Vous êtes sur la page 1sur 66

Quality Management

16
4

Journal v o l u m e 1 6 , i s s u e 4

Process Improvement: Using Toyota’s A3 Reports


Satya Chakravorty
Quality Management Journal

The Role of Front-Line Ideas in Lean Performance Improvement


Alan Robinson and Dean Schroeder

Enhancing Six Sigma Implementation Through Human Resource Management


Xingxing Zu and Lawrence Fredendall
2009

www.asq.org
Volume 16 Issue 4

ARTICLES
Contents DEPARTMENTS
7 Process Improvement: Using Toyota’s A3 Reports
4 Introduction
Satya Chakravorty
This little-known tool has been used by Toyota for identifying and solving
5 Executive Briefs
problems, and reporting results of improvement activities.
55 Book Reviews
27 The Role of Front-Line Ideas in Lean Performance Improvement
Alan Robinson and Dean Schroeder 59 Cumulative Index—
Many companies that are beginning their lean efforts lack a real understanding
of the importance of implementing high-performing idea systems and creating Volume 16
a lean culture of daily improvement.

41 Enhancing Six Sigma Implementation Through Human Resource


Management
Xingxing Zu and Lawrence Fredendall
Three human resource management practices—employee involvement,
employee training, and employee performance and recognition—play a
significant role in Six Sigma implementation.

AIMS AND SCOPES: The Quality Management Journal (QMJ) is a rigorously refereed periodical published
quarterly by the American Society for Quality (ASQ). It is the first journal to link the efforts of academic researchers
Annual Subscription Rates
and quality management practitioners. QMJ provides a forum for communicating and discussing research findings. Members Nonmembers Institutional
New research that scientifically explores the principles of quality management is actively sought for the journal.
U.S. $50.00 $75.00 $130.00
All papers must be original works and be grounded in research and experience. Each article must provide
readers with significant new information that contributes to the development of the field of quality management. International $74.00 $90.00 $150.00
Highly technical papers of limited scope are not appropriate for this publication. Manuscripts submitted to QMJ
must be original works not previously published or under review by another publication. Canadian $80.00 $95.00 $160.00
Note that ASQ and QMJ cannot be responsible for unsolicited manuscripts. Rates subject to change without prior notification. Institutional rates
SUBSCRIPTIONS: For subscriptions to QUALITY MANAGEMENT JOURNAL, please contact ASQ’s Customer include first-class delivery. Canadian rates include 7% GST.
Care Center at 800-248-1946 or 414-272-8575 (outside North America) or visit the Web site at www.asq.org. Institutional subscriptions are held in the name of a company,
IDENTIFICATION STATEMENT: Copyright 2009 by ASQ. QUALITY MANAGEMENT JOURNAL (ISSN 1068-6967) corporation, government agency, or library.
is published quarterly (January, April, July, October) by ASQ, 600 N. Plankinton Ave., P.O. Box 3005,
Milwaukee, WI 53201-3005. Preferred periodicals postage paid at Milwaukee, WI, and additional mailing offices. Canadian GST #128717618. Canadian Publications Mail
Agreement #40030175, Returns: 4960-2 Walker Rd., Windsor, ON N9A 6J3. Back issues are available by calling ASQ at 800-248-1946 (U.S. or Canada) or 414-272-8575.
ASQ members $15 per copy; nonmembers $23 per copy and based on availability.
Authorization to photocopy items for internal or personal use is granted by QUALITY MANAGEMENT JOURNAL provided that the fee of $1 per copy is paid to the
Copyright Clearance Center Inc., 222 Rosewood Drive, Danvers, MA 01923, 978-750-8400. Copying for purposes other than internal or personal reference requires the
express permission of QUALITY MANAGEMENT JOURNAL. For permission, contact Valerie Funk at ASQ, P.O. Box 3005, Milwaukee, WI 53201-3005, or call 414-272-8575.
To request bulk reprints (100 or more) contact Barbara Mitrovic at the same address or phone number.
For microform, contact ProQuest Information and Learning, 300 N. Zeeb Road, Ann Arbor, MI 48106, 800-521-0600, ext. 2888, international 734-761-4700,
www.il.proquest.com.
MANUSCRIPT REQUIREMENTS: Manuscripts should be submitted to James R. Evans, Editor, Quality Management Journal c/o ASQ, 600 N. Plankinton Ave., Milwaukee,
WI 53203. See the Author Guidelines in the back of this issue for details about manuscript requirements and submission or see ASQ’s Web site at www.asq.org.
Claims: No claim for missing issues will be accepted after three months following the month of publication of the issue for domestic addresses and six months for Canadian
and international addresses.
POSTMASTER: Please send address changes to Quality Management Journal, ASQ, P.O. Box 3005, Milwaukee, WI 53201-3005. Printed in USA
QMJ Editorial

Editor
James R. Evans
University of Cincinnati

FOUNDING Editor
William A. Golomski

BOOK REVIEW Editor


James B. Kohnen
St. Mary’s College of California

QMJ Administration/Production

publisher
William Tony

manuscript coordinator
Valerie Funk

Copy EditorS
Leigh Ann Klaus
JoAnn Regenauer

Production
Cathy Schnackenberg

Digital Production Specialist


Laura Franceschi
Editorial Editorial
Advisory Board Review Board

Christine Cantarino Sanjay Ahire Frank Knight


Abbott University of South Carolina FISI Madison Financial
Barbara B. Flynn Robert Batson Ronald D. Kurtzmann
Indiana University University of Alabama Diamond Management Systems
Steven Hoisington Peter Billington Yongjin (James) Kwon
Electro-Motive Diesels, Inc. Colorado State University–Pueblo Drexel University
Karen E. Koch Ram Bishu Deborah Manzo
North Mississippi University of Nebraska University of North Carolina at Chapel Hill
Medical Center Luis Calingo Kathleen L. McFadden
Peter J. Kolesar Dominican University Northern Illinois University
Columbia University Adrian S. Choo Satish Mehra
Rensselaer Polytechnic Institute University of Memphis
John Latham
Monfort Institute, Sharon Clinebell Nat Natarajan
University of University of Northern Colorado Tennessee Tech
Northern Colorado Lori Cook Ceyhun Ozgur
Cathy Lawson DePaul University Valparaiso University
General Dynamics Sime Curkovic Gertrude Pannirselvam
Roger G. Schroeder Western Michigan University Southern Illinois University Edwardsville
University of Minnesota Maling Ebrahimpour Victor Prybutok
Kalyan Singhal Roger Williams University University of North Texas
University of Baltimore Jacob K. Eskildsen Darrell Radson
Aarhus School of Business (Denmark) Drexel University
Ken Stephens
University of South Florida Joy Field Gipsie B. Ranney
Boston College Belmont University
Fran Zenzen
General Dynamics Matt Ford Alan Robinson
Northern Kentucky University University of Massachusetts Amherst
S. Thomas Foster Jr. Borut Rusjan
Brigham Young University University of Ljubljana (Slovenia)
Lawrence Fredendall Brooke Saladin
Clemson University Wake Forest University
Brian Fynes
The Michael Smurfit Graduate School of Business Paulo Sampaio
(Ireland) University of Minho

Vidyaranya Gargeya Danny Samson


University of North Carolina at Greensboro University of Melbourne (Australia)

Thomas Gattiker Joseph Sarkis


Boise State University Clark University
Sherrill Gelmon Helmut Schneider
Portland State University Louisiana State University
Soumen Ghosh Marc Schniederjans
Georgia Institute of Technology University of Nebraska
Susan Meyer Goldstei Dean Schroeder
University of Minnesota Valparaiso University
John Grout Scott Shafer
Berry College Wake Forest University
Sandra J. Hartman Vinod Singhal
University of New Orleans Georgia Institute of Technology
Janelle Heineke Marilyn Smith
Boston University Winthrop University
Marilyn Helms Rui Sousa
Dalton State College Universidade Catolica Portuguesa (Portugal)
Jeff Heyl John G. Surak
Lincoln University Clemson University
Steve Hillmer Kwei Tang
University of Kansas Purdue University
Jane Humble Milé Terziovski
Arizona State University University of Melbourne (Australia)
Dana M. Johnson Joseph G. Van Matre
Michigan Tech University of Alabama at Birmingham
Hale Kaynak Rohit Verma
University of Texas-Pan American Cornell University
Ray A. Klotz Gregory H. Watson
Qualcomm, Inc. Oklahoma State University
Intro
duction
I recently returned from my second trip to China to lecture and provide advice on understanding
and using the Baldrige criteria in conjunction with some local and provincial quality award programs
(namely, the Ningbo Mayor’s Quality Award and the Shandong Province Governor’s Quality Award).
There clearly is an intense interest in quality among Chinese business owners and government officials,
which supports the conclusions in other articles I have read in Quality Progress and elsewhere. While
many large corporations have highly developed quality systems that can benefit from a comprehensive
approach to high-performance management practices, I also see many smaller companies struggling
with the basics for whom the Baldrige criteria would be overwhelming, intimidating, and counter-
productive (thinking of Jim Harrington’s work on best practices and organizational maturity back in the
1990s). Nevertheless, I was impressed by the fact that in each lecture, some 100 participants listened
intently, took copious notes, and asked many questions. I have not seen this scale of interest locally for
some time, and we all know that interest in Baldrige and quality in general has waned among manufac-
turing and small businesses. This all reminds me of Joseph Juran’s observation of the relative trajectories
of quality improvement in Japan and the United States back in the 1950s. The question is how long
will it take before their trajectories overtake ours—unless, of course, we begin again to accelerate our
rate of improvement.
Improvement is the focus of the first paper by Satya Chakravorty. “Process Improvement: Using
Toyota’s A3 Reports” describes an interesting, but little-known, tool used by Toyota for problem
identification and solution, focusing on understanding successful factors related to implementation.
Alan Robinson and Dean Schroeder, in their paper “The Role of Front-Line Ideas in Lean Performance
Improvement,” provide insights on high-performing idea systems for lean initiatives, along with help-
ing us to understand why many companies have difficulty in creating a lean improvement culture.
In “Enhancing Six Sigma Implementation Through Human Resource Management” Xingxing Zu
and Lawrence Fredendall investigate the role of three quality-based HRM practices—employee
involvement, training, and performance and recognition—in Six Sigma implementation.
I would also encourage readers to consider submitting papers to the special issues on healthcare
and supply chain management that we are trying to organize. Please see the announcements on pages 60
and 64 of this issue.
Enjoy the issue.
James R. Evans, Editor
james.evans@uc.edu

4 QMJ VOL. 16, no. 4/© 2009, ASQ


Executive
Briefs
Process Improvement: effectively guide a process improve- only limited productivity improve-
Using Toyota’s A3 Reports ment effort using A3 reports to ment until management adopted
(pp. 7–26). Satya S. Chakravorty, reduce waste from the operations. a high-performance idea system.
Kennesaw State University The authors decided to delve
Toyota uses A3 reports to drive The Role of Front-Line more deeply into the cause of this
process improvement. The com- Ideas in Lean Performance relationship.
pany created these reports as a tool Improvement (pp. 27– 40). The data used in this study
to identify problems, find solutions, Alan G. Robinson, University were derived from field research
and report results of improvement of Massachusetts, and Dean M. in more than 300 organizations
activities. The A3 report is an effec- Schroeder, Valparaiso University in 25 countries. All were apply-
tive tool because it contains not only Over the years, many manufac- ing lean principles with employee
text, but also pictures, diagrams, turing and service organizations ideas as their primary con-
and charts, all of which enrich and have adopted lean principles in tinuous improvement tool. The
clarify the data. hopes of improving performance. three strongest relationships the
The author found no study, Yet the majority of these compa- authors’ data showed between
however, that explained how to nies have not been truly successful high-performing idea systems and
implement the A3 report in manu- at becoming lean. This can be lean performance improvement
facturing operations. Thus, the explained by the fact that many are that a high-performing idea
purpose of this study is to show leaders of companies that start system: 1) creates a lean improve-
how A3 reports are implemented in lean efforts lack a real understand- ment culture by engaging the work
a successful process improvement ing of the principles involved and, force in daily improvement activity;
project in aircraft maintenance therefore, focus on short-term 2) taps improvement opportunities
and repair operations. In doing so, application of isolated tools rather that are difficult for managers to
he shows a systematic approach, than the deeper changes neces- spot; and 3) promotes rapid orga-
improvement event, and the process sary. This paper identifies a critical nizational learning.
used to implement and document component that is often missing The authors’ work has identified
the reports. in underperforming initiatives — what they believe to be two barriers
An improvement event is gener- the ability to get large numbers of for any company setting up a high-
ally completed in four weeks and improvement ideas from front-line performing idea system. First, most
has four distinct phases: 1) prepa- employees . managers have experience with only
ration and training; 2) process The authors noticed that there the suggestion-box type of system,
mapping and analysis; 3) process appeared to be a relationship which causes them to shy away from
mapping and analysis of future state; between the performance of a com- any kind of initiatives to promote
and 4) implementation and own- pany’s idea system and the success front-line ideas. The second barrier
ership transfer. The author notes of its lean effort, as defined by its is that high-performing idea sys-
five implications of this process rate of productivity improvement. tems frequently require significant
improvement effort involving A3 In several companies they stud- and difficult changes in operating
reports. This research shows how to ied, the lean initiatives resulted in practices.

www.asq.org 5
Briefs
E n h an c i n g S ix S i g ma employee training, and employee effect on the three traditional
Implementation Through performance and recognition—that quality-oriented HRM practices.
Human Resource Management are important in forming a quality The data for the study were
(pp. 41–54). Xingxing Zu, Morgan culture and influencing the attitudes drawn from a Web-based survey that
State University, and Lawrence D. of employees in favor of quality. investigated the implementation
Fredendall, Clemson University Three hypotheses were proposed of quality management programs
Many companies claim to have to determine if the traditional HRM in the U.S. manufacturing indus-
achieved remarkable improvements practices significantly affect the level try. The study comprised 95 plants
as a result of implementing Six to which an organization applies Six that had implemented Six Sigma
Sigma methodology. Not all orga- Sigma methods such as the struc- as a formal quality management
nizations, however, have had the tured improvement procedure and method.
same success. Organizations that performance metrics: For the current study, the Six
have implemented Six Sigma suc- • Hypothesis 1: The three tradi- Sigma and HRM constructs were
cessfully claim that the best way tional quality-oriented HRM measured using a seven-point Likert
to manage the change that results practices have a positive direct scale. Results of this study indicate
from the implementation is through effect on the use of Six Sigma that the three HRM practices sig-
issues related to human resource methodology. nificantly affect the use of Six Sigma
management (HRM). This article • Hypothesis 2: The Six Sigma role methodology. In addition, it was
presents a study that investigates the structure has a positive direct found that Six Sigma role struc-
role of HRM practices on Six Sigma effect on the use of Six Sigma ture integrates with the traditional
implementation. methodology. quality-oriented HRM practices in
Prior research identified three HRM • Hypothesis 3: The Six Sigma role supporting the use of Six Sigma
practices—employee involvement, structure has a positive direct methodology.

6 QMJ VOL. 16, no. 4/© 2009, ASQ


Process Improvement:
Using Toyota’s
A3 Reports
Satya S. Chakravorty
Kennesaw State University
© 2009, ASQ

In order to drive process improvement, Toyota uses


A3 reports as a tool to identify and solve problems. INTRODUCTION
A3 reports are usually written on paper size 11 inches In order to drive process improvement, Toyota created
by 17 inches and are enriched with visuals such A3 reports as a tool to identify problems, find solutions,
as pictures, diagrams, and charts to improve com-
munication. To date, the author has found no study
and report results of improvement activities (Sobek and
explaining how to implement A3 reports in manu- Jimmerson 2004). The A3 report got its name from the
facturing operations. The purpose of this exploratory paper size on which the report is printed. In its purest
study is to show how A3 reports were implemented in form, A3 reports are printed on a single sheet of 11-inch
a successful process improvement project in aircraft by 17-inch paper (Radeka 2005). The A3 report is an
maintenance and repair operations. In doing so, he
effective tool because it contains not only text, but also
shows a systematic approach, improvement event,
and the process used to implement and document pictures, diagrams, and charts, all of which enrich and
A3 reports. The duration of an improvement event clarify the data. The thought behind the A3 report is
is generally four weeks and has four distinct phases: to include all relevant information and to establish a
1) preparation and training; 2) process mapping and clear representation of the current problem, eliminat-
current state analysis; 3) process mapping and future ing “waste” in the form of information that is not
state analysis; and 4) implementation and ownership.
absolutely pertinent to the problem at hand. The idea
Important for both practitioners and academicians,
the author also discusses implications of A3 report is to streamline the report so it focuses only on the
implementation and directions for future research. problem and its solution, and nothing else. A3 reports
Key words: lean, process improvement, Six Sigma,
are adopted in operations (Sobek and Jimmerson 2006)
theory of constraints and promoted by the Shingo Prize for Operational
Excellence (Chakravorty, Atwater, and Herbert 2008a).
To date, the author has found no study explaining how
to implement A3 reports in manufacturing operations.
One purpose of this exploratory study is to show how
A3 reports were implemented to improve the perfor-
mance of aircraft maintenance and repair operations.
The author demonstrates a systematic approach to the
improvement event, and the implementing and doc-
umenting of A3 reports. Each improvement event is
conducted at a target shop by an experienced facilitator
with a team of workers or process owners from the shop.
An improvement event consists of a host of activities, is
generally completed in four weeks, and has four distinct

www.asq.org 7
Process Improvement: Using Toyota’s A3 Reports

phases: 1) preparation and training; 2) process map- problem. In pursuit of operational excellence, Toyota
ping and analysis of current state; 3) process mapping calls these improvement ideas “countermeasures” to
and analysis of future state; and 4) implementation and imply that a solution is currently being reached for a
ownership transfer. Important to both practitioners and specific problem only until a better solution is found
academicians, this article discusses three implications (Sobek and Jimmerson 2004). With the objective of
of A3 report implementation and includes directions for countermeasures, participants draw the target condi-
future research. tion or future state. The future state diagram shows
how the modified or improved process will work when

TOYOTA’S A3 REPORTS countermeasures are in place. The second heading


is the “Implementation Plan,” which identifies the
According to Sobek and Jimmerson (2004), Toyota steps that need to be completed in order to realize the
has developed many kinds of A3 reports for different improvements outlined under the future state map.
applications. An example of an A3 report format is The participants clearly write the changes necessary to
included in Appendix 1. Other examples of completed improve the process, define a priority for the changes,
A3 reports can be found in Sobek and Smalley (2008), establish a timeline to complete the changes, and
Shook (2008), Jimmerson (2007), and Abilla (2007). identify the results expected from the process improve-
Typically, the report has left and right sections, and ment steps. The third heading is “Follow-Up,” and it
each section has many headings. involves activities that are not completed in the time
On the left section, there are four headings. The first outlined. Follow-up activities also are necessary to docu-
heading is the “Theme,” which succinctly states the ment problems or obstacles encountered during the
problem(s) being addressed in one or two sentences. implementation so the future implementation can be
The second heading is “Background,” which contains improved. In addition, results of the implementation are
a description of all pertinent information needed to also written, which outline what specific improvements
understand the scope of the problem at hand. The third have been realized.
heading is “Current Condition,” which deals with devel-
oping an understanding of what is happening currently
using a value-stream map (Rother and Shook 1998). METHODOLOGY
The map should be enhanced by inserting quantita- Action research is a collaborative process of critical
tive information (for example, takt time, setup times, inquiry that fosters the learning of theory and practice
and so on), storm bursts, or notes at appropriate places (Argyris 1985). The author used action research to
to develop a good understanding of all existing con- document how to implement process improvement pro-
ditions. These illustrations use words and pictures to grams using Toyota’s A3 report. According to Kemmis
enhance readability and understand the problem. See and McTaggart (2000), there are two reasons why
Tufte’s (1983) and Cleveland’s (1985) books for several action research is appropriate for these objectives. First,
examples of illustrations. The fourth heading, “Cause action research focuses on “… learning from trying
Analysis,” deals with determining the cause of the to bring about change….” (Kemmis and McTaggart
current problem. Sobek and Jimmerson (2004) recom- 2000, 572), where the typical participants are shop-floor
mend the “5 Why’s” method where participants ask the employees, middle managers, and outside consul-
“why” question five times to get to the bottom of the real tants. In this case, there is very little known about how
problem. There are, however, additional methods for to implement Toyota’s A3 reports, so the researcher,
performing root-cause analysis (see Lepore and Cohen as a participant, academic researcher, and process
1999; Womack and Jones 2003; and Keller 2005). improvement expert, was essential for this exploratory
On the right section, there are three headings. The investigation. Second, action research does not require
first heading is the “Target Condition,” which consid- control over the behavioral elements. Instead, it relies
ers possible improvement ideas that could rectify the on reflection and participation of subjects to evaluate

8 QMJ VOL. 16, no. 4/© 2009, ASQ


Process Improvement: Using Toyota’s A3 Reports

phenomena rather than control and objectivity. As events with several participants—including a steer-
participant-observer, the researcher was able to observe ing committee that was initially formed and chaired
how a host of activities were identified and coordinated by the vice president (VP) of operations. It would have
in implementing Toyota’s A3 reports. improved reliability to have the author’s findings evalu-
The action research methodology that was ated by an independent source; however, many of the
employed is based on Susman and Evered’s (1978) findings were considered proprietary by the organization
seminal work on how to conduct rigorous scientific and were not available for review by others. This process
action research, which is so highly regarded that it is also satisfies the “reflection” stage of CPM. The ideas
commonly referred to as “canonical action research” and events that improved performance were noted, as
(Davidson, Martinsons, and Kock 2004), or “action well as the researcher’s preliminary insights into why
science” (Kemmis and McTaggart 2000). Davidson they worked. This satisfied the “evaluation” stage of
clearly articulates five stages of rigorous action research. the CPM. The events observed while coordinating dif-
They are the principles of: 1) researcher-client agreement ferent activities related to improvement projects were
(RCA); 2) cyclical process model (CPM); 3) theory; compared with previous experiences of the researcher.
4) change through action; and 5) learning through Discrepancies in proposed causes and sequencing of the
reflection. Next, the author briefly discusses each stage events were noted for further examination. Solutions to
and shows how the study generally complemented, as problems in one stage of implementation were tried in
well as differed, with his recommendations. others. Each morning, based on consensus, the partici-
The RCA articulates the relationship among stake- pants chose the problems and events to first attack that
holders in the study, and is a key to establishing the satisfied the “planning” stage of the CPM. The planned
internal validity of the research findings. Stakeholders solutions were implemented during the first shift opera-
include the researcher, workers, managers, owners, tions of the organization, and new events were noted.
and all who will potentially benefit from the effort. The During this period, the researcher focused solely on
researcher participated in the steering committee and assisting with the implementation efforts and docu-
with shop-floor work groups. An acceptable RCA must menting the process. This satisfies the “intervention”
ensure the researcher’s access to all pertinent data and stage of CPM. This procedure occurred on an iterative
personnel who can provide insight into the “cause and basis throughout the study.
effect” phenomenon observed during the study. The orga- The findings in this study are explained through
nization agreed to these conditions as long as proprietary existing theories, and suggest how a theory or model
data were excluded from external review. for implementation of process improvement should be
CPM is a procedure for systematically applying solu- developed. The processes of action and the resulting
tions in an action research study (Davidson, Martinsons, changes are indivisible, because both exist in successful
and Kock 2004). Susman and Evered (1978) describe problem solving. According to Davidson, Martinsons,
five stages for systematically applying solutions in action and Kock (2004), if action does not bring about change,
research. In summary, they are: 1) diagnosis (identify- then: 1) no problem truly existed; 2) the intervention
ing the cause of a problem); 2) planning (identifying (action) was inappropriate; or 3) the problem could not
prospective solutions and how best to apply them to a be solved because of practical obstacles. To strengthen
problem); 3) intervention (actually applying the pro- reliability in learning through reflection, the author’s
posed solution); 4) evaluation (analyzing outcome team had at least two judges evaluate the consistency
data); and 5) reflection (the process of reviewing the of their results (internal validity). In this study, the
results of the effort). researcher independently evaluated the information
The primary form of “diagnosis” in this study was from participants, and then resolved the discrepan-
the reflection by the researchers on their own experi- cies through reflection and argument. The team then
ences. They spent several hours brainstorming ideas presented its findings back to the VP of operations and
and reflecting on what had happened during the day’s steering committee to evaluate the results.

www.asq.org 9
Process Improvement: Using Toyota’s A3 Reports

This 12-month study was conducted in aircraft would be available for at least two hours per day to
maintenance and repair operations with in-house reflect and provide feedback to the researcher. The Speed
manufacturing capability located in the southern team was responsible for strategizing process improve-
United States. As suggested by Yin (2008), the team ment with active participation from all functional areas,
used multiple sources of evidence such as documents, implementing process improvement, and following up
archival records, interviews, participation, and direct on implementation results.
observation. Essential steps of these operations con- Second, the focus was to adopt an improvement tool
sist of performing disassembly of aircraft, separating and an instrument to document and communicate the
nondefective parts from defective parts, replacing implementation of process improvement ideas. Over
defective parts with high-quality parts, and carrying the years, the manufacturing operations had initiated
out assembly of the aircraft. The parts to replace the many process improvement tools such as Six Sigma
defective parts were produced in the manufacturing (Keller 2005; Pyzdek 2003), lean (Chakravorty and
shops. The redesign effort was initiated to stay com- Hales 2004; Womack and Jones 2003; Robinson 1990),
petitive in the domestic and international markets. The and theory of constraints principles (Chakravorty and
pressure from the VP of operations was to drastically Atwater 2006; Goldratt and Cox 2004; Chakravorty
reduce turnaround time for aircraft maintenance and 2000) (see Appendix 2). One problem with these initia-
repair operations while improving the quality of overall tives was that they were fragmented and rarely worked
maintenance and repair operations. together to synergistically improve the performance of
various operations. One objective of this initiative was

DESCRIPTION OF PROCESS
to integrate all of these improvement strategies into one
core strategy that was simple to understand and to drive
IMPROVEMENT IMPLEMENTATION operational excellence from the bottom up. While the
Speed team recognized the need for sophisticated tools

Initial Initiative (for example, statistical process control), the general


census was that the majority of managers and workers
Four major steps were necessary before implementation did not possess the needed skills to either fully under-
of process improvement was carried out. First, the VP of stand or to implement such tools. Implementation of
operations, along with divisional managers and branch sophisticated tools was left to the discretion of indi-
heads of functional areas, established a core team called vidual facilitators and to the specific needs of a given
“Speed” to develop a strategic intent and to drive the situation. The Speed team worked diligently to develop
process improvement. The Speed team consisted of the contents of the training program, including illus-
managers and workers from the functional areas who trations, examples, and interactive simulation games
were experienced in process improvement, and outside to provide training in the basics of process improve-
experts or researchers (the author) in process improve- ment. Essentials of the training program included the
ment strategies. The core team also included trainees concept of waste, process or value-stream mapping,
from the functional areas. The RCA stipulated that: and applying the problem-solving steps: identify the
1) the client was committed to improving mainte- problem, gather information, generate solutions, pri-
nance and repair operations, and was willing to provide oritize solution, and implement solutions (similar to
all pertinent data to the researcher; 2) the researcher Six Sigma’s approach of define, measure, analyze,
would document the application of process improve- improve, and control). As an instrument to document
ment in a research log and provide findings to the VP of and communicate the progress of all process improve-
operations and to the divisional managers as requested; ment efforts, the Speed team decided to use a version of
3) the researcher would provide training and participate Toyota’s A3 report as Speed A3 report (see Appendix 3).
in improvement efforts in exchange for publishing This report was usually printed on one page of 11-inch
the results; and 4) all participants and the Speed team by 17-inch paper, but sometimes it was printed on two

10 QMJ VOL. 16, no. 4/© 2009, ASQ


Process Improvement: Using Toyota’s A3 Reports

pages of 11-inch by 8 ½-inch paper. To reinforce the consultants for their input and approval. After delib-
understanding of A3 reports among managers and erations, the Speed team developed the final priority
workers in the application of the report, the team devel- for 25 process improvement projects in various stages
oped examples of trial reports, and supervised a session of the entire maintenance and repair operations, and
where the managers and workers applied the report to immediately began application of A3 reports.
eliminate waste from the process.
Third, the Speed team performed high-level pro-
cess mapping of maintenance and repair operations. Application of Speed A3 Report
This was designed to understand the flow of parts and The Speed team developed an appropriate human
information into the existing operations. Although infrastructure to drive improvement from the bottom
these operations involved complex and intertwined up. The Speed team established low-level improve-
flows, the Speed team determined that there are four ment teams involving processes, and chose champions
distinct stages. In stage 1, aircraft are scheduled for to manage these teams. In addition to communicating
maintenance. Once they physically arrive at the main- with the Speed team, the champions worked with the
tenance area, they are pulled into a hanger, and an low-level improvement teams on various improve-
in-depth inspection is performed. In stage 2, they are ment events. These events involved coordinating a
disassembled, and defective parts are separated from host of activities to apply A3 reports. Each event was
nondefective parts. Some parts are replaced as man- orchestrated by an experienced facilitator along with
dated by the Federal Aviation Agency (FAA) guidelines. a couple of Speed team trainees. The trainees are
In stage 3, orders are released to produce component included so they can become future facilitators by
parts in manufacturing operations consisting of 14 learning the latest process improvement strategies
different shops. Once the parts are produced, they are and their deployment to improve actual operations.
transported to the assembly area. In stage 4, final The trainees also saved the facilitator’s valuable time
assembly of the aircraft is performed, testing and by providing assistance in gathering and organiz-
inspection is done, and, finally, the aircraft is sent out ing relevant data to accelerate implementation. It is
for use. important to understand that no two events are alike,
Fourth, since the Speed team could not effectively and that each event had to be treated as a separate
address all of the problems simultaneously, they strug- entity. In general, each event took four weeks, and
gled to decide which ones to address first. The Speed each week involved different activities.
team documented many wasteful activities in different
departments, and segregated them using the frequency
of their occurrences. After several iterations, there was Phase 1: Preparation and
agreement on the problems based on two possible
outcomes, either potential cost savings or revenue gen- Training (First Week)
eration. When applicable, the potential cost savings were There were five major activities in this phase. First, once
computed in terms of reduction in defects, inventory, the target shop was designated, the first objective was to
returns, or temporary workers’ payroll, and so on. When form a team to lead improvement efforts in the shop. The
applicable, the revenue generation ideas were calculated team consisted of an experienced facilitator, Speed team
in terms of faster response time, increased throughput, trainees, and workers from the shop. Generally, four to
or better utilization of bottleneck operations. Combing nine shop workers were chosen, and each worker devoted
the two potential outcomes, the Speed team prioritized at least 20 hours per week for the first three weeks, and
process improvement projects based on those with the 40 hours per week for the fourth week. To get an idea of
strongest support from the workers and managers. The the extent of possible improvements, the facilitator made
Speed team then held a meeting with the VP of opera- arrangements for workers to visit another shop where an
tions, divisional managers, branch heads, and outside improvement event was previously conducted.

www.asq.org 11
Process Improvement: Using Toyota’s A3 Reports

Second, the team members spent time studying strategies, three training sessions for two hours each
the existing shop operations. They obtained the latest (with a lunch break and other breaks) per day were
shop layout drawings, identified shop boundaries, and scheduled. At the end of each session, the workers were
noted material flow through the shop. They walked given simulation games or Tinker Toy® games to apply
through the process, observed material flow, and noted their process improvement strategies. Throughout the
various machines and tools used throughout the process. training session, open discussions were encouraged, so
In doing so, they identified and “red tagged” old and workers felt comfortable providing their input. Finally,
unused machines and/or tools for their removal from the team secured a digital camera to archive before
the shop. The team collected preliminary data, which and after implementation pictures, and later used these
included actual output, customer demand, on-time pictures to document the implementation.
percentages, start times, breaks, shifts, lunch times, and
similar information. The team also discussed target goals
and measurements (for example, travel time reduction, Phase 2: Process Mapping
work-in-process reduction, take time reduction, mistake and Analysis of Current State
reduction, and so on), and documented all suggestions
for improvement coming from shop workers. (Second Week)
Third, after studying the shop operations, the team There were three important activities during this
deliberated on verbalizing a problem statement for the phase. First, with active participation from work-
shop. Typically, the first time a problem statement was ers, the facilitator orchestrated the development of a
written, there was no clear agreement among workers. current state map of the shop operations. They used
While each worker was very familiar with his or her job, sticky notes to describe an operation (or machine),
he or she still lacked an understanding of flow through and Sharpies® (permanent dry markers) to connect
the shop. The facilitator and the Speed trainees played each operation in order to highlight the flow through
an important role, and used the Socratic approach the target shop. The team used sticky notes and
to seek the shop workers’ input in order to refine the Sharpies® because they were simple to use. They tried
problem statement. After several iterations, patiently to use electronic display boards, but they encoun-
considering the workers’ input and the Speed trainees’ tered problems due to power or battery failure, and
suggestions, the facilitator wrote the actual problem lost many hours of work. Often, they used red sticky
statement on the A3 report. notes to show non-value-added activities and green
Fourth, a conference room close to the target shop sticky notes to show value-added activities. While
was secured in order for workers to meet frequently creating the process map, discussions among work-
and to openly discuss ways to improve the process. To ers, Speed trainees, and the facilitator were crucial for
incorporate management’s suggestions, an invitation the success of an improvement event. In all of these
to the kick-off meeting was sent to the VP of operations, improvement events, workers acknowledged they were
divisional managers, branch heads, managers, and shop aware of wasteful activities (for example, wait time,
supervisors. In addition, a suggestion box was set up near transportation, and defects) in their shop, but they
the shop to encourage the rest of the workers, especially were not aware that these activities could occupy the
those who were not included in the team, to give their majority (for example, 80 percent) of their time.
input about the shop’s problems and their solutions for Second, the team used both qualitative and quanti-
improvement. tative data to analyze the existing shop. Qualitative data
Fifth, process improvement training was provided were gathered through independent surveys, interviews,
in the conference room. The training was delivered observations, and participation. In addition, they found
by the facilitator in an interactive manner by using that casual discussions with workers and supervisors
presentation slides with audio and video enhance- during breaks and lunch hours were very effective in
ments. To cover all aspects of process improvement gaining insights into the existing shop’s difficulties. In

12 QMJ VOL. 16, no. 4/© 2009, ASQ


Process Improvement: Using Toyota’s A3 Reports

fact, many times these discussions provided insights using sophisticated procedures. Once a thorough analysis
into the type of quantitative data necessary to better of the current state was complete, the facilitator filled the
understand the existing conditions. These insights (or appropriate section in the A3 report.
qualitative data) provoked their interest in searching for
a type of quantitative data that they would otherwise not
have discovered. Phase 3: Process Mapping
Quantitative data were collected through a variety and Analysis of Future State
of sources, including personal observations and mea-
surements. First, the team obtained layout drawings (Third Week)
of the existing shop and ascertained that there were There are four activities involved in this phase. First,
no major discrepancies between the drawing and the with active participation from workers, the facilitator
physical layout of the shop. Second, they obtained as orchestrated the development of a future state map of
much shop information as possible, which included the shop operations. Once again, the facilitator played
shop routing, down times, setup times, quality an important role, and using the Socratic Method,
reports, and efficiency reports. Third, they collected guided the workers to improve the current state of the
data by observing and measuring cycle time, travel shop operations. To start discussions, the facilitator
time, square footage of each area, type of defects, and challenged non-value-added activities and asked sim-
similar data associated with the shop. It is important ple questions like, “Do we need this step?” “How can
to note that the facilitator needs to use experience we eliminate this step?” or “Can we move this machine
and judgment in collecting just enough data (opti- here to reduce travel time?” Usually workers answered
mum amount) to perform a thorough analysis of the these questions, and soon they started to actively par-
existing conditions. They found that many facilitators ticipate in providing suggestions for improving their
got bogged down in collecting an exhaustive set of existing shop operations. The facilitator should exercise
data, and then were left with insufficient time to per- utmost caution, however, and not hastily provide solu-
form an adequate analysis, which resulted in a poor tions to the problems. It took a little longer, but the
implementation. workers eventually provided suggestions for improving
Third, a thorough analysis was performed to find the their shop’s problems, an absolute must for ownership
root cause of the problem. Qualitative techniques used to and “buy in” to occur. After several iterations, there
perform analysis ranged from simple procedures such as usually was an agreement among the workers on the
“5 Why’s” and fishbone charting to a current reality tree. future state of the shop operations.
Similarly, quantitative techniques to perform analysis Second, once the future state of the shop operations
ranged from simple procedures that included histograms was decided, the facilitator and Speed team train-
(content analysis), Pareto charts, and “t” tests, and ees developed a “to do” list, which included action
sophisticated procedures such as analysis of variance items, responsibilities, and deadlines to complete all
(ANOVA), regression, and design of experiments (DOE). tasks. The facilitator went through the list diligently
In general, they found that simple procedures often and made sure that all supporting functions were
worked better than sophisticated procedures. Although informed. For example, there were usually layout
a majority of the workers did not have a college degree, changes involving moving machines and tools from
they easily understood simple procedures, and experi- one location to the other. The facilitator coordinated
enced little or no trouble in applying such procedures with plant operations to be sure that machine founda-
to perform current state analysis. In other words, the tion requirements, machine preparations, availability
team had to rely on simple procedures, rather than of electricians, and, if necessary, that heavy machinery
sophisticated procedures, to drive process improvement movers, would be available.
from the bottom up. Many times, however, the facilitator Third, the facilitator held a meeting with the
augmented worker’s analysis with additional analysis entire shop to explain the forthcoming changes or

www.asq.org 13
Process Improvement: Using Toyota’s A3 Reports

Table 1
Speed A3 Report Date 06/02/08

Target Shop: 3553


Facilitator: Satya Chakravorty
Speed Trainees: James Ivey, Lewis Carroll, Dave Davies, John Johnson, Kenneth John
Process Owners: John Copland (Supervisor) and Heat Treatment Artisans

1. Problem Statement
The heat treatment is designed to deliver treated parts to the foundry components and the manufacturing components. Parts processed
through heat treatment are frequently delayed, which in turn negatively impact the performance of the manufacturing components.

2. Current State Analysis


Process map of the existing conditions reveal that only about 25 percent of activities are adding value. Many activities are
performed manually.

Non-value-added activities Value-added activities

Artisan from another Verify Create heat treat Transport to Treat part with
area carries part paperwork requisition oven / solution solution and
to heat treat (1 min) document (5 min) (20 min) remove (8 min)

Non-value-added activities Value-added activities Value-added activities


Value-added = 24.64%
Put in freezer (9 min) Stamp off Non-value-added = 75.36%
Transport to Rinse
Note: Part sets in freezer until artisan paperwork, 1st heat
glyco-solution chemical
retrieves it for re-form / re-shaping treat completion
(20 min) (1 min)
and sets it on the incoming table for (5 min)
2nd heat treat process

Turn Around Time—Before Heat Treat Area


90 Interview and a walk-through with Hubert Suggs
80
70
60 Artisans bring the work with the paperwork to the heat treat area. Parts
50
Hours

going to the oven then SW (solution wash to make material soft) after SW
40
30 goes to clear water to wash off the chemical. After SW and water go back
Part 3456
20 Part 3407 to where they came from to be reform/straighten, then go back to heat
10
0 Part 4006 treat to be aging (check AMS standard American Metal Society) then go to
1 2 3 4 standard machine, if meet the standard then for sale. 2-3 times heat treat.
Quarters Heat, average temperature 925 degree for 30 minutes, after the oven to
solution 100 degree for 8 seconds (glycol solution) then go into the water
(wash off the chemical) go into the freezer –60 degree, stay in the freezer
until they need it. (Aging) test machine.

Quincy oven / furnace (underground unit), can only process 1 job at a time,
utilized 3-4 times a year. This furnace primarily processes 5' exhaust duct.
New furnace (walk-in furnace has 4235 generated) can do multiple jobs
(Waltz)
Need better working tools for efficient job.

Clean up the area-5S plus 1 event


Better equipment to work with
Better tools to work with
Only have
Better test equipment for accuracy (certain parts require stress test accuracy.
Every two weeks 30 parts small parts) save time.
©2009, ASQ

Recommend walk-in-freezer
Recommend a replacement “Quincy” oven/furnace that is above ground
and can handle multi-job requirements

14 QMJ VOL. 16, no. 4/© 2009, ASQ


Process Improvement: Using Toyota’s A3 Reports

Table 1 (continued)
3. Future State Analysis
After implementation, value-added activities will increase to about 60 percent. There are additional opportunities for buying new
machines to speed up the treatment process.

Non-value-added activities Value-added activities

Artisan from another Verify Create heat treat Treat part with
area carries part paperwork requisition solution and
to heat treat (1 min) document (5 min) remove (8 min) Many activities before
and after treatment
could be automated.
Non-value-added activities Value-added activities Value-added activities
Two software packages
have been contacted.
Put in freezer (9 min) Stamp off
Rinse
Note: Part sets in freezer until artisan paperwork, 1st heat
chemical
retrieves it for re-form / re-shaping treat completion
(1 min)
and sets it on the incoming table for (5 min)
2nd heat treat process

Heat treatment engineer


informed that newer models
of this process could cut down
processing by 50%.

4. Implementation
Implementation was generally smooth. Oven-solution and glyco-solution baths were moved closer to the heat treatment area.
Follow-up visits revealed that new equipment was not purchased. The shop now has a new supervisor. After four weeks, results
showed the performance of the shop improved and results are included here.

Value Analysis: After Turn Around Data—After


45
40
35
30
25
Hours

20
Value Add 15 Part 3456
Non-Value Added 10 Part 3407
5
0 Part 4006
1 2 3 4
Weeks ©2009, ASQ

The turnaround time performance also improved. The shop supervisor indicated that turnaround time for many other parts have
gone down. That area has not received any complaints about treated parts from manufacturing components. Automation of order
processing is under way. IT department is evaluating two software vendors.

improvement initiatives. At this time, the team mem- map with the future state map to estimate reduction
bers shared the details of changes with rest of the in all non-value-added activities. For example, a 40
workers. Many workers provided additional sugges- percent reduction in travel time, an 80 percent reduc-
tions for improvement in the future state map, and tion in transportation, and a 20 percent reduction
the facilitator incorporated those suggestions to refine in wasteful activities in the shop. Once all of these
the future state map of the shop operations. estimates were complete, the facilitator completed the
In the fourth and final stage, the facilitator started appropriate section in the A3 report and made a final
to impart all of the upcoming changes to the shop check before all the changes were implemented the
operations. The facilitator compared the current state following week.

www.asq.org 15
Process Improvement: Using Toyota’s A3 Reports

Phase 4: Implementation responsibilities, and a timeline to complete those


activities. The facilitator followed up and made sure
and Ownership Transfer that all unfinished activities were completed on time.

(Fourth Week) As the last activity of an improvement event, four to


six weeks following the implementation, the facilita-
There were two major steps taken during this phase. tor completed the appropriate sections of the Speed A3
First, the facilitator orchestrated actual imple- report. Examples of three implementation reports are
mentation in the target shop. Good planning and provided in Tables 1, 2, and 3.
participation of the workers in the previous stages
facilitated a smooth transition to all of the changes
in the shop. Since this phase involved all aspects of IMPLICATIONS FOR PROCESS
a shop (machines and tools, method, materials, and
personnel), there were often last-minutes glitches. The
IMPROVEMENT IMPLEMENTATION
facilitator provided assistance in coordinating these There are five implications of this process improve-
activities to make the implementation a success. The ment effort involving A3 report implementation. First,
workers followed through with the changes, discussed the team encountered many problems in developing
the benefits of the changes openly, and began to oper- A3 reports. Initially, the facilitator along with many
ate under the changed conditions. As the changes participants who were involved in the actual process
were introduced, the performance of the shop did not improvement wrote parts of A3 reports. There was pro-
immediately improve, even in the next week. In fact, pensity among the participants to fill every space on
the performance of the shop deteriorated as workers A3 reports with descriptions, pictures, and diagrams.
were transitioning into new ways of operating. There Often times, the handwriting of many participants
was chaos and confusion in many areas of shop oper- was barely legible. In addition, many A3 reports got
ations. In a couple of weeks, however, as the workers soiled with manufacturing oil or grease as participants
became accustomed to operating in the new way, their wrote on them. These initial attempts cluttered many
individual performance improved and, eventually, A3 reports and created confusion among participants,
the target shop’s performance improved. At the end facilitators, and process owners. In fact, many of the
of this week, the facilitator took pictures of the shop initial reports had to be either completely rewritten, or
to document “after” implementation conditions, and additional pages of explanation had to be attached.
assisted the workers in preparing for the presentation, Later, as they gained experience, instead of filling out
which included all the changes. The presentation was the entire A3 report, only the most important descrip-
done by the shop workers for the VP of operations, tions and pictures or diagrams were included. Typically
divisional managers, branch heads, managers, and the facilitator or another participant with satisfactory
shop supervisors. handwriting completed the A3 report. There was no
Second, once the implementation was complete, readily available solution to protect the A3 reports from
a follow up was necessary. The facilitator visited the manufacturing oil or grease. More research is necessary
target shop to learn from the improvement event. The to determine the feasibility of developing a software
facilitator documented specific methods that worked, system to create A3 reports. Once the required infor-
specific methods that did not work, and determined mation is provided, such a system should be able to
how to modify the future process improvement event. generate a digital version of A3 reports.
It is important to note, however, that many times all Second, A3 reports implementation was successful
activities could not be completed, despite the team’s because the team developed an appropriate human
best efforts. The facilitator diligently documented infrastructure to drive improvement from the bot-
all unfinished activities and developed a follow-up tom up. The approach was to establish low-level
list of activities, specifying action items, individual improvement teams along product flows and choose

16 QMJ VOL. 16, no. 4/© 2009, ASQ


Process Improvement: Using Toyota’s A3 Reports

Table 2
Speed A3 Report Date 07/01/08

Target Shop: 3675


Facilitator: Satya Chakravorty
Speed Trainees: Jeff Anderson, Nick Johnston, and Mike Rogers
Process Owners: Jim Grant (Supervisor) and Manufacturing Component Artisans

1. Problem Statement
The manufacturing component produces parts needed for the assembly process of maintenance and repair operations. The workers
suspected that there were too many jobs in work-in-process causing long lead-times, and the bottleneck resource was poorly utilized
(and working on wrong jobs).

2. Current State Analysis


Process mapping revealed that “form material” (Farquar) machine was the bottleneck. This implies that this machine will dictate
the output of the line.
Layout changes were difficult in this shop.

Obtain work order Review WK pkg. Travel to Verify & match metal
from PC area & pull sheet metal room with pull sheet Bottleneck time = 45 min
(2 min) (5 min) (5 min) (10 min) Output (8 hours) = 10 jobs

Is template in Yes Template in pkg. travel Scribe Travel to Trim material


pkg. or need to to workbench template bard saw to template
obtain? (2 min) (10 min) (1 min) (7 min)

No
Obtain template
from rack
(2 min)

Debur Is form Yes Transport to QA Transport to


Form material
material required? workbench heat treatment
(Farquar: 45 min)
(3 min) (2 Min) (2 min)
No
Transport to
Is part good Good
brake shop
(1 min) or defective?
The analysis confirms that
Bad too many jobs were in the
Defective part is scrapped and process process and bottleneck is
re-starts at travel to metal room. not properly utilized.

Work in Process—Before Bottleneck Utilization—Before


80 60%
70 50%
60
50 40%
40 30%
30
20 20%
©2009, ASQ

10 10%
0 No. of Jobs
1st Wk 2nd Wk 3rd Wk 4th Wk 0%
Setup Breakdowns Utilization

www.asq.org 17
Process Improvement: Using Toyota’s A3 Reports

Table 2 (continued)
3. Future State Analysis
A drum buffer rope (DBR) solution was developed. First, drum was developed for the bottleneck machine. Second, buffer size
was developed to protect the drum. Third, rope was tied to properly release jobs into manufacturing component area.

Obtain work order Review WK pkg. Travel to Verify & match metal
from PC area & pull sheet metal room with pull sheet
(2 min) (5 min) (5 min) (10 min)

Is template in Yes Template in pkg. travel Scribe Travel to Trim material


pkg. or need to to workbench template bard saw to template
obtain? (2 min) (10 min) (1 min) (7 min)

No
Obtain template
from rack
(2 min)

Debur Is form Yes Transport to QA Transport to


Form Material
material required? workbench heat treatment
(3 min) Buffer Drum
(Farquar: 45 min)
(2 Min) (2 min)
No
Transport to
Is part good Good
brake shop
(1 min) Rope or defective?

Bad
Defective part is scrapped and process
re-starts at travel to metal room.

4. Implementation
Development of the initial drum schedule and rules to improve the efficiency of the bottleneck was difficult. The bottleneck had
some maintenance issues, which were studied by the maintenance department. The number of jobs in the system decreased and
bottleneck utilization improved.

Work in Process—After Bottleneck Utilization—After


14 70%
12 60%
10 50%
8 40%
6 30%
4 20%
2 10%
0 No. of Jobs
1st Wk 2nd Wk 3rd Wk 4th Wk 0%
Setup Breakdowns Utilization
©2009, ASQ

Four weeks after the implementation, bottleneck performance had increased. The shop supervisor confirmed that parts lead-time
decreased. The supervisor also knew that many steps of the operation were manually done and that there was an opportunity
for automation.

18 QMJ VOL. 16, no. 4/© 2009, ASQ


Process Improvement: Using Toyota’s A3 Reports

Table 3
Speed A3 Report Date 09/01/08

Target Shop: 4095


Facilitator: Satya Chakravorty
Speed Trainees: Maggie Davis, John Anderson, and Ivey James
Process Owners: Kevin Rice (Supervisor) and Tubing Area Artisans

1. Problem Statement
The problem in the tubing area was that there was high variability in processing time through the area. The artisans pointed out
that the problem was around one machine “process tube.”

2. Current State Analysis


After interviewing workers and completing the process map, the improvement team observed variation in processing time for
“process tube” operation. The facilitator suggested a statistical process control chart to pinpoint the problem and applied Six
Sigma’s DMAIC method.

Obtain work Verify print Travel to Retrieve conversion code from


order from box matches P/N on computer computer or cabinet for tubing
by aisle way work document or cabinet machine setup sequence
Samples were obtained
(1 min) (2 min) (5 min) (1 min)
from this machine

Cut tube to Clean tube in Stamp off


Debur tubing Process tube
length varsol tank paper work
(2 min) (20 min)
(3 min) (5 min) (1 min)

Travel to clock station Deliver completed 3R


UCL = X +
and clock-off work tubing to PC d2 n
(1 min) (1 min)
3R
LCL = X −
d2 n
n = Sample size
X = Average of mean of each sample
R = Range of each sample (largest-smallest)
R = Average of all sample’s range

Tubing Area
Interview and walk-through simulation with 50.00
Change of raw material/new vendor
Wesley King 45.00
40.00
Processing Time

93553 Tubing Area 35.00 UCL


This shop has 4 people on 1st shift and 1 30.00
“Loaner” from H-53 AC line. 25.00 X
1/4" to 3/4' tubing has 30 minute setup 20.00
15.00 LCL
2" plus tubing machine has 8 hr. set up 10.00
Concerns and Recommendations 5.00
a. Have “conversion code”computer and 0.00
1 2 3 4 5 6 7 8 9 10
tubing “machine” computer communicate Days
together. Once conversion code is retrieved
at front desk it would automatically
download conversion to tubing machine.
This would eliminate duplicate effort of
©2009, ASQ

work. Three new machines, if possible,


have capabilities that computer can talk to
the machine. (Conversion not accurate.)

www.asq.org 19
Process Improvement: Using Toyota’s A3 Reports

Table 3 (continued)
b. Machines are set too close together, need more room.
c. Pines mfg. tube bender (new machine) was ordered without additional tooling support, agreed by upper management to
share tooling support from “old” tube bender and new tube bender. With new additional tooling, could produce double the
work. Some of the “old” tooling support will not work with new setup.
d. Needs more room, people, air conditioner, workbench and no tools for the particular machine, tube bender. (PIN NC25
Green)

3. Future State Analysis


The variation in shop performance was due to several vendors supplying same raw materials with slightly different specifications
to the shop. The raw materials were delivered to the shop where there was no inspection or quality check of the incoming raw
materials. Using operators’ input, inspection strategy (for example, number of times in a day, what to check, and how to check)
and a vendor scorecard (for example, quality and delivery) were developed. The purpose was to choose one main and one
back-up vendor, based on high performance as evidenced by vendor scorecards.

Obtain work Verify print Travel to Retrieve conversion code from


order from box matches P/N on computer computer or cabinet for tubing
by aisle way work document or cabinet machine setup sequence
(1 min) (2 min) (5 min) (1 min)

Incoming material
(1) Inspection
(2) Vendor scorecard Cut tube to Clean tube in Stamp off
Debur tubing Process tube
length varsol tank paper work
(2 min) (20 min)
(3 min) (5 min) (1 min)

Travel to clock station Deliver completed


and clock-off work tubing to PC
(1 min) (1 min)

4. Implementation
Vendor scorecards were implemented, and one vendor was chosen. This vendor supplied material to the shop, and after about
four weeks, shop performance stabilized. (A back-up plan was in place until success with the single vendor was confirmed.)

30.00 UCL
25.00
X
Processing Time

20.00
LCL
15.00
10.00
5.00
0.00
1 2 3 4 5 6 7 8 9 10
Days
©2009, ASQ

Five weeks after the implementation, the shop performance continued to be stable. The purchasing department wanted to
implement statistical process control and vendor scorecards for all of their vendors.

champions to manage the teams. In addition to com- literature. For example, according to Liker (2004),
municating with the Speed team, champions worked low-level improvement teams and champions are
with the improvement teams on various improve- essential to drive improvement projects from the
ment projects. This approach is well supported in the bottom up. According to McManus (2007, 20):

20 QMJ VOL. 16, no. 4/© 2009, ASQ


Process Improvement: Using Toyota’s A3 Reports

“Every organization should have a process necessary on how to mix these tools to correctly identify
improvement team approach in place that and prioritize improvement projects to align them with
engages a high percentage of the work force. the overall process improvement objectives to achieve a
Such an approach is mandatory for sustained sustained competitive advantage in the ever-changing
progress toward process excellence…. If you global market.
want to sustain your improvement efforts over Fourth, the A3 report is an improvement tool, and
time…give a training [to the improvement various implementation activities need to be coordi-
teams], and turn teams loose.” nated for its successful adoption. The author believes
this A3 report implementation was a success because
The human side of the improvement initiative is crit-
various implementation activities (for example, stra-
ical for successful improvement implementations. While
tegic intent, core improvement team, and so on) were
implementing improvement programs, Vavra (2008)
properly coordinated. Many process improvement
found that human (or organization) culture issues dom-
programs fail not because improvement tools are inad-
inate when compared with tools (or technology) issues.
equate; they fail because implementation activities
According to Chakravorty and Dulaney (2010), effective related to such programs are not properly coordinated
management of human aspects is critical for improve- (for example, Chakravorty 2009). Unfortunately, a
ment initiatives. Chakravorty (2009) points out that lot of academic research tends to focus on uncovering
companies need to pay attention to the human side of intricate, many times unnecessary details of improve-
improvement initiatives. Often times, more importance ment tools (for example, Schroeder et al. 2008), rather
is given to intricate details of improvement tools and not than on how to coordinate activities to implement such
to how humans adapt to such improvement tools. Future tools. In the real world, the author believes that practic-
research should focus on identifying human aspects ing managers do understand the definition of process
(for example, team composition, communications, and improvement tools. They simply lack an understanding
incentives) of A3 reports to facilitate implementation in of different activities critical to implementation, and
their business environment. how to coordinate those activities in a systematic man-
Third, in order to implement A3 reports, the team ner. Research in developing an implementation model
experienced substantial difficulty in identifying and pri- for coordinating various activities related to A3 reports
oritizing improvement projects aligned to overall process is an important area for future research.
improvement objectives. To prioritize these improvement Fifth, A3 reports are promoted as improvement tools
projects, they used cost reduction and revenue genera- primarily for lean (for example, Sobek and Smalley
tion (or throughput based) potential, along with input 2008; Shook 2008; Jimmerson 2007). Likewise, different
from workers and management. It is important to learn improvement tools are endorsed by Six Sigma or theory
more about how to identify improvement projects, and of constraints. Consistent with the team’s implementation
how to prioritize them. One reason many improvement experience, it is not surprising that there is a good bit of
programs fail is because improvement projects are not confusion among managers attempting to select specific
correctly identified and prioritized (Zimmerman and improvement tools for their business environment. The
Weiss 2005). Over the years, many researchers have problem is that managers waste their time in adopting
worked on prioritizing improvement projects by mixing the newest improvement tool and using consultants, and
tools such as Six Sigma, lean, or theory of constraints. spend very little time in driving process improvement from
For example, Draman and Chakravorty (2000) and the bottom. Hayes et al. (2004) argue that improvement
Chakravorty and Atwater (1998) showed how to pri- tools fail to show a significant increase in performance
oritize quality improvement projects using theory of because, prior to implementing them, most companies
constraints. Chakravorty (1996) and Chakravorty and do not develop deep problem-solving capabilities in their
Sessum (1995) showed how to blend lean improvement employees. They refer to the development of these capa-
projects using theory of constraints. More research is bilities as “learning by doing.” As the name implies,

www.asq.org 21
Process Improvement: Using Toyota’s A3 Reports

managers and workers must practice the art and science and practice of implementation of A3 reports to reduce
of problem solving to use it effectively. Further, they write waste and create value.
“…you are not likely to be able to make substantial
progress through analysis and detailed improvement pro- REFERENCES
grams, no matter how many consultants you hire…” Abilla, P. 2007. Toyota A3 Report, March. http://www.shmula.
This research shows that deep problem-solving capability com/363/the-toyota-a3-report
could be developed using A3 reports. In doing so, A3 reports Argyris, C. 1985. Action science: Concepts, methods, and
could be used to implement lean, Six Sigma, or theory skills for research and intervention. San Francisco: Jossey-Bass
Publishers, 136-148.
of constraints. Additional insights are available on deep
problem-solving capability in various real-world settings Chakravorty, S. S., and R. E. Dulaney. 2010. ERP systems: An
implementation experience. International Journal of Business
(for example, Chakravorty, Hales, and Herbert 2008b;
Excellence, in press.
Chakravorty and Hales 2008; Chakravorty and Franza
Chakravorty, S. S. 2009. Six Sigma programs: An implementa-
2009). More research on A3 implementation is necessary
tion model. International Journal of Production Economics 119,
in different business environments to enhance the team’s no. 1:1-16.
experience from this implementation. This research will be
Chakravorty, S. S., and R. M. Franza. 2009. Implementation
greatly helpful for practicing managers wanting to effec- of design for Six Sigma (DFSS): A development experience.
tively implement improvement programs using A3 reports. International Journal of Product Development 9, no. 4:329-342.

Chakravorty, S. S., and D. N. Hales. 2008. The evolution of

CONCLUSIONS manufacturing cells: An action research study. European Journal


of Operational Research 188:153-168.
In this study, the author described how Toyota’s A3 Chakravorty, S. S., J. B. Atwater, and J. I. Herbert. 2008a. The
reports were implemented at a facility in the southern Shingo Prize for operational excellence: Rewarding world-class
practices. International Journal of Business Excellence 1, no.
United States to improve aircraft maintain and repair. He
4:418-433.
provided a systematic approach, improvement event, and
Chakravorty, S. S., D. N. Hales, and J. I. Herbert. 2008b. How
a process to implement and document A3 reports. Each
problem solving really works. International Journal of Data
improvement event was conducted at a target shop by an Analysis Techniques and Strategies 1, no. 1:44-59.
experienced facilitator with a team of workers from the Chakravorty, S. S., and J. B. Atwater. 2006. Bottleneck manage-
shop. An improvement event consists of a host of activi- ment: Theory and practice. Production Planning & Control 17, no.
ties, and they are generally completed in four weeks and 5:441-447.
consist of four distinct phases: 1) preparation and train- Chakravorty, S. S., and D. N. Hales. 2004. Implications of cell
ing; 2) process mapping and analysis of current state; design implementation: A case study and analysis. European
Journal of Operational Research 152, no. 3:602-614.
3) process mapping and analysis of future state; and
4) implementation and ownership transfer. Important Chakravorty, S. S. 2000. Improving a v-plant operation: A
window manufacturing case study. Production and Inventory
for both practitioners and academicians, the author
Management Journal (Third Quarter):37-42.
provided five implications of the process implementation
Chakravorty, S. S., and J. B. Atwater. 1998. Implementing qual-
experience with directions for future research. ity improvement programs using the focusing steps of the theory
This research shows how to effectively guide process of constraints. International Journal of Technology Management
improvement effort using A3 reports to reduce waste 16(4/5/6):544-555.
from the operations. This is particularly important Chakravorty, S. S. 1996. Robert Bowden Inc.: A case study
because today’s hard economic times demand that of cellular manufacturing and drum-buffer-rope implementa-
tion. Production and Inventory Management Journal (Third
companies reduce waste to stay in business, retain
Quarter):15-19.
employees, and nurture customers. There is increasing
Chakravorty, S. S., and J. L. Sessum. 1995. Developing effective
pressure to pursue new and innovative ways of thinking
strategies to prioritize setup reduction in multi-machine produc-
as a source of competitive advantage. More research tion system. International Journal of Operations and Production
in this area is necessary to contribute to the science Management 15, no. 10:103-11.

22 QMJ VOL. 16, no. 4/© 2009, ASQ


Process Improvement: Using Toyota’s A3 Reports

Cleveland, W. 1985. The elements of graphing data. Monterrey, Sobek II, D. K., and A. Smalley. 2008. Understanding A3 think-
Calif.: Wadsworth, Inc. ing: A critical component of Toyota’s PDCA management system.
New York: Productivity Press.
Draman, R. H., and S. S. Chakravorty. 2000. An evaluation
of quality improvement project selection alternatives. Quality Sobek II, D. K, and C. Jimmerson. 2006. A3 reports: Tool for
Management Journal 7, no. 1:58-73. organization transformation. In Proceedings of the Industrial
Engineering Research Conference, Orlando, Fla.
Davidson, R., M. Martinsons, and N. Kock. 2004. Principles of
canonical action research. Information Systems Journal 14, no. Sobek II, D. K., and C. Jimmerson. 2004. A3 Reports: A tool
1:65-86. for process improvement and organizational transformation. In
Proceedings of the Industrial Engineering Research Conference,
Hayes, R. H., G. P. Pisano, D. M. Upton, and S. C. Wheelwright. Houston, Texas.
2004. Operations, strategy, and technology: Pursuing the com-
petitive edge. New York: John Wiley & Sons. Susman, G., and R. Evered. 1978. An assessment of the scien-
tific merits of action research. Administrative Sciences Quarterly
Goldratt, E. M., and J. Cox. 2004. The goal. Great Barrington, 23:582-603.
Mass.: North River Press.
Tufte, E. R. 1983. The visual display of quantitative information.
Jimmerson, C. 2007. A3 problem solving for healthcare: A prac- Cheshire, Conn.: Graphics Press.
tical method of eliminating waste. New York: Productivity Press.
Vavra, B. 2008. Which way do you lean. Plan Engineering
Jimmerson, C. 2004. Unique features of the A3 problem solving (March):31-36.
method: A breath of fresh air for ailing healthcare. Lean Health
Care West. http://leanhealthcarewest.com/ Womack, J. P., and D. T. Jones. 2003. Lean thinking. New York:
Free Press.
Kemmis, S., and R. McTaggart. 2000. Participatory action
research. In Handbook of Qualitative Research, second edition, Yin, R. K. 2008. Case study research: Design and methods.
eds. N. K. Denzin, and Y. S. Lincoln, 567-606. California: Sage Thousand Oaks, Calif.: Sage Publications.
Publications. Zimmerman, J. P., and J. Weiss. 2005. Six Sigma’s seven sins.
Keller, P. 2005. Six Sigma: Demystified. New York: McGraw-Hill. Quality 44, no. 1:62-66.

Lepore, D., and O. Cohen. 1999. Deming and Goldratt: The the-
BIOGRAPHY
ory of constraints and the system of profound knowledge. Great
Barrington, Mass.: North River Press. Satya S. Chakravorty is Caraustar professor of operations man-
agement and professor at Michael J. Coles School of Business
Liker, J. K. 2004. The Toyota way: 14 Management principles
at Kennesaw State University, Kennesaw, GA. He received his
from the world’s greatest manufacturer. New York: McGraw-Hill.
doctorate in production and operations management from the
McManus, K.. 2007. The trouble with teams. Industrial Engineer University of Georgia. He holds bachelor’s and master’s degrees
39, no. 10:20. in engineering and sciences from BITS, Pilani (India). He is
a Certified Fellow of Production and Inventory Management
Pyzdek, T. 2003. The Six Sigma handbook: A complete guide for
(CFPIM), and a certified academic associate (JONAH) from
green belts, black belts, and managers at all levels. New York:
Goldratt Institute. He has training in lean manufacturing and has
McGraw-Hill. Six Sigma Black Belt training experience. He has also worked as
Robinson, A. 1990. Modern approaches to manufacturing an examiner for the Shingo Prize for Operational Excellence.
improvement. Portland, OR: Productivity Press. Chakravorty has worked as a senior advisor for BearingPoint
Radeka, K. 2005. Anatomy of A3 Report: Focusing knowl- and Deloitte Consulting companies. His expertise is in develop-
edge for better decision-making. Camas, Wash.: Whittier ing, training, and implementing process improvement (lean, Six
Consulting Group, Inc. http://www.whittierconsulting.com/pdf/ Sigma, and theory of constraints) programs in large organiza-
anatomy_of_a3.pdf tions such as the U.S. Marine Corps Air Station, Shaw Industries,
Lockheed Martin, Heinz, Delta Engine Repair, Beech-Nut, 3M
Rother, M., and J. Shook. 1998. Learning to see. Brookline, Corporation, AT&T, Harlequin, Beechnut, DariGold, and Los
Mass.: The Lean Enterprise Institute, Inc. Angeles Times. Many of his implementation experiences can be
found in journals such as Operations Management Research;
Schroeder, R. G., K. Linderman, C. Liedtke, and A. S. Choo.
International Journal of Production Economics; European
2008. Six Sigma: Definition and underlying theory. Journal of
Journal of Industrial Engineering; Production and Operations
Operations Management 26, no. 4:536-554.
Management; European Journal of Operational Research;
Shook, J. 2008. Managing to learn: Using the A3 management Production and Inventory Management Journal; Industrial
process to solve Problems, gain agreement, mentor, and lead. Management; and Quality Management Journal. Chakravorty
Cambridge, Mass.: The Lean Enterprise Institute, Inc. can be reached at satya_chakravorty@kennesaw.edu.

www.asq.org 23
Process Improvement: Using Toyota’s A3 Reports

Appendix 1
A3 Report
To: ___________________
THEME: “What are we trying to do?”
By: ___________________
Date: _________________

Background Target Condition

• Background of the problem • Diagram of proposed new process


• Context required for full understanding • Countermeasures noted as fluffy clouds
• Importance of the problem • Measurable targets (quantity, time)

Implementation Plan
Current Condition
What? Who? When? Where?
• Diagram of current situation (or process)
• Highlight problem(s) with storm bursts
Actions to Responsible Times,
• What about the system is not IDEAL
be taken person dates
• Extent of the problem(s), i.e., measures

Cost:

Cause Analysis Follow-Up


• List problem(s) Plan Actual Results
• Most likely direct (or root) cause • How will you • In red ink/pencil
Why?
Why? check the effects • Date check done
Why?
Why? • When will you • Results, compare
Why?
check them? to predicted

Downloaded from Web site: http://www.coe.montana.edu/IE/faculty/sobek/A3/report.pdf

24 QMJ VOL. 16, no. 4/© 2009, ASQ


Process Improvement: Using Toyota’s A3 Reports

Appendix 2
Process Improvement Training Program
• Six Sigma simply means a measure of quality that strives for near perfection. Six Sigma is a disciplined,
data-driven approach and methodology for eliminating defects (driving toward six standard deviations between
the mean and the nearest specification limit) in any process from manufacturing to service operations and from
product to service. Six Sigma tools include:
o Process identification and mapping
o DMAIC (define, measure, analyze, improve, and control) methodology
o Statistical process control
o Analysis of variance (ANOVA)
o Multiple regression
o Taguchi’s experimental design

• Lean operations principles categorize activities into value-added and non-value-added activities. The focus of these
principles is on eliminating all forms of non-value-added activities. There are seven forms of non-value-added (or
waste): waste of over production, waste of inventory, waste of defects, waste of motion, waste of processing, waste of
waiting, and waste of transportation. Lean operations tools include:
o Value-stream mapping
o Lean events
o SMED (a.k.a quick changeover)
o Manufacturing cell design
o Poka-yoke (a.k.a. mistake proofing)
o 5S Plus One (sort, straighten, shine, standardize, sustain, and safety)

• Theory of constraints (TOC) challenges the belief of functional independence with the view of an organization
as a chain of dependent activities. According to TOC, every organization has a constraint or bottleneck, and the
existence of a bottleneck provides an opportunity for process improvement priority. In addition, TOC provides a
set of measures that link local actions to the measures of organization-wide measures. TOC tools include:
o Bottleneck analysis
o Drum buffer rope
o Buffer management
o Buffer sizes and locations
o Throughput maximization
o VAT operations analysis

1) Keller (2005)
2) Womack and Jones (2003)
3) Goldratt and Cox (2004)

www.asq.org 25
Process Improvement: Using Toyota’s A3 Reports

Appendix 3
Speed A3 Report Date _____________

Target Shop
Facilitator ______________________
Speed Trainees _________________
Process Owners _________________

1. Problem Statement
This section delineates problems associated with the target shop.

2. Current State Analysis


This section documents data collection and analysis to understand the current conditions.

3. Future State Analysis


This section summarizes the future conditions after improvements are introduced.

4. Implementation
This section highlights implementation, shows results, and provides follow-up activities.

Adapted from Toyota’s A3 Report and printed on one page of 11-inch by 17-inch (A3) paper or two pages of 11-inch by 8.5-inch paper.

26 QMJ VOL. 16, no. 4/© 2009, ASQ


The Role of Front-Line
Ideas in Lean Performance
Improvement
Alan G. Robinson, University of Massachusetts
Dean M. Schroeder, Valparaiso University
© 2009, ASQ

Companies are increasingly embracing lean produc-


tion techniques in their efforts to improve performance. INTRODUCTION
Yet the majority of these companies fail to tap the full Over the last three decades, an increasing number
potential of “going lean.” By comparing a sample of manufacturing and service organizations have
of successful lean initiatives with less successful ones
(as defined by the rate of ongoing productivity improve-
embraced lean principles as a way to improve perfor-
ment), this paper identifies a critical component that mance (Chase and Stewart 1994; Schonberger 2007;
often is missing in underperforming initiatives—the Swank 2003; Womack and Jones 2005). But more
ability to get large numbers of improvement ideas from recently, a number of experts have noted that other
front-line employees. than Toyota, few companies have been truly suc-
High-performing idea systems — which the authors cessful at becoming lean (Womack and Jones 1996;
define as those that implement 12 or more ideas per Liker 2004; Liker and Hoseus 2007; Spear and Bowen
employee per year—were found to be a major factor 1999). The consensus explanation of this phenom-
in successful lean initiatives, for three reasons. First,
enon seems to be that many leaders of companies
they created a “lean culture” of daily improvement.
Second, they addressed improvement opportunities that start lean efforts lack a real understanding of
that were difficult for managers to spot. Third, they the principles involved and, therefore, focus on the
promoted rapid organizational learning. short-term application of isolated tools rather than
In addition to demonstrating the importance of the deeper changes necessary.
high-performing idea systems for lean, this research One way this short-term emphasis has manifested
provides insight into why such systems are relatively itself is in the popularity in the United States of the
rare: 1) the predominance of the suggestion-box “kaizen event” (also known as a “kaizen blitz” or
paradigm; and 2) they frequently require significant “kaizen burst”). The APICS Dictionary defines a
and difficult changes in operating practices.
kaizen event as “a rapid improvement of a limited
Key words: idea system, lean, organizational learning, process area, for example, a production cell” (Cox and
suggestion system Blackstone 1999). For many companies, the kaizen
event has become the primary, and in some cases
the exclusive, vehicle for lean improvement (Burch
2008; Laraia, Moody, and Hall 1999; Nicholas and
Soni 2005; Strategos 2009). The notion was originally
developed by Taiichi Ohno in the late 1980s to demon-
strate to Toyota suppliers the potential improvement
that could be made through sustained application
of the Toyota Production System. Its creators never
intended this dramatic shock tactic to become a

www.asq.org 27
The Role of Front-Line Ideas in Lean Performance Improvement

company’s primary ongoing approach to lean perfor- Table 1 Comparative statistics at the national
mance improvement. In practice, the improvements level, 1990.
from them have proved hard to sustain (Bodek 2004;
United States Japan
Burch 2008). Indeed, Veech (2004) noted that up to
90 percent of the benefits of kaizen events disappear Ideas per employee 0.11 32.5
within six months. Implementation rate 32% 87%
Toyota, almost from the outset, placed its emphasis
Participation rate 9% 72%
on getting a continuous stream of front-line ideas
rather than management-driven bursts of improve- Average reward $491.71 $2.50
ment (Liker 2004; Toyota Motor Corporation 1988; Source: 1991 National Association of Suggestion Systems and

©2009, ASQ
Tozawa and Bodek 2001; Yasuda 1990). In 1951, Eiji Japan Human Relations Association Statistical Report (based
Toyoda, the new managing director of the fledgling on 336 reporting organizations in the United States and 696
in Japan).
Toyota Motor Company, visited the United States
to learn more about automobile manufacturing. A
highlight of his trip was a visit to Ford, where he was company in the sample was getting more than 300
intrigued by the company’s employee suggestion sys- times the number of front-line ideas than the average
tem (Toyoda 1987). Soon after his return to Japan, his U.S. firm. What is more, a much higher percentage
company faced a serious financial crisis and was forced of the Japanese ideas were being implemented. The
to look for low-cost ways to streamline operations. As idea gap was even greater in the automobile indus-
Toyoda put it: try. Japanese automobile companies got an average
of 61.8 ideas per employee per year, while U.S. and
All we had to do was use our know-how. While at European counterparts averaged 0.4 ideas (Womack,
Ford, I had seen how considerable savings could Jones, and Roos 1990).
be had in materials handling by judiciously Toyota has always been open about its emphasis
making even minor changes, so we decided on front-line ideas. The company even posted this
to begin there. That’s how Toyota’s suggestion fact on its Web site for a number of years. When users
system got started. (Toyoda 1987, 114) clicked on Toyota’s tab “What Sets Us Apart?” they
This focus on minor changes was reinforced when, found the following brief summary:
in the early 1950s, like many Japanese companies, Based on the concept of continuous improve-
Toyota adopted the Training Within Industries (TWI) ment, or Kaizen, every Toyota team member
programs (Graupp and Wrona 2006; Nemoto 1983). is empowered with the ability to improve
These programs emphasized daily improvement their work environment… Improvements
through large numbers of small front-line improve- and suggestions by team members are the
ment ideas (Graupp and Wrona 2006; Robinson and cornerstone of Toyota’s success. (Toyota 2004)
Schroeder 1993). During the 1950s and 1960s, front-
line employee ideas grew into the primary driver of
the Toyota Production System (Nemoto 1987; Yasuda THE RESEARCH PROCESS
1990). By 1973, the company was getting more than While a number of authors have noted Toyota’s
a million ideas per year, an average of more than 10 emphasis on front-line ideas (see, for example, Liker
ideas per person (Hall 1983). 2004; Liker and Hoseus 2007; Womack, Jones, and
The focus on front-line ideas became a distin- Roos 1990; Yasuda 1990), little research has been
guishing characteristic of Japanese management done to evaluate the specific nature of the relation-
(Imai 1986). By 1990, the disparity between the ship between front-line ideas and lean performance
Japanese and Western approaches had become improvement. This relationship is the topic of this
quite apparent (see Table 1). The average Japanese paper, which grew out of a stream of work on idea

28 QMJ VOL. 16, no. 4/© 2009, ASQ


The Role of Front-Line Ideas in Lean Performance Improvement

systems that the authors have been conducting lean principles with employee ideas as their primary
over the last 20 years. The purpose of this ongoing continuous improvement tool. Additionally, four were
research has been to identify the principles that recipients of the Malcolm Baldrige National Quality
govern high-performing idea systems (defined as Award, two had received the European Quality Award,
those implementing 12 or more ideas per person per one had been named several times as running the
year), by comparing them with low- and medium- most efficient plant in North America by Industry
performing ones. Week, and two had received the Shingo Prize.
One of the patterns they noticed in their sample Using an inductive approach (see, for exam-
was that there appeared to be a relationship between ple, the grounded theory approach in Strauss and
the performance of a company’s idea system and Corbin 1998), the authors sought to determine the
the success of its lean effort, as defined by its rate relationships between lean success and idea system
of productivity improvement. In several companies performance in the companies in their sample, and
they studied, the lean initiatives resulted in only examine the ensuing patterns to develop proposi-
limited productivity improvement until manage- tions. The propositions were then tested against
ment adopted a high-performance idea system. The other organizations in the sample, as well as new
authors decided to delve more deeply into the cause companies that were added to the study as it pro-
of this relationship. Combining the findings reported gressed. Whenever possible, they employed what
by other researchers and authors with what they had Denzin (1970) called data triangulation (cross-
been observing in their work, they developed their checking information from interviews, supporting
initial questions for this study. They sought first to data, secondary data, and observations for inter-
identify the nature of the relationship between high- nal consistency) and investigator triangulation
performance idea systems and lean performance (cross-checking the impressions and observations
improvement, and second to find out why, if high- of the members of the research team) in order to
performance idea systems are important for success verify and strengthen their findings (Nykiel 2007;
with lean objectives, such systems are still so rare. Downward and Mearman 2007). Only the findings
This research is exploratory and intended to build with the strongest and most consistent relationships
theory rather than to test hypotheses. As Richards were selected for discussion in this paper.
and Morse (2006) emphasize, it is important to Because little has been written about high-
choose a research method that is consistent with performing idea systems, before talking about the
the purpose of the research. Consequently, the findings, it is important to identify and describe some
authors selected a method that would provide of the underlying principles that distinguish them
the best opportunity to develop new insights and from traditional suggestion systems.
awareness (Vishnevsky and Beanlands 2004) while
taking advantage of the rich database they had
accumulated. THE PRINCIPLES
The data used in this study are derived from DISTINGUISHING A HIGH-
field research in more than 300 organizations in
25 countries; notes and recordings from more than PERFORMANCE IDEA SYSTEM
a thousand interviews, supporting company doc- The goal of a high-performing idea system is to gen-
umentation of processes and performance results, erate significant front-line involvement in identifying
and observations made during the visits and post- and implementing opportunities for improvement.
visit debriefings. Thirty-six of the companies were Four of the primary principles that differentiate
identified as having high-performing systems. high-performing systems from low-performing ones
Twenty-seven of these were manufacturers, including include (Imai 1986; Robinson and Schroeder 2006;
five Toyota and two Honda units. All were applying Savageau 1996; Tozawa and Bodek 2001):

www.asq.org 29
The Role of Front-Line Ideas in Lean Performance Improvement

• Ideas are integrated into everyday work corrective action of urgent problems. At 8:00 every morn-
• The emphasis is on small ideas ing, each team meets around its idea board for eight
minutes to discuss the previous day’s performance on the
• Front-line performance metrics focus ideas on
plant’s three key performance indicators: safety, quality,
what is important
and line stoppage. Performance issues that emerged the
• Both managers and workers are held accountable
previous day are discussed and, if possible, ideas to cor-
for their roles in the idea process
rect them are proposed and implemented. If the team
cannot resolve an issue, it is escalated to the next level
Ideas Are Integrated Into and posted on the local supervisor group’s idea board to

Everyday Work
be addressed at its 8:15 a.m. meeting. Each supervisor
group has technicians and additional resources at its
In traditional suggestion systems, ideas are vol- disposal. If the issue is beyond the scope of this group, it
untary. Management may welcome them, but is escalated again, this time to the management group,
employees are not required, or even expected, to offer and it is listed on its board for discussion at its 8:45 a.m.
them (recall the participation rate of 9 percent in meeting. This group includes plant maintenance and
Table 1). Because high-performance idea systems still more support and authority. If further escalation is
begin with the expectation that every employee can still needed, it is addressed at the 9:30 a.m. top manage-
see many improvement opportunities, these systems ment meeting, which includes the plant manager and all
are designed with the capability to process large of his direct reports, including plant engineering.
numbers of ideas rapidly and efficiently. (Thirteen According to the company’s CEO, in order to stay
of the companies in the sample were implementing competitive, Scania has to improve productivity by
more than 50 ideas per employee per year.) a minimum of 8 to 10 percent each year. In each
Take, for example, the Scania engine assembly plant of the last two years, the company has increased its
in Södertälje, just outside of Stockholm, Sweden. Every manufacturing productivity by 15 percent.
Wednesday at 8:00 a.m. the production line is stopped
for 26 minutes so every work team, generally consist-
ing of 9 to 12 people, can hold its weekly improvement Emphasis on Small Ideas
meeting around its idea whiteboard. Team members Traditional suggestion systems focus on getting big
check the progress of each open idea, remove those that ideas with major cost or revenue implications. But
have been completed, and discuss the new problems and to generate more involvement, increase the rate of
ideas that have been posted during the week. To ensure improvement, and achieve the greatest overall impact,
workers have enough time to implement the improve- high-performance idea systems target small ideas
ments, every team has built-in slack; it is deliberately (Imai 1986; Japan Human Relations Association 1988;
“over staffed” by two positions. If additional resources Robinson and Schroeder 2006; Tozawa and Bodek
or authority are needed for a specific idea, it is escalated 2001). Not only can front-line workers come up with
up to the idea board of the next level of management. a lot of them, but small ideas are easier to imple-
If necessary, an idea that needs the highest level of ment, face little resistance, and don’t need to go far
approval can move within a week from the team board up the hierarchy for approval. Small ideas can be a
to the supervisor group’s board, to the management routine part of daily work, and employees can see their
group’s board, and finally to the plant manager’s board. ideas making a difference. This creates an invigorating
All boards are public. Top management’s board is in atmosphere of rapid ongoing improvement.
the middle of the plant where everyone can see the ideas One of the surprising benefits of small ideas
that it is working on. is that they create competitive advantage that is
The weekly process is aimed at improvement activi- more sustainable (see, for example, Robinson
ties, but Scania also uses the same boards for daily and Schroeder 2006). While competitors generally

30 QMJ VOL. 16, no. 4/© 2009, ASQ


The Role of Front-Line Ideas in Lean Performance Improvement

become aware of big ideas fairly quickly, and can The central warehouse was the one exception.
copy or counter them, it is much harder for them The warehouse manager had translated the com-
to find out about small ideas. Because these remain pany’s strategic goals into lean metrics that his
effectively proprietary, they accumulate over time front-line workers could understand and that they
into a cushion of significant competitive advantage. could affect directly with their ideas. He came up
Take Milliken & Company, a U.S.-based textile com- with three metrics:
pany, for example, whose idea system has consistently • Shipments (in euros) per week per employee
averaged around 100 implemented ideas per person
• Percentage of orders shipped correctly and on the
per year. In Milliken Denmark, the managing direc-
same day
tor showed the authors a number of looms, each of
which had several hundred small ideas applied to it, • Inventory turnover
that collectively made them two to three times faster These three metrics encompassed the primary
than they were designed to operate, and capable of goals of the company for the shipping department:
making special weaves that their manufacturers had efficiency/productivity, quality/customer satisfaction,
thought were impossible. Competitors could easily and flexibility and innovativeness. (In the electron-
buy the same models of loom, but would find it much ics and software business, high inventory turnover
more difficult to come up with all of the ideas that is particularly important because of the rapid rate of
would be needed to match this performance. product obsolescence.)
The warehouse manager believed that these

Performance Metrics prominently displayed performance measures


played an important role in stimulating ideas in his
That Focus Ideas area for three reasons. First, they emphasized the
aspects of performance that were important. Second,
A standard complaint about suggestion systems is
they sensitized employees to problems and opportu-
that the ideas that come in are unfocused and of little
nities they might otherwise have ignored. Finally,
value (see, for example, Savageau 1996). If ideas are
keeping score added a bit of competitiveness and
to be integrated into the daily work, they must be tied
fun. As his workers saw the numbers reflecting the
to key companywide improvement goals. The case of
improvements from their ideas, they felt a sense of
Introduxi, a large Iberian electronics retail chain—
involvement and personal achievement.
and one of the high-performing companies in the
The result of these employee ideas was that in
authors’ sample—illustrates this point.
just over a year, the shipping department was able
In 2006, the company launched an idea system.
to double the number of orders it shipped without
The first year’s results met the standard of a high-
adding any employees. The number of orders filled
performing system—the company received 18 ideas
incorrectly dropped by 90 percent, and inventory
per employee, with almost 100 percent participation.
turnover increased 30 percent.
The authors were surprised when they met with the
CEO to hear he was concerned about the system,
because he thought the ideas were scattershot and of Holding People Accountable
limited value. The authors spent several days in this
company studying its idea system. They visited stores, for Ideas
interviewed employees and managers, and examined A number of researchers have observed that tradi-
the kinds of ideas the employees had come up with. tional suggestion systems have trouble with follow
They found that the company did indeed have a through and implementation. Generally, there
well-designed process. Its problem, however, was that are large backlogs of unevaluated and unimple-
management had not told the employees what kinds mented ideas (Savageau 1996; Fairbank, Spangler,
of ideas it wanted. and Williams 2003). This was corroborated by the

www.asq.org 31
The Role of Front-Line Ideas in Lean Performance Improvement

Figure 1 Siemens VDO idea accountability tracking.

Idea Performance by Unit


50
45
40
35
Ideas/Employee

30 “...you do not want to be one


25 of the executives out here...”
Siemens Executive
20
15
10
5
0
Korea
Seattle
Taiwan
Munich
Singapore
London
Milan
Paris
St. Louis
Peoria
Warsaw
Bonn
Hartford
Chicago
Stockholm
Toledo
Phoenix
Delhi
Moline
San Francisco
Denver

©2009, ASQ
Plant

organizations in the authors’ sample. In those with


traditional suggestion systems, backlogs of 18 months HIGH-PERFORMANCE
or more were common. The reason was that no one
was held accountable for getting, processing, or
IDEA SYSTEMS AND LEAN
implementing ideas. PERFORMANCE IMPROVEMENT
To assure prompt action on ideas, high-performing The three strongest relationships the authors’ data
systems have strong mechanisms for accountability. showed between high-performing idea systems and
Idea performance often is included in annual reviews lean performance improvement are as follows. A
and taken into consideration when making decisions high-performing idea system:
about pay raises and bonuses. • Creates a “lean improvement culture” by engaging
The mechanisms used to hold people accountable the work force in daily improvement activity
do not need to be complicated. Take, for example,
• Taps improvement opportunities that are difficult
the approach used by Siemens VDO (the global vehi-
for managers to spot
cle parts division with almost 100,000 employees,
now Continental VDO). The CEO used a very simple • Promotes rapid organizational learning
chart to track his division managers’ performance
in getting ideas. Every month his staff prepared and
distributed a chart (like the one in Figure 1, where Creating a Lean Improvement
for illustrative purposes the authors have curtailed Culture by Engaging the
the number of locations and changed their names)
showing how many ideas per person each of his 98 Work Force
plants had implemented that month. As one of his As a number of researchers have identified, a com-
executives said, “When the CEO gets this chart, you mon reason lean initiatives perform poorly is that
do not want to be the executive in charge of one of they fail to engage the work force in creating a culture
these operations [pointing to the right end, where the of lean improvement (see, for example, Imai 1997;
poor performers were].” Liker 2004; Liker and Hoseus 2007; Spear and Bowen

32 QMJ VOL. 16, no. 4/© 2009, ASQ


The Role of Front-Line Ideas in Lean Performance Improvement

Table 2 Differences between high- and low-performing lean initiatives.


Less successful lean initiatives Successful lean initiatives

Improvement is management driven Improvement is front-line driven

Improvement is done primarily through larger-scale events or projects Small improvements are made on a daily basis

©2009, ASQ
There are limited opportunities for front-line involvement Front-line involvement is primary to improvement activity

Improvement activity is results focused Improvement activity is process focused

1999). Almost all the company leaders the authors Since all the improvement projects had been dictated
interviewed stressed the importance of employee from above, the employees felt disconnected from
engagement, and the amount of training they pro- the lean effort; indeed, they had become very cynical
vided to their employees was not a differentiator. about it. All six production coordinators asked to be
But clear differences emerged in the nature and transferred to other jobs.
extent of employee involvement. These differences Management realized the company couldn’t
are summarized in Table 2. make any real progress with lean until the work force
Generally, in the less-successful lean initiatives, became more engaged in the improvement process.
improvement efforts were management driven. They After some study and benchmarking, in late 2004,
focused on larger-scale improvement projects — Pyromation decided to integrate problem-identification
using tools such as kaizen events, ad-hoc task forces, and idea-generation into the regular work of front-
or Six Sigma—intended to generate significant bot- line employees. Idea boards were set up, supervisors
tom-line results. Ongoing or regular opportunities were trained in idea-meeting facilitation, and weekly
for front-line people to engage in the improvement shop-floor idea meetings were scheduled. In this way,
process were not emphasized. In the more successful front-line workers were given the opportunity to use
lean initiatives, however, generating, processing and the tools and techniques of lean production that they
implementing ideas were integrated into the normal had been taught.
work of front-line workers. The high-performance The resulting stream of improvement ideas made
idea system was the primary vehicle by which front- an enormous difference. In two years, productivity
line employees drove the lean improvement process. increased by a third, lead-time was cut by 60 percent,
It was this ongoing and regular engagement with and late deliveries were reduced by 70 percent. By 2008,
daily problems and opportunities, and the compa- Pyromation was getting an average of 47 implemented
nies’ process-focused approaches (see Choi and Liker ideas per person per year. Dan Atkinson, the company’s
1995), that built their lean cultures. The example of lean coordinator, observed that “the idea system was
Pyromation shows how this happens. the turning point in our lean effort—it was what we
In 2002, Pyromation, a medium-sized producer had been missing all along.”
of high-temperature measurement and control
devices located in Fort Wayne, IN, began implement-
ing lean. The company launched the initiative with Improvement Opportunities
great fanfare, trained its people in the standard lean That Are Hard for
Managers to See
tools (such as 5S, poka-yoke, quick changeover, and
value-stream mapping), created new work teams, and
radically restructured reporting relationships on the Managers deal primarily with information that
production floor. But two years later, the lean effort has been aggregated — such as “profits are
was still struggling to gain traction. Morale was low. down,” “market share is dropping,” or “labor

www.asq.org 33
The Role of Front-Line Ideas in Lean Performance Improvement

as a percentage of costs is up” (Hayek 1945). the line. As long as the bottles were properly spaced,
Information in this form is helpful in identifying this process worked quite well. Unfortunately, the
issues, but not so helpful in dealing with them. But, bottles often would bunch together as they rounded
as Hayek also observed, front-line workers are the the corner. Then, when the air piston pushed a defec-
ones who have specific and detailed knowledge of tive bottle aside, the next bottle (now in contact with
how their organization’s work actually gets done. the first one) sometimes would be shifted slightly,
As such, they are in much better positions than their nick the corner, and tip over and block the line. Ten
managers to see many problems and opportuni- bottles of Coke per second would then slam into the
ties. They also are in the best positions to develop fallen bottle and fly everywhere, creating a huge mess
ideas that will work to deal with these problems and many defective bottles before the line could be
and opportunities. Consider the example of the stopped. This disruption to production occurred two
Coca-Cola bottling plant in Stockholm, Sweden, the or three times per day.
highest-performing corporate bottling plant in the Two Six Sigma Black Belt projects had failed
Coca-Cola system. to solve the problem, which was caused by friction
A few years ago, Coca-Cola headquarters required between the bottles and the corner guide. The proj-
all corporate-owned bottlers to implement Six Sigma. ect teams had fiddled with many variables: the line
Each plant was expected to: a) train a cadre of Black speed, different kinds of lubricating strips along the
and Green Belts; b) focus on Six Sigma improvement curve guide, the spacing of the bottles — but with
projects that generated large documented monetary little success. The problem eventually was solved by
savings; and c) strive for high plant capacity utili- an idea from one of the bottling-line workers. His
zation. But unlike its peers, Coca-Cola Stockholm simple solution was to reduce the contact surface
already had a high-performance idea system in area between the guide and the bottles. By using a
place. In 2007, the company implemented 15 ideas standard washer as a spacer in between the guide
per person. and its lower mounting bracket, the guide was
The implementation of Six Sigma on top of an cocked inward slightly so only its upper edge now
effective idea system provided interesting data on the came in contact with the bottle. In this way, the
relative impact of both approaches. In 2007, there were friction was lowered enough to keep the bottles from
seven Six Sigma projects (both Green and Black Belt), bunching. The idea saved 91,000 kronor per year,
which saved a total of 2.5 million Swedish Kronor (one not including the costs of damaged product.
U.S. dollar equals about seven Swedish Kronor). The Over the three-year period that the authors tracked
idea system, however, generated 8 million in savings this plant, it ranked first among Coca-Cola’s corpo-
from a total of 1,720 front-line ideas. In 2008, Coca- rate-owned bottlers around the world in productivity,
Cola Stockholm increased its emphasis on the idea quality, safety, environmental performance, and cus-
system. As a result, front-line ideas saved 9 million tomer fulfillment. The only key metric in which the
Swedish Kronor as compared to 1.5 million from Six Stockholm bottler did not outperform its peers was
Sigma projects. plant capacity utilization. Managers said this was
One example of an idea that illustrated the advan- because the large number of front-line improvement
tage of the front-line perspective came from a worker ideas kept increasing plant capacity.
on the high-speed, half-liter Coca-Cola bottling line. Notice that in 2007, 76 percent of the overall
It solved what had been a tricky problem there. After cost savings for Coca-Cola Stockholm came from its
being filled and capped, the bottles zoomed around idea system. In 2008, the figure was 86 percent. Five
a 90-degree curve before passing an electronic eye other companies in the authors’ sample with high-
that scanned each bottle in order to assure it had performing idea systems also measured bottom-line
been properly filled. If not, an air piston would auto- improvement by source. Each of these companies
matically activate and push the defective bottle off reported similar results — around 80 percent of

34 QMJ VOL. 16, no. 4/© 2009, ASQ


The Role of Front-Line Ideas in Lean Performance Improvement

overall improvement came from front-line ideas. SIA’s “green lean” program is not driven by
While the authors initially were surprised by these multimillion-dollar recovery systems, but by thou-
data, they clearly attest to the extent that front-line sands of small environmental improvement ideas
people see improvement possibilities that their bosses from front-line workers every year. Since 2000, these
do not. ideas have: a) reduced the amount of steel scrap
generated by 102 pounds per vehicle; b) resulted in

Idea Systems Promote Rapid the reuse of more than 6 million pounds of packag-
ing materials each year; c) lowered the consumption
Organizational Learning of electricity by 25 percent; and d) cut the waste
generated per vehicle by more than 50 percent.
The purpose of adopting lean principles is to SIA began its green initiative in 1989, long before
improve operations at a rapid rate. To do this, the environmental sustainability became popular.
organization must be capable of learning quickly. Consequently, SIA has had to learn on its own how
“Organizational learning” (see, for example, Argyris to identify and exploit green opportunities. Its kaizen
and Schon 1995) happens whenever an organiza- idea system played a central role in this. Because
tion improves the way work is done in a manner that the front-line workers are the ones who physically
incorporates these changes into its standard work or handle the parts, materials, packaging, and equip-
the technology and equipment in use. ment, they are well positioned to spot ways to reduce
Organizational learning became popular with consumption and reuse materials, and to identify
business leaders in the 1990s following the success waste that can be recycled. They also are in the best
of books such as Peter Senge’s The Fifth Discipline positions to implement reuse and recycling plans, in
(1990) and Thomas Stewart’s Intellectual Capital which the biggest challenge is usually that of sepa-
(1997). Unfortunately, while the concept was gen- rating out the various materials. This sorting process
erally sound, in practice the movement itself was is most easily and economically done where the
short on examples and practical advice on how waste is actually generated. SIA managers told the
to create a learning organization. Because most authors that the company could not have reached its
improvement opportunities are seen by front-line high level of environmental performance without the
workers (recall the 80/20 ratio above), it is not sur- active participation of its front-line workers.
prising that the high-performance idea systems in Front-line ideas not only helped SIA achieve its
the authors’ sample were facilitating rapid organi- ambitious zero landfill goal two years early, but they
zational learning. Some companies, including three also were the primary force for its ongoing organi-
of Autoliv’s Utah air-bag production facilities and zational learning. Following are two examples that
Scania’s engine plant outside of Stockholm, were show how this worked:
averaging 15 percent rates of annual productivity
improvement. Distilling toxic solvent for reuse
To understand how a high-performance idea system One of the more toxic chemicals used in automo-
can work as a tool of organizational learning, consider bile manufacturing is the solvent used to flush the
the example of Subaru Indiana Automotive (SIA). This painting system between color changes (at SIA,
company assembles almost 1000 automobiles each this typically occurs every three or four vehicles).
day, including 300 Camrys for Toyota. What makes SIA Previously, the used solvent was shipped offsite
interesting in this context is the way it turned the focus for processing as toxic waste, a costly affair that
of its lean initiative onto environmental improvement. required special handling and special transpor-
It has been a zero landfill operation since May 2, 2004, tation procedures. An employee had the idea to
putting less waste into landfills in a year than an develop an onsite distillation process to recover the
average U.S. household does in a day. solvent for reuse. When looking for vendors of such

www.asq.org 35
The Role of Front-Line Ideas in Lean Performance Improvement

technology, SIA found one that proposed an even Today, they are sold to a company that uses them
more environmentally friendly approach. Since as raw materials for the plastic wheel-well linings it
existing distillation processes could not separate makes for other auto companies.
out all the solvent and invariably left a toxic sludge
of paint residue and solvent in the bottom of the Processing welding sparks
still, the contractor suggested distilling the solvent Another set of ideas came from the welding depart-
in a vacuum. Vacuum distillation would make it ment. If zero landfill was the goal, something had
possible to extract all of the toxic liquid and leave to be done with the residue constantly being swept
a solvent-free dry cake in the bottom of the still. up from the floor around the robotic welders used
Unfortunately, halfway through the project, the to assemble car bodies. This residue consisted of
contractor, who was having difficulty getting the the remnants of sparks emitted during the welding
new technology to work as promised, went out of process. These sparks are primarily small pieces of
business, and the responsibility for completing the copper oxide blown off the welding tips by the arcing
project fell onto the shoulders of front-line mainte- of the high-amperage electric current used to fuse the
nance people. By the end of the project, these workers steel body components together. The first idea was to
had come up with hundreds of small ideas that find a way to process this welding slag to recover the
cumulatively solved the problem the vendor’s engi- copper in them. After some searching, SIA found a
neers could not. With the new vacuum distillation company in Spain that could do this.
process in place—the first of its kind in industry— While processing the welding slag kept it out of
the company’s solvent use dropped from three to five the landfill, it was expensive to ship it to Spain (and
truckloads a month to less than one every quarter, the shipping added to the company’s carbon foot-
and the need to truck an almost equivalent amount print). A follow-up idea was to reduce the amount
of toxic waste offsite for processing was eliminated. of sparks created in the first place. Because sparks
Once the distillation process was operational, are caused by arcing between the copper welding tips
additional front-line ideas built upon it. Rather than and the steel, the better the fit between the tip and
shipping the dry still-bottom residue to a special the steel, the fewer the sparks that are generated. A
toxic-waste incineration plant almost five hundred new tip of the proper shape sparks very little. But
miles away, an employee suggested a way to recycle with use, the copper welding tips heated up, softened
it. She identified a company that could extract the and deformed, which degraded the fit and created
organic elements from the still-bottom residue and more sparks. Because it is expensive to replace the
reuse them. The char left over from the organic copper tips as they start to deform, standard prac-
recovery process went to a local steel company, which tice is to increase the amperage on the welder every
used it as a coating to prolong the life of its ladles for two hours in order to assure a good weld. The extra
handling molten steel. power produces even more sparks and heat, cre-
Another idea involved the rags used to clean the ating more tip deformation, which requires even
painting equipment. As had been the case with the more amperage, and so on. Now, instead of turning
solvent-contaminated sludge, these solvent-soaked up the electricity when the tips deform, a special
rags needed to be shipped as toxic waste to the spe- device mounted on the welder quickly “dresses the
cial incineration plant. A worker suggested that tips,” that is, machines them back to their original
the rags could be centrifuged to extract the solvent shape. This idea meant that fewer sparks were gen-
from them, and this solvent then could be distilled erated, shipping costs were reduced, less electricity
for reuse. Now, for every 34 barrels of rags that are was consumed, weld quality improved, and 58,000
centrifuged, one barrel of solvent is recovered. This, fewer copper welding tips were used in the first five
in turn, led to another idea. Since the polyester rags months, a 75 percent reduction. The reduced tip
were no longer toxic, they too could be recycled. usage alone saved $23,000.

36 QMJ VOL. 16, no. 4/© 2009, ASQ


The Role of Front-Line Ideas in Lean Performance Improvement

WHY HIGH-PERFORMING IDEA The suggestion box has been the dominant
paradigm for seeking employee ideas for more
SYSTEMS ARE SO RARE than a century. It was first used in industry in the
late 19th century at companies such as William
If the findings associated with the authors’ first
Denny Shipbuilders in Scotland (William Denny
research question—about the links between high-
and Brothers 1932) and NCR in the United States
performance idea systems and lean performance
(Crowther 1924). Schuring and Luijten (2001, 361)
improvement—are valid, and the strong relation-
observe that “since the birth of suggestion systems,
ships in their sample indicate that they are, then why
their structure has hardly changed.” A standard
are such systems so rare? Given that Toyota, whose
process is as follows. Suggestions are written on
lean practices are highly watched and emulated, has
special forms and dropped in boxes, or in many
publicly and repeatedly identified front-line ideas
organizations today, submitted electronically via
as key to its improvement methodology, why aren’t
intranet or the Internet. The suggestions then go
more companies adopting good idea systems as part to an individual or a committee that gives them
of their lean initiatives? This was the authors’ sec- a preliminary assessment. If the idea is deemed
ond research question. While the first question was worthy of further consideration, it is sent to one
relatively straightforward to answer through analysis or more experts for evaluation. If the evaluations
of the relationships between ideas and improvement come back positive, then the suggester typically is
performance, addressing the second question requires given a reward that is a percentage of the revenue
a less structured approach. Here their findings derive generated or money saved by the idea. (For a more
less from observing direct relationships than from complete discussion of the suggestion-box model, see
studying the perspectives of the leaders of companies Bassford and Martin (1996)). A review of two dozen
that did not use high-performance idea systems and peer-reviewed articles published over the last sev-
interpreting their answers to the interview questions. eral decades confirms both Schuring and Luijten’s
The authors also tracked the experiences of companies observation and the dominance of suggestion-box
as they implemented, or attempted to implement, thinking. All but one of the papers assumed the
high-performance idea systems. suggestion-box process as the model for getting
Their investigation identified two reasons for the employee ideas. Ironically, although each of these
scarcity of high-performance idea systems. The first is studies recognized various deficiencies in this model,
the dominance of the suggestion-box paradigm. The and proposed and tested various changes to deal with
second is that the adoption of a high-performance these deficiencies, such as automation, enhanced
idea system invariably requires significant changes reward systems, faster turnaround, more diplomatic
in behaviors that challenge deeply held assumptions and informative rejection letters, none of the authors
and norms. questioned the underlying model.
For the leaders of companies without high- Unfortunately, the suggestion box is a very
performing idea systems, “asking employees for poor tool for getting ideas. Employees, and even
ideas” was synonymous with “installing a sugges- cartoonists, have poked fun at them for years.
tion box” (whether physical or electronic). This was Suggestion-box type systems, even in their elec-
the only approach they were aware of. The problem tronic manifestations, rarely get more than one idea
was that suggestion boxes are an ineffective process per person per year. Even the best systems get no
for collecting ideas (see, for example, Fairbank, more than two. Worse, “a 10 percent to 25 percent
Spangler, and Williams 2003; Schuring and Luijten adoption rate is considered good for a suggestion
2001), and experience with them had taught these program” (Bassford and Martin 1996, 95).
managers that seeking front-line ideas was rarely The second reason why high-performing idea
worth the time and effort. systems are so rare is that they usually require

www.asq.org 37
The Role of Front-Line Ideas in Lean Performance Improvement

fundamental changes in a company’s operat- single price increase. Sales grew at double digit rates
ing practices and its managers’ behavior. As part annually and the return on assets (ROA) increased to
of this research, the authors chronicled more than almost 50 percent.
a hundred successful and unsuccessful attempts Hickory Chair is one of America’s great lean
to implement high-performing idea systems, and transformation success stories, only made possible
discovered that the process of implementation through a very painful process. Over the transition
often required a transformational journey involv- period, 70 percent of the company’s managers left,
ing wrenching change. The unsuccessful including two vice presidents. They found themselves
companies were either incapable of making the unable to operate effectively in an environment where
necessary changes, or they decided that changes of the majority of improvements were driven by their
that magnitude weren’t worth making. For those subordinates.
companies both willing and able to make the pro- Generally, the required transition in leader-
found changes, the benefits proved to be substantial. ship behavior (from directive to engaging) can be
The case of Hickory Chair, a furniture manufacturer made less traumatic if the organization prepares
in North Carolina, illustrates this well. for it. An example of how this can work comes from
The domestic furniture industry has been one Pyromation (mentioned earlier), which experienced
of the hardest hit by low-cost foreign competition. 100 percent turnover of its mid-level production
Many of Hickory’s domestic competitors have moved managers, none of whom left the company. Senior
their production offshore or have gone out of busi- leaders explicitly identified the behavioral changes
ness. In order to survive, President Jay Reardon they needed in their managers and discussed the
realized his company had to dramatically lower its reasons for these changes openly. They created
costs, dramatically improve quality, and dramati- meaningful staff positions for those managers who
cally increase responsiveness. But according to him, did not wish to make these changes. With its candid
“I was the sales guy (he had been vice president and unthreatening approach, Pyromation made the
of marketing before becoming president after the transition to a new management team much easier.
sudden death of his predecessor). I didn’t know
anything about making furniture. But the people
who put the furniture together know a lot about CONCLUDING DISCUSSION
it.” Reardon’s first act after being appointed presi- A great many lean initiatives have fallen short of
dent was to ask for everyone’s help in consolidating what is possible, because they have failed to incor-
Hickory’s two underutilized manufacturing plants porate a critical component needed for success—a
into one. He asked front-line workers to design the high-performing idea system. The authors research
layout of their own departments before the move. indicates that without such a system, a company may
After the move, Reardon was able to persuade Hajime have a difficult time creating a lean improvement
Ohba, former head of the TSSC and then one of culture and could be ignoring as much as 80 percent
the most prominent lean production experts in the of its improvement potential.
world, to look at Hickory’s initiative and to pro- There are considerable opportunities for further
vide guidance to his people on where to focus their research into the links between high-performing idea
efforts. Over the next eight years, employee ideas systems and lean performance improvement, both in
significantly increased the company’s performance. further testing the propositions presented here and
Hickory Chair’s quality, responsiveness, and inno- in identifying and testing new ones. The authors
vativeness improved dramatically. Work-in-process believe, however, that the more important future
inventory was cut more than 80 percent, and the research will study why it is that so many organiza-
company was able to improve its margins without a tions do not adopt high-performance idea systems

38 QMJ VOL. 16, no. 4/© 2009, ASQ


The Role of Front-Line Ideas in Lean Performance Improvement

as part of their lean initiatives. Certainly Toyota, Burch, M. 2008. Lean longevity: Kaizen events and determinants
of sustainable improvement. Ph.D. diss. Amherst, Mass.: University
Daneher, Autoliv, Milliken, Scania, and other “lean
of Massachusetts.
leaders” have demonstrated the importance of such
Chase, R. B., and D. M. Stewart. 1994. Make your service fail-safe.
systems for lean success. The authors’ work has
Sloan Management Review (Spring):35-44.
identified what they believe to be two of the first-
Choi, T. Y., and J. K. Liker 1995. Bringing Japanese continuous
order barriers for any company in setting up such a improvement processes to U.S. manufacturing: The roles of pro-
system. First, most managers have experience with cess orientation and communications. Decision Sciences 26, no.
only the suggestion-box type of system — an out- 5:589-620.
dated and ineffective process—and this causes them Cox, J. F., and J. H. Blackstone, eds. 1999. The APICS diction-
to shy away from any kind of initiatives to promote ary. Falls Church, Va.: The American Production and Inventory
Control Society.
front-line ideas. To overcome this hurdle is primar-
ily a matter of education, that is, demonstrating to Crowther, S. 1924. John H. Patterson—Pioneer in industrial wel-
fare. New York: Doubleday.
managers the results they can expect from a high-
performance idea system, and teaching them the Denzin, N. K. 1970. The research act in sociology. Chicago:
Aldine.
principles involved in designing and operating one.
The second barrier is more subtle and difficult to Downward, P. M., and A. Mearman. 2007. Retroduction as
mixed-method triangulation in economic research: Reorienting
overcome, as it requires a fundamental rethinking
economics into social sciences. Cambridge Journal of Economics
of the roles of both employees and managers, that is, 31, no. 1:77-99.
a challenge to what Argyris and Schon (1996) refer
Fairbank, J. F., W. E. Spangler, and S. D. Williams. 2003.
to as a “theory in use.” It is understandably hard for Motivating creativity through a computer-mediated employee
managers to confront the limitations of the very para- suggestion management system. Behavior and Information
digm of behavior that led to their personal success. Technology 22, no. 5:305-314.

As Thomas Kuhn pointed out in his classic book The Fuller, U., H. Helbling, and R. Cooley. 2002. Suggestion schemes
Structure of Scientific Revolutions (1996), whenever as information and knowledge management systems. In Information
Systems Research, Teaching and Practice: Proceedings of the
a significant shift in a paradigm occurs, it is very dif-
7th Annual UKAIS Conference, eds. B. Howell and G. Orange,
ficult for those who built their careers on the earlier 226-234. Leeds, United Kingdom: Leeds Metropolitan University.
paradigm to embrace the new one. This observation
Graupp, P., and R. Wrona. 2006. The TWI workbook. New York:
also may explain why so many lean initiatives focus Productivity Press.
on the tools of lean rather than the fundamental
Hall, R. W. 1983. Zero inventories. New York: McGraw-Hill.
changes in management behavior and thinking that
Hayek, F. 1945. The use of knowledge in society. American
are needed to allow front-line employees to truly drive
Economic Review XXXV, no. 4: 519-30.
performance improvement.
Imai, M. 1986. Kaizen: The key to Japan’s competitive success.
It is the authors’ belief that future research may
New York: McGraw-Hill.
well identify the high-performing idea system as the
Imai, M. 1997. Gemba kaizen. New York: McGraw-Hill.
single most important, and the most intractable, part
of a lean initiative to implement. Japan Human Relations Association. 1988. The idea book.
Cambridge, Mass.: Productivity Press.

REFERENCES Kuhn, T. S. 1996. The structure of scientific revolutions. Chicago:


University of Chicago Press.
Argyris, C., and D. Schon. 1995. Organizational learning II:
Theory, method, and practice. New York: Prentice-Hall. Laraia, A. C., P. E. Moody, and R. W. Hall. 1999. The Kaizen
blitz: Accelerating breakthroughs in productivity and performance.
Bassford, R. L., and C. L. Martin. 1996. Employee suggestion
New York: John Wiley and Sons.
systems: Boosting productivity and profits. Lanham: Maryland:
Crisp Publications. Liker, J. K. 2004. The Toyota way. New York: McGraw-Hill.

Bodek, N. 2004. Kaikaku: The power and magic in lean. Liker, J. K., and M. Hoseus. 2007. Toyota culture. New York:
Vancouver, Wash.: PCS Press. McGraw-Hill.

www.asq.org 39
The Role of Front-Line Ideas in Lean Performance Improvement

Nemoto, M. 1987. Total quality control for management. Veech, D. S. 2004. A person-centered approach to sustaining a
Englewood Cliffs, N.J.: Prentice Hall. lean environment job-design for self-efficacy. Defense Acquisition
Review Journal (August-November):159-171.
Nicholas, J. M., and A. Soni 2005. The portal to lean production.
New York: Auerbach Publications. Vishnevsky, T., and H. A. Beanlands. 2004. Neurology Nursing
Journal 31, no. 2:234-8.
Nykiel, R. A. 2007. Handbook of marketing research methodolo-
gies for hospital and tourism. London: The Haworth Press. William Denny and Brothers. 1932. Denny Dumbarton. London:
E. J. Burrow.
Richards, L., and J. Morse. 2007. README FIRST for a user’s
guide to qualitative methods. Thousand Oaks, Calif.: Sage Womack, J. P., and D. T. Jones. 2005. Lean solutions. London:
Publications. Simon and Schuster.

Robinson, A. G., and D. M. Schroeder. 1993. Training, continu- Womack, J. P., and D. T. Jones. 1996. Lean thinking. London:
ous improvement, and human relations: The U.S. TWI programs Simon and Schuster.
and the Japanese management style. California Management
Womack, J. P., D. T. Jones, and D. Roos. 1990. The machine that
Review 35, no. 2:35-57.
changed the world. New York: Harper Perennial.
Robinson, A. G., and D. M. Schroeder. 2006. Ideas are free. San
Francisco: Berrett-Koehler. Toyota Motor Corporation, 1988. Toyota: A History of the First
50 Years. Toyota City, Japan: Toyota Motor Corporation.
Savageau, J. 1996. World-class suggestion systems still work
well. The Journal for Quality and Participation 19:86-90. Yasuda, Y. 1990. Forty years, twenty million ideas. Cambridge,
Mass.: Productivity Press.
Schonberger, R. 2007. Best practices in lean Six Sigma process
improvement. New York: Wiley.
BIOGRAPHIES
Schuring, R. W., and H. Luijten. 2001. Reinventing suggestion
Alan G. Robinson is on the faculty of the Isenberg School of
systems for continuous improvement. International Journal of
Technology Management 22:359-372. Management at the University of Massachusetts. He received his
doctorate in applied mathematics from Johns Hopkins University,
Senge, P. 1990. The fifth discipline. New York: Doubleday. and bachelor’s and master’s degrees in mathematics from the
University of Cambridge in Great Britain. His book Corporate
Spear, S., and H. K. Bowen. 1999. Decoding the DNA of
the Toyota Production System. Harvard Business Review Creativity: How Innovation and Improvement Actually Happen
(September-October):1-12. (co-authored with Sam Stern) has been translated into 13 lan-
guages and was named “Book of the Year” by the Academy
Stewart, T.A. 1997. Intellectual capital: The new wealth of orga- of Human Resource Management. In addition, his 2004 book
nizations. New York: Bantam Doubleday Dell. Ideas Are Free, co-authored with Dean Schroeder, was named
Strategos Inc. 2009. Available at: http://www.strategosinc.com/ Reader’s Choice by Fast Company magazine and named as one
kaizen.htm, accessed June 23. of the 30 best business books of 2004 by Soundview Executive
Books. Robinson can be reached at agr@som.umass.edu.
Strauss, A., and J. Corbin. 1998. Basics of qualitative research:
Grounded theory, procedures and techniques. Newbury Park, Dean M. Schroeder is the Herbert and Agnes Schulz Professor of
Calif.: Sage Publications. Management at Valparaiso University. He received his doctorate
in strategic management from the Carlson School at the University
Swank, C. K. 2003. The lean service machine. Harvard Business
of Minnesota, his MBA from the University of Montana, and his
Review 81, no. 10 (September-October):123-129.
bachelor’s degree in mechanical engineering from the University
Toyoda, E. 1987. Fifty years in motion. New York: Kodansha of Minnesota. Schroeder has authored more than 80 articles and
International. papers. His latest book, co-authored with Alan G. Robinson, Ideas
Are Free, was featured on ABC World News, CNN Headline
Toyota Motor Company. 2004. What sets us apart. http://www.
News, and several NPR programs. He served for five years on
toyota.com/about/operations/manufacturing/index.html.
the board of examiners of the Malcolm Baldrige National Quality
Tozawa, B., and N. Bodek. 2001. The idea generator. Portland, Award and has served on several corporate boards. Schroeder
Ore.: PCS Press. can be reached by e-mail at dean.schroeder@valpo.edu.

40 QMJ VOL. 16, no. 4/© 2009, ASQ


Enhancing Six Sigma
Implementation Through
Human Resource Management
Xingxing Zu, Morgan State University
Lawrence D. Fredendall, Clemson University
© 2009, ASQ

While many companies have implemented Six Sigma


and claim that they have achieved remarkable INTRODUCTION
benefits from their investment, not all Six Sigma Many large companies, including General Electric,
implementations yield the positive results promoted Honeywell, Raytheon, Sony, Caterpillar, and
by its advocates. Human resource management
(HRM) is recognized as a critical factor that influ-
Johnson Controls, have implemented Six Sigma and
ences the adoption of Six Sigma in organizations. report remarkable improvements in market share,
Using data collected from 95 manufacturing plants customer satisfaction, reliability, and performance
that practice Six Sigma, this study investigates the role of products and services with impressive financial
of three quality-oriented HRM practices — employee savings (Foster 2007; Harry and Schroeder 2000;
involvement, employee training, and employee
Pande, Neuman, and Cavanagh 2000; Snee and
performance and recognition — in Six Sigma imple-
mentation. Results of this study indicate that the three Hoerl 2003). Not all organizations, however, have
HRM practices significantly affect the use of Six Sigma implemented this methodology successfully (Gijo
methodology. In addition, it is found that Six Sigma and Rao 2005). Some of the organizations that
role structure (that is, the human infrastructure have successfully implemented Six Sigma report
for Six Sigma using the Six Sigma Green and Black that the best way to manage the change is through
Belt system) integrates with the traditional quality-
increased and sustained communication, motiva-
oriented HRM practices in supporting the use of Six
Sigma methodology. tion, and training (Antony and Banuelas 2002),
which are the issues related to human resource
Key words: human resource management, quality
management (HRM). The importance of HRM to
management, Six Sigma
Six Sigma implementation has been recognized
in the literature (for example, Breyfogle, Cupello,
and Meadows 2001; Lee and Choi 2006; Motwani,
Kumar, and Antony 2004), but little research has
been done to empirically examine the relationship
between HRM and Six Sigma implementation.
This study seeks to investigate the role of HRM
practices in Six Sigma implementation. Prior
research has identified three HRM practices —
employee involvement, employee training, and
employee performance and recognition — that
are important in shaping a quality culture and in
influencing employees’ attitudes toward quality (for
example, Bayo-Moriones and de Cerio, 2001; Bou

www.asq.org 41
Enhancing Six Sigma Implementation Through Human Resource Management

and Beltrán 2005; Howard and Foster 1999; Langbert using improvement specialists, a structured method,
2000). Using empirical data collected from 95 man- and performance metrics. In a study investigating
ufacturing plants that practice Six Sigma, this study the relationship between Six Sigma and traditional
examines the effects of the three quality-oriented QM practices, Zu, Fredendall, and Douglas (2008)
HRM practices on the use of Six Sigma methodology. identify three practices that are particularly important
Also, this study investigates Six Sigma role structure, in applying Six Sigma principles and methods. These
a special human infrastructure that uses a group of practices are Six Sigma role structure, Six Sigma
improvement specialists in the deployment of Six structured improvement procedure, and Six Sigma
Sigma and its relationship with the traditional HRM focus on metrics. Zu, Fredendall, and Douglas (2008)
practices and how both affect the application of Six suggest that Six Sigma structured improvement
Sigma tools and techniques. procedure and Six Sigma focus on metrics are the
methodological core of Six Sigma, while Six Sigma

LITERATURE REVIEW AND role structure is the human infrastructure specifi-


cally developed for Six Sigma implementation. In this
HYPOTHESIS DEVELOPMENT study, the authors adopt these practices to examine
the relationship between HRM and Six Sigma. These

Six Sigma practices are briefly discussed next.


Six Sigma prescribes a rigorous structured
Six Sigma involves using a comprehensive set of approach to conducting quality improvement proj-
tools and techniques in continuous improvement. ects, typically represented by the define, measure,
It is a formal methodology for measuring, analyz- analyze, improve, and control (DMAIC) procedure
ing, improving, and then controlling or “locking for process improvement and the define, measure,
in” processes (Bolze 1998). Six Sigma has evolved analyze, design, and verify (DMADV) procedure for
beyond a technical program and has become a stra- product design. These procedures consist of five
tegic management approach that seeks to increase specific problem-solving steps with recommended
the customer satisfaction and financial health of an statistical and scientific tools in each step (Choo,
organization (Pyzdek 1999; Snee 1999). Linderman Linderman, and Schroeder, 2007; Linderman et al.
et al. (2003, 195) define Six Sigma as “an organized 2003). As the basic structure of how Six Sigma imple-
and systematic method for strategic process improve- ments quality improvement, the procedures provide
ment and new product and service development a methodological framework for when tools should
that relies on statistical methods and the scientific be used, assist Six Sigma teams to design solutions
method to make dramatic reductions in customer that are sustainable once applied, and help team
defined defect rates.” members understand the link between tools and
While some argue that Six Sigma only repackages improvement steps and how they support each other
the tools and techniques from total quality manage- to produce an output that can be acted on (Devane
ment (TQM), a careful examination of Six Sigma 2004). Choo, Linderman, and Schroeder (2007) sug-
concepts and techniques and a comparison between gest that adherence to structured procedures such as
them and traditional quality management (QM) DMAIC or DMADV in the process of conducting Six
methods reveals that the practical approach employed Sigma improvement projects increases the learning
by Six Sigma does not necessarily imply an absence behaviors of team members, which will result in
of theory underlying it. Schroeder et al. (2007) sug- improved knowledge and better project performance.
gest that although Six Sigma tools and techniques Moreover, Six Sigma emphasizes using quanti-
are similar to some QM methods, they provide an fiable metrics in continuous improvement. These
organizational structure not previously seen, which measures include defects per unit (DPU), defects per
reduces variation in organizational processes by million opportunities (DPMO), proportion defective,

42 QMJ VOL. 16, no. 4/© 2009, ASQ


Enhancing Six Sigma Implementation Through Human Resource Management

throughput yield and rolled throughput yield, process such as Antony and Banuelas (2002), Hendricks
sigma, and 10× improvement measures, as well as and Kelbaugh (1998), and Lee and Choi (2006) also
traditional quality measures such as process capabil- recognize the importance of HRM for Six Sigma. The
ity measures (Breyfogle, Cupello, and Meadows 2001; next section examines the nature of the relationship
Dasgupta 2003; Linderman et al. 2003). Six Sigma between HRM and QM in general, and then proposes
uses these measures to closely monitor critical busi- hypotheses about the relationship between HRM and
ness processes in order to detect quality problems Six Sigma practices.
and respond to changes. Six Sigma sets clear and
explicit improvement goals by means of the met-
rics. Linderman, Schroeder, and Choo (2006) find The Relationship of
that using explicit goals motivates team members to
improve quality, particularly when the teams rigor-
HRM and QM
HRM is concerned with people and the way they are
ously follow the Six Sigma structured procedure and
managed, and is recognized as one of the impor-
use the associated tools. Six Sigma also emphasizes
tant sources of competitive advantage (Schuler and
connecting operational performance to business-level
performance when determining metrics for project MacMillan 1984). From the resource-based view of
selection and evaluation, to help ensure that qual- the firm, HRM contributes to sustained competi-
ity improvement projects will finally increase both tive advantage by facilitating the development of
customer satisfaction and the company’s bottom line other organizational capabilities (Saá-Pérez and
(Breyfogle, Cupello, and Meadows 2001). García-Falcón 2002). The HRM system supports an
On the other hand, to deploy the Six Sigma meth- organization’s QM effort by reinforcing employee
odology throughout the organization, companies relationships and group consciousness of the need for
practicing Six Sigma use a group of improvement customer satisfaction, raising employee competence,
specialists who are often referred to as champion, and helping to achieve culture change by involving
Master Black Belt, Black Belt, and Green Belt members in quality decision making (Yang 2006).
(Breyfogle, Cupello, and Meadows 2001; Henderson The existing body of literature examining the
and Evans 2000; Linderman et al. 2003). These relationship of HRM and QM provides a theoreti-
specialists take key roles and responsibilities in their cal background to investigate HRM and Six Sigma.
company’s continuous improvement efforts. For Prior studies have examined various HRM dimen-
example, the company’s senior executives usually sions such as human resource planning, recruiting
serve as champions for promoting and leading the and selection, work design and analysis, training
Six Sigma deployment in the organization, and and education, job rotation, leadership development,
Master Black Belts and Black Belts lead improvement performance appraisal, incentive compensation,
teams and mentor Green Belts in Six Sigma projects benefits and profit sharing, employee development,
(Henderson and Evans 2000; Sinha and Van de Ven employee security and health, communication, and
2005). The improvement specialists receive intensive the use of teams (for example, Dean and Bowen
Six Sigma training to improve their knowledge and 1994; Bayo-Moriones and de Cerio 2001; Bou and
skills in statistical methods, project management, Beltrán 2005; Flynn 1994; Mayer 2002; Yang 2006).
process design, problem-solving techniques, leader- Among them, dimensions related to such practices
ship skills, and other managerial skills (Barney 2002; as employee involvement, employee training, and
Linderman et al. 2003; Snee and Hoerl 2003). employee performance recognition are suggested to
Based on General Electric’s experience imple- have a particularly important impact on QM imple-
menting Six Sigma, Henderson and Evans (2000) mentation (Bayo-Moriones and de Cerio 2001; Bou
suggest that the implementation of Six Sigma needs and Beltrán 2005; Flynn, Schroeder, and Sakakibara
to link to human resources-based actions. Others, 1995; Kaynak 2003).

www.asq.org 43
Enhancing Six Sigma Implementation Through Human Resource Management

Employee involvement is necessary to con- The QM research has shown that the three
tinuous improvement because ultimately people quality-oriented HRM practices identified previously
make quality happen (Rahman and Bullock 2005). contribute to quality improvement by helping orga-
Teamwork and group problem solving are impor- nizations develop a competent, committed work force
tant parts of QM that permit decentralized decision for continuous improvement (Flynn, Schroeder,
making by allowing employees to make decisions on and Sakakibara 1994). Kaynak (2003) found that
their own (Dean and Bowen 1994; Flynn, Schroeder, organizations use quality data better by training
and Sakakibara 1994). Teamwork contributes to their employees in quality tools and by encouraging
employee involvement by creating collaboration them to participate in decision-making processes,
between management and employees that allows teamwork, and employee recognition. Similarly,
nonmanagerial employees to make important con- Sila and Ebrahimpour (2005) found that it is criti-
tributions to quality improvement (Dean and Bowen cal to designing high-quality products and services
1994). Also, cross-functional teams create synergy by and to managing processes for quality that firms
involving different functions to achieve the outcomes build organizational competencies through effec-
of the whole organization. tive HRM practices that are focused on employee
Employee training is the cornerstone of QM imple- training and satisfaction. Nair (2006) conducted
mentation (Juran 1993). The QM-related training a meta-analysis of 26 QM studies and found that
includes training in small group problem solving, people management practices are highly correlated
communication, statistical tools, and other relevant to aggregate business performance, financial perfor-
areas, in addition to classroom and on-site training mance, and operational performance. In addition,
about specific tasks, with the purpose of transform- people management significantly interacts with
ing employees into creative problem solvers (Flynn, other QM practices to affect customer service and
Schroeder, and Sakakibara 1994; Kaynak 2003). product quality.
Through training, employees also can better under-
stand the QM policies implemented by the organization
and become more inspired to take part in the quality
Research Model and
improvement effort (Joseph 1999). Hypotheses
Employee performance and recognition To effectively implement Six Sigma, it is critical to
involves the methods used by organizations to pro- strengthen job security, motivate employees to speak
vide appropriate compensation, promotion, and out with ideas, and provide employees with techni-
recognition policies to their employees. The tradi- cal and psychological support to provide better
tional employee performance appraisal approach products and services for customers (Bhote 2003).
emphasizes the impact of individual differences, Lee and Choi (2006) suggest that Six Sigma entails
but the quality-oriented performance appraisal communication through cross-functional teams,
practice requires group performance, quality-based cooperation and interactive connection processes
incentives, and compensation based on breadth of between people, sustainable education/training
skills (Dean and Bowen 1994; Flynn et al. 1994). to foster learning at all organizational levels, top
Maintaining an effective quality culture requires management support, and a fair compensation
recognizing and rewarding continuous quality policy for employees.
improvement activities and quality customer ser- The three HRM practices considered here —
vices, including both formal and informal, and employee involvement, employee training, and
financial and nonfinancial rewards for individuals employee performance and recognition — should
and teams that contribute to the quality improve- support the sustainable use of Six Sigma methodol-
ment effort (Blackburn and Rosen 1993). ogy. First, employee involvement leads to active

44 QMJ VOL. 16, no. 4/© 2009, ASQ


Enhancing Six Sigma Implementation Through Human Resource Management

participation of organizational members in the the long term, and thus using Six Sigma accom-
new quality initiative (Henderson and Evans 2000). plishments as key measures for management
For an organization to successfully convert to a performance and compensation encourages success-
Six Sigma culture, many people must be directly ful selection and completion of Six Sigma projects
involved and many support systems must be in (Henderson and Evans 2000). Overall, as a company
place to make the transformation work smoothly applies the three quality-oriented HRM practices, its
(Hendricks and Kelbaugh 1998). work force is more likely to be prepared for applying
Second, employee training helps to commu- the Six Sigma methodology. Thus, the following
nicate why and how the organization adopts Six hypothesis is proposed to determine if the tradi-
Sigma and to improve the employees’ understand- tional HRM practices significantly affect the level to
ings of the policies implemented by the organization which an organization applies Six Sigma methods
(Hendricks and Kelbaugh 1998; Lee and Choi 2006). such as the structured improvement procedure and
Continual education and training for manage- performance metrics:
ment and other employees assists in developing • Hypothesis 1: The three traditional quality-
the knowledge and skills required for Six Sigma oriented HRM practices have a positive direct
improvement (Breyfogle, Cupello, and Meadows effect on the use of Six Sigma methodology.
2001; Gale 2003). General Electric, for instance,
The organizational infrastructure is important
required 13 days of training for every employee,
to firms using Six Sigma methodology (Breyfogle,
and made promotions dependent on the completion
Cupello, and Meadows 2001). The Six Sigma role
of green belt training (Henderson and Evans 2000;
structure is a human infrastructure specifically
Hendricks and Kelbaugh 1998). Organizationwide
designed for Six Sigma and is critical in facilitat-
training increases all members’ understanding of
ing the use of Six Sigma tools and techniques. The
the importance of Six Sigma and helps to maintain
differentiated and intensive Six Sigma training
improvement results over time.
programs received by Six Sigma specialists from
Third, employee performance and recognition
champions to Green Belts are designed to improve
aligns individual interests with organizational
their knowledge, skills, and abilities in using Six
goals. Six Sigma emphasizes not only improving
product and service quality to better satisfy cus- Sigma tools, techniques, and metrics, so that they
tomers’ needs and expectations but also providing will be able to effectively lead and conduct improve-
benefits for employees, customers, and sharehold- ment projects. These improvement specialists serve
ers (Pande and Holpp 2002). An organizational as leaders of the organization’s improvement efforts.
policy that recognizes and rewards employees’ per- They spread Six Sigma philosophy throughout the
formance in quality improvement motivates them to organization and have the responsibility to teach
participate in and contribute to Six Sigma projects. other employees about Six Sigma tools and tech-
Linderman et al. (2003) suggest that incentives niques (Antony and Banuelas 2002; Henderson and
and rewards help to encourage a higher level of Evans 2000). Also, Six Sigma training mitigates the
goal commitment and more efforts in fulfilling difficulty of attaining challenging goals of improve-
organizational improvement goals. When organiza- ment projects set by Six Sigma metrics, which
tions have an effective mechanism to evaluate their reduces the uncertainty associated with improvement
employees’ performance and accordingly recognize projects and increases the commitment of the orga-
and reward their contribution to quality improve- nizational members (Linderman et al. 2003). This
ment, employees are more willing to learn and discussion thus suggests:
develop themselves (LLoréns-Montes and Molina • Hypothesis 2: The Six Sigma role structure has
2006). Six Sigma goals must be internalized on a positive direct effect on the use of Six Sigma
an individual level to truly change behavior over methodology.

www.asq.org 45
Enhancing Six Sigma Implementation Through Human Resource Management

Figure 1 Proposed model of HRM and Six Sigma.

HRM practices
• Employee involvement
• Employee training
• Employee performance
and recognition
Use of Six Sigma methodology
Six Sigma • Six Sigma structured improvement

©2009, ASQ
role structure procedure
• Six Sigma focus on metrics

In organizations that practice Six Sigma, the Moreover, Six Sigma teams focus on projects at
adoption of the Six Sigma role structure brings the strategic level and are formed with people along
innovative elements into their existing HRM sys- process lines to improve a particular process and are
tem. First, the Six Sigma role structure enhances disbanded after the process improvement is imple-
employee involvement and teamwork by provid- mented, unlike TQM teams which aim to involve all
ing better leaders in improvement projects. Teams employees, particularly shop-floor employees, and
work better when there is strong leadership and have an ongoing charter for improvement in their
effective administrative support. As compared to work areas (Schroeder et al. 2007). Second, Six
TQM, Six Sigma demands more leadership involve- Sigma training adds to traditional employee train-
ment on improvement projects and requires ing and education on QM. Different from the TQM
leaders to be involved in the improvement pro- training for every employee, Six Sigma training
cess on an ongoing basis (Schroeder et al. 2007). is offered on an as-needed basis and is differenti-
Top management serves as champions leading the ated by task (Schroeder et al. 2007). The amount
organization’s improvement effort and actively and content of training are tailored for different
participates in directing and supporting improve- levels of Six Sigma specialists to match their tasks’
ment projects (Henderson and Evans 2000; Lee complexity, which increases their capabilities of
and Choi 2006; Schroeder et al. 2007). The direct solving complex problems and helps to focus on
involvement of top management in Six Sigma challenging problems and increase the magnitude
provides visible leadership to the employees and of improvement efforts (Linderman et al. 2003).
demonstrates the importance of the quality initia- Particularly, as Six Sigma training and certification
tive, which encourages employees to participate is being accepted by many companies as a formal
in the organization’s improvement effort (Flynn, component for recruitment and promotion, more
Schroeder, and Sakakibara 1995; Kaynak 2003). people are willing to participate in quality training
Meanwhile, the Six Sigma Green and Black Belt (Gale 2003; Lee and Choi 2006). Third, associated
system can be used as a vehicle to develop future with the Six Sigma training, Six Sigma role struc-
leaders (Schroeder, Linderman, and Zhang 2005). ture entails a certification program of Master
Master Black Belts, Black Belts, and Green Belts Black Belt, Black Belt, and Green Belt. Through
develop skills for managing change and leading the Green and Black Belt certifications, a firm offi-
teams and they are clearly assigned with the respon- cially recognizes and rewards employees’ expertise
sibilities of supporting teamwork, determining team and achievement in continuous improvement.
members’ roles and duties, setting tasks, and assess- Organizations strictly implementing the Green and
ing team members’ performance, which helps to Black Belt system emphasize that every member in
foster collaboration and increase involvement of the company should reach a certain level of exper-
team members (Hackman 2002). tise in continuous improvement skills, and a certain

46 QMJ VOL. 16, no. 4/© 2009, ASQ


Enhancing Six Sigma Implementation Through Human Resource Management

level of Six Sigma qualification is required for each sent to the target respondents. This study sample
position in a core department (Lee and Choi 2006). comprises 95 plants that have implemented Six
Six Sigma training and the associated certifica- Sigma as a formal QM method. The respondents
tion promote the value of quality training as both a include operations managers, quality managers,
path to promotion and as a means to solve quality Six Sigma Master Black Belts, and Black Belts, who
problems, which increases employees’ interest and had sufficient knowledge of Six Sigma implemen-
involvement in quality improvement activities and tation in their plant. The responding plants were
their commitment to the organization’s quality goals from a diverse set of manufacturing industries with
(Linderman et al. 2003). In addition, in the Six transportation equipment, electrical equipment,
Sigma role structure, explicit policy is included to and fabricated metal products being the best rep-
determine how to appraise the employees’ and teams’ resented. Most of the plants had more than 100
quality improvement performance and to reward employees. Among these plants, 53 had been imple-
them accordingly. Specific Six Sigma sections are menting Six Sigma for three years or less, 25 plants
added to the annual performance evaluation form, had been implementing Six Sigma for four to six
and executive incentive compensation is awarded years, 14 plants had been implementing Six Sigma
based on the achievement of Six Sigma goals, which for more than six years, and three plants did not
is expected to motivate employees’ efforts in continu- indicate how long they had used Six Sigma. The
ous improvement and increase employee fulfillment number of Black Belts and Green Belts in these
(Henderson and Evans 2000; Hendricks and Kelbaugh plants was distributed as: 30 plants had fewer than
1998). Thus, the influence of Six Sigma role structure 10 trained Green and Black Belts, 39 plants had 10
on traditional HRM practices is proposed as: to 100 trained Green and Black Belts, and 18 plants
• Hypothesis 3: The Six Sigma role structure has had 100 or more trained Green and Black Belts.
a positive direct effect on the three traditional Overall, this study sample demonstrates an adequate
quality-oriented HRM practices. range of maturity and experience in Six Sigma
implementation.
From these hypotheses, the following research
model is derived, as shown in Figure 1. As explained
earlier, the research model consists of three sections.
The first section is the Six Sigma role structure. The
Measures of HRM and
authors have assumed that the Six Sigma role struc- Six Sigma Practices
ture will positively affect the second section, three In this study, the Six Sigma and HRM constructs
traditional quality-oriented HRM practices, which were measured using multiple items on a seven-
will influence the third section, the use of Six Sigma point Likert scale with 1 for strongly disagree and 7
methodology. for strongly agree. The measures for the three tradi-
tional quality-oriented HRM practices — employee

METHODOLOGY involvement, training, and performance and recog-


nition — were developed based on prior empirical

Sample studies on QM that included HRM as a construct


in their model (for example, Anderson et al. 1995;
The data for this study were drawn from a cross- Douglas and Judge 2001; Flynn, Schroeder, and
sectional Web-based survey that investigated the Sakakibara 1994; 1995; Kaynak 2003). Compared
implementation of QM programs in the U.S. manu- to the measures used in the general HRM litera-
facturing industry. The sample frame was selected ture, these measures were designed to reflect their
from the directories of ASQ and Thomas Register orientation toward QM. Employee involvement was
and then e-mails with a link to the Web survey were measured by items relating to teamwork, group

www.asq.org 47
Enhancing Six Sigma Implementation Through Human Resource Management

problem solving, and employees’ participation in items assessed how a plant deployed the Six Sigma
quality decisions. Employee training was evaluated Green and Black Belts in improvement projects, and
in terms of the availability of quality training for the related training and reward and recognition
employees and managers and the contents of train- policies. As to the use of Six Sigma methodology,
ing. Employee performance and recognition was the Six Sigma structured improvement procedure
assessed by items addressing
whether top management
is rewarded for quality and Table 1 Descriptive statistics and construct validity and reliability of the factors.
whether employees receive
Factor 1 2 3 4 5 6
feedback about quality and
are recognized for their 1. Employee involvement 1.00
quality achievements. 2. Employee training 0.73 1.00
The items measuring the
3. Employee performance and recognition 0.79 0.77 1.00
Six Sigma constructs were
based on practitioner publi- 4. Six Sigma role structure 0.36 0.42 0.36 1.00
cations (for example, Bhote
5. Six Sigma structured procedure 0.42 0.49 0.40 0.77 1.00
2003; Breyfogle, Cupello,
and Meadows 2001; George 6. Six Sigma focus on metrics 0.40 0.54 0.51 0.66 0.70 1.00

2003; Pande, Neuman, and No. of items 3 4 3 6 6 13


Cavanagh 2000; 2002) and
Mean 5.26 5.10 5.01 4.31 5.21 5.36
academic studies (Choo,
Linderman, and Schroeder Std. dev. 1.19 1.28 1.28 1.72 1.37 1.13

2004; Linderman et al.

©2009, ASQ
Cronbach’s alpha 0.84 0.84 0.81 0.94 0.93 0.94
2003; Schroeder 2000). The
Eigenvalue 2.28 2.76 2.17 4.69 4.55 7.75
Six Sigma role structure

Table 2 Results of simple regression analysis.


Dependent variable Independent variable Adj. R2 Beta Std. error t-value P-value

Six Sigma structured procedure Employee involvement 0.17 0.42 0.11 4.43*** 0.000

Six Sigma structured procedure Employee training 0.23 0.49 0.10 5.36*** 0.000

Six Sigma structured procedure Employee performance and recognition 0.15 0.40 0.10 4.26*** 0.000

Six Sigma focus on metrics Employee involvement 0.15 0.40 0.09 4.17** 0.000

Six Sigma focus on metrics Employee training 0.28 0.54 0.08 6.19*** 0.000

Six Sigma focus on metrics Employee performance and recognition 0.25 0.51 0.08 5.68*** 0.000

Six Sigma structured procedure Six Sigma role structure 0.59 0.77 0.05 11.59*** 0.000

Six Sigma focus on metrics Six Sigma role structure 0.42 0.66 0.05 8.36*** 0.000

Employee involvement Six Sigma role structure 0.12 0.36 0.07 3.76*** 0.000

Employee training Six Sigma role structure 0.17 0.42 0.07 4.44*** 0.000
©2009, ASQ

Employee performance and recognition Six Sigma role structure 0.12 0.36 0.07 3.77*** 0.000

* Significant at p < 0.10, ** Significant at p < 0.05, *** Significant at p < 0.01

48 QMJ VOL. 16, no. 4/© 2009, ASQ


Enhancing Six Sigma Implementation Through Human Resource Management

Table 3 Hierarchical regression analysis for Six Sigma structured improvement procedure.
Dependent variable: Six Sigma structured procedure

Independent variable Beta t-value P-value Adj. R2 ΔR2 Sig. F-Change

Model 1 Employee involvement 0.42 4.43 0.000*** 0.17

Model 2 Employee involvement 0.16 2.29 0.025** 0.60 0.43*** 0.000


Six Sigma role structure 0.71 10.21 0.000***

Model 1 Employee training 0.49 5.36 0.000*** 0.23

Model 2 Employee training 0.20 2.82 0.006*** 0.62 0.39*** 0.000


Six Sigma role structure 0.69 9.73 0.000***

Model 1 Employee performance and recognition 0.40 4.26 0.000*** 0.15

Model 2 Employee performance and recognition 0.14 2.05 0.043** 0.60 0.45*** 0.000

©2009, ASQ
Six Sigma role structure 0.72 10.23 0.000***

* Significant at p < 0.10; ** Significant at p < 0.05; *** significant at p < 0.01

Table 4 Hierarchical regression analysis for Six Sigma focus on metrics.


Dependent variable: Six Sigma focus on metrics

Independent variable Beta t-value P-value Adj. R2 ΔR2 Sig. F-Change

Model 1 Employee involvement 0.40 4.17 0.000*** 0.15

Model 2 Employee involvement 0.18 2.22 0.029** 0.45 0.30*** 0.000


Six Sigma role structure 0.59 7.15 0.000***

Model 1 Employee training 0.54 6.19 0.000*** 0.28

Model 2 Employee training 0.32 4.04 0.000*** 0.51 0.23*** 0.000


Six Sigma role structure 0.52 6.51 0.000***

Model 1 Employee performance and recognition 0.51 5.68 0.000*** 0.25

Model 2 Employee performance and recognition 0.31 3.97 0.000*** 0.50 0.25*** 0.000 ©2009, ASQ

Six Sigma role structure 0.54 6.94 0.000***

* Significant at p < 0.10; ** Significant at p < 0.05; *** significant at p < 0.01

was measured by multiple items evaluating how the and validity. All six scales used were reliable with
plant used DMAIC or DMADV as a standard procedure all Cronbach’s alphas above the generally accept-
in process improvement or product design projects, able level of 0.7 (Nunnally 1978). The construct
and the Six Sigma focus on metrics was assessed by validity (that is, the degree to which a scale appro-
the degree to which the plant systematically used Six priately operationalizes the construct) was tested
Sigma metrics in setting improvement goals, deter- using factor analysis. All eigenvalues for the six
mining quality measures, and connecting customer scales were higher than 1.00, and the factor loadings
needs and business-level performance measures with of the items exceeded 0.40, which indicates all the
process-level metrics. items contributed substantially to their respective
Table 1 contains the descriptive statistics of the scales (Hair et al. 1998). Since all the scales met the
factors and the results of verifying their reliability reliability and construct validity requirements, the

www.asq.org 49
Enhancing Six Sigma Implementation Through Human Resource Management

composite scores were calculated for each factor by recognition (β = 0.36, p < 0.01). Thus, Hypothesis 3
averaging its items to represent each plant’s scores is supported. This finding suggests that Six Sigma’s
on the factors for subsequent analyses (Hair et al. new approach to developing and managing human
1998). resources for continuous improvement has a posi-
tive effect on the traditional quality-oriented HRM

Analysis and Results practices of employee involvement, training, and


performance appraisal and reward.
Hypotheses 1 through 3 concern the direct relation- In addition, the authors conducted hierarchi-
ships among the Six Sigma role structure, three cal regression analysis to evaluate whether the Six
traditional HRM practices, and two Six Sigma meth- Sigma role structure can enhance an organiza-
odological practices. Simple regression analysis tion’s capability of human resource development
was conducted to test these hypotheses. As shown for Six Sigma improvement. Two sets of hierarchical
in Table 2, each of the three traditional quality- regression analysis models were evaluated for the
oriented HRM practices is significantly related to Six Sigma structured improvement procedure and
the Six Sigma structured improvement procedure: Six Sigma focus on metrics, respectively. In Table 3,
employee involvement with standardized regression where the Six Sigma structured improvement proce-
coefficient β = 0.42, p < 0.01; employee training dure was the dependent variable, each HRM practice
with β = 0.49, p < 0.01; and employee performance was first entered as an independent variable in model
and recognition with β = 0.40, p < 0.01. The three 1, and then the Six Sigma role structure was added
HRM practices also are significantly and positively in model 2. The analysis of standardized regression
related to the Six Sigma focus on metrics: employee coefficients showed significant relationships among
involvement with β = 0.40, p < 0.01; employee the Six Sigma role structure, the HRM practices, and
training with β = 0.54, p < 0.01; and employee per- the Six Sigma structured improvement procedure.
formance and recognition with β = 0.51, p < 0.01. The explained variances (ΔR 2) were significantly
These results support the proposition that the three higher (that is, adjusted R2 values increased by 39
quality-oriented HRM practices have direct positive percent to 45 percent) after the Six Sigma role struc-
effects on the level of applying Six Sigma methodol- ture was entered into the regression model. Similar
ogy, thus supporting Hypothesis 1. results were found for the hierarchical regression
The regression results in Table 2 show that the models evaluating the relationships among the Six
Six Sigma role structure is significantly related to Sigma role structure, the HRM practices, and the Six
both the Six Sigma structured improvement proce- Sigma focus on metrics (see Table 4). Overall, these
dure (β = 0.77, p < 0.01) and the Six Sigma focus
results suggest that adopting Six Sigma principles
on metrics (β = 0.66, p < 0.01), which supports
adds to the organization’s existing HRM system in
Hypothesis 2. The high standardized regression coef-
supporting the use of Six Sigma methodology.
ficients, as well as the high correlation between the
Six Sigma role structure and the two Six Sigma
methodological practices (see Table 1), indicate that DISCUSSION AND
the Six Sigma role structure is a particularly criti-
cal infrastructure for the effective use of Six Sigma CONCLUSIONS
methodology. Both practitioners and researchers have empha-
Table 2 shows that the Six Sigma role structure sized that human resources play a critical role in
is significantly and positively related to all three deploying Six Sigma (for example, Antony and
traditional HRM practices: employee involvement Banuelas 2002; Bhote 2003; Breyfogle, Cupello,
(β = 0.36, p < 0.01), employee training (β = 0.42, and Meadows 2001; Henderson and Evans 2000;
p < 0.01), and employee performance and LLoréns-Montes and Molina 2006). The results

50 QMJ VOL. 16, no. 4/© 2009, ASQ


Enhancing Six Sigma Implementation Through Human Resource Management

of this study provide the empirical evidence that improvement procedures within their business units
people-based practices have a significant effect (Antony 2004; LLoréns-Montes and Molina 2006).
on the application of Six Sigma methodology. In These Six Sigma improvement specialists are in a
this study, three traditional quality-oriented HRM role where they focus on how to use the Six Sigma
practices (that is, employee involvement, employee procedures and the associated tools, techniques,
training, and employee performance and recog- and metrics, which facilitates the use of Six Sigma
nition) are found to have a positive relationship structured procedures and performance metrics in
with two Six Sigma methodological practices—Six improvement projects.
Sigma structured improvement procedure and Six Moreover, the results presented in this study
Sigma focus on metrics. This finding supports previ- show that this Six Sigma role structure adds to
ous research suggesting that a high-quality system the traditional HRM practices and their synergy
is embedded within a HRM system that uses teams, significantly facilitates the application of Six
engages employees, promotes employee participa- Sigma methodology. The training and certifica-
tion in decision making, and provides training and tion/qualification mechanisms associated with
rewards (Bowen and Lawler 1992; Kochan, Gittel, the Six Sigma role structure generate motivation
and Lautsch 1995; Yang 2006). The use of Six and commitment to the organization’s continu-
Sigma methodology entails substantial changes ous improvement activities (Bhote 2003; Breyfogle,
in an organization’s business processes and man- Cupello, and Meadows 2001). The Six Sigma role
agement styles. Factors such as communication, structure differs from other QM programs, since it
training, and rewards and recognition, if imple- assigns full-time specialists (that is, Black Belts)
mented effectively, can accelerate the integration of to take the responsibility of planning and manag-
Six Sigma into the organization’s culture (McAdam ing improvement projects so that Six Sigma is not
and Evans 2004). perceived as overburdening executives (LLoréns-
In addition, Six Sigma creates a unique human Montes and Molina 2006). So, the specialists are
infrastructure — the Six Sigma role structure — held accountable for applying Six Sigma methods to
consisting of improvement specialists who have meet improvement goals, which drives them to con-
clearly specified roles and responsibilities in the sistently seek innovative ways to improve products,
organization’s improvement efforts and are assigned services, and processes. The reward and recogni-
to take leading positions in project teams. This study tion they receive for their success will publicize
found that this Six Sigma role structure positively Six Sigma throughout the organization and thus
supports the use of the two Six Sigma methodologi- increase the organizationwide interests in and com-
cal practices. Six Sigma emphasizes conducting mitment to quality improvement. It is important
improvement projects in a disciplined manner by that human resource professionals be involved in
offering structured procedures that specify the Six Sigma efforts in selecting and developing people
sequence of improvement activities and prescribe with appropriate knowledge and skills, creating a
the appropriate tools and techniques for each activ- Six Sigma culture, increasing team effectiveness,
ity. When teams follow such procedures to plan and improving communication, and establishing the
execute their projects, it is easier for them to divide right rewards and recognition system (Federico and
complicated projects into feasible tasks so that they Thomson 2003).
are more likely to achieve better project performance The findings of this study are relevant to both
(Linderman et al. 2003; Linderman, Schroeder, and QM researchers and practicing managers. In the
Choo 2006). The improvement specialists, as the QM literature, it has been recognized that many
influential members of management and the leaders companies did not achieve the expected benefits
of project improvement teams, are expected to pro- from QM implementation because they failed to
mote the application, acceptance, and evolution of address the issues related to people and culture

www.asq.org 51
Enhancing Six Sigma Implementation Through Human Resource Management

when implementing QM practices (Prajogo and Bhote, K. R. 2003. The power of ultimate Six Sigma: Keki Bhote’s
proven system for moving beyond quality excellence to total busi-
McDermott 2005). To successfully apply QM meth-
ness excellence. New York: AMACOM.
ods and tools, organizations must establish a sound
Blackburn, R., and B. Rosen. 1993. Total quality and human
people-based, soft, cultural, and organizational
resource management: Lessons learned from Baldrige award-
environment (Evans and Lindsay 1999; Rahman winning companies. Academy of Management Executive 7, no.
and Bullock 2005; Tari and Sabater 2004; Wilkinson 3:49-66.
1992). Effective human resource use is critical for Bolze, S. 1998. A Six Sigma approach to competitiveness.
improving quality (Ahire, Golhar, and Waller 1996). Transmission and Distribution World 50, no. 8:18.
The empirical evidence in this study demonstrates Bou, J. D., and I. Beltrán. 2005. Total quality management, high-
the importance of people-based practices, both the commitment human resource strategy and firm performance: An
traditional quality-oriented HRM practices and empirical study. Total Quality Management 16:71-86.

the Six Sigma role structure, in implementing Six Bowen, D., and L. Lawler. 1992. Total quality-oriented human
Sigma methodology. Based on the results of this resource management. Organizational Dynamics 24, no. 4:39-41.

study, managers are advised to prepare for Six Sigma Breyfogle, F. W., J. M. Cupello, and B. Meadows. 2001.
implementation with careful evaluation of their Managing Six Sigma: A practical guide to understanding,
assessing, and implementing the strategy that yields bottom-line
current HRM practices, such as whether their orga-
success. Danvers, Mass.: John Wiley & Sons, Inc.
nizational culture supports employee involvement
Choo, A.S., K. Linderman, and R. G. Schroeder. 2004. Social
and participation, whether top management is will-
and method effects on learning behaviors and knowledge cre-
ing to invest in employee training and education, ation in Six Sigma projects. In Proceedings of 2004 Annual
and whether the appraisal and reward policy takes Meeting of the Academy of Management, New Orleans.
quality performance into account. More important, Choo, A. S., K. Linderman, and R. G. Schroeder. 2007. Method
the synergy of the Six Sigma role structure and the and psychological effects on learning behaviors and knowledge
traditional HRM practices encourages managers creation in quality improvement projects. Management Science
53, no. 3:437-450.
to innovate their policies and tactics in managing
human resources. It is valuable to integrate the Six Dasgupta, T. 2003. Using the six-sigma metric to measure
and improve the performance of a supply chain. Total Quality
Sigma role structure into the organization’s existing
Management & Business Excellence 14, no. 3:355-367.
HRM system to create high-performance work force.
Dean, H. W., and D. E. Bowen. 1994. Management theory
and total quality: Improving research and practice through
REFERENCES
theory development. Academy of Management Review 19, no.
Ahire, L. S., D. Y. Golhar, and M. A. Waller. 1996. Development 3:392-418.
and validation of TQM implementation constructs. Decision
Desai, D. A. 2006. Improving customer delivery commitments
Sciences 27, no. 1:23-56.
the Six Sigma way: Case study of an Indian small scale industry.
Anderson, J. C., M. Rungtusanatham, R. G. Schroeder, and International Journal of Six Sigma and Competitive Advantage 2,
S. Devaraj. 1995. A path analytic model of a theory of qual- no. 1:23-47.
ity management underlying the Deming Management Method:
Devane, R. 2004. Integrating lean Six Sigma and high-perfor-
Preliminary empirical findings. Decision Sciences 26:637-658.
mance organizations: Leading the charge toward dramatic, rapid
Antony, J., and R. Banuelas. 2002. Key ingredients for the effec- and sustainable improvement. San Francisco: Pfeiffer.
tive implementation of a Six Sigma program. Measuring Business
Douglas, T. J., and W. Q. Judge Jr. 2001. Total quality man-
Excellence 6, no. 4:20-27.
agement implementation and competitive advantage: the role
Antony, J. 2004. Some pros and cons of Six Sigma: An academic of structural control and exploration. Academy of Management
perspective. The TQM Magazine 16, no. 4:303-306. Journal 44:158-169.

Barney, M. 2002. Macro, meso, micro: Six Sigma. The Industrial- Evans, J. R., and W. M. Lindsay. 1999. The management and
Organizational Psychologist 39, no. 4:104-107. control of quality. Cincinnati: South-Western College Publishing.

Bayo-Moriones, A., and M. J. de Cerio. 2001. Quality manage- Federico, M., and T. Thomson. 2003. The role of human
ment and high performance work practices: Do they coexist? resources (HR) in Six Sigma. Available at: www.isixsigma.com/
International Journal of Production Economics 73:251-259. library/content/c030414a.asp#about.

52 QMJ VOL. 16, no. 4/© 2009, ASQ


Enhancing Six Sigma Implementation Through Human Resource Management

Flynn, B. B. 1994. The relationship between quality manage- Kochan, T. A., J. H. Gittel, and B. A. Lautsch. 1995. Total
ment practices, infrastructure and fast product innovation. quality management and human resource systems: An interna-
Benchmarking for Quality Management & Technology 1, no. tional comparison. The International Journal of Human Resource
1:48-64. Management 6, no. 2:201-22.

Flynn, B. B., R. G. Schroeder, and S. Sakakibara. 1994. A Langbert, M. 2000. Human resource management and Deming’s
framework for quality management research and an associated continuous improvement concept. Journal of Quality Management
measurement instrument. Journal of Operations Management 11: 5:85-101.
339-366.
Lee, K. C., and B. Choi. 2006. Six Sigma management activities
Flynn, B. B., R. G. Schroeder, and S. Sakakibara. 1995. The and their influence on corporate competitiveness. Total Quality
impact of quality management practices on performance and Management & Business Excellence 17, no. 7:893-911.
competitive advantage. Decision Sciences 26, no. 5:659-692. Linderman, K., R. G. Schroeder, S. Zaheer, and A. S. Choo.
Foster, S. T. Jr. 2007. Does Six Sigma improve performance? 2003. Six Sigma: A goal-theoretic perspective. Journal of
Quality Management Journal 14, no. 4:1-20. Operations Management 21:193-203.

Linderman, K., R. G. Schroeder, and A. S. Choo. 2006. Six


Gale, S. F. 2003. Building framework for Six Sigma. Workforce
Sigma: The role of goals in improvement teams. Journal of
(May):64-69.
Operations Management 24, no. 6:779-790.
George, M. L. 2003. Lean Six Sigma for service. New York:
LLoréns-Montes, F. J., and L. M. Molina. 2006. Six Sigma and
McGraw-Hill.
management theory: Processes, content and effectiveness. Total
Gijo, E. V., and T. Rao. 2005. Six Sigma implementation— Quality Management 17, no. 4:485-506.
hurdles and more hurdles. Total Quality Management 16, no.
McAdam, R., and A. Evans. 2004. The organizational contextual
6:721-725.
factors affecting the implementation of Six-Sigma in a high tech-
Hackman, J. R. 2002. Leading teams: Setting the stage for great nology mass-manufacturing environment. International Journal of
performances. Boston: Harvard Business School Press. Six Sigma and Competitive Advantage 1, no. 1:29-43.

Hair, J. F., R. E. Anderson, R. L. Tatham, and W. C. Black. 1998. Mayer, K. J. 2002. Human resource practices and service quality
Multivariate data analysis. Upper Saddle River, NJ: Prentice-Hall. in theme parks. International Journal of Contemporary Hospitality
Management 14, no. 4:169-175.
Harry, M., and R. G. Schroeder. 2000. Six Sigma: The break-
Motwani, J., A. Kumar, and J. Antony. 2004. A business pro-
through management strategy revolutionizing the world’s top
cess change framework for examining the implementation of Six
corporations. New York: Doubleday Publishers.
Sigma: A case study of Dow Chemicals. The TQM Magazine 16,
Henderson, K. M., and J. R. Evans. 2000. Successful implemen- no. 4:273-283.
tation of Six Sigma: Benchmarking General Electric company.
Nair, A. 2006. Meta-analysis of the relationship between quality
Benchmarking: An International Journal 7, no. 4: 260-281.
management practices and firm performance—implications for
Hendricks, C. A., and R. Kelbaugh. 1998. Implementing Six quality management theory development. Journal of Operations
Sigma at GE. The Journal of Quality and Participation 21, no. Management 24, no. 6:948-975.
4:48-53.
Nunnally, J. C. 1978. Psychometric theory, second edition. New
Howard, L. W., and S. T. Foster. 1999. The influence of human York: McGraw-Hill.
resource practices on empowerment and employee percep- Pande, P. S., and L. Holpp. 2002. What is Six Sigma? New York:
tions of management commitment to quality. Journal of Quality McGraw-Hill.
Management 4, no. l:5-22.
Pande, P. S., R. P. Neuman, and R. R. Cavanagh. 2000. The Six
Joseph, I. N. 1999. An instrument for measuring total quality Sigma way: How GE, Motorola, and other top companies are
management implementation in manufacturing based business honing their performance. New York: McGraw Hill.
units in India. International Journal of Production Research
37:2201-2215. Pande, P. S., R. P. Neuman, and R. R. Cavanagh. 2002. The Six
Sigma way, team fieldbook: An implementation guide for process
Juran, J. M. 1993. Made in the USA: A renaissance in quality. improvement teams. New York: McGraw Hill.
Harvard Business Review 71, no. 4:42-50.
Prajogo, D. I., and D. M. McDermott. 2005. The relation-
Kaynak, H. 2003. The relationship between total quality manage- ship between total quality management practices and
ment practices and their effects on firm performance. Journal of organizational culture. International Journal of Operations &
Operations Management 31:1-31. Production Management 25, no. 11:1101-1122.

www.asq.org 53
Enhancing Six Sigma Implementation Through Human Resource Management

Pyzdek, T. 1999. Six Sigma is primarily a management program. Tarí, J. J., and V. Sabater. 2004. Quality tools and techniques:
Quality Digest (June):26. Are they necessary for quality management? International Journal
of Production Economics 92, no. 3:267-280.
Rahman, S., and P. Bullock. 2005. Soft TQM, hard TQM, and
organizational performance relationships: An empirical investiga- Wilkinson, A. 1992. The other side of quality: Soft issues and the
tion. Omega 33:73-83. human resource dimension. Total Quality Management 3, no.
3:323-329.
Saá-Pérez, P. D., and J. M. García-Falcón. 2002. A
resource-based view of human resource management and orga- Yang, C. C. 2006. The impact of human resource management
nizational capabilities development. International Journal of practices on the implementation of total quality management: An
Human Resource Management 13, no. 1:123-140. empirical study on high-tech firms. The TQM Magazine 18, no.
2:162-173.
Schroeder, R. G. 2000. Six Sigma quality improve-
ment: What is Six Sigma and what are the important Zu, X., L. D. Fredendall, and T. J. Douglas. 2008. The evolving
implications? In Proceedings of the Fourth Annual International theory of quality management: The role of Six Sigma. Journal of
POMS Conference, Seville, Spain. Operations Management, 26, no. 5:630-650.

Schroeder, R. G., K. Linderman, and D. Zhang. 2005. Evolution


of quality: First fifty issues of production and operations manage- BIOGRAPHIES
ment. Production & Operations Management 14:468-481.
Xingxing Zu is assistant professor in the Department of
Schroeder, R. G., K. Linderman, C. Liedtke, and A. S. Choo. Information Science & Systems at Morgan State University. She
2007. Six Sigma: Definition and underlying theory. Journal of received a bachelor’s degree and master’s degree in industrial
Operations Management (June). engineering from Tianjin University, China, and her doctorate in
operations management from Clemson University. Her research
Schuler, R. S., and I. C. MacMillan. 1984. Gaining competi-
interests are implementation of business improvement methods
tive advantage through human resource management practices.
such as TQM, Six Sigma, and lean in manufacturing and ser-
Human Resource Management 23:241-255.
vice industries and quality communication and assurance in the
Sila, I., and M. Ebrahimpour. 2005. Critical linkages among global supply chain. Her research has been published in Journal
TQM factors and business results. International Journal of of Operations Management, Omega, International Journal of
Operations & Production Management 25:1123-1155. Quality and Reliability Management, and other journals. She can
be reached at xingxing.zu@morgan.edu.
Sinha, K. K., and A. H. Van de Ven. 2005. Designing work
within and between organizations. Organization Science 16, no. Lawrence D. Fredendall is associate professor of management
4:389-408. at Clemson University. He received his MBA and his doctorate
in operations management from Michigan State University. His
Snee, R. D. 1999. Why should statisticians pay attention to Six
most recent book is titled Basics of Supply Chain Management
Sigma?: An examination for their role in the six sigma methodol-
and was published by The St. Lucie Press/APICS Series. His
ogy. Quality Progress 32 no. 9:100-103.
work has appeared in journals such as the Journal of Operations
Snee, R. D., and R. W. Hoerl. 2003. Leading Six Sigma: A step- Management, Decision Sciences, International Journal of
by-step guide based on experience with GE and other Six Sigma Production Research, European Journal of Operational Research,
companies. Upper Saddle River, NJ: Prentice Hall. and Production and Operations Management.

54 QMJ VOL. 16, no. 4/© 2009, ASQ


Book
Reviews
Communication: The Key types in order to cope with his or her language to the individual is not
to Effective Leadership. 2009. environment. Based on the circum- easy. In some circumstances, how-
Judith Ann Pauley and Joseph F. stances, however, one or two will ever, it can be a very effective tool to
Pauley. Milwaukee: ASQ Quality be dominant in their hierarchical get results.
Press. 90 pages. structure. Over time, these personal- Reviewed by
Communication is a very con- ity types can rearrange themselves in Dr. James Kohnen
cise book that describes how to a specific individual to better cope
apply the process communication with the environment in which he The China Price: The True
model developed by Taibi Kahler. or she lives. Fortunately, the leader Cost of Chinese Competitive
The model is reported to be effective only has to identify the dominate Advantage. 2008. Alexandra
in every aspect of one’s life, in every personality type exhibited by his or Harney. New York: The Penguin
personal and business interaction. her individual followers to effectively Press HC. 336 pages.
It does this by identifying another communicate with them. Alexandra Harney pres-
person’s primary, or “base,” per- Given that all of this can be ents a well-written, thoroughly
sonality type, primarily through the internalized to the point that it is use- documented and very informative
language that he or she uses, and ful, the leader will be in a position presentation on the business condi-
the unique communication styles, to choose the language that is most tions that currently prevail in China.
psychological needs, behaviors, and effective in motivating the follower She provides a comprehensive view
other characteristics of each of the into action. The interaction style for of the factors contributing to the
six personality types. each type described by Kahler (1982) phenomenal changes that are tak-
The words that describes the six and used by the Pauley’s is shown in ing place in the social structure and
personality types that Kahler settled Table 5.1 (p. 29): economic climate in China, plus
on include: dreamer, reactor, rebel, The Pauleys present a fasci- the techniques used by individuals,
promoter, workaholic, and persister. nating array of cases, antidotes, business entities, and the govern-
While these words are over simpli- and testimonials to illustrate how ment to cope with them. And while
fications of all the nuances found individuals in all walks of life a disclaimer at the beginning of the
in the various behavioral aspects of and situations have used Kahler’s book states: “At the request of some
a personality type, they do express Process Communication Model to individuals mentioned in this work,
the essence of each one described effectively lead others. Their attempt the author has changed their names
in the book. No test or clinical to convey the intricacy of the model and, in some instances, omitted
method is provided by the Pauleys is noteworthy in the array of per- identifying characteristics,” the
to determine the intensity of the per- sonality profile models available characters created to illustrate the
sonality types, other than inspection from some very noteworthy behav- material presented in each chapter
of one’s own behavior or observa- ioral researchers of the day in both all seem to ring true to the footnotes
tion of other’s behavior, which they academic and popular press. While that support them.
say research shows is effective. The Kahler’s model is worthy of exami- This technique of using a
fact is that everyone possesses some nation, its complexity and onus character to track the material
form of each of these personality on the leader to adapt his or her present in each chapter softens the

www.asq.org 55
Reviews
academic tone of the book and the make money for themselves and The Performance Paradox:
material presented. Nevertheless, their family with little regard for Understanding the Real
each chapter quickly gets to the anything else. Drivers that Critically Affect
heart of the topic at hand, illus- The consequences of these Outcomes. 2009. Jerry L. Harbour.
trating shadow factories, falsified underlying conditions can and New York: Productivity Press. 175
records, and unreliable audits by do lead to abuses of the human pages.
both the government and custom- capital that is employed through- Harbour’s passion for detailed
ers representatives. That is not to out China to support the world’s examination of the essence of
say the government and customers demand for cheap goods. Chapter performance is noteworthy. By
do not have contemporary stan- 7, Accounts and Accountability, thoroughly examining it from a
dards; they just are not effectively does an excellent job of describing declarative and procedural perspec-
communicated and enforced. This how the auditing effort can become tive he ferrets out all the theoretical
is especially true of adjudication jaded as the pressure for low cost and practical aspects of its mean-
of contract disputes because of the goods grows. Harney reports that ing. With the zeal of Diogenes,
fledgling legal system found in the difference between China and who carries a lantern that shines
China today. Occasionally, how- the rest of the world, in the produc- the light of truth into the shad-
ever, someone does get severely tion of fake factory records used to ows, and the sincerity of Apollo,
punished by imprisonment, fines, document manufacturing, is scale the god of truth, who cannot speak
or loss of business for a specifically and skill. “Falsification engineers” a lie, Harbour seeks what is true
horrendous act. are routinely hired to create fake about the concept of performance.
The point of Harney’s rhetoric is factory records that are considered He claims that “Incorrectly held
that the business system in China is an art form. performance-related truths set
structured to provide goods to the The closing chapters of the up business leaders and inves-
world at an artificially low price. book provide considerable hope for tors for disappointment and
To do this China has been, is, and the future of China and the world disillusionment.”
will continue to use its unique market. In the new model factory, Harbour seeks to debunk the
position in the world to sustain conditions will improve and records prevailing notion that increased
itself in this very profitable mode. will accurately reflect the conditions resources will always increase
With more than 1.3 billion people they are documenting, because it is performance. He illustrates with
who live very frugally, China has good politics to value workers and the logical statement that perfor-
an ample labor force to do any- know what is actually happening. mance is the action that results in
thing inexpensively. China also The cost of the goods in the factory outcomes. He quantifies this in a
has an extensive education system will grow, but the China price will performance equation in which
to train selected professional indi- remain competitive, because it has the performance outcome Y can be
viduals to support the physical and built the infrastructure to support expressed as a function of a variable
intellectual infrastructure capable its manufacturing sector. There will set x. The relationship can then be
of reacting effectively, and some- always be cheaper alternatives, but portrayed by the formula Y=f(x).
times forcefully, to correct actions they come with problems orders of Given this approach, three basic
that are perceived not to be in magnitude greater than those found types of x variables emerge.
their national interests. It seems in China. • Those that significantly affect
that, from Harney’s perspective, Reviewed by performance in a positive
all Chinese citizens are trying to Dr. James Kohnen manner

56 QMJ VOL. 16, no. 4/© 2009, ASQ


• Those that significantly affect in Army tanks changed the horse- Sam Carpenter is the founder,
performance in a negative power to a weight ratio allowing majority owner, chief execu-
manner for heaver offensive and defensive tive officer (CEO), and general
• Those that have little or no real improvements to be added without manager of Centratel LLC, which
effect on performance degrading the vehicle’s mobility provides exclusive-quality 24/7/365
The critical thinking task for because of their weight. This change telephone-answering service to all
management is to identify which is started a new S-curve that should be 50 states. He presents a compelling
which. noted on the vehicle’s cumulative look into what it takes to develop
Simply managing resources, life-cycle chart. and maintain a small business that
however, is not enough. With this theoretical back- has a singled-minded focus to “do
Performance is shown to have ground, Harbour ventures off into whatever is necessary to maintain
limits using asymptotic analysis, the practical application of his the position as the highest quality
which is a method of describing theories. Sometime the case studies, telephone answering service in the
limiting behavior. This is illus- anecdotes, and stories become more United States.”
trated by an S-shaped cumulative interesting than the point they are Reading the book clearly identi-
life-cycle curve, which is said to illustrating. He does provide sum- fies that a CEO of a small business
show essentially the same data as maries at the end of each chapter must be cognizant of every aspect
seen in a normal bell curve. The to reinforce the teaching point of of the product and service it offers,
other benefit of using an S-curve each of his descriptive practical the customers it serves, and the
as a universal model (logistic func- applications. suppliers that provide the goods
tion) for performance is that it At times the book seems to pro- and services it needs. Internally,
is derived from a law that states vide too much information about every aspect of running the busi-
that “the rate of growth is pro- a single subject. Harbour is aware ness must be attended to without
portional to both the amount of of this, but being an academic at a large staff or any staff. The sheer
growth already accomplished and heart and very passionate about his magnitude and catastrophic con-
the amount of growth remaining subject and the research time he sequences of handling any one
to be accomplished.” The implica- and his colleagues have put into it, of them incorrectly makes the
tions of this insight are enormous. he is almost compelled to overstate job enormous, if not impossible.
Harbour summarizes this notion his position. If the material seems Unless, as Carpenter discovered,
as: A performance life cycle will, overbearing, simply reading the a system is found to make more
after getting off to a slow start, rap- chapter summaries will significantly while working less. His journey
idly accelerate and eventually hit expand the reader’s understanding from fire-killing to his holistic
some limiting threshold or wall of performance. approach of appreciating the value
and stop regardless of the resources Reviewed by of systems in the universe and
Dr. James Kohnen
expended at any given time. their application in the workplace
Management can sometimes is certainly intriguing.
thwart this paradox superficially Work the System: The It is unfortunate that Carpenter
through innovation. It does not Simple Mechanics of Making was not aware of the work of
change the process, but only adds More and Working Less. 2009. Frederick Winslow Taylor, a
a new beginning to the S-curve. Sam Carpenter. Austin, Texas: mechanical engineer, who is
The replacement of internal com- Greenleaf Book Group, LLC. 240 regarded as the father of scien-
bustion engines with jet engines pages. tific management. Taylor had very

www.asq.org 57
Reviews
precise ideas about how to intro- principles, which are also uncon- picked up by Greenleaf Publishing
duce his system: “It is only through ditional and uncompromisingly and is being distributed in major
enforced standardization of meth- enforced. Number 11 states: “we markets by big-box book stores.
ods, enforced adoption of the best operate the company via docu- The appeal is in its contrast to
implements and working condi- mented procedures and systems.” the retiring corporate CEO’s part-
tions, and enforced cooperation The systems are said to have an “off ing memoirs, usually co-authored
that this faster work can be assured. the street meaning that anyone with with a professional writer, that
And the duty of enforcing the adop- normal intelligence can perform offer their bland wisdom to those
tion of standards and enforcing this the procedures unassisted because willing to read it. Most of them
cooperation rests with manage- they are efficient, simple and thor- should not have taken the sug-
ment alone” (Taylor, Principles oughly documented in no. 13.” gestion to write a book, given
of Scientific Management). But it The procedures provide a detailed freely by their colleagues at their
clearly illustrates that rediscovery account of how to deal with reoccur- retirement gala, seriously because
is the lot of small business owners ring systems, subsystems, and event their books come out poorly in
such as Carpenter, who claims to activities that are considered impor- content and presentation that tar-
have had an epiphany when he was tant to the efficient operation of the nish their own reputation. This
at the depths of despair that led to firm. They are all subject to imme- book provides an uninhibited look
his current theory of management diate revision when a documented into the development of an active
that includes systems. The book does recommendation is presented that CEO for a small business, as did
include five pages (pp. 228-232) of will improve the process. David Novak’s The Education
contemporary references, although Carpenter defends his approach of an Accidental CEO: Lessons
not linked to specific notions he as being a very logical method of Learned From the Trailer Park
describes that he derived from this achieving high efficiency, excellent to the Corner Office (QMJ vol. 15,
life-altering experience. quality, and producing a loyal work- issue 4) for a large corporation.
Carpenter’s concept includes sev- force. He also is enamored with the Both Carpenter and Novak exhibit
eral levels of systems that include concept “keep it simple,” embodied their unbridled passion for the
goals and strategies that are cre- in Ockham’s Razor. There are other organization, the product, and the
ated by the owner — after all, it truisms like these that support his people they lead. Their belief in
is his business, published as a contentions that Centratel offers the themselves, the integrity of their
brief statement for all to see and highest quality telephone answering conviction, and unwavering focus
unconditionally subscribed to as a service in the United States. on excellence is overwhelming.
condition of employment. These This book initially emerged as Reviewed by
are reinforced by Centratel’s 30 a self-published offering that was Dr. James Kohnen

58 QMJ VOL. 16, no. 4/© 2009, ASQ


QMJ Volume 16 Author
Index
A G M
Amara, Nabil. See Boiral, Olivier Guimaraes, Tor, Curtis P. Armstrong, Mahanti, Rupa, “The Application of
and Brian M. Jones, “A New Approach Quality Function Deployment to User
Armstrong, Curtis P. See Guimaraes,
to Measuring Information Systems Interface Design” (vol. 16, no. 1):
Tor
Quality” (vol. 16, no. 1): 42–54. 29–41.

B
H N
Boiral, Olivier, and Nabil
Huang, Xiaowen. See Finch, Byron J. Norton, William I. Jr., and Lyle
Amara, “Paradoxes of ISO 9000
Sussman, “Team Charters:
Performance: A Configurational
J Theoretical Foundations and
Approach” (vol. 16, no. 3): 36–60.
Practical Implications for Quality and
Jones, Brian M. See Guimaraes, Tor Performance” (vol. 16, no. 1): 7–17.
C
Cantrell, R. Stephen. See K R
Laohavichien, Tipparat Koch, Karen E. See Van Matre, Robinson, Alan G., “The Role
Chakravorty, Satya S., “Process Joseph G. of Front-Line Ideas in Lean
Improvement: Using Toyota’s A3 Kolesar, Peter, “A Quality Perspective Performance Improvement” (vol. 16,
Reports” (vol. 16, no. 4): 7–26. on the Mortgage Crisis: More no. 4): 27–40.
Questions Than Answers” (vol. 16, Rodchua, Suhansa, “Comparative
F no. 3): 30–34. Analysis of Quality Costs and
Finch, Byron J., and Xiaowen Huang, Organization Sizes in the
“Predictability of Impending Online L Manufacturing Environment”
Auction Business Failure: A P-Chart (vol. 16, no. 2): 34–43.
Laohavichien, Tipparat, Lawrence D.
Analysis” (vol. 16, no. 2): 25–33. Fredendall, and R. Stephen Cantrell, Rodrigues, António Guimarães.
Fredendall, Lawrence D. See “The Effects of Transformational and See Sampaio, Paulo
Laohavichien, Tipparat Transactional Leadership on Quality
Improvement” (vol. 16, no. 2): 7–24. S
Fredendall, Lawrence D. See Zu,
Xingxing Latham, John R., “Complex System Sampaio, Paulo, Pedro Saraiva, and
Design: Creating Sustainable António Guimarães Rodrigues, “A
Change in the Mortgage-Finance Statistical Analysis of ISO 9000-Related
System” (vol. 16, no. 3): 19–25. Data for European Union Ultra-
Peripheral and Portuguese Regions”
(vol. 16, no. 2): 44–58.

www.asq.org 59
Author Index
Saraiva, Pedro. See Sampaio, Paulo V Z
Schroeder, Dean M. See Robinson, Van Matre, Joseph G., and Karen E. Zipkin, Paul, “Quality Snags in the
Alan G. Koch, “Understanding Healthcare Mortgage-Finance Supply Chain”
Clinical Process and Outcome (vol. 16, no. 3): 7–18.
Stephens, Ken, “Quality Principles,
Measures and Their Use in the
Philosophies, and Methodologies Zu, Xingxing, and Lawrence D.
Baldrige Award Application Process”
Applicable to the Mortgage-Finance Fredendall, “Enhancing Six Sigma
(vol. 16, no. 1): 18–28.
Supply Chain” (vol. 16, no. 3): Implementation Through Human
26–27. W Resource Management” (vol. 16,
no. 4): 41–54.
Sussman, Lyle. See Norton, Watson, Gregory H., “Time to
William I. Jr. Sharpen These Blunt Instruments
and Give Them to Some Living
Spirits!” (vol. 16, no. 3): 28–29.

Special Issue
Research in Supplier Development and Global Supply Chain Quality
Guest Editor: global environment. This includes working with suppli-
S. Thomas Foster Jr. ers in emerging economies such as the BRIC countries.
Area Leader and Professor of Global Supply Chain 2. Papers relating to supplier development are encour-
Management aged. This can be in either a domestic or global
Ford Motor Company Fellow in Quality Management context. What are firms doing to improve supplier
Brigham Young University performance? What does and doesn’t work?
The special issue on Research in Supplier Development 3. A related area of interest is supplier evaluation. What
and Global Supply Chain Quality aims to publish papers are effective methods for evaluating suppliers? Do
that provide greater insights into how decisions about these relate to improved performance?
quality management, quality assurance, and quality 4. Global supply chain quality strategy. Strategy relates
control need to be recast to improve supply chain perfor- to both content and process relating to managing
mance. Papers may be either conceptual or empirical in suppliers in global supply chains.
nature, and pursue either theory building or theory testing. Manuscripts must be submitted by September 30,
Methodologically, papers will typically be based on empiri- 2009, and conform to QMJ requirements. Manuscripts
cal methodologies (for example, case research, survey will be reviewed in a double-blind fashion and accord-
research, and so on) and should be in alignment with the ing to QMJ review procedures. The guest editor in
mission of the QMJ to encourage research that is relevant to consultation with the editor of QMJ will make all final
practitioners. Interdisciplinary papers in terms of content or decisions as to the suitability of manuscripts for the
in terms of methodologies are strongly encouraged. special issue.
Appropriate topics include but are not limited to: Papers should be submitted according to QMJ
1. Global supply chain quality management: Companies guidelines, but authors should clearly note that their
are struggling to improve supply chain performance in a submissions are being submitted for this special issue.

60 QMJ VOL. 16, no. 4/© 2009, ASQ


QMJ Volume 16 Subject
Index
Configurations Information Systems Robinson, Alan G., “The Role
Boiral, Olivier, and Nabil Guimaraes, Tor, Curtis P. Armstrong, of Front-Line Ideas in Lean
Amara, “Paradoxes of ISO 9000 and Brian M. Jones, “A New Approach Performance Improvement” (vol. 16,
Performance: A Configurational to Measuring Information Systems no. 4): 27–40.
Approach” (vol. 16, no. 3): 36–60. Quality” (vol. 16, no. 1): 42–54.
MBNQA
Empirical Research ISO 9000 Van Matre, Joseph G., and Karen E.
Laohavichien, Tipparat, Lawrence D. Boiral, Olivier, and Nabil Koch, “Understanding Healthcare
Fredendall, and R. Stephen Cantrell, Amara, “Paradoxes of ISO 9000 Clinical Process and Outcome
“The Effects of Transformational and Performance: A Configurational Measures and Their Use in the
Transactional Leadership on Quality Approach” (vol. 16, no. 3): 36–60. Baldrige Award Application Process”
Improvement” (vol. 16, no. 2): 7–24. (vol. 16, no. 1): 18–28.
Sampaio, Paulo, Pedro Saraiva, and
António Guimