right of Way
to Show Cause Supplemental (various types) (various types)

Correspondence : General Project


Correspondence? : Owner Notification Letter Owner Notification Letter Right of Way

Correspondence : Request for Action : Owner Owner Replacement Housing Right of Way
Replacement Housing Supplement Supplement
Procurement : Agreement : Ownership Procurement - Professional
Ownership Disclosure
Disclosure Services
Design : Report : Pachometer Survey (LB-277) Pachometer Survey (LB-277)

Design : Report : PAECE Report PAECE Report Right of Way

Correspondence : General Project Parcel Descriptions


Correspondence? : Parcel Descriptions

Correspondence : Request for Information : Partial Release of Mortgage


Partial Release of Mortgage (Corporate, (Corporate, Individual) Right of Way
Individual)

Planning : Report : Past Studies Past Studies

Procurement - Professional
Design : Report : Pavement Design Pavement Design Services

: Pavement Design Data Pavement Design Data Pavement

Design : Report : Pavement Life Cycle Cost Pavement Life Cycle Cost Analysis Pavement
Analysis

Procurement - Professional
: Pavement Management Systems Pavement Management Systems Services
Concept Development : Report : Pavement Pavement Mgt Sys Report Pavement
Mgt Sys Report

Design : Report : Pavement Recommendation Pavement Recommendation Pavement

Financial : Payment : Payment and Payment and Performance Bonds


Performance Bonds
Financial : Payment : Payment Voucher Payment Voucher Right of Way
Construction : Report : PCARD Confirmation PCARD Confirmation Order Construction
Order

Concept Development : Report : PE PIAP PE PIAP

Concept Development : Report : PE Project PE Project Management Plan Project Management


Management Plan

Correspondence : Certification : PE Quality PE Quality Management Project Management


Management Certification Certification

Procurement - Professional
: Pedestrian and Bicycle Facilities Pedestrian and Bicycle Facilities Services
Design : Report : Pedestrian Safety Mgt Sys Pedestrian Safety Mgt Sys Report
Report

Financial : Payment : Performance and Performance and Payment Bonds


Payment Bonds

Design : Permit : Permits Permits Utilities


Correspondence : Memo : Permits Review Permits Review Memo
Memo

Correspondence : Meeting Minutes : Permitting Agency Meeting Minutes


Permitting Agency Meeting Minutes
Correspondence : Request for Action : Personal Service Request Right of Way
Personal Service Request
Correspondence : General Project
Correspondence? : Personalty Moving Cost Personalty Moving Cost Right of Way
Authorization Letter
Authorization Letter
: Pictures Pictures
Design : Permit : Pinelands Commission Pinelands Commission Public Environmental
Public Development Approval Development Approval
Procurement : Agreement : Planning Rating Planning Rating Criteria Procurement - Professional
Criteria Services

Design : Drawing / Plan : Plans Plans Multimodal

Correspondence : Memo : Plant Acceptance Plant Acceptance Memo Environmental


Memo
Correspondence : Memo : Plant Guarantee Plant Guarantee Memo Environmental
Memo
Correspondence : Memo : Plant
Replacement List Memo Plant Replacement List Memo Environmental
: Police Police
Design : Report : Portland Cement Concrete Portland Cement Concrete
Proportions (LB-125) Proportions (LB-125)
Construction : Report : Pre-bid meeting Pre-bid meeting Multimodal

Correspondence : Meeting Minutes : Pre-Bid Pre-Bid Meeting Minutes Construction


Meeting Minutes

Correspondence : Meeting Minutes : Pre- Pre-Construction ITS Meeting Construction


Construction ITS Meeting Minutes Minutes

Correspondence : Meeting Minutes : Pre- Pre-Construction Meeting Minutes Construction


Construction Meeting Minutes

Correspondence : Request for Information : Preconstruction Meeting Construction


Preconstruction Meeting Notification Notification

Design : Report : Pre-Final Right of Way Pre-Final Right of Way Submission


Submission
Design : Report : Preliminary Construction Preliminary Construction Schedule
Schedule

Concept Development : Drawing / Plan : Preliminary Detour and Staging


Preliminary Detour and Staging Plans Plans

Design : Report : Preliminary Drainage Design Preliminary Drainage Design Report Drainage
Report

Design : Report : Preliminary Engineering Preliminary Engineering Approvals


Approvals

Concept Development : Report : Preliminary Preliminary Engineering Budget


Engineering Budget

: Preliminary Engineering Initiation Preliminary Engineering Initiation

Design : Report : Preliminary Engineering Preliminary Engineering Report Environmental


Report

Concept Development : Report : Preliminary Preliminary Engineering Schedule


Engineering Schedule
Financial : Scope Statement : Preliminary Preliminary Engineering Scope
Engineering Scope Statement Statement

Design : Report : Preliminary Geotechnical Preliminary Geotechnical


Engineering Report Engineering Report

Design : Drawing / Plan : Preliminary ITS Preliminary ITS Facility Design Plans Intelligent Transportation
Facility Design Plans Systems

Concept Development : Report : Preliminary Preliminary Preferred Alternative


Preferred Alternative (PPA) (PPA)

Design : Drawing / Plan : Preliminary Preliminary Roadway Plans Roadway


Roadway Plans

Pre-PS&E Package (Full Oversight


: Pre-PS&E Package (Full Oversight Only) Project Management
Only)
Correspondence : Certification : Prequalification Certification and Procurement - Professional
Prequalification Certification and Notorization Services
Notorization
Procurement : Agreement : Prequalification Prequalification Debarement Clause Procurement - Professional
Debarement Clause Services
Construction : Report : Prestressed/Precast Prestressed/Precast Concrete Procurement - Professional
Concrete Inspection Inspection Services
Design : Report : Prestressed/Precast Prestressed/Precast Concrete
Concrete Proportions or Computerized Proportions or Computerized
Equivalent (LB-104) Equivalent (LB-104)

Planning : Report : Priority Score from Priority Score from Management


Management System System

: Problem Screening Approvals Problem Screening Approvals

Planning : Problem Statement : Problem Problem Screening Report


Screening Report

Planning : Problem Statement : Problem Problem Statement


Statement

Design : Report : Producer's Bituminous Producer's Bituminous Concrete


Concrete Mix Design (LB-83) Mix Design (LB-83)
Financial : Funding (includes job number) : Program Schedule Multimodal
Program Schedule
Correspondence : Approval or Concurrence : Programmatic Section 4(f) Environmental
Programmatic Section 4(f) Evaluation Evaluation

Correspondence : Request for Information : Project / Parcel Hold Requests Right of Way
Project / Parcel Hold Requests

Design : Drawing / Plan : Project Access Plan Project Access Plan Right of Way

Correspondence : Meeting Minutes : Project Project Briefing Meeting Minutes Construction


Briefing Meeting Minutes

: Project Closeout Project Closeout


Procurement - Professional
Design : Report : Project Details Form Project Details Form Services

Concept Development : Report : Project Fact Project Fact Sheet


Sheet
Design : Report : Project Management Plan Project Management Plan (Major Project Management
(Major Projects) Projects)

Design : Report : Project Manager Comments Project Manager Comments Form Procurement - Professional
Form Services

Design : Drawing / Plan : Project Plans Project Plans Project Management

: Project Specifications Project Specifications Project Management

Construction : Report : Project Supervisor Project Supervisor Field Inspection Construction


Field Inspection Report (DC-152) Report (DC-152)
Correspondence : Certification : Proof of Proof of compliance with New
compliance with New Jersey Affirmative Jersey Affirmative Action Technical & Administrative
Action Requirements Requirements

Correspondence : Approval or Concurrence : Property Access Agreement Right of Way


Property Access Agreement

Correspondence : Request for Action : Property Releases Right of Way


Property Releases

Correspondence : Certification : PS&E PS&E Submission Quality


Submission Quality Management Project Management
Certification Management Certification

Correspondence : Approval or Concurrence : PSE&G Utilities


PSE&G
Correspondence : Meeting Minutes : Public Public Information Center Meeting Project Management
Information Center Meeting Minutes Minutes

Correspondence : General Project Public Involvement – Transportation Procurement - Professional


Correspondence? : Public Involvement – Issues Services
Transportation Issues

Correspondence : General Project


Correspondence? : Public Notification Form Public Notification Form Right of Way

Correspondence : Meeting Minutes : Public Public Outreach Meeting Minutes Construction


Outreach Meeting Minutes

Procurement : Proposal : Public Works Public Works Contractor


Contractor Registration Registration
Correspondence : Certification : Publication Publication Affidavit Right of Way
Affidavit

Correspondence : General Project


Correspondence? : Publication Cover Letter Publication Cover Letter Right of Way

Concept Development : Report : Purpose and Purpose and Need Statement


Need Statement

: Quality Management Quality Management

: Quality Management Quality Management


: Quality Management Quality Management

: Quality Management Quality Management

Correspondence : Certification : Quality Quality Management Certifications


Management Certifications

Concept Development : Report : Quantitative Quantitative Risk Analysis Report


Risk Analysis Report

Concept Development : Report : Quantitative Quantitative Risk Analysis


Risk Analysis Worksheet Worksheet

Correspondence : Request for Action : Quit Quit Notice (Lease or No Lease) Right of Way
Notice (Lease or No Lease)
Design : Report : Radiographic Inspection Radiographic Inspection Report
Report (MT-143) (MT-143)

Correspondence : Approval or Concurrence : Rail Award letter Multimodal


Rail Award letter

Correspondence : Request for Information : Rail Rating Sheets & Criteria Multimodal
Rail Rating Sheets & Criteria

: Rail Regulations Rail Regulations Multimodal

: Railroad 100% Submission Railroad 100% Submission Multimodal

: Railroad 60% Submission Railroad 60% Submission Multimodal

Procurement : Agreement : Railroad Railroad Agreement Multimodal


Agreement

Financial : Adjustment : Railroad Agreement Railroad Agreement Modification Multimodal


Modification Change Order Change Order
Procurement : Agreement : Railroad Railroad Agreement Modification
Agreement Modification Construction Multimodal
Construction Authorization
Authorization

Correspondence : Memo : Railroad Railroad Diagnostic Team Meeting Multimodal


Diagnostic Team Meeting Memo of Record Memo of Record
Procurement : Agreement : Railroad Railroad Engineering Construction
Engineering Construction Agreement Multimodal
Agreement CONRAIL
CONRAIL
Procurement : Agreement : Railroad Railroad Engineering Construction Multimodal
Engineering Construction Agreement CSX Agreement CSX
Procurement : Agreement : Railroad
Engineering Construction Agreement New Railroad Engineering Construction Multimodal
Agreement New Jersey Transit
Jersey Transit
Procurement : Agreement : Railroad
Engineering Construction Agreement New Railroad Engineering Construction Multimodal
Agreement New York Susquehanna
York Susquehanna
Procurement : Proposal : Rating Form and Rating Form and Checklists Procurement - Professional
Checklists Services
Procurement : Proposal : Rating Program for Rating Program for Technical Procurement - Professional
Technical Proposals Proposals Services

Concept Development : Report : Reasonable Reasonable Assurance for a Design Project Management
Assurance for a Design Exception Exception

Procurement : Agreement : Recommendation of Award Project Management


Recommendation of Award

Design : Report : Record of Decision (ROD) Record of Decision (ROD) Environmental

Correspondence : Department Action : Recording Slip Right of Way


Recording Slip

Correspondence : Department Action : Referral form (AD-37) Utilities


Referral form (AD-37)

Design : Permit : Reforestation Application Reforestation Application Environmental

: Regional Administration Regional Administration


: Regional Database Regional Database
Design : Report : Reinforcing Steel Inspection Reinforcing Steel Inspection Report
Report (LB-137) (LB-137)
Construction : Report : Release of Liens for Release of Liens for Materials Construction
Materials Stored (DC-149) Stored (DC-149)
Financial : Audit : Relocation Audit Relocation Audit Right of Way
Financial : Audit : Relocation Record (call Relocation Record (call data) Right of Way
data)
Design : Report : Remedial Investigation Remedial Investigation Report Environmental
Report

Design : Report : Remedial Investigation Remedial Investigation Report


Report

Construction : Report : Report for Application Report for Application of Construction


of Bituminous Materials (DC-26) Bituminous Materials (DC-26)

Design : Report : Report of Analysis of Report of Analysis of Aggregate (LB-


Aggregate (LB-9) 9)
Design : Report : Report of Analysis of Pipe Report of Analysis of Pipe (LB-114)
(LB-114)
Design : Report : Report of Analysis of Report of Analysis of Portland
Portland Cement (LB-5) Cement (LB-5)
Design : Report : Report of Analysis of Report of Analysis of Reinforcing
Reinforcing Metal (LB-10) Metal (LB-10)
Design : Report : Report of Progress and Report of Progress and Inspection
Inspection of Structural Materials (LB-142) of Structural Materials (LB-142)
Design : Report : Report of Title Report of Title Right of Way
Design : Report : Report of Ultrasonic Test Report of Ultrasonic Test (LB-279)
(LB-279)
Construction : Report : Request for Approval Request for Approval to Sublet (DC- Construction
to Sublet (DC-18a, b, d) 18a, b, d)
Design : Report : Request for Certificates of Request for Certificates of
Compliance (LB-232) Compliance (LB-232)
Design : Report : Request for Certificates of Request for Certificates of
Compliance (Steel) (LB-2325) Compliance (Steel) (LB-2325)
Construction : Report : Request for Field Request for Field Survey Personnel Construction
Survey Personnel (DC-112) (DC-112)
Design : Report : Request for Inspection Request for Inspection (Steel) (LB-
(Steel) (LB-168S) 168S)
Design : Report : Request for Inspection Request for Inspection Information
Information (LB-168) (LB-168)

Financial : Billing : Request for Overtime Request for Overtime Budget


Correspondence : Department Action : Request for Travel Authorization Budget
Request for Travel Authorization

Construction : Report : Resident Engineer's Resident Engineer's Bi-Weekly Construction


Bi-Weekly Status Report (DC-156) Status Report (DC-156)
Construction : Report : Resident Engineer's Resident Engineer's Final Status Construction
Final Status Summary (DC-155) Summary (DC-155)

Correspondence : Approval or Concurrence : Resolution of Award Construction


Resolution of Award

Correspondence : Approval or Concurrence : Resolution of Disputes and Claims Construction


Resolution of Disputes and Claims

Correspondence : Approval or Concurrence : Resolution of Support


Resolution of Support

Correspondence : Approval or Concurrence : Resolution of Support


Resolution of Support

Correspondence : Request for Information : RFI (from Contractor)


RFI (from Contractor)

Correspondence : General Project


Correspondence? : Right of Entry Right of Entry Negotiations Right of Way
Negotiations

Correspondence : General Project


Correspondence? : Right of Entry Site Parcel Right of Entry Site Parcel Right of Way

Correspondence : General Project Right of Entry No fee Right of Way


Correspondence? : Right of Entry No fee

Procurement : Agreement : Right of Entry Right of Entry Pending Agreement Right of Way
Pending Agreement

: Right of Way and Access Right of Way and Access Right of Way
: Right of Way and Access Right of Way and Access Right of Way

: Right of Way Authorization Right of Way Authorization Right of Way

Design : Drawing / Plan : Right of Way Impact Right of Way Impact Plan Right of Way
Plan

Design : Drawing / Plan : Right of Way Plans Right of Way Plans and Documents Right of Way
and Documents

Design : Report : Right of Way Report Right of Way Report Right of Way

: Right of Way Services Right of Way Services Right of Way

Design : Permit : Riparian License Application Riparian License Application Environmental

: Risk Register Risk Register Project Management

Design : Report : Risk Report Risk Report Project Management


: Roadway Engineering Roadway Engineering Roadway

: Roadway Engineering Roadway Engineering Roadway

Design : Report : Rockfall Hazard Mgt Sys Rockfall Hazard Mgt Sys Report
Report
Design : Report : Rolling Straight Edge Report Rolling Straight Edge Report (LB-
(LB-315) 315)
Correspondence : Department Action : Routing Slip Right of Way
Routing Slip
Design : Report : ROW Environmental ROW Environmental Reevaluations Environmental
Reevaluations
Design : Report : Safety Inspectors Reports Safety Inspectors Reports
Design : Report : Safety Mgt Sys Report Safety Mgt Sys Report

Correspondence : Approval or Concurrence : Sample Job Description Form Procurement - Professional


Sample Job Description Form Services

Design : Report : Samples to be Charged to Samples to be Charged to


Contractor (LB-23) Contractor (LB-23)
: Scenic Byway-Program Scenic Byway-Program
Design : Report : Schedule Schedule
Construction : Report : Schedule of ESBE/DBE Schedule of ESBE/DBE Participation Construction
Participation
Construction : Report : Schedule of SBE Schedule of SBE Participation Construction
Participation

Correspondence : Meeting Minutes : Scope Scope Team Meeting Minutes


Team Meeting Minutes
: Scored Proposals Scored Proposals

Design : Report : Scour Analysis Scour Analysis Environmental

Correspondence : Approval or Concurrence : Section 106 Consultation letter Environmental


Section 106 Consultation letter

Correspondence : Approval or Concurrence : Section 106 Memorandum of


Section 106 Memorandum of Agreement- Agreement- Cultural Resource Environmental
Cultural Resource Document Document

Design : Permit : Section 4(f) Section 4(f) Environmental

Design : Report : Seismic Retrofit Analysis Seismic Retrofit Analysis

Correspondence : Approval or Concurrence : Service Electric Utilities


Service Electric

Design : Drawing / Plan : Shop Drawings Shop Drawings


Design : Report : Sign Structure Form and Procurement - Professional
Sign Structure Form and Checklist
Checklist Services

Procurement : Agreement : Signed Contract Signed Contract

Design : Report : Site Investigation Report Site Investigation Report Environmental

Design : Report : Site Survey (business & Site Survey (business & individual) Right of Way
individual)
Procurement : Proposal : Small Construction Small Construction Project Request
Project Request for Proposal for Proposal
Design : Report : Smart Growth Mgt Sys Smart Growth Mgt Sys Report
Report

Design : Report : Socio-Economic Study Socio-Economic Study Environmental

Design : Report : Socioeconomics/EJ Field Socioeconomics/EJ Field Visit Environmental


Visit Checklist Checklist

Correspondence : Certification : Soil Erosion Soil Erosion and Sediment Control Environmental
and Sediment Control Certification – Design Certification – Design

Design : Drawing / Plan : Soil Erosion and Soil Erosion and Sediment Control Environmental
Sediment Control Plans Plans

Design : Report : Soil Erosion and Sediment Soil Erosion and Sediment Control Environmental
Control Report Report

Design : Report : Soil Field Test Report (LB- Soil Field Test Report (LB-136) Environmental
136)
Correspondence : General Project Solicitation Letter
Correspondence? : Solicitation Letter

: Solicitation Package Solicitation Package

: Source Disclosure Source Disclosure

Correspondence : Approval or Concurrence : South Jersey Gas Utilities


South Jersey Gas

: Special Provisions Special Provisions


Design : Permit : Special Use Permit-Permit Special Use Permit-Permit
: Specification Specification Multimodal

Correspondence : Approval or Concurrence : Sprint Utilities


Sprint

Correspondence : Meeting Minutes : Staff Staff Meeting Minutes


Meeting Minutes

: Stakeholder Input Stakeholder Input

Correspondence : Meeting Minutes : Stakeholder Meeting Minutes


Stakeholder Meeting Minutes

Procurement : Agreement : Standard Terms Standard Terms and Conditions of Procurement - Professional
and Conditions of Agreement Agreement Services
Correspondence : General Project Start of Construction Written
Correspondence? : Start of Construction Multimodal
Notification
Written Notification
Design : Permit : State Agriculture State Agriculture Development
Development Commission-Permit Commission-Permit
: State Aid Handbook State Aid Handbook Multimodal
: State Aid Rating Sheet Guidance State Aid Rating Sheet Guidance

Correspondence : General Project


Correspondence? : State Aid Rating Sheets State Aid Rating Sheets

Design : Report : State Approved Material State Approved Material Release


Release (LB-167) (LB-167)
Design : Permit : State House Commission State House Commission Approval
Approval for Green Acres Parcels for Green Acres Parcels
Financial : Funding (includes job number) : State of NJ W-9 Form Procurement - Professional
State of NJ W-9 Form Services
Procurement : Proposal : Statement of Joint Statement of Joint Venture
Venture
Procurement : Agreement : Statement of Procurement - Professional
Statement of Joint Venture Form
Joint Venture Form Services

Construction : Report : Status of Construction Status of Construction Projects Construction


Projects Update Form (DC-114) Update Form (DC-114)

Financial : Expense : Stock Transfer (PS-17) Stock Transfer (PS-17)

Design : Report : Structural Design Structural Design Recommendation Environmental


Recommendation Summary Summary

: Structural Engineering Structural Engineering Structures

: Structural Engineering Structural Engineering Structures

Correspondence : Memo : Subject Matter Subject Matter Expert


Expert Recommendation Recommendation

Procurement : Agreement : Subordination Subordination Agreement Right of Way


Agreement (corporate & individual) (corporate & individual)

Construction : Report : Substantial Substantial Completion Inspection Construction


Completion Inspection

Design : Report : Subsurface Utility Subsurface Utility Engineering (SUE) Procurement - Professional
Engineering (SUE) Services

Design : Report : Subsurface Utility Subsurface Utility Engineering Test


Engineering Test Pit Report Pit Report
Design : Report : Summary Documentation- Summary Documentation-Cultural Environmental
Cultural Resource Document Resource Document

Concept Development : Report : Summary Summary Independent Cost


Independent Cost Estimate Report Estimate Report

Financial : Report (includes STIP, etc.) : Summary Independent Cost


Summary Independent Cost Estimate Report Estimate Report

Procurement : Proposal : Summary of Summary of Telephone Quotations


Telephone Quotations (PB-119) (PB-119)

Correspondence : Approval or Concurrence : Sunesys Utilities


Sunesys

Construction : Report : Supervising Supervising Construction Engineer's Construction


Construction Engineer's Final Status Final Status Summary (DC-157)
Summary (DC-157)
Correspondence : Certification : Surety's Surety's Disclosure Statement &
Disclosure Statement & Certification Certification
Financial : Report (includes STIP, etc.) : Surety's Financial Balance Sheet
Surety's Financial Balance Sheet
Correspondence : Certification : Surety's Surety's Power of Attorney
Power of Attorney
Financial : Invoice : Surplus Property Surplus Property Transmittal of
Transmittal of Income (PS-81) Income (PS-81)
Procurement - Professional
Design : Drawing / Plan : Surveying Surveying Services

Concept Development : Report : Systems Systems Engineering Review Form


Engineering Review Form

Construction : Report : Table of Contents Table of Contents Construction


: Tabulation of Bids Tabulation of Bids Multimodal
Construction : Report : Tabulation of Working Tabulation of Working Days (DC-23) Construction
Days (DC-23)
Procurement : Proposal : Task Order Task Order Agreement Proposal Environmental
Agreement Proposal Request-Task Order Request-Task Order
Procurement : Proposal : Task Order Average Task Order Average Form Procurement - Professional
Form Services
Procurement : Proposal : Task Order Task Order Checklist-Task Order Environmental
Checklist-Task Order
Procurement : Agreement : Task Order Form Task Order Form for Cost Plus Fixed Procurement - Professional
for Cost Plus Fixed Fee Agreements Fee Agreements Services
Procurement : Agreement : Task Order Form Task Order Form for Fixed Price Procurement - Professional
for Fixed Price Term Agreements Term Agreements Services
Correspondence : Memo : Task Order Task Order Submittal Memo-Task Environmental
Submittal Memo-Task Order Order
Procurement : Proposal : Task Order Task Order Template Right of Way
Template

Design : Report : Technical Environmental Technical Environmental Studies Environmental


Studies

Concept Development : Report : Technical Technical Proposal


Proposal

Procurement : Proposal : Technical Proposal Technical Proposal Posting Request Procurement - Professional
Posting Request Memo Memo Services
Procurement : Proposal : Technical Proposal Technical Proposal Tracking One Procurement - Professional
Tracking One Step Process Step Process Services
Procurement : Proposal : Technical Proposal Technical Proposal Tracking Two Procurement - Professional
Tracking Two Step Process Step Process Services

Correspondence : Memo : Technical Review Technical Review Memo


Memo

Design : Permit : Temporary Access Temporary Access Agreement Right of Way


Agreement
Correspondence : Memo : Tenant Tenant Notification Right of Way
Notification
Correspondence : General Project Tenant Relocation Benefits Letter
Correspondence? : Tenant Relocation Right of Way
(RE-176)
Benefits Letter (RE-176)
Correspondence : Memo : Tenant Rent Tenant Rent Supplement Right of Way
Supplement
Construction : Report : Test Pile Report (DC- Test Pile Report (DC-92) Construction
92)
Design : Report : Threatened and Threatened and Endangered Environmental
Endangered Species Survey study Species Survey study

Design : Permit : Tidelands Grant Application Tidelands Grant Application Right of Way

: Tier 1 Screening Documentation Tier 1 Screening Documentation Project Management

: Tier 2 Screening Request Tier 2 Screening Request Project Management

Correspondence : Certification : Title Title Certification Right of Way


Certification

Correspondence : Request for Information : Title Check Order Right of Way


Title Check Order

Design : Report : Title Summary Document Title Summary Document Right of Way

Design : Drawing / Plan : Topographic Survey Topographic Survey Survey

Concept Development : Report : Traffic Traffic Analysis


Analysis

Design : Drawing / Plan : Traffic Control and Traffic Control and Staging Plans
Staging Plans
Concept Development : Report : Traffic Data Traffic Data

Procurement - Professional
: Traffic Engineering Traffic Engineering Services

Traffic Engineering Facility Locations Traffic Signal & Safety


: Traffic Engineering Facility Locations Engineering

Correspondence : General Project Traffic Signal & Safety


Correspondence? : Traffic Interference Traffic Interference Notices
Notices Engineering
Design : Report : Traffic Lighting Design Traffic Signal & Safety
Traffic Lighting Design Report
Report Engineering

: Training Training
Financial : Funding (includes job number) : Transfer of Funds Appropriation Budget
Transfer of Funds Appropriation
Financial : Budget : Transfer of Funds Transfer of Funds Expense Budget Budget
Expense Budget
Correspondence : General Project
Correspondence? : Transmittal Letter Transmittal Letter (various types) Right of Way
(various types)

Transportation Access Management Procurement - Professional


: Transportation Access Management Services
Procurement - Professional
: Transportation Data Collection Transportation Data Collection Services
Design : Drawing / Plan : Transportation Procurement - Professional
Demand Modeling Transportation Demand Modeling Services
Procurement - Professional
: Transportation Planning Transportation Planning Services

Concept Development : Report : Travel Travel Projections


Projections

Procurement : Agreement : TTF Swap MOU TTF Swap MOU

Correspondence : Certification : Two-Year Two-Year Chapter 51/Executive


Chapter 51/Executive Order 117 Vendor Order 117 Vendor Certification and
Certification and Disclosure of Political Disclosure of Political Contributions
Contributions form form
Design : Permit : U.S. Coast Guard (Bridge) U.S. Coast Guard (Bridge) Environmental

Design : Report : Updated Base Plans (With Updated Base Plans (With Identified Environmental
Identified Conflicts) Conflicts)
Planning : Report : Updated Highway Updated Highway Operational
Operational Improvement List Improvement List

Design : Report : Updated Preliminary Detour Updated Preliminary Detour and


and Construction Staging Plans Construction Staging Plans

Design : Report : Updated Project Updated Project Management Plan


Management Plan

Design : Report : Updated Project Updated Project Management Plan


Management Plan (Major Projects) (Major Projects)

: Updated PRS Updated PRS


: Updated Risk Register Updated Risk Register Risk

: Updated Risk Register Updated Risk Register Risk

: Updated Risk Register Updated Risk Register

: Updated Risk Register Updated Risk Register

Design : Report : Updated Utility Risk Updated Utility Risk Assessment Utilities
Assessment Plan Plan
: Updates to Problem Statement Database Updates to Problem Statement
Database

: Urban Aid Formula Spreadsheet Urban Aid Formula Spreadsheet


Design : Permit : USACE Jurisdictional USACE Jurisdictional Determination Environmental
Determination
Design : Permit : USACOE Section 10 USACOE Section 10 (Navigable Environmental
(Navigable Waters) Waters)
USACOE Section 404
Design : Permit : USACOE Section 404 (Individual/Nationwide) discharge Environmental
(Individual/Nationwide) discharge of fill of fill
Design : Permit : USACOE Section 9 (Dam or USACOE Section 9 (Dam or Dike) Environmental
Dike)
Procurement : Agreement : Use of Term Use of Term Agreements in the Procurement - Professional
Agreements in the Procurement of Procurement of Professional Services
Professional Services (No. 354) Services (No. 354)
Correspondence : Approval or Concurrence : USFWS Section 7 Endangered
USFWS Section 7 Endangered Species Environmental
Species Consultation
Consultation
Financial : Invoice : Utilities Utilities Utilities

Correspondence : Memo : Utility Acceptance Utility Acceptance Memorandum Utilities


Memorandum (Federally funded projects) (Federally funded projects)

Correspondence : Memo : Utility Acceptance Utility Acceptance Memorandum Utilities


Memorandum (State funded projects) (State funded projects)

Procurement : Agreement : Utility Utility Agreement Utilities


Agreement

Financial : Adjustment : Utility Agreement Utility Agreement Modification Utilities


Modification Change Order Change Order
Financial : Adjustment : Utility Agreement Utility Agreement Modification Utilities
Modification Construction Authorization Construction Authorization

Financial : Adjustment : Utility Agreement Utility Agreement Modification Utilities


Modification Construction Authorization JCPL Construction Authorization JCPL

Financial : Adjustment : Utility Agreement Utility Agreement Modification


Modification Construction Authorization Construction Authorization State Utilities
State Does Work Does Work
Financial : Adjustment : Utility Agreement Utility Agreement Modifications Utilities
Modifications

Design : Drawing / Plan : Utility Agreement Utility Agreement Plans, Utilities


Plans, Specifications and Estimates Specifications and Estimates

Correspondence : Certification : Utility Utility Authorization Utilities


Authorization

Design : Drawing / Plan : Utility Base Plans Utility Base Plans Utilities

Procurement : Agreement : Utility Change Utility Change Orders Utilities


Orders

Correspondence : Certification : Utility Utility Clearance Certification Utilities


Clearance Certification
: Utility Closeout Procedures Utility Closeout Procedures Utilities
Correspondence : Memo : Utility Utility Construction Memorandum Utilities
Construction Memorandum Full Oversight Full Oversight
Correspondence : Memo : Utility Utility Construction Memorandum Utilities
Construction Memorandum State State

Correspondence : Request for Information : Utility Contact Letter Utilities


Utility Contact Letter
Correspondence : General Project Utility Contact Letter Template -
Correspondence? : Utility Contact Letter Utilities
Consultant
Template - Consultant
Correspondence : General Project Utility Contact Letter Template - In
Correspondence? : Utility Contact Letter Utilities
House
Template - In House
Correspondence : General Project
Correspondence? : Utility Contractor Utility Contractor Approval Letter Utilities
Approval Letter

: Utility Engineering Utility Engineering Utilities

: Utility Engineering Utility Engineering Utilities

Procurement : Agreement : Utility Utility Engineering Construction Utilities


Engineering Construction Agreement AT&T Agreement AT&T
Procurement : Agreement : Utility Utility Engineering Construction Utilities
Engineering Construction Agreement JCP&L Agreement JCP&L
Procurement : Agreement : Utility Utility Engineering Construction
Engineering Construction Agreement Agreement Municipality Does Work Utilities
Municipality Does Work
Procurement : Agreement : Utility Utility Engineering Construction
Engineering Construction Agreement Agreement Municipality State Does Utilities
Municipality State Does Work Work

Procurement : Agreement : Utility Utility Engineering Construction Utilities


Engineering Construction Agreement Normal Agreement Normal

Procurement : Agreement : Utility


Engineering Construction Agreement Private Utility Engineering Construction Utilities
Agreement Private Pipe
Pipe
Procurement : Agreement : Utility Utility Engineering Construction
Engineering Construction Agreement South Agreement South Jersey Gas Utilities
Jersey Gas Company Company
Procurement : Agreement : Utility Utility Engineering Construction
Engineering Construction Agreement United Agreement United Telephone as Utilities
Telephone as Century Century

Financial : Funding (includes job number) : Utility Engineering Funding Utilities


Utility Engineering Funding Authorization Authorization
Design : Report : Utility Environmental Utility Environmental Reevaluations Environmental
Reevaluations

Planning : Report : Utility Inventory Utility Inventory Utilities

Design : Report : Utility Letter No. 2 Utility Letter No. 2 Utilities

Financial : Adjustment : Utility Master Utility Master Agreement Change Utilities


Agreement Change Order Order

Financial : Invoice : Utility Memorandum - Utility Memorandum - Utility Utilities


Utility Invoice Invoice
Financial : Funding (includes job number) : Utility Memorandum Additional
Utility Memorandum Additional Preliminary Preliminary Engineering Funding Utilities
Engineering Funding Request Request
Financial : Funding (includes job number) : Utility Memorandum Preliminary
Utility Memorandum Preliminary Utilities
Engineering Funding Request
Engineering Funding Request
Procurement : Proposal : Utility Owner Utility Owner Checklist Utilities
Checklist

Design : Report : Utility Owner Design Utility Owner Design Authorization Utilities
Authorization Checklist Checklist

Correspondence : General Project


Correspondence? : Utility Procedure 00109 - Utility Procedure 00109 - First Utilities
Notice
First Notice
Correspondence : Certification : Utility Utility Procedure 00110 - Utilities
Procedure 00110 - Certification Letter Certification Letter
Correspondence : Department Action : Utility Utility Procedure 00112 - Utility Utilities
Procedure 00112 - Utility Checklist Checklist
Correspondence : Department Action : Utility Utility Procedure 00113 - Utility Job
Procedure 00113 - Utility Job Number Number Closeout Revised Utilities
Closeout Revised Procedure Procedure
Correspondence : Department Action : Utility Utility Procedure 00209 - Private Utilities
Procedure 00209 - Private Pipeline Pipeline

Procurement : Agreement : Utility Procedure Utility Procedure 00210 - Master Utilities


00210 - Master Agreement Procedure Agreement Procedure

Correspondence : Department Action : Utility Utility Procedure 00211 - Steel


Procedure 00211 - Steel Poles in State Right- Poles in State Right-of-Way Utilities
of-Way
Correspondence : Department Action : Utility Utility Procedure 00212 - Contract Utilities
Procedure 00212 - Contract ID Numbers ID Numbers

Correspondence : Department Action : Utility Utility Procedure 00213 - Revised


Procedure 00213 - Revised Buckslips (AD37s) Buckslips (AD37s) for UECAs and Utilities
for UECAs and UAMCAs UAMCAs

Correspondence : Department Action : Utility Utility Procedure 00309 - Utilities


Procedure 00309 - Employment Modification Employment Modification

Correspondence : General Project


Correspondence? : Utility Procedure 00310 - Utility Procedure 00310 - PSE&G Utilities
Letter
PSE&G Letter
Correspondence : Department Action : Utility Utility Procedure 00311 - Revised Utilities
Procedure 00311 - Revised AD-37 AD-37
Correspondence : Department Action : Utility Utility Procedure 00312 -
Procedure 00312 - Agreement Date in lieu of Agreement Date in lieu of Contract Utilities
Contract ID Number ID Number
Correspondence : Department Action : Utility Utility Procedure 00313_1 - Revised
Procedure 00313_1 - Revised Close Out Close Out Procedures for Utility Utilities
Procedures for Utility Relocation Relocation
Correspondence : Department Action : Utility Utility Procedure 00410 - Utility Utilities
Procedure 00410 - Utility Website Website

Correspondence : Department Action : Utility Utility Procedure 00411 - PSE&G Utilities


Procedure 00411 - PSE&G Address Change Address Change

Correspondence : Department Action : Utility Utility Procedure 00510 - Verizon Utilities


Procedure 00510 - Verizon Address Change Address Change

Correspondence : Department Action : Utility Utility Procedure 00511 - Revised


Procedure 00511 - Revised Comcast Utilities
Comcast Information
Information
Correspondence : Department Action : Utility Utility Procedure 00609 - United Utilities
Procedure 00609 - United Telephone Telephone
Correspondence : Department Action : Utility Utility Procedure 00711 -
Procedure 00711 - Preliminary Engineering Preliminary Engineering Codes for Utilities
Codes for PSE&G Invoices PSE&G Invoices
Correspondence : Department Action : Utility Utility Procedure 00909 - SUNESYS Utilities
Procedure 00909 - SUNESYS
Correspondence : Department Action : Utility Utility Procedure 01009 - Clearance Utilities
Procedure 01009 - Clearance Letter Letter

Correspondence : Department Action : Utility Utility Procedure 01109 - Master Utilities


Procedure 01109 - Master Agreement Use Agreement Use

Correspondence : Department Action : Utility Utility Procedure 01209 - Utility Utilities


Procedure 01209 - Utility Notice Update Notice Update
Correspondence : General Project
Correspondence? : Utility Procedure 01309 - Utility Procedure 01309 - Utility Utilities
Contact List
Utility Contact List

Correspondence : Department Action : Utility Utility Procedure 01409 - AD12 Utilities


Procedure 01409 - AD12 AD37 Update AD37 Update

Correspondence : Department Action : Utility Utility Procedure 01509 -


Procedure 01509 - Betterment Modification Betterment Modification Update Utilities
Update
Correspondence : Department Action : Utility Utility Procedure 01609 - Executed
Procedure 01609 - Executed Agreement Agreement Letter Utilities
Letter
Correspondence : Department Action : Utility Utility Procedure 01709 - AT&T Utilities
Procedure 01709 - AT&T

Correspondence : Department Action : Utility Utility Procedure 01809 - Master Utilities


Procedure 01809 - Master Agreement List Agreement List

Concept Development : Drawing / Plan : Utility Risk Assessment Plan Utilities


Utility Risk Assessment Plan

Correspondence : General Project Utility Verification Request Letter -


Correspondence? : Utility Verification Utilities
Consultant
Request Letter - Consultant
Correspondence : General Project Utility Verification Request Letter
Correspondence? : Utility Verification Utilities
Template - In House
Request Letter Template - In House

: Value Engineering Requests Value Engineering Requests

Correspondence : Department Action : Various Department Actions (RE-27) Right of Way


Various Department Actions (RE-27)

Concept Development : Report : VE Technical VE Technical Report Value Engineering


Report

Design : Permit : Vegetation Canopy Vegetation Canopy Management Environmental


Management (Highway Occupancy Permit) (Highway Occupancy Permit)
Procurement : Agreement : Vendor Vendor Certification – Chapter 271
Certification – Chapter 271
Procurement : Agreement : Vendor Id Vendor Id Utilities

Procurement : Agreement : Verizon Verizon Utilities

Construction : Report : Wage Rate Wage Rate Inspections (DC-126) Construction


Inspections (DC-126)

Correspondence : General Project Waiver of Lease Right of Way


Correspondence? : Waiver of Lease

Design : Report : Weekly Report of Material Weekly Report of Material Analysis


Analysis (LB-135) (LB-135)

Design : Report : Wetland Delineation Report Wetland Delineation Report Environmental

Design : Permit : Wetlands Monitoring Plan Wetlands Monitoring Plan Environmental

: Wholly State funded project Attachments Wholly State funded project


Attachments

Correspondence : Memo : Withdraw Memo Withdraw Memo

Construction : Report : Work Status Form Work Status Form Right of Way

Construction : Drawing / Plan : Working Working Drawings Construction


Drawings
e document types (DocType), document subtypes
nd tagged with the correct metadata.

CPD Phase (proj Document Description


level)

Access Cut-Outs include the project work packages


FD that show the proposed revisions to existing
driveways affected by the project.

An Access Impact Assistance (AIA) Report details the


investigation, analysis and documentation of all site
FD impacts related to access alterations and provides
feasible mitigation measures.

Access Impacts Summary (AIS) includes the


identification of NJ State Highway Access
Management Code implications and the identification
PE and elimination of any potential “fatal flaw” access
issues. The AIS Identifies any warranted "waivers" to
the Access Code requirements with justifications.

Acquired Right of Way is the right of way purchased


FD by the Department that is needed to accommodate
the project’s proposed improvements.
Addenda are contract revisions or responses to a
CON Contractor's inquiry issued after advertisement and
before the opening of bids.
Determiniation from State Historic Preservation Office
CD (SHPO) about area of potential adverse effects of the
project.
Advertisement is the public announcement, as
CON required by law, which invites bids for construction
work to be performed.

POSSIBLE PROCESS - AD12, AD-37 Adv. Routing Slip,


Advertise Memo to Construction Services,
Advertisement Information Memo, Construction
Management Certification, Calcs Transmittal Memo,
CON Draft Advert Memo, FHWA Authorization Request to
Advertise, Geotech Report & Soil Boring Request, Key
Sheet Transmittal, Engineers Estimate notification for
Advertisement, Bid Opening Memorandum, Bid
Analysis, Ratable Categories, CI Budget
POSSIBLE PROCESS - The Authorization Package shall
FD be completed for the project’s construction
advertisement.

The Bureau of Construction Management shall


prepare the Advertising Memo and send it to the
CON Bureau of Construction Services Procurement by FAX
or e-mail no later than the Friday before the
scheduled advertisement date.

Aerial flights are conducted to obtain aerial photos of


topographic features within the project area. The
CD aerial photos are converted into 30, 50, 100 or 200
scale mapping for future use and can be used for PE
and Final Design.

PB120

No. 328
When required, the Designer or the Division of
Environmental Resources (DER) evaluates potential
impacts to air quality including hot spot carbon
monoxide analysis and Particulate Matter (PM) 2.5
and PM 10 analysis. If an Air Study is not required,
then the Designer or DER completes the air quality
PE section of the Categorical Exclusion Document (CED).
Some projects may require an air quality analysis. The
results of the air quality analysis will be completed
and incorporated into a CED or TES as appropriate.
The Division of Environmental Resources approves the
Air Quality Technical Environmental Study (TES).

Alternative analysis is performed to evaluate each


proposed alternative’s ability to address the project
need in compliance with design standards with
respect to safety, capacity, Context Sensitive Design
CD (CSD), the environment and operational
improvements. Alternative analysis may reveal there is
a need for revision, integration or elimination of
alternatives to assure consistency with environmental,
community and budget constraints.

Alternatives are developed as conceptual solutions by


the Task Order Consultant based on the data collected
and the ability to address the project need with
respect to safety, capacity, the community and
CD environmental and operational improvements.
Information from meetings with local
officials/internal and external stakeholders is
considered in the development of the Alternatives.

An Alternatives Analysis Report clearly indicates the


reasons for developing the range of the alternatives,
why the alternative(s) were eliminated from
consideration, and why they do not meet the purpose
PE and need of the project. The “No Action Alternative”
(which may include short-term minor activities)
should be included to serve as a baseline for
comparing all other alternatives developed.

An Alternatives Matrix assesses the impacts of the


developed Alternatives. The potential impacts of each
Alternative may include environmental, right of way,
CD utilities, access, drainage, storm water management
and socio-economic factors, bicycle compatibility,
constructability, design exceptions etc.
An Alternatives of Accommodation Plan confirms the
proposed utility accommodation with each utility
FD company. On complex projects where multiple utilities
may be in conflict, a Utility Master Plan that overlays
all utilities present within the project area is prepared.

LB-16

LB-17

LB-3

LB-65

LB-201

LB-18

LB-281

LB-14

LB-280

MT 33A

MT 120A
An Approved Annual Financial Plan (Major Projects)
includes the updated and FHWA approved Project
Financial Plans for Major Projects, as required by
CON FHWA regulations. In accordance with FHWA
regulations, a Financial Plan must be completed for a
project that is estimated to cost $100,000,000 or
more.

The Approved Project Plan (APP) is the advancement


and approval of the Preliminary Preferred Alternative
(PPA) developed during the Concept Development
phase (CD). The APP selection is based on alternative
analysis comparisons and provisions of a reasonable
PE cost for derived benefits that satisfy the problem
statement. This plan will incorporate detailed
environmental analysis and input as obtained in the
Preliminary Engineering phase. The PPA as established
in the Concept Development phase may address and
provide adequate detail for consideration as the APP.

An Asbestos Survey is performed on all buildings that


are scheduled for demolition in a given project when
the property in question has been acquired or a Right
FD of Entry has been obtained. The presence of asbestos
requires remediation. The Right of Way (ROW) District
Office notifies the Project Manager if an asbestos
survey is necessary.

DC-177
As-built roadway and or bridge plans are obtained
from NJDOT’s Configuration Management Unit for
state owned roads and from other outside agencies
for non-state owned roads. Other plans
(rehabilitation/reconstruction/development) may also
CD be obtained within the project study area from
outside sources including NJDOT, Municipal and
County offices, developers, businesses, utility
companies and others sources as pertinent to the
project.

As-built plans are a set of drawings that represent the


actual built environment upon completion of the
CON project, which also lists the quantities and contract
items.

As-Built Plans are existing plans that depict the


PS original alignment, right of way, and jurisdiction of the
problem in question.

The As-Built Summary (DC-104), completed by the


Resident Engineer, lists the as-built quantities to assist
CON in preparation of the as-built plans. The As-Built
Summary also lists the original Contract Quantities to
be compared to the as-built quantities.

T-MT-1291(A)

Utility Companies Assurance Plan

DC-150

DC-150U

For federally funded construction projects, FHWA


grants Authorization to Advertise upon approving the
FD Advertising Authorization Package. For state funded
construction projects, an AD-12 is circulated for
signature to grant Authorization to Advertise.
The Bureau of Construction Services Procurement
CON shall post on the Department's website the results of
the bid selection process.

The contract is awarded to the lowest bidder. The


Project Manager sends the award memo to the
CON Bureau of Construction Services Procurement
announcing the selected Contractor.

Base maps depict in detail the required existing


topography including the mainline and secondary
PE road baselines and existing right of way deed search
results.

DC-176

The Department reviews bids for conformity with the


CON Contract and compares bids on the basis of the
correctly determined summation. The Department
makes the total bid amount for all bids available.
The Bureau of Construction Services Procurement
CON shall organize and tabulate the bids so that they are
ranked by cost and can be compared across bid items.

Bids are the submissions by contractors that outline


each contractor's proposed cost for completing the
advertised work. Bids also include the process by
CON which the Department manages the submission of
bids for advertised work from an individual, firm, or
corporation.

The Bureau of Construction Services Procurement


shall post the project within BidX, the Department's
CON electronic bidding process program, to allow for the
submission of bids.

The Capital Program Support - Program Systems


Management shall post the project addenda within
CON BidX, the Department's electronic bidding process
program, to allow bidders to electronically
acknowledge the posted addenda.

DC-27

A Boring and In-Situ Testing Layout Plan shows the


location of borings and the in-situ testing required to
initiate the subsurface explorations. The plan may also
include geophysical and geologic surveys. The Boring
FD and In-Situ Testing is used to evaluate foundation
support, settlement, slope stability and ground water
conditions and determines the general geology of the
project site.

Boring Contract Specifications include the number,


location and depth of borings, the depth and types of
FD samples and the in-situ testing required to initiate the
subsurface explorations.

The Boring Data Submission consists of the boring


logs, boring location plans, in-situ testing and other
investigative analysis, as well as foundation type
selection. The boring data is submitted to the
FD Geotechnical Engineering Unit according to the Boring
Data Submission Template and Standards located on
the NJDOT Geotechnical Data Management System
(GDMS) website.
Provides access to certain predefined corporate
reports.

DC-17U

Utility Companies Assurance Plan

The CPSC Package is prepared by the Project Manager


at the request of the Director of Capital Investment
Planning and Development with a request for
placement on Capital Program Screening Committee
PS Agenda. The package includes but is not limited to the
following: - Location Map - A Presentation of the
recommendation - Preliminary cost estimate - Project
Charter

Based on the recommendation from the Capital


Program Screening Committee, the Capital Program
PE Committee evaluates and grants approval to prepare
the Final Environmental Impact Statement.

The CPSC provides their approval to advance the


proposed project to the PE phase. The Project
CD Manager signs and approves the CD Quality
Certification upon receipt of CPC approval to advance
the project to the PE phase.

The Capital Program Committee (CPC) approves the


recommendations of the Capital Program Screening
PS Committee to advance the project to the Concept
Development phase.
The Division of Project Management presents the
screening to the Capital Program Screening
Committee (CPSC) for a recommendation on
PS advancement to the Concept Development (CD)
phase. The CPSC will recommend that the project
advance to the CD phase or terminate the proposed
project.

The Project Manager prepares a memo for the Capital


Investment Planning and Development (CIPD)
Executive Director once BLAES, FHWA, the Designer
and other SME units select a final alternative for
PE inclusion in the Final Environmental Impact
Statement. The CPSC provides their recommendation
for advancement to the Project Manager and
forwards their recommendation to the CPC for
approval.

LB-196

A Categorical Exclusion Document is an environmental


PE document for projects that do not involve significant
environmental impacts.

The Task Order Consultant prepares a Fee Proposal


based on the CD Scope Statement. The CD Fee
CD Proposal is negotiated between the Project Manager
and the Task Order consultant.

The Task Order consultant prepares photogrammetric


CD base mapping, as required. Level 1 mapping is
typically created for the Concept Development phase.

The CD Public Involvement Action Plan is developed


by the Project Manager in coordination with the
Division of Community and Constituent Relations
(CCR). It identifies the critical points for public
CD involvement, and the objectives for each point. The
goal of the PIAP is to solicit thorough public
involvement as early as possible to achieve
community ownership in the proposed project.

A Right of Way (ROW) and Access Impact Cost


Estimate is prepared by the ROW Regional Office for
CD the purpose of obtaining the ROW funding needs of
the Preliminary Preferred Alternative (PPA).

The CD ROW and Access Impact Plan shows the


affected properties , the area of the proposed right of
CD way takings, the type and use of properties and
potential easements needed for the Preliminary
Preferred Alternative(PPA).
The CD ROW and Access Plan and Matrix lists the
Block and Lot, indicating the type of acquisition
(partial, entire or easement) the amount of property
CD to be acquired, the existing use of the property (e.g.
residential, commercial, industrial) and access impacts
(adjustment, modification, revocation waiver) for the
Preliminary Preferred Alternative (PPA).

The Task Order consultant submits a schedule defining


project milestones and tasks in terms of weeks to
complete the Concept Development phase. When the
CD Task Order Agreement is ready to be executed, the
schedule is updated to include anticipated completion
dates.

The CD Scope Statement lists the anticipated work for


a project and includes details of the project
CD deliverables and a description of the limit of scope of
the project to the extent known at the inception of
the Concept Development phase.

Utility Companies Assurance Plan

The Certification of Completion (DC-20) is the form


prepared by the Regional Construction office at the
CON request of the Resident Engineer that certifies to the
Contractor that the project is contractually complete.

Road, Bridge, Contractor Personnel (i.e. SAT, ACI,


welding, etc.)
There are a number of certifications and clearances
needed in support of the project's certified plans,
specifications and estimate. Typical certifications and
clearances include: Designer's Certification, Project
Management Division Certification, Soil Erosion and
FD Sediment Control Certification, Right of Way
Clearance Letter, Utility Clearance Letter, and
Environmental Reevaluation and Checklist. For 100%
state funded projects, an Environmental Reevaluation
and Checklist is not needed.

After bids are received on an individual project, the


Bureau of Construction Services Procurement certifies
the individual bid prices that make up each
contractor’s total bid. The Office of Information
Technology group then loads this information onto
CON the Mainframe Computer. Once this has been
completed, Construction Management produces a
Line Item Profile Report for that project for use in the
bid analysis if needed. Construction Management also
files a hard copy into the Master Line Item Profile files.

A Certified Categorical Exclusion Document is a


certification by NJDOT that the project meets certain
conditions and criteria that will not result in significant
environmental impacts. A Certified CED document
PE does not require a formal submission to the FHWA to
request FHWA concurrence in accordance with a
Memorandum of Agreement and Memorandum of
Understanding with the FHWA, NJDOT and NJDEP.

The Plans, Specifications and Estimate (PS&E) package


is prepared in response to comments received from
project stakeholders on the project’s final design
FD submission package. The project’s PS&E package shall
be certified by the Department. Certification of the
package proceeds upon receipt of the designer’s
plans, specifications, and estimate package.

Change Orders are written orders from the


CON Department provided to the Contractor that modifies
the Contract.
Changed Field Conditions includes contractual
CON changes based on existing field conditions.
Contractor Claim, Tort Claim

Utility Companies Assurance Plan

Communications include the formal flow of project


CD information that shall be carried from Concept
Development through to Construction.

The flow or exchange of information during the


PE design, the development and the construction of the
project between internal and external stakeholders.

Communications encompasses deliverables associated


with communicating project information to internal
and external project stakeholders, such as public
FD officials, the general public, outside agencies, internal
management, subject matter experts, and project
consultants.

Communications encompasses deliverables associated


with communicating project information to internal
and external project stakeholders, such as public
CON officials, the general public, outside agencies, internal
management, subject matter experts, and project
consultants.

A Community Profile is developed by the Division of


Project Management or the Task Order Consultant to
include U.S. Census demographic data for the study
area to determine the characteristics of the affected
area, neighborhood boundaries, locations of
CD residences and businesses, demographic and
economic information and land use patterns. The
Community Profile is utilized for the development of
the Public Involvement Action Plan and the
stakeholder list.

Community Relations includes the development and


implementation of the project’s public involvement
FD action plan (PIAP). Some common elements of those
plans include official’s briefings, public information
centers, public workshops and hearings.
The Complete Streets Checklist is used by Project
Managers and designers throughout Concept
Development and Preliminary Engineering to ensure
that all developed alternatives reflect compliance with
the Complete Streets Policy. Being in compliance with
the policy means that Project Managers and designers
plan for, design, and construct all transportation
CD projects to provide appropriate accommodation for
bicyclists, pedestrians, and transit users on New
Jersey’s roadways, in addition to those provided for
motorists. The Project Manager is responsible for
completing the checklist and must work with the
Designer to ensure that the checklist has been
completed prior to advancement of a project to Final
Design.

The Complete Streets Checklist is used by Project


Managers and designers throughout Concept
Development and Preliminary Engineering to ensure
that all developed alternatives reflect compliance with
the Complete Streets Policy. Being in compliance with
the policy means that Project Managers and designers
plan for, design, and construct all transportation
PE projects to provide appropriate accommodation for
bicyclists, pedestrians, and transit users on New
Jersey’s roadways, in addition to those provided for
motorists. The Project Manager is responsible for
completing the checklist and must work with the
Designer to ensure that the checklist has been
completed prior to advancement of a project to Final
Design.

EMS

Concept Development Approvals includes PE Scope of


Work Approval, CD Report Approval by FHWA, and
CD Capital Program Screening Committee presentation
and approval.
Upon approval of the CPC to advance the proposed
project from the Problem Screening phase to the
Concept Development (CD) phase, a Division of
Project Management Project Manager is assigned the
CD proposed project to initiate CD. The Project Manager
is responsible for managing the Scope of Work,
Project Schedule, Task Order Budget, Funding,
Mapping Level, Resource Determination, Consultant
Evaluation, and Project Reporting System Updates.

The Concept Development Quality Certification is


signed and submitted by the Task Order consultant
certifying the work has been completed in accordance
CD with the CD Scope Statement and in accordance with
the current Department Quality Management Process
and Procedures, and applicable State and Federal
design standards and requirements.

The Concept Development Report is prepared from


the CD Report template that includes all support
information used to develop the Preliminary Preferred
Alternative (PPA). It is compiled as a package
CD describing the problem, the collected data, the
findings and evaluation of all alternatives that were
developed and the PPA and other documented
information associated with the project location.

A Concept of Operations Report is required for


Intelligent Transportation System (ITS) deployments
CD that are not covered as part of the programmatic
conformance process.

The Designer or Bureau of Landscape Architecture


and Environmental Solutions (BLAES) develops various
FD alternatives to mitigate wetland impacts. These
various alternatives are the Conceptual Wetlands
Mitigation Plans.

LB-47

DC-83
Updated Preliminary Detour and Construction Staging
Plans and related information are submitted to
Construction Management, Traffic Operations and the
Regional Maintenance Engineer for a constructability,
maintenance and traffic impact review. The desired
PE result is to incorporate the review comments to
potentially reduce the duration of construction,
develop a reasonable construction cost estimate and
ensure the project can be constructed while
maintaining public safety.

Construction personnel review the Preliminary


Preferred Alternative (PPA) and provide comments for
the purpose of improving construction methods and
CD construction staging to identify options or methods
that could reduce the construction duration and refine
the construction cost estimate.

The Department has the right to make changes to the


Work at any time, including altering the Contract,
altering the requirements of an Item, increasing or
CON decreasing the quantities of any Item, or deleting any
Item. Such changes neither invalidate the Contract,
nor release the Surety. The Contractor agrees to
perform the work as changed.

Construction Completion includes the series of action


CON items that shall be performed to obtain final approvals
and achieve project closeout.

A construction cost estimate is a detailed estimate


based on knowledge and information obtained in the
PE PE Phase with input and concurrence of Subject
Matter Expert units.

A detailed Construction Cost Estimate shall be


completed for the project, for use in comparing the
FD bids eventually received from prospective
construction contractors.
Construction Cost Estimates are prepared for each
Alternative with the same base assumptions applied
CD to each. As a minimum, the Construction Cost
Estimates shall include the costs of Construction, Right
of Way and Utilities.

FD

Construction Initiation encompasses deliverables


associated with the development, implementation
and control of the project’s schedule, budget and
scope, including the solicitation for a contractor and
CON execution of a construction contract. The lead office
develops these project parameters as project baseline
documents in the early stages of Construction. The
baseline documents serve to help manage the
project’s development.

Construction Operations includes the physical


CON construction of work done in the performance of the
Contract within the Project Limits.

Construction Orders include any change of scope,


design or specifications that the Department, Regional
CON Construction Engineer, Field Manager, or Resident
Engineer may request of the Contractor.

A detailed construction schedule shall be completed


FD for use in identifying the project’s substantial
completion and final completion dates.

The Consultant Agreement is the fully negotiated and


executed contract between the NJDOT and the
consultant designer. The consultant agreement
CD includes the fee proposal, schedule and scope of
services of the work to be provided by the consultant
designer.
A Consultant Agreement Addendum is typically
needed to secure additional project support during
the next phase of project development (e.g., an
agreement addendum is issued when advancing from
Preliminary Engineering to Final Design, under the
FD same consultant agreement). The Construction
Engineering Addendum is the contract addendum
that provides additional funding for the same
consultant to continue from Final Design to
Construction Engineering.

Proposal, Agreement, Closeout, Evaluation, Invoice

No. 312

Notice to Proceed, Coversheet of Contract and Bond,


Table of Contents, Certificate of Award, Special
Provision, Addenda, Prevailing Wage Rate
Determination, New Jersey Department of
Transportation Code of Ethics for Vendors, Cost
Participation Breakdown, Contract - Form DC-81,
Payment Bond, Performance Bond

The Bidder shall acknowledge all addenda posted


through the Department's electronic bidding process
CON program before the opening of bids. The Department
will not accept the bid if the Bidder has not
acknowledged all addenda posted.

The Bureau of Construction Services Procurement


CON shall notify the selected Contractor of the
Department's selection.
Contractor Evaluation is performed by the Resident
Engineer on a yearly basis. It provides an objective,
CON consistent method for measuring consultant
performance.

DC-123

Contracts include Designer Selection, Consultant


Agreement, Contract Payables, Independent Cost
CD Estimate, Preliminary Engineering Budget, Consultant
Evaluation, Concept Development Closeout and the
Preliminary Engineering Schedule.

Contracts include the deliverables associated with the


development and execution of consultant design
PE agreements. This includes tasks associated with
modification of and closeout of the agreement.

Contracts includes deliverables associated with the


development, execution, and implementation of
project-specific agreements, such as consultant design
FD agreements and municipal police agreements. Tasks
associated with modification and closeout of those
agreements are also included.

DC-161

The Geodetic Survey approves a Control Survey


Report. The report consists of the control survey and
PE data required to establish primary and
photogrammetric control.

Coordination with Internal Stakeholders is obtained


through Scope Team Meeting (STM)/Core Group
Meeting (CGM) for internal stakeholders. External
CD Coordination meetings are planned with the
development of the Public Involvement Action Plan
(PIAP) for external stakeholders.

Coordination meetings are conducted through an


PS external stakeholders meeting and an internal Scope
Team Meeting (STM)/Core Group Meeting (CGM).

A Core Group Meeting could be a formal or informal


PS meeting with selected Subject Matter Experts to get
input about the problem and the possible solutions.
The Designer prepares Core Group Meeting Minutes
for all coordination meetings with internal and
external stakeholders including Department Subject
PE Matter Experts and local officials and agencies.
Important design decisions and agreements made
should be further documented in the project’s Design
Communications Report (DCR).

The purpose of the Core Group meeting minutes is to


document the important decisions of the Core Group
CD meetings. (All important decisions are to be
documented in the Design Communications Report).

General Incoming and Outgoing (Includes


Correspondance Log), Contractor Incoming and
Outgoing (Includes Correspondance Log)
A memo is sent to the Director of Capital Investment
Planning and Development (CIPD) once the final
Concept Development Report (CDR) is approved by
FHWA. The memo should state that the Concept
Development (CD) phase has been completed,
provide the appropriate recommendation for
assignment of the project, request to advance the
project to the Preliminary Engineering (PE) phase and
request placement on the next scheduled Capital
Program Committee Screening Committee
Meeting. The Capital Program Screening Committee
Request Package includes the following: 1. Location
CD Map 2. Presentation of the Preliminary Preferred
Alternative (PPA) 3. Statement of Community
Support 4. Construction, ROW, environmental
mitigation, utility relocation, PE and CE cost
estimates. 5. Identification of Major
Obstacles/Issues including constructability issues 6.
Recommendation for further action 7. Defined
Capital Investment Strategy - Division of Project
Management will forward approved memo, Screening
package to the Director of CIPD - The Director of CIPD
will place the project on the agenda of the next
Capital Program Screening Committee Meeting

The Project Manager presents the Preferred Project


Alternative (PPA) to the Capital Program Screening
CD Committee (CPSC). The CPSC forwards their
recommendation for advancement to the Capital
Program Committee (CPC) for approval.

A Crash Report/Analysis Request Form is completed


and sent to the Bureau of Safety Programs (BSP) to
request copies of crash data, rates, summaries and
CD details. Additionally, police crash reports may be
obtained if necessary for more details about the
causes of the crashes.

Crash Data includes a summary of crash data obtained


from the Bureau of Safety Programs for the most
recent (3) year period available. The crash data
PS consists of the crash rate for the roadway section, and
a crash rate for the statewide average of similar
roadways with similar typical sections.
A Crash Diagram is a plot all crashes from crash
reports and police records, if applicable. The cause of
the crashes and associated sub-standard features are
CD identified on the diagram. The information is used in
the development of the Purpose and Need Statement
and the preparation of the proposed Project Fact
Sheet.

Cultural Resources Mitigation Reports document the


project specific cultural resource mitigation design
measures being incorporated in the project design
plans and specifications. Depending upon the specific
FD cultural resource mitigation design measures being
proposed, various Cultural Resources Mitigation
Reports (e.g., Historic American Engineering Record)
may be prepared and submitted to the appropriate
agencies and interested parties.

A Cultural Resources Study includes the identification


and analysis, background research, interviews and
fieldwork for both archaeology and architectural
resources (which may be included on or be eligible for
the National Register of Historic Places leading to a
determination of effect pursuant to Section 106 of the
PE Historic Preservation Act). Consultation with the State
Historic Preservation Office (SHPO),
Interested/Consulting parties, the Advisory Council on
Historic Preservation (as needed) and the FHWA are
included in this effort. Appropriate measures are
established to mitigate adverse impacts including
mitigation needs and identifying mitigation lands.

DC-102

LB-64

DC-144
The Resident Engineer has the responsibility for
ensuring that the Daily Construction Report Form (DC-
3b) and weekly Progress Report Form (DC-24), or
CON Resident Engineer's Bi-Weekly Progress Report (DC-
156) is completed using the Automated Construction
Estimate System (ACES) as per procedure.

Data analysis includes analyzing and assessing the


traffic analysis, crash analysis, drainage and
management systems input. The data collected is
compared to current design standards. Substandard
CD features/deficiencies are analyzed and compared to
the transportation problem statement to determine if
they are contributing factors to the problem
statement.

Gather any additional data and information needed


but not obtained during the Tier 2 Screening or in the
initial CD activities. The data may include the
following: - As-Built plans - Drainage inventory - Base
Maps - Jurisdictional Maps and Agreements - ROW
and Access - Utility information - Environmental Data -
CD Bridge Inspection and Scour Reports - Intelligent
Transportation Systems information - Traffic Signal
Timing Plans - Maintenance Work Orders - Any
relevant reports from other agencies such as the
Metropolitan Planning Organization, County, Town,
etc.

Data Collection involves requesting the necessary data


needed to analyze the problem statement. Data
collection may include Management System Input,
PS crash data, as built plans, etc. A memo is prepared
requesting information of other projects, planned or
ongoing in the vicinity.

A De Minimis Section 4(f) Evaluation documents the


proposed project’s De Minimis impacts to historic
PE sites, recreation land, parkland, or wildlife and
waterfowl refuges. The agency having jurisdiction over
the resources must concur with the “De Minimis
finding.”

Consultant firms are entitled to PM comments via an


e-mail debriefing. Once the selection is posted,
CD consultant firms have five (5) days to request PM
comments. Requests received subsequent to the 5
day cut-off period are not honored.
May be Boxed with reference in file

The AD-12 is the Department Action Slip authorizing


CON the execution of the contract. Can be used for Close
out.

The Department completes the Department


Certification and submits to FHWA certifying that they
FD have managed the work on the project in accordance
with the current Department and FHWA Quality
Management Process and Procedures.

Design changes are made based on field observations


that may be requested by Regional Construction
CON Engineering forces, the Resident Engineer, or the
Contractor.
The Design Communications Report (DCR) documents
significant issues/critical decisions and agreements.
The DCR is signed by the Task Order Consultant and
approved by the Project Manager. The DCR Report is
CD a living document and is updated as decisions are
made throughout the CD phase (and all subsequent
project delivery phases to the completion of
construction).

The Design Communications Report (DCR) is a Quality


Management process required of all designers. The
DCR documents the significant issues/critical design
decisions and agreements made during design
development and the construction of a project. The
Designer creates DCR Entries in the project’s Design
PE Communications Report as design decisions are made
in accordance with the Interactive Communications
Procedure. The Designer submits DCR Entries to the
Project Manager for approval for the CD and PE
phases and to the DPM PM for the FD and
Construction phases.

The Design Communications Report shall be updated


during FD to further document significant
FD issues/critical decisions and provide clarity of design
decisions.

The Design Communications Report is established for


the project in Concept Development and receives
continual updates throughout the remainder of the
CON project’s development, through the Construction
Phase, to document coordination efforts completed
for the project, and the guidance and decisions
associated with those efforts.

DC-145

The Design Exception Report itemizes the existing


controlling substandard design elements that will
remain or be proposed in the project. The Design
Exception Report is prepared for controlling
PE substandard design elements within the proposed
construction areas of a project. The Design Exception
Report requires the approval of the FHWA on full
oversight and interstate projects.
The selected designer prepares a Fee Proposal
CD utilizing the PE Scope Statement and forwards it to
the Division of Project Management.
The Project Manager requests the consultant designer
CON submit a Final Invoice to close out the PE phase of
work.

The Memo of Record or Order documents the


discussions and decisions made at the Diagnostic
Team Meeting (DTM). The first DTM is held during
Preliminary Engineering. If the design of the roadway
FD has been altered significantly after the first DTM was
held or strong public opposition or comments are
presented, another DTM is held to address a possible
amendment to the Memo of Record or Order.

EMS

EMS

Drainage Area Maps are created based on the


watershed boundaries that contribute stormwater
CD runoff to the proposed project site by utilizing USGS
topographic maps, field reconnaissance survey and or
other available information.

The Drainage Inventory is field verified and


documented of all drainage features within the
project study area including but not limited to
CD drainage inlets, manholes, ditches, swales, streams,
floodplains/floodways, lakes, reservoirs, aquifers,
water wells, and existing “Storm water Management
Systems” (SWM) and others.

The identification and documentation of existing


PS drainage infrastructure including evidence of drainage
issues or flooding.
DC-19

An Ecology Study includes the evaluation and


documentation of potential impacts of the Preferred
Project Alternative to natural resources that include
surface and ground water quality, wetlands, water-
bodies, aquatic species and habitats, floodplains and
PE flooding, terrestrial species and habitats, and
threatened and endangered species. The Ecology
Study makes recommendations as to measures to
avoid, minimize or mitigate the impacts. The Division
of Environmental Resources approves the Ecology
Technical Environmental Study (TES).

Project Specific - Aero, Project Specific - Rail,


Construction
An Entire Tract Map is a plan used to show the
location of all parcels to be acquired and their
remaining area. This map shall be signed and sealed
FD by a New Jersey licensed surveyor and filed by
NJDOT’s Engineering Documents Unit in the County
courthouse where the deed was obtained.

On projects where the significance of environmental


impacts are not clearly established, the preparation of
an Environmental Assessment (EA) is required. An EA
is prepared, circulated, and commented on to make a
PE determination. If no significant impacts are
determined, then a Finding of No Significant Impact
(FONSI) is made by FHWA. If significant impacts are
identified, an Environmental Impact Statement (EIS) is
required.

Environmental Commitments/Plan Sheets are


construction plans and specifications that identify all
the sensitive environmental areas in the project
PE corridor that must be avoided and any commitments
that must be adhered to as a result of the
environmental process. Soil erosion and control
measures are included.

Environmental data collection is information gathered


to include wetland boundaries, floodplains, historic
CD facilities, land use, etc. This information is acquired
through photogrammetric/base mapping/field survey
on a large scale, such as 200 scale.

Environmental Documents include the Technical


Environmental Studies, Executive Order 215
document, Environmental Impact Statement,
PE Categorical Exclusion document, Self-Certified
Categorical Exclusion document, Environmental
Assessment and the Environmental Commitments
Plan Sheet(s).

Environmental Documents include deliverables


associated with the project’s environmental
evaluations and securing any needed environmental
FD clearances and approvals. It also includes activities
associated with incorporating the project’s
environmental commitments.
Projects requiring an Environmental Impact Statement
(EIS) have large scopes, require an evaluation of
design alternatives, and can potentially have
significant environmental impacts. 23CFR771describes
the types of projects that normally require an EIS.
PE Examples of projects requiring an EIS are a new
controlled access freeway and a highway project of
four or more lanes on new alignment. The EIS process
includes circulation of a Draft and Final EIS with a
mandatory comment period.

The identification and documentation of


PS environmental constraints.
A Notice of Construction is sent by the Office of
CON Environmental Solutions to the environmental
permitting agencies.

Based on the project's involvement with


environmental resources, certain environmental
clearances (usually in the form of permits or licenses)
FD are needed from state and/or federal environmental
resources agencies. Those clearances typically must
be obtained prior to advancing the project to the
construction stage.

Procurement

Procurement

Procurement

For federally funded projects, Environmental


Reevaluations (ER's) must be completed, at certain
stages of a project's development, in accordance with
federal environmental policies and procedures. After
completion of the project's original environmental
documentation, ER's are needed to secure additional
federal funding authorizations, such as right of way,
utilities and construction authorizations. ER's also are
FD needed when there is a change in the project's scope
and/or social, environmental and economic impacts.
ER's involve completion and approval of the
Department's Environmental Revaluation Form, which
assesses the project's current scope and associated
impacts, and identifies the project's current
environmental classification, as defined by federal
regulations.
Procurement

The Environmental Screening Report identifies and


documents potential environmental issues including
environmental constraints /sensitive areas (such as
wetland, parkland, cultural resources, hazardous
waste contaminated property, CAFRA, air/noise, socio-
economics, etc.). The Report determines a need for
SHPO and LURE involvement during CD or PE phases.
CD The alternatives developed during CD will be analyzed
against the environmental constraints documented in
the Environmental Screening Report. Additionally, the
potential PPA that has reasonable internal/external
buy in will be reevaluated by the Environmental
Project Support Unit to obtain assurance of the
anticipated environmental document classification.

The Environmental Summary Memorandum (ESM)


provides costs from the Property Acquisition
Environmental Cost Estimate (PAECE) Report and
indicates the appropriate environmental clause to be
FD used in the acquisition agreement. Once the PAECE
Report and ESM are sent to the appropriate ROW
District Office, the negotiations with the property
owner can begin.

An Executed Task Order Agreement is the contract


CD that authorizes a Task Order consultant to commence
work based on the scope of work, budget, and
schedule.

The Executive Decision Document (EDD document) is


prepared to request the approval of the Deputy
CD Commissioner. The EDD is signed by the Deputy
Commissioner when approving consultant selection.
An E.O. 215 is a comprehensive environmental
document approved by NJDEP exclusively for 100%
State-funded projects. The E.O. 215 assesses the
environmental impacts. An E.O. 215 EA is prepared for
PE projects with anticipated construction costs in excess
of $1 million (Level 1), or an Environmental Impact
Statement (EIS) for projects with construction costs in
excess of $5 million and land disturbance of five acres
(Level 2).

Existing Traffic Counts consist of Average Daily Traffic


counts, peak hour volumes or truck percentages
PS obtained from existing files and databases, if
available.

A field inventory of the study area will be conducted


to locate and document all visual evidence of existing
utility facilities such as the type of aerial facilities,
CD poles, risers, manholes, handholes, valve boxes, utility
vents, markers, etc. Also, verification or coordination
may be needed with Utility Owners and/or Railroads
to verify utilities.

FHWA completes an independent review of the PE


Report and Environmental Document and grants
PE approval, indicating it meets all requirements of
23CFR771, as applicable.

FHWA completes an independent review of the


CD Concept Development Report and approves the
report when the requirements of 23CFR771 are met.

FHWA certification shall be obtained on contracts with


CON Federal-Aid funding awarded by the State.
There are several required documents that must be
sent to FHWA, which include: Original LB-96 Material
Certification; Original fully executed Final Construction
Order without attachments but with the final cost
sharing distribution (DC-17/174); Original DC-123
Contractor's Final Certification of Compliance; Copy of
CON the final Certification of Cost; Copy of the AD-12
Department of Action Slip (Accepting the Project);
Form FA-8 - Contractor's Statement of Materials and
Labor; and written confirmation that the Final
Inspection Deficiencies noted by the FHWA have been
corrected, if applicable.

Utility Companies Assurance Plan

The Task order consultant arranges a field visit and


evaluates existing conditions. Roadway features are
CD inventoried and may include utilities, drainage,
environmental, geometric, ITS etc.

A verification and evaluation of existing conditions,


including utilities, drainage, environmental, ROW,
PS design deficiencies and observation of traffic
patterns / behavior within the limits of the problem
statement.

Field Orders are direction given to a Contractor to


CON proceed with work.

Final Acceptance Inspection is the review and


CON inspection of the work that required corrective actions
as identified during the Corrective Action Inspection.

Utility Close Out Procedure

Utility Close Out Procedure

Utility Close Out Procedure


Utility Close Out Procedure

All claims filed and force account work are subject to


audit at any time following the filing, whether or not
part of a suit pending in the courts of this State
pursuant to N.J.S.A. 59:13-1, et seq. The audit may
begin after the Department has given 15-day notice to
CON the Contractor, subcontractor, or supplier. If an audit is
to be commenced more than 60 days after
Acceptance, the Department will provide the
Contractor with reasonable notice of the time when
such audit is to begin.

The Final Construction Cost Estimate shall be


FD completed for use in comparing the bids eventually
received from prospective construction contractors.
The detailed Final Construction Schedule shall be
FD completed for use in identifying the project’s
substantial completion and final completion dates.

A Final Design Addendum is executed to allow the PE


Designer to continue to provide design services for
PE NJDOT within the FD Phase. The Final Design
Addendum provides additional funding to the original
agreement executed for the PE Phase.

Final Design Approvals encompasses deliverables


associated with securing project-related approvals
from the Department’s Senior Management, including
FD such approvals as: (1) advancing the project to the
next major phase of development; and, (2) approval
of proposed changes in a project’s scope, schedule
and budget.

The Final Design Budget includes approval of a


PE baseline budget covering final design and approval of
proposed revisions to the baseline budget.
The Designer prepares a Fee Proposal utilizing the FD
PE Scope Statement and forwards it to the Division of
Project Management Project Manager.

An Independent Cost Estimate is an engineering man-


hour cost estimate that is developed by the
Department for consultant design services for projects
advancing into Final Design. The Division of Project
PE Management Project Manager requests that the
Office of Schedule and Budget Management develop
an Independent Cost Estimate (ICE) to compare to the
Designer’s fee proposal. The ICE will be used in
contract negotiations.
Final Design Initiation encompasses deliverables
associated with the development, implementation
and control of the project’s schedule, budget and
scope. The lead office develops these project
FD parameters as project baseline documents in the early
stages of project development. The baseline
documents serve to help manage the project’s
development.

The Final Design Public Involvement Action Plan is


prepared to identify critical points for public
involvement during the Final Design phase. It includes
PE as a minimum, the updating of the database of known
stakeholders, the number of anticipated meetings
with local officials, citizen groups and other outside
agencies impacted by the project.

The Final Design Schedule includes the approval of


PE the project’s baseline schedule covering final design
and approval of any proposed revisions.

The Designer prepares the Final Design Scope


Statement using a standard template. The Designer
updates the tasks to include and customize standard
PE activities and to add new activities to include all tasks
needed to conduct the Final Design phase of work. It
is also used to solicit a designer man–hour estimate
and fee proposal for the Final Design phase of work.

The Final Design Submission includes the project’s


final construction contract plans, specifications and
construction schedule and estimate. The plans
typically consists of the following types: (1) roadway,
FD (2) lighting, (3) traffic signing, striping, and signals, (4)
intelligent transportation systems facilities, (5)
landscape, (6) drainage, (7) structures, (8)
environmental, and (9) reforestation.

The Designer completes and submits the Final Design


Submission (FDS) Quality Management Certification to
the Department with the FDS Submission that states
they have performed the work on the project in
FD accordance with the current Department Quality
Management Process and Procedures, and the project
has been designed in accordance with all applicable
State and Federal design standards and requirements.

FD
The Final Design Supplemental Survey includes the
FD undertaking of any additional survey needed to
support the project’s final design development.

If additional Intelligent Transportation Systems (ITS)


facilities have been proposed since the latest Systems
Engineering Review Form (SERF) revision (either in
Concept Development or Preliminary Engineering), a
FD revised SERF shall be prepared to obtain approval
from Traffic Operations prior to submitting it to ITS
Engineering. The Systems Engineering Review Form
has been developed to document the development of
all ITS deployments.

The Final Drainage Design Report sets the scope of


FD the project’s drainage design for environmental
clearances and final plan development.

The Final Drainage Plans present the completed


design for the project’s drainage features, such as
FD proposed stormwater inlets and piping, stormwater
basins and outfall structures. Items to be constructed
are identified and quantified.

The project’s Final Environmental Plans provide


information on the environmental constraints,
FD impacts, mitigation and commitments included in the
project.

Final Horizontal and Vertical Geometry includes the


completion of the horizontal and vertical geometry
FD calculations, bridge geometrics, driveway profiles,
basins, layout & contours, roadway widths, and slopes
& ROW Impacts.

CON

The Final Intelligent Transportation Systems (ITS)


Facilities Plans include the completion of the project’s
ITS Facilities design, culminating in the completion of
final ITS plans. Some key design features presented in
FD the final ITS plans include: proposed traffic camera
types, quantities, and locations; and, proposed
communications conduit and fiber installation types,
quantities and locations. Items to be constructed are
identified and quantified.

The Project Manager requests the consultant designer


PE submit a Final Invoice to close out the PE phase of
work.
The Project Manager requests the consultant designer
FD submit a Final Invoice to close out the FD phase of
work.
The Final Landscape Plans include the completion of
the project’s Landscape design, culminating in the
completion of final landscape plans. Some key design
features presented in the project's final landscape
FD plans include: vegetative plant types, locations, and
quantities, and other proposed landscape
architectural features, such as landscape walls and
aesthetic treatments. Items to be constructed are
identified and quantified.

The Final Lighting Plans present the completed design


for the project's highway lighting features, such as the
FD number and type of lamps, poles and pole
attachments. Items to be constructed are identified
and quantified.
LB-96
If necessary, a Final Noise Study is prepared to
document the location, height and aesthetics of
FD proposed noise barriers or other sound attenuation
measures. The Final Noise Study includes input from
NJDOT, FHWA, local officials and stakeholders.

The Final Project Plans include the complete package


of plans that are produced during Roadway
Engineering, Structural Engineering, Right of Way and
FD Access, Utility Engineering, and Environmental
Documents that have addressed the Final Design
Submission Package comments.

The Final Project Specifications include the project’s


Special Provisions outlining where the project’s
FD specifications differ from the Department’s currently
approved Standard Specifications.

The Final Purpose and Need Statement consists of the


Purpose, the Need, and Goals and Objectives. The
Purpose defines the transportation problem to
address the issue. The Need provides data to support
CD the problem statement (purpose). The Goals and
Objectives describe other issues that need to be
resolved as part of a successful solution to the
problem.

The Final Right of Way (ROW) Cost Estimate is


FD developed by the ROW District Office and is based on
the ROW Plans and Documents.
The Final Right of Way Submission includes the review
and approval of the project’s final right of way
engineering documents through the Department’s
FD Right of Way Engineering subject matter experts. This
submission is based on the input obtained for Subject
Matter Expert’s on the pre-final submission.

The Final Roadway Plans include the completion of


the project’s final roadway design, culminating in the
completion of final roadway plans. Some key design
features presented in the project's final roadway plans
FD include: proposed horizontal and vertical geometry,
grading details, and existing and proposed roadway
cross sections. Items to be constructed are identified
and quantified.

The Final Structure Appraisal and Design Report


documents the final recommendations for the
footprint of the bridge and details the project’s
FD structural design approach. Bridge GP&E plans shall
be prepared, and the report shall identify ROW needs
and environmental impacts.

The Final Structures Plans document the final


FD recommendations on the project’s structural design,
culminating in the completion of final structural plans.

The Final Traffic Signing, Striping and Signal Plans


include the completion of the project’s final signing,
striping and signal design, culminating in the
completion of final signing, striping and signal plans.
Some key design features presented in the project's
FD final traffic signing, striping and signal plans include:
proposed traffic sign types and locations, proposed
roadway striping, and proposed traffic signal layout
and electrical design. Items to be constructed are
identified and quantified.

The project’s Final Wetlands Mitigation Plans identify


FD mitigation needed to address impacts on wetland
habitat.

An Approved Initial Financial Plan (Major Projects)


includes the completion of Project Financial Plans for
Major Projects, as required by FHWA regulations. In
accordance with FHWA regulations, a Management
FD Plan and Financial Plan must be completed for a
project that is estimated to cost $500,000,000 or
more. If a project is estimated to cost $100,000,000 or
more, a Financial Plan must be completed.
The Division of Environmental Resources prepares the
Finding of No Significant Impact (FONSI) request
package and submits it to FHWA along with the public
hearing transcript and copies of all public and agency
PE comments to FHWA for approval. If approved by
FHWA, the project will obtain a Categorical Exclusion
(CE) classification. If FHWA does not approve the
FONSI, an EIS is required.

A Flood Hazard Area Permit is required for all projects


proposing a change to the bridge opening, roadway
FD profile, or any activity within the 100-year floodplain
of a stream with a drainage area over 50 acres to the
point of interest.

EMS

DC-97

General Property Parcel Maps are plans used to show


each property to be acquired. This map shall be
FD signed and sealed by a New Jersey licensed surveyor
and filed by NJDOT’s Engineering Documents Unit in
the County courthouse where the deed was obtained.

EMS, P2

The Geodetic Survey Report conducted by consultants


(outside vendors) is approved by NJDOT’s Geodetic
CD Survey Unit and includes the location of project, field
notes, horizontal datum, vertical datum, baseline data
and other survey related data.
The Final Geotechnical Foundation Engineering Report
includes the final recommendations on the projects
structural foundations and documents coordination
with the Department’s Geotechnical Subject Matter
FD Experts. The report also includes analysis of items
such as soil bearing capacity, pile bearing capacity,
estimated pile tip elevation, required pile
embedment, foundation settlement and foundation
stability.

The Geotechnical Roadway and Rock Engineering


Report includes the roadway geotechnical analysis
and recommendations required for the design of
FD roadway embankments and cuts. Geotechnical
analysis includes items such as slope stability,
settlement, required ground improvement, and
subsurface drainage analysis.

The EEO Special Provisions, DBE, SBE or ESBE Goals


CON shall be included as part of the Special Provisions
within the Advertising Package.

Prequalification

A Green Acres Compensation Appraisal is required for


any Green Acres parcels and any replacement parcels
FD to be acquired. Appraisals may be performed by in-
house staff or by an appraisal consultant.

Conventional ground surveying is used to develop the


mapping on small projects. The mapping is secured
via Geodetic Survey Report Approval in accordance
with NJDOT guidelines and procedures. Field Survey is
utilized to establish ground control and reference
CD points to supplement Photogrammetric Mapping
including horizontal and vertical datum, roadway
baseline data, drainage inverts, location of visible
utilities, roadway profile and cross sections, the
location of drainage facilities and environmental
features.
A Hazardous Waste Study evaluates and documents
the project’s potential involvement with known or
PE suspected contaminated sites, underground storage
tanks, or other hazardous waste.

The Historic Sites Council Concurrence is a formal


recommendation made by the Council after receiving
public comments to the NJ Department of
Environmental Protection Commissioner. Considered
PE in the Council’s recommendation is an evaluation of
the public benefit of the proposed project, potential
and prudent and feasible alternatives and measures
taken to avoid, minimize or mitigate the
encroachment of the historic site.

Hydrologic and hydraulic (H&H) stream analysis is


completed for all projects proposing a change to the
bridge opening, roadway profile, or any activity within
the 100-year floodplain of a stream with a drainage
FD area over 50 acres to the point of interest. H&H
analysis includes stream flow modeling and backwater
analysis to determine impacts to water surface
elevation.

Hydrology and Hydraulics analysis includes an analysis


of the existing drainage features within the project
limits using the Hydrology/Hydraulic (H&H)
CD computation model software. Drainage area maps,
collected drainage, land use inventories, and other
pertinent information are used as input to perform
the H&H Analysis.

The identification and documentation of non-standard


PS design elements and non-conforming features within
the limits of the problem statement.
An Independent Cost Estimate is an engineering man-
hour cost estimate that is developed by the
Department for consultant design services for projects
advancing into Preliminary Engineering. The Project
CD Manager requests that the Office of Schedule and
Budget Management develop an Independent Cost
Estimate (ICE) to compare to the designer’s fee
proposal. The ICE will be used in contract negotiations

Individual Parcel Maps (IPM) are plans that depict a


parcel and related parcels, having unity of ownership
and associated easements and are used for appraising
and negotiating acquisition. An IPM is also used as the
FD map attached as an exhibit to a condemnation
complaint and declaration of taking where and when
condemnation is pursued. It must be based upon and
totally consistent with the General Property Parcel
Map.

Projects having more than a minor impact to 4(f)


properties require an Individual Section 4(f)
document. Processing this form of document involves
circulation of a Draft and Final Document for formal
PE comments on the project’s impacts and alternatives.
The process ends with formal determination that the
project has no prudent or feasible alternatives that
avoid the resource.

An Initial Deforestation/Reforestation Plan identifies


areas that may be considered for possible
PE deforestation and reforestation. An Initial
Deforestation/Reforestation Plan is prepared if the
total area of deforestation is greater than ½ acre.

The Division of Right of Way and Access Management


PE prepares the Initial ROW Estimate from the ROW
Impact Plan at the request of the Project Manager.

The Bureau of Regional Construction Engineering


CON requests the inspection consultant to submit their
Final Invoice for construction inspection services.

LB-150
Inspections include the interim completion,
substantial completion, final completion and final
acceptance inspections. Inspections shall be
CON conducted at their respective project completion
milestones and conducted by the appropriate
inspection body. Dam Inspection; Structural Seel and
Welding Inspection

DC-10

Information is gathered to inventory the Intelligent


CD Transportation Systems (ITS) elements such as
cameras, DMS, variable message signs, etc.

An Interim Design Submission may be required at the


FD Department's direction to provide feedback on the
design prior to the Final Design Submission.

Provides access to phones, (cell, smart or landline),


voicemail, or mifi connections for laptop computers.

EMS, OIT-0084

Utility Companies Assurance Plan

Jurisdictional Limit Maps and Agreements document


FD the stakeholders who will have jurisdiction over
improvements completed under the project.

DC-34

Preliminary Engineering Kickoff Meetings are held


with the Project Manager, Designer and local officials.
PE The Designer documents the meeting minutes to
include important comments and input received at
the meeting.
A Lighting Warrant Analysis Report evaluates the need
PE to install street lighting at a specific location based on
a set of standard warrants.

The Limited Scope CD Bridge Checklist is utilized by


the Designer and Project Manager while conducting
the field inventory to determine the full impacts
associated with the identified problem and to confirm
CD that the study should continue to follow the Limited
Scope process. The Limited Scope CD Bridge Checklist
is only utilized on Bridge Deck/Superstructure
Replacement projects.

The Limited Scope CD Culvert Checklist is utilized by


the Designer and Project Manager while conducting
the field inventory to determine the full impacts
associated with the identified problem and to confirm
CD that the study should continue to follow the Limited
Scope process. The Limited Scope CD Culvert Checklist
is only utilized on Culvert Repair or Replacement
projects.

The Limited Scope CD Pavement Checklist is utilized


by the Designer and Project Manager while
conducting the field inventory to determine the full
impacts associated with the identified problem and to
CD confirm that the study should continue to follow the
Limited Scope process. The Limited Scope CD
Pavement Checklist is only utilized on Mill “X” / Pave
“X + 1” Resurfacing projects.

The Limited Scope CD Sign Structure Checklist is


utilized by the Designer and Project Manager while
conducting the field inventory to determine the full
impacts associated with the identified problem and to
CD confirm that the study should continue to follow the
Limited Scope process. The Limited Scope CD Sign
Structure Checklist is only utilized on Sign Structure
Replacement projects.

Related to the certification of bids from contractors.


All existing substandard design elements (roadway
and bridge) within the project limits are identified
through as-built plans review, mapping, field
CD Inventory and past studies. The Bureau of Safety
Programs reviews the list to determine if a
substandard design element or elements are
contributing factors to the crash data.

All input received from Local Officials meetings are


CD documented in meeting minutes by the Task Order
Consultant.
The Bureau of Construction Services Procurement
CON shall post the advertisement for construction bids
within the local newspapers.

Local Officials Meetings are conducted by the Project


Manager and the Task Order consultant to present the
proposed project and solicit input from local officials
PS and impacted agencies (D&R Canal Commission,
NJDEP Parks and Forestry, Army Corps of Engineers,
etc.).

Tort claim, Phase Review, Dispute Review Board (Step


II Claim), Project Start Up, Department Acceptance,
Federal Closeout, Quaterly Trainee Report, Utility,
Consultant Inspection

A Lot Owner Access Concurrence is a form the lot


FD owner signs if he agrees to the proposed access
alterations.

A Lot Owner Lease Agreement is a form the lot owner


signs if he agrees to have the contractor enter his
FD property for an administratively determined payment
to construct the access alterations.

EMS
The Project Manager prepares a request to obtain the
various Management Systems information to solicit
input or information that may be relevant to the
project. Management Systems information is utilized
in the preparation of the CD Scope Statement. A table
of Management Systems input is prepared that ranks
and measures the problem area within each system’s
jurisdiction. NJDOT Management Systems are: -
CD Congestion Management Systems (CMS) - Pavement
Management Systems (PMS) - Bridge Management
Systems (BMS) - Safety Management Systems (SMS) -
Drainage Management Systems (DMS) - Maintenance
Management Systems (MMS) - Rockfall Hazard
Management Systems (RHMS) - Smart Growth
Management Systems (SGMS) - Pedestrian Safety
Management System (PSMS)

Management System Input is data obtained from the


PS Department’s various Management Systems that rank
and prioritize the problem in question.

Utility Agreement Modifications and Change Orders

A Material Management Plan provides a defined set


of procedures to be employed when contaminated
soil and ground water are encountered during
construction activities. A Material Management Plan
FD shall be completed when a project involves properties
where environmental contamination is present in
accordance with the NJDEP Linear Construction
Technical Guidance.

DC-2891

EMS, PS31
LB-95a

The Memo of Record documents the input obtained


CD at meetings, Public Information Centers, etc. The sign
in sheet of attendees is attached.

Grant Award Process

Grant Award Process

Preconstruction Meeting, Utility Meeting, Bi-Weekly


Meeting, EEO Meeting, Mid Contract Meeting, Pre-
Paving or Pre-concrete Placement Meeting, ITS
Meeting, Pre erection Meeting, Closeout Meeting

CON

DC-127

Re 170

EMS, MSC-VS
Municipal Police Agreements provide the means by
FD which the Department secures traffic control and
support services from municipal police agencies.

TES

Projects that will use property of a Section 4(f) park,


recreation area, wildlife or waterfowl refuge, or
historic property, which in the view of the
PE Administration and official(s) with jurisdiction over the
Section 4(f) property, the use of the Section 4(f)
property will result in a net benefit to the Section 4(f)
property.

EMS

Utility Companies Assurance Plan


DC-175

The Noise Barrier Detail Plans for the approved noise


walls are included within the Final Roadway Plans and
FD Final Structures Documents and are submitted as part
of the Final Design Submission.

A Noise Mitigation Questionnaire is prepared to solicit


feedback from the local community regarding
proposed noise mitigation treatments. The Noise
FD Mitigation Questionnaire is then utilized to complete
the Final Noise Study and obtain a formal resolution
of support from the local officials.

If a noise study is required, the Designer or DER


evaluates potential noise impacts on noise sensitive
areas such as residences, businesses, schools, parks,
etc. The scope of this activity can vary significantly in
response to project scope. If required, the Designer or
DER conducts a noise monitoring study. If no noise
study is required, then the Designer or DER completes
PE the noise section of the Categorical Exclusion
Document (CED). Some projects may require a noise
analysis. The results of the noise analysis will be
completed and incorporated into a CED or TES as
appropriate. The Division of Environmental Resources
approves the Air Quality Technical Environmental
Study.

LB-278
A Notice of Authorization is prepared by Capital
Program Coordination and provided to the Division of
PE Project Management Project Manager indicating that
Final Design funds have been authorized and the
authorization date.

LB-296

Notice to Proceed is a Department document that


CON authorizes the contractor to start construction
activities.
The Project Manager and Bureau of Construction
CON Services Procurement shall be notified upon receiving
the approval to Advertise.

LB-264

EMS

An Oral Presentation is the second step of a two step


Consultant Selection Process where short listed firms
provide an oral presentation to the Consultant
CD Selection Committee. The oral presentation consists
of set up, the oral presentation and a question and
answer period.

EMS
LB-277

A PAECE Report shall be completed when a project


FD involves properties where environmental
contamination is present.
Parcel Descriptions include a description of each
FD parcel to be acquired with their respective metes and
bounds.

Past Studies include information and data from


PS previous studies made in the vicinity of the problem.

Pavement Design Data is traffic data that is used to


calculate the recommended depth of pavement on a
proposed project. The traffic data includes: - Base Year
PE Average Daily Traffic (ADT) per direction - Design Year
ADT per direction - Heavy Truck percentage within a
24 hour period - Total Truck percentage within a 24
hour period

A Pavement Life Cycle Cost Analysis recommends the


most cost effective pavement treatment
(rehabilitation vs. reconstruction and flexible vs. rigid)
FD considering initial cost, future maintenance,
constructability, and roadway user delay costs. The
analysis is submitted with the Final Design Submission
Package.

A Pavement Recommendation is the recommended


pavement depth and material composition on a
proposed project. This depth is based on structural
design calculations utilizing pavement design data,
PE environmental constraints and material
considerations. The Pavement Recommendation is
included within the Pavement Recommendation
Report and is submitted to the Pavement Design Unit
for approval.
A Public Involvement Action Plan is prepared to
identify critical points for public involvement during
the Preliminary Engineering phase. It includes as a
CD minimum, the updating of the database of known
stakeholders, the number of anticipated meetings
with local officials, citizen groups and other outside
agencies impacted by the project.

A formal document that is mandatory for all projects.


The Project Management Plan details the approach to
be used to deliver a specific project and how the
CD project will be executed, monitored and controlled,
including the overall approach and justification for
exceptions to the typical process.

The Designer submits the signed Quality Management


Quality Certification for the Preliminary Engineering
phase of work to the Project Manager to certify that
the work on the project was performed in accordance
PE with the Department’s Quality Management
Procedures, the project has been designed in
accordance with all applicable State and Federal
design standards and requirements and in accordance
with the Preliminary Engineering Scope Statement.

A performance bond and a payment bond shall be


provided to the Department within 15 days of the
date of Award or Conditional Award. Ensure that the
penal sum of the bond is equal to at least the Total
Contract Price less the bid price for Performance and
CON Payment bond. With the bond, provide a certification
authorizing the attorney-in-fact to commit the Surety
and a true and correct statement of the Surety’s
financial condition. Submit the broker’s fees, the
certified rate schedule, and the report of execution for
the bond to the Resident Engineer.

All input received from permitting agency


CD coordination meetings are documented in meeting
minutes by the Task Order Consultant.
Rating

LB-125

The Regional Construction Engineer or designee will


record, transcribe and complete the meeting minutes
for distribution within ten (10) working days of the
CON meeting to all attendees. The Project Manager will
review a draft of the minutes prior to distribution to
ensure that the information presented was properly
understood.

The Pre-Construction ITS Meeting is for projects that


include installation of ITS facilities. Attendees include
the winning Contractor, the Sub-Contractor for ITS
CON work, Bureau of ITS Engineering, Bureau of Traffic
Operations, Regional Construction and other key
stakeholders.

The Pre-Construction Meeting is the meeting between


the Department, the winning Contractor and other
CON key stakeholders that provides a project overview and
establishes initial project contacts.

The Pre-Final Right of Way Submission includes the


review and approval of the project’s pre-final right of
FD way engineering documents through the
Department’s Right of Way Engineering subject matter
experts (Subject Matter Expert’s).
A Preliminary Construction Schedule identifies the
PE anticipated dates and estimated durations of the
proposed construction stages.

Preliminary construction staging plans are prepared to


determine the required stages of construction, the
anticipated durations of each stage and whether a
CD detour of traffic would be necessary for Alternatives
being considered. A construction sequence narrative
that summarizes each stage is also prepared to
accompany the staging plans.

The Preliminary Drainage Design Report addresses the


proposed preliminary layout plans of drainage pipes
(excluding pipe sizes or inverts) for the design of a
stormwater runoff system and discharge to an
PE adequate receiving area. The report identifies the
footprint of the proposed storm water runoff system
and conflicts with underground utilities, and
addresses potential conflicts with environmental
impacts.

Preliminary Engineering Approvals encompasses


PE deliverables associated with securing project-related
approvals to advance the project to Final Design.

The Preliminary Engineering Budget includes approval


of a baseline budget covering preliminary
CD engineering, and approval of proposed revisions to
the baseline budget.

Preliminary Engineering Initiation includes the


implementation of the project’s funding and
PE notification of the consultant or in-house design staff
to commence work, the Preliminary Engineering
Kickoff Meeting with the Designer.

The Preliminary Engineering Report documents the


work performed in Preliminary Engineering and also
includes the Environmental Document, Design
PE Exception Report, Final Design Scope Statement, the
Project Management Plan, and the appropriate plans
in support of the Environmental Document and
Design Exception Report.

The Preliminary Engineering Schedule includes the


approval of the project’s baseline schedule covering
CD preliminary engineering, and approval of any
proposed revisions.
Developed from a standard template document, the
PE Scope Statement lists the anticipated work for a
project for the Preliminary Engineering phase of work.
CD It includes the details of the project deliverables and a
description of the limit of scope of the project to the
extent known.

Existing soil information is obtained using NJDOT


GDMS (on-line soil boring data), the Engineering Soil
Survey Report by Rutgers University, available
geologic publications, and as-built plans to conduct a
geotechnical study and to prepare a Preliminary
PE Geotechnical Engineering Report. The Geotechnical
Engineering Report includes recommendations on the
projects structural foundations and documents the
coordination with the Department’s Geotechnical
Subject Matter Experts.

Preliminary Intelligent Transportation Systems (ITS)


facility design plans are prepared and include
PE resolving any conflicts associated with the conduit
and ITS facility layout and potential utility and
network conflicts.

The Preliminary Preferred Alternative (PPA) is the


selected alternative identified among all alternatives
developed to address the Purpose and Need
Statement. It is selected from an alternative analysis
CD comparison. Identifying a PPA initially requires data
analysis, NEPA classification determination, alternative
analysis and input from internal/external stakeholders
to conclude if the selected alternative provides
reasonable cost for the derived benefit.

Preliminary Roadway Plans are developed to include


horizontal and vertical geometry, drainage, traffic
engineering, geotechnical design and structural design
PE to the level of detail necessary to support obtaining
an approved environmental document and the
approved design exception report.

The Pre-PS&E package is a submission that is sent to


the FHWA for review. The FHWA will review the Pre-
PS&E Package for Full Oversight projects. The Pre-
FD PS&E review will be required when the Final Design
Submission falls less than 100% complete. All FHWA
comments will be addressed and the decisions
documented in the Design Communications Report.
LB-104

The Priority Score from Management System is the


development of a priority ranking based on
Management System performance data (drainage,
pavement, safety, congestion, bridge, maintenance,
PS etc.) consistent with Capital Investment Strategy goals
and objectives. Priority rankings are provided to the
Division of Project Management to support the Tier 2
Screening recommendations.

Problem Screening Approvals include the Capital


Program Screening Committee presentation, the
PS approval of the Project Charter, and Capital Program
Committee (CPC) Approval.

A Tier 2 Screening is a review process of a problem


statement performed by the Division of Project
Management to further define the problem. It
includes an evaluation of potential constraints and a
technical assessment of right of way and
environmental issues and constraints. The Tier 2
Screening Report includes but is not be limited to the
PS following: - Documented field observations (notes,
pictures, including input from Subject Matter Experts
and pertinent Local Officials) - Management System
Rankings - Environmental Inventory Report -
Preliminary needs and scope of work
recommendations. (The scope of work
recommendation includes consideration of existing
and proposed projects.)

A Problem Statement is a written document (Form TP-


PS 1) that identifies and describes a potential deficiency
on the State Transportation System.

LB-83
A Programmatic Section 4(f) Evaluation documents
the proposed project impacts to historic sites,
recreation land, parkland, or wildlife and waterfowl
PE refuges utilizing the alternatives analysis performed in
Concept Development to justify selection of the most
prudent and feasible alternative.

The Designer prepares the Project Access Plan (PAP) in


accordance with the “NJDOT Access Management
PE Guidelines”. The PAP identifies each driveway within
the project area and the proposed alterations to each
property’s access.

Project briefings may be held if necessary during the


Construction Phase at the start of a new construction
stage if significant traffic stages/traffic impacts are
planned. A project briefing would be held with the
Department’s Senior Management to provide an
executive summary of the planned traffic detours,
CON control, and construction staging. The main purpose
of the briefing is to inform Senior Management on the
upcoming traffic stage, to provide an update on the
current status of community reaction, and to present
the community involvement activities planned during
construction.

A Project Fact Sheet includes relevant information


such as traffic data, accident data, environmental
data, management systems input, a description of the
problem and any other information necessary to
CD understand the proposed project need and intent
before holding the scope meeting. The proposed
Project Fact Sheet and other relevant information are
sent to the Scope Team approximately three weeks
prior to the Scope Team Meeting.
The Designer shall prepare a Draft Project
Management Plan (Major Projects) for Major Projects
as required by FHWA regulations. A Draft Project
Management Plan should be submitted at least 60
PE days prior to the submission of the Final NEPA
document. As required by FHWA regulations, a Project
Management Plan shall be completed for projects
with a total estimated cost of $500,000,000 or more.

Project Plans are the complete package of plans


included in the Final Design Submission Package that
FD are produced during Roadway Engineering, Structural
Engineering, Right of Way and Access, Utility
Engineering, and Environmental Documents.

The project’s specifications include the project’s


Special Provisions outlining where the project’s
FD specifications differ from the Department’s currently
approved Standard Specifications.

DC-152

EMS

The Designer completes and submits the Plans,


Specifications and Estimate (PS&E) Quality
Management Certification to the Department with
the PS&E Submission that states they have performed
FD the work on the project in accordance with the
current Department Quality Management Process and
Procedures, and the project has been designed in
accordance with all applicable State and Federal
design standards and requirements.

Utility Companies Assurance Plan


The Public Information Center (PIC) obtains public
input for the Preliminary Preferred Alternative (PPA).
The PIC is usually conducted subsequent to in-house
endorsement of the PPA. (It is preferable to obtain
CD documentation of local officials support before the
PIC; however, local officials may not provide their
support a project until the public has had a chance to
comment.)

Internal Core Group coordination meetings and


CON external local officials and agency coordination
meetings may be necessary during Construction.

A Purpose and Need Statement is a requirement for


NEPA documentation when developing and
considering alternatives. It consists of the Purpose,
the Need, and Goals and Objectives. The Purpose is
CD the solution to the transportation problem. The Need
includes the data that supports the purpose of the
problem statement .The Goals and Objectives describe
all other issues that will need to be addressed as part
of a successful solution to the problem.

Quality Management includes the procedures and


activities associated with the development and
implementation of a quality management plan, and
CD includes required actions and procedures to be taken
by designers to obtain a project’s quality assurance
certification.

Quality Management includes the quality controls


that are to be applied by the Designer during the
Concept Development, Preliminary Engineering, Final
PE Design and Construction phases of the Project
Delivery Process, including adherence to the
requirements of a Quality Management Plan and
NJDOT Quality Management procedures.
Quality Management encompasses deliverables
associated with the development and implementation
of quality management plans, and identifies actions
that must be taken to obtain a project’s quality
management certification. Quality Management Plans
FD document the specific quality controls that shall be
applied during the Concept Development, Preliminary
Engineering and Final Design phases. A project
specific Quality Management Plan for complex
projects may be required.

Quality Management encompasses deliverables


associated with the development and implementation
of quality management plans, and identifies actions
that must be taken to obtain a project’s quality
CON assurance certification. Quality management plans
may take the form of plans that are part of a
consulting firm’s prequalification requirements, or
may be project-specific plans that are prepared for
more complex projects.

Quality Management Certifications include the


checklist and certification form that certifies that the
FD Department’s Quality Management procedures have
been followed for the project.

A Quantitative Risk Analysis Report is prepared to


document and summarize the results of quantitative
risk analysis. Quantitative risk analysis results in a
more accurate estimation of probability of occurrence
and a numerical value in days of schedule impact and
CD dollars of cost impact. Quantitative risk analysis is only
performed on projects with a total construction cost
over $100 million and if approved by the Project
Manager and concurred with by the Program
Manager.

A Quantitative Risk Analysis Worksheet is utilized to


list the major risks for each alternative being
considered for selection as the Preliminary Preferred
Alternative and calculate the probability of occurrence
and magnitude of schedule and cost impact. The
CD Quantitative Risk Analysis Worksheet is included as an
attachment to the Quantitative Risk Analysis Report
and only utilized on projects with a total construction
cost over $100 million and if approved by the Project
Manager and concurred with by the Program
Manager.
MT-143

The Railroad 100% Submission includes the


completed roadway or bridge plans submitted to the
railroad company and a master bill of material, which
quantifies every component within every assembly
detail. This submission includes: - The final bonding
and grounding plan and elevations - The final bonding
FD and grounding assembly - The final structure erection
diagrams - The final detailed structural elements -
The final catenary and transmission structural
hardware design. - The new catenary and
transmission hardware - The final bill of materials and
scope of work related to the individual structures.

The Railroad 60% Submission includes the roadway or


bridge plans submitted to the railroad company at the
60% point of design. If the project has Amtrak
FD involvement, there must be a 30% and 60%
submission. Included within the submission is a
proposed construction sequence for railroad work
that will minimize impacts to existing facilities.

The Railroad Agreement establishes the reimbursable


CD costs of the review work by the Railroad Agency.

Railroad Engineering Construction Agreements (RECA)


and Modifications

Railroad Engineering Construction Agreements (RECA)


and Modifications

A Memo of Record is prepared to document that


discussions, decisions and results of a Railroad
Diagnostic Team Meeting. A Railroad Diagnostic Team
Meeting is an on-site meeting with the railroad
operator, local officials, engineer, school and
PE emergency services, Designer and any NJDOT unit or
entity deemed relevant to discuss the grade crossing,
gather expert testimony, and develop
recommendations for modifications to the grade
crossing.
Railroad Engineering Construction Agreements (RECA)
and Modifications

Railroad Engineering Construction Agreements (RECA)


and Modifications

Railroad Engineering Construction Agreements (RECA)


and Modifications

Railroad Engineering Construction Agreements (RECA)


and Modifications

Consultant Evaluations

The Project Manager is responsible for obtaining


reasonable assurance that the Bureau of Quality
Management Services will approve the design
exceptions associated with the Preliminary Preferred
CD Alternative (PPA). Reasonable assurance of a design
exception shall be documented in the Design
Communications Report to assure the potential
project can advance into PE.

A signed Federal document representing the


culmination of the Federal environmental document
PE review and approval process, and documenting
Federal project environmental approval.

AD-37 This is utilized for a number of department


actions, each one pre filled out for a number of
reasons. This includes: Buckslip for Agreement
Closeout and Cancellation; Buckslip for Agreement
CON Modification Change Order; DAG Buckslip; DAS
Agreement or Construction Authorization; Master
Agreement Change Order - Blank; Utility Agreement
(UECA)

The project’s Final Reforestation Plans identify


FD mitigation needed to address impacts on forest
habitat.

LB-137
DC-149

A Remedial Investigation Report presents the results


of the delineation sampling conducted at the
contaminated properties. Delineation sampling
FD determines the extent of contamination identified in
the Site Investigation Report. The Remedial
Investigation Report is sent to the appropriate
property owners notifying them of the findings.

DC-26

LB-9

LB-114

LB-5

LB-10

LB-142

LB-279

DC-18a, b, d

LB-232

LB-232S

DC-112

LB-168S

LB-168

For planned (scheduled) overtime, non-scheduled


(emergency) overtime, as well as adding funding to
existing overtime requests.
This is also within the Accounting unit. These form
need to be completed for anyone traveling on official
business of the Department.

DC-156

DC-155

Resolution of disputes and claims is composed of the


following four steps: Step 1 - Review by the Resident
Engineer/Project Manager; Step 2 - Review by the
CON Regional Dispute Board; Step 3 - Review by the
Department Claims Committee; Step 4 - Nonbinding
Mediation.

The Resolution of Support is the formal


CD documentation provided by local officials that
endorses the Preferred Project Alternative.

A Resolution of Support is a document approved by a


municipality formally supporting a project. A
FD Resolution of Support may be needed during Final
Design to obtain approval for installation of noise
mitigation measures.

Right of Way, Access and Jurisdiction encompasses


the deliverables needed to acquire the required right
PE of way for the project, complete driveway access
changes and obtain jurisdictional agreements.
Right of Way, Access and Jurisdiction encompasses
deliverables needed to acquire right of way required
FD for the project, complete driveway access changes
required for the project and obtain jurisdictional
agreements.

Right of Way Authorization includes the deliverables


FD necessary to secure the project’s Right of Way
Funding.

The Right of Way Impact Plan depicts all ROW impacts


(acquisitions). It includes the block and lot numbers,
the properties owner’s names, the acquisition area of
each parcel and preliminary site plans and final site
PE plan approvals. It is utilized for the ROW Kickoff
Meeting and updated to incorporate comments from
the meeting. It is also utilized for preparing the Initial
ROW Estimate.

The Right of Way Plans and Documents include the


Entire Tract Maps (ETM), General Property Parcel
FD Maps (GPPM), descriptions of each parcel, the
Individual Parcel Maps (IPM) and all project
commitment letters or memorandums.

A Right of Way (ROW) Report is required for all


roadway improvement projects that have right of way
acquisition. The ROW Report identifies the potential
PE acquisition and easements that are required for the
project. The ROW Report is updated and submitted
for all ROW submissions and used for the presentation
at the ROW Kickoff Meeting.

A Riparian License is needed from the NJ Department


of Environmental Protection for proposed roadway
and bridge construction within tidal areas. The
FD license provides the Department with permission to
access those areas to construct, operate and maintain
the highway infrastructure.

A Risk Register is a tool that the Project Risk Manager


and Project Risk Team Members can use to address
and document project risks throughout the project life
PS cycle. It is a living document that includes a
comprehensive listing of risks and the manner in
which they are being addressed.

A Risk Report is a summary of the information


contained within the Risk Register and is included
FD with the Final Design Submission. It is intended to
summarize the major risks that the Department
should be aware of prior to Construction.
Roadway Engineering includes the deliverables
associated with the project’s roadway design features,
such as pavement design, horizontal and vertical
PE geometry, soil erosion and sediment control, highway
lighting, drainage, survey efforts and the completion
of jurisdictional limit maps and agreements.

Roadway Engineering encompasses deliverables


associated with the project’s roadway design features,
such as pavement design, soil erosion and sediment
FD control, horizontal and vertical geometry, traffic
lighting, drainage, and survey efforts. It also
encompasses the completion of jurisdictional limit
maps and agreements.

LB-315

Title Concurrence

LB-23

Base Line, Progress

Scope Team Meetings (STMs) are conducted by the


Project Manager and the Task Order consultant with
internal stakeholders to introduce the project and
solicit input on various issues including but not limited
to project need, identification of potential initial
CD concepts to address problems, etc. STMs are held at
any point during the CD and PE phases, but are
usually held during the initiation of CD, the selection
of the Preliminary Preferred Alternative (PPA) and at
the conclusion of the CD phase to discuss the details
for the preparation of the PE Scope Statement.
Scored Proposals may include a Step 1 or 2 Step
Process, as follows: 1-Step Process: The Technical
Evaluation Committee will review and rank consultant
designers technical proposals and submit the results
to the Consultant Selection Committee (CSC). 2-Step
CD Process: The Technical Evaluation Committee
determines the list of technically qualified firms within
5% of the top ranked firm. The Project Manager
presents this list to the CSC to determine the short-list
of the technically qualified firms that will be
requested to give an oral presentation.

Scour Analysis includes the calculations to determine


the existing scour of a structure and if necessary, the
FD countermeasures to incorporate in the structural
design.

Section 4(f) includes the identification of any publicly


owned land in the project study area, which may
include recreational properties purchased with
municipal, county, state, or federal funds including
Green Acres funded land. Impacts are evaluated to
these properties and alternatives are assessed to
avoid and minimize impacts to the Section 4(f)
PE resource. Historic properties are identified in the
Cultural Resources process that would have an
adverse effect to the property and/or a loss of
property due to ROW acquisition. The appropriate
Section 4(f) document is prepared pursuant to federal
regulations based on the extent of impact or loss of
land due to the acquisition.

Seismic Retrofit Analysis includes the calculations to


determine a structure’s retrofit eligibility and cost
FD effectiveness. The Seismic Retrofit Analysis
recommendations are included with the Final Design
Submission Package.

Utility Companies Assurance Plan

Road, Bridge
Consultant Evaluations

Within 14 days of the date of Award or Conditional


CON Award, the Bidder shall properly and duly sign the
Contract.

The Site Investigation Report presents the results of


the sampling performed at all sites of concern. The
Site Investigation Report is sent to the appropriate
property owners notifying them of the findings. If
FD contamination levels are above NJDEP soil
remediation standards, the Designer must hire a
Licensed Site Remediation Professional (LSRP) to
oversee the management of contamination
encountered during the linear construction project.

EMS, Small Const. RFP

Socio-Economic Study and Environmental Study


includes the evaluation and documentation of
potential project-related impacts to communities,
land use patterns, businesses, and community
facilities, accounting for public mobility, access and
PE use, as well as displacements of residents and
businesses. The study includes identification of
minority and other populations covered by EO 21898
on Environmental Justice and an analysis of the
potential for disproportionate impacts to these
communities.

The Final Soil Erosion and Sediment Control Plans


identify those specific measures to be taken to
FD mitigate the project’s soil erosion and sediment
impacts.

The Soil Erosion and Sediment Control Report and


Certification identifies the measures, such as silt
FD fences and inlet filters, that will be used to mitigate
soil erosion and sedimentation associated with the
project's construction.

LB-136
Grant Award Process

The Project Manager determines the selection


process (1-Step or 2-Step process) to be used and
prepares the solicitation package. The Division of
CD Project Management Director sends the solicitation
package to the Division of Procurement Professional
Services. Professional Services approves and posts
the solicitation documents on the NJDOT Website.

EMS

Utility Companies Assurance Plan

Utility Companies Assurance Plan

“Stakeholder Input” is requested from internal and


external stakeholders and information obtained is
CD utilized to refine the Problem Statement or define the
Purpose and Need Statement.

Input received at Stakeholder meetings is


documented in the meeting minutes by the Task
CD Order consultant. (Important decisions / agreements
from stakeholder meetings shall be documented in
the Design Communications Report.)

Grant Award Process

Grant Award Process

LB-167
State House Commission approval is needed for
FD projects affecting Green Acres parcels.

Corporate Re-Org

Bidding

DC-114

EMS, PS17

A structural design recommendation summary is


prepared that documents the structural selection
PE process, the recommended structure, and utility, right
of way and environmental impacts, the structural type
(if not determined in CD), length, width and footprint.

Structural Engineering includes the deliverables


PE associated with the project’s structural design
features, such as bridges, culverts and retaining walls.

Structural Engineering encompasses deliverables


FD associated with the project’s structural design
features, such as bridges, culverts and retaining walls.

Subject Matter Expert Recommendation is a technical


analysis recommendation made by a Subject Matter
Expert at the request of the Capital Investment
Strategy Division on a specific problem statement.
PS Based on the recommendations and other pertinent
information, the Capital Investment Strategy Division
Problem Statement Committee may request a Tier 2
Screening.

Substantial Completion Inspection is the review and


inspection of the entire project by the Field Manager
CON and Resident Engineer after receipt of the
Contractor's notice of Substantial Completion.

The Subsurface Utility Engineering (SUE) Test Pits


Report identifies the locations of potential utility
PE conflicts with the proposed design through subsurface
test pits and includes the notes from the SUE
Contractor and or Utility Company.
The Office of Schedule and Budget Management
prepares a Summary Independent Cost Estimate (ICE)
Report at the request of the Project Manager. The
CD Summary ICE Report compares the design man-hour
estimates between ICE values and the designers’ man-
hour proposal.

The Office of Schedule and Budget Management


prepares a Summary Independent Cost Estimate (ICE)
Report at the request of the Division of Project
PE Management Project Manager. The Summary ICE
Report compares the design man-hour estimates
between ICE values and the Designers’ man-hour
proposal.

EMS, PB119

Utility Companies Assurance Plan

DC-157

EMS, PS81

A Systems Engineering Review Form is required as


CD part of the programmatic conformance process for
Intelligent Transportation System (ITS) deployments.

DC-23

Corporate Reorg
Environmental Documents require Technical
Environmental Studies (TES) to be performed that
include analysis of potential environmental impacts in
seven general activity categories including Air Quality,
Noise, Ecology, Cultural Resources, Hazardous Waste,
PE Section 4(f) and Socio-Economics. The scope of these
studies will align with the NEPA classification,
regulatory requirements, public involvement,
environmental scope statements and the project
scope.

Technical Proposals are submitted by Pre-qualified


consultants to the Division of Procurement
Professional Services within 15 working days from the
CD posting date, unless otherwise noted. The Technical
Proposal includes the qualifications and experience of
their project manager, key staff, the project approach
and the capability score based on CES ratings.

A basic analysis prepared by Subject Matter Experts


that includes the technical issues that are necessary
to consider. Included in the memorandum is a
PS recommendation from the Subject Matter Expert as to
whether the problem statement should proceed as a
quick fix, or whether it should proceed to a Tier 2
Screening or if no further action is to be taken.

RE 176
DC-92

The documentation of the preliminary review of a


problem statement that weighs the merits of the
problem statement against other competing problem
PS statements statewide. Information contained in the
Department’s Management Systems is utilized in the
Tier 1 Screening review process of the problem
statement.

A request by Capital Investment Strategies to the


PS Division of Project Management to perform a Tier 2
Screening of a problem statement.

A Title Summary Document summarizes the


FD information obtained during the title search and
accompanies all right of way submissions.

The Designer conducts a topographic survey that


provides documentation within specific project limits
and offsets of the site’s existing field conditions
including existing baselines, centerlines, existing and
PE proposed right of way lines, structure clearances,
drainage systems, utility lines, soil borings, control
points, and elevations. The topographic survey may
supplement necessary photogrammetric survey or GIS
work.

A traffic count program is established for all projects


and accounts for all roads, streets, ramps, highways,
CD driveways, traffic generators, seasonal influences, and
related modes that have an impact on the project and
surrounding area.

The Traffic Control and Staging Plans detail the


FD protection and maintenance of traffic during
construction.
A traffic count program is conducted by the Bureau of
Traffic Data Development at the request of the Project
Manager to account for all roads, streets, ramps,
CD highways, driveways, traffic generators, seasonal
influences and related modes that would have an
impact on the project and surrounding area.

Traffic Engineering Facility Locations include the


preparation of concept level plans for the layout of
major guide signs, pavement markings, regulatory
traffic control devices, ITS facilities, bicycle and
PE pedestrian design accommodations, signal design and
the associated ROW needs. Conceptual plans are
prepared using Traffic Signal and Safety Engineering
(TSSE) standards.

The Contractor has to provide the Resident Engineer


notice for traffic interference. There are a few
different types of notice: The Contractor has to
provide a 28 day, 14 day and 7 day notice for all traffic
changes - usually meaning a major traffic stage. There
would be such a notice for the first time traffic was
interfered with, for each stage change, and for the
final traffic pattern. With the 28 day notice, the
Division of Community and Constituent Relations
contacts local stakeholders (municipalities) and gives
them notification. At 14 days, messages are placed on
Portable Changeable Message Signs. With each notice
received by the Contractor, the Resident Engineer -
CON passes the information along to Traffic Operations and
the Traffic Interference Coordinator (TIC) to
disseminate the information to Senior Management.
Additionally, the Contractor has to provide weekly
and daily notices for lane closures. On a project basis,
this may involve a permanent closure with a detour,
but on a daily basis may also involve a right lane
closure for a portion of a highway. The Contractor
gives the Resident Engineer a weekly notice and a
daily confirmation of what they're doing - that info
gets sent to Traffic Operations and the TIC, so they
know who's out on the road and how they're
interfering with traffic at any time.
The Traffic Lighting Design Report identifies the
FD lighting needs associated with a project, and identifies
lighting design features proposed for the project.

For funds transferred from the Office of Management


and Budget.

For funds transferred within the Office of Budget.

Traffic volumes are projected by the Task Order


consultant based on the Growth Rate Factor that is
provided to them by the Project Manager. (The traffic
CD Volumes are projected 20 years beyond the
anticipated construction completion date; 10 years
beyond the anticipated construction completion date
for resurfacing projects).

Two-Year Chapter 51/Executive Order 117

Utility Base Plans are updated to Identify potential


subsurface utility engineering (SUE) test pit locations
to verify the exact location of existing utilities. The
PE update also includes the collective utility owner
comments to identify potential utility conflicts
between existing utility facilities and the proposed
design.
A priority ranking of all highway operational
improvement problem statements that are candidates
for entry into project development. A comprehensive
technical evaluation is updated for all candidate
PS problem statements. Problem statements are ranked
based on technical merit using relevant management
system data (congestion, smart growth compatibility,
etc.).

The Designer updates the preliminary construction


staging plans of the Preliminary Preferred Alternative
(PPA) that was developed during the Concept
PE Development phase and coordinates with outside
agencies, local officials and engineers. Construction
sequence narrative and schedule is updated, as
necessary.

The Project Management Plan (PM Plan) is a formal


document (different than a PM Plan for Major
Projects) created during the Concept Development
phase that is updated to include any significant
changes that resulted from the PE Phase. The PM Plan
PE defines how the project is executed, monitored and
controlled. The objective of a PM Plan is to define the
approach to be used by the Project Team to deliver
the intended project management scope of the
project. The PM Plan should identify when an Interim
Design Submission is or may be necessary.

An Updated Project Management Plan (Major


Projects) shall be prepared to reflect any changes to
Approved Project Management Plans for Major
Projects, as required by FHWA regulations. This
updated plan should be submitted 90 days prior to the
FD start of the Construction Phase. In accordance with
FHWA regulations, a Management Plan and Financial
Plan must be completed for a project that is estimated
to cost $500,000,000 or more. If a project is estimated
to cost $100,000,000 or more, a Financial Plan must
be completed.

The Project Manager is responsible to enter all


available information into Project Reporting System
CD (PRS) and is required to update PRS monthly to reflect
current status and changes.
A Risk Register is a tool that the Project Risk Manager
and Project Risk Team Members can use to address
and document project risks throughout the project life
cycle. It is a living document that includes a
PE comprehensive listing of risks and the manner in
which they are being addressed. It is updated
throughout the life of the project whenever new risks
are identified or response action plans are modified.

A Risk Register is a tool that the Project Risk Manager


and Project Risk Team Members can use to address
and document project risks throughout the project life
cycle. It is a living document that includes a
CD comprehensive listing of risks and the manner in
which they are being addressed. It is updated
throughout the life of the project whenever new risks
are identified or response action plans are modified.

A Risk Register is a tool that the Project Risk Manager


and Project Risk Team Members can use to address
and document project risks throughout the project life
cycle. It is a living document that includes a
FD comprehensive listing of risks and the manner in
which they are being addressed. It is updated
throughout the life of the project whenever new risks
are identified or response action plans are modified.

A Risk Register is a tool that the Project Risk Manager


and Project Risk Team Members can use to address
and document project risks throughout the project life
cycle. It is a living document that includes a
CON comprehensive listing of risks and the manner in
which they are being addressed. It is updated
throughout the life of the project whenever new risks
are identified or response action plans are modified.

The updated Utility Risk Assessment Plan further


refines the potential high risk utility impacts based on
information received from utility companies and any
PE subsurface utility engineering conducted. This
updated plan is utilized as a reference to address
utility risks and to prepare the updated construction
staging plans and preliminary roadway plans.
Updates include the entry of a new problem
statement into the database. A review is made to
determine if duplication of the problem statement
exists. Work also includes assigning the DB number
and asset category classification and entering
PS descriptive information, status and documentation
into the problem statement database. The problem
statement database updates are made to reflect
changes in status until the problem statement is
finalized.

Grant Award Process

No. 354

Agreement, Invoice

Utility Closeout Procedure, Letters and Memoranda

Utility Closeout Procedure, Letters and Memoranda

Utility Agreements set forth the terms, conditions and


PE responsibilities between the Department and the
Utility Company.

Utility Agreement Modifications and Change Orders

Utility Agreement Modifications and Change Orders

Utility Agreement Modifications and Change Orders

Utility Agreement Modifications and Change Orders


During final design, modifications are needed to the
project’s utility engineering and construction
agreements (UECA’s) to finalize the construction scope
of work and funding reimbursement between the
Department and affected Utility Companies. These
FD modifications are commonly referred to as, Utility
Agreement Modifications, which constitutes the
interagency agreement between the Department and
the affected utility companies during the project’s
construction stage.

The Utility Agreement Plans are the project’s utility


accommodation plans, which are developed by the
project’s designer based on coordination with affected
FD utility companies. The plans are referenced within and
attached to the Utility Agreement Modification
(UAM).

Utility Authorization is the approval sent to each


FD utility company informing them that utility
construction work can begin.

Utility Base Plans show existing utility facilities. The


plans are utilized for the development of the
PE alternatives of accommodation and the Utility
Agreements.

Utility Change Orders are Master Agreement Change


Orders that are submitted to Project Management for
execution. The Project Manager assures the Master
CON Agreement Change Order is complete, transmitting
the Change Order through the chain of command for
approval and execution, and distributing the executed
document to the Utility Owner.

Utility Closeout Procedure, Letters and Memoranda


Utility Funding Requests Memoranda

Utility Funding Requests Memoranda

Utility and Railroad companies that have been


identified in the study area through field investigation
are sent Utility Letter 1 utilizing the NJDOT Utility
Company database. Utility Letter 1 requests the utility
CD owner to identify a contact person, verify existence of
their facilities in the project area and requests an
order of magnitude Preliminary Engineering Utility
cost estimate.
Utility Owner and Municipal Letters

Utility Owner and Municipal Letters

Utility Owner and Municipal Letters

Utility Engineering encompasses deliverables to


protect, adjust and/or relocate existing utility facilities
required for the project. It includes activities needed
FD to develop the project's contract documents and
activities to establish project responsibilities between
the DOT and the Utility and Railroad owners.

Utility Engineering includes the deliverables


PE associated with the advancement of utility base plans
and Utility Agreements.

Utility Engineering Construction Agreements (UECA)

Utility Engineering Construction Agreements (UECA)

Utility Engineering Construction Agreements (UECA)

Utility Engineering Construction Agreements (UECA)

Utility Engineering Construction Agreements (UECA)

Utility Engineering Construction Agreements (UECA)

Utility Engineering Construction Agreements (UECA)

Utility Engineering Construction Agreements (UECA)

Utility Engineering Funding Authorization is provided


from Program Coordination at the request of the
PE Project Manager. Funding is authorized on the order
and magnitude utility engineering estimate obtained
in the Concept Development phase.
Utility Inventory includes the identification and
PS documentation of the existing aerial or ground utilities
evident in the problem statement area.

Utility Letter No. 2 and the Utility Base Plan are sent
to each utility owner with a request they locate their
PE utility facilities within the project limits on the utility
base plans provided.

A Utility Master Agreement Change Order modifies


the affected utility company’s existing Utility Master
FD Agreement to accommodate any necessary utility
design work.

The Utility Owner Design Authorization Checklist is a


form signed by the Utility Owner, NJDOT and the
FD Designer that includes information regarding the
proposed impacts (e.g., interruption of service,
seasonal impacts) to the Utility Owner’s facilities.

Utility Procedure 00109

Utility Procedure 00110

Utility Procedure 00112

Utility Procedure 00113

Utility Procedure 00209

Utility Procedure 00210

Utility Procedure 00211


Utility Procedure 00212

Utility Procedure 00213

Utility Procedure 00309

Utility Procedure 00310

Utility Procedure 00311

Utility Procedure 00312

Utility Procedure 00313_1

Utility Procedure 00410

Utility Procedure 00411

Utility Procedure 00510

Utility Procedure 00511

Utility Procedure 00609

Utility Procedure 00711

Utility Procedure 00909

Utility Procedure 01009

Utility Procedure 01109

Utility Procedure 01209


Utility Procedure 01309

Utility Procedure 01409

Utility Procedure 01509

Utility Procedure 01609

Utility Procedure 01709

Utility Procedure 01809

The Utility Risk Assessment Plan highlights potential


high risk utility impacts and notes those impacts on
the plan. This plan is utilized to complete the utility
CD section within the Project Fact Sheet. The Designer
should consult with the utility companies to prepare
the Utility Risk Assessment Plan. Identified utility risks
may be included within the project Risk Register.

Utility Verification Request Letter

Utility Verification Request Letter Template

Value Engineering Requests include a proposal or


concept submitted by the Contractor in accordance
CON with Subsection 104.02 of the Contract Specifications
for changing the plans, the specifications, or other
requirements of the contract.

Re 27

The Value Engineering (VE) Unit prepares a VE


CD Technical Report documenting their review comments
and recommendations.

EMS, Chapter 271


Utility Companies Assurance Plan

DC-126

LB-135

A Wetland Delineation Report details the results of


the wetland delineation including the marked
FD locations of the wetland limits. The marked locations
are surveyed and included in the construction plans.

A Wetlands Monitoring Plan puts forth the details on


monitoring newly constructed wetlands to determine
FD if they are successful. A Wetlands Monitoring Plan is
only necessary if it was a condition of the permit
approval.

The Charter is the document created by Capital


Investment Strategies and approved by the Capital
Program Committee that formally authorizes the
existence and advancement of a proposed project,
PS and provides the authority to apply organizational
resources to project activities. The Charter typically
includes the name of the proposed project,
justification, objectives, recommendation, responsible
unit and authorizing signatures.

Working Drawings are technical plans on a


construction project that are prepared by the
Contractor to illustrate items not included within the
Contract Documents. Working Drawings shall include
CON methods of construction, material designations,
design calculations, catalogue cuts, illustrations,
schedules, performance charts, brochures, and other
information necessary to construct the work as
specified in the Contract.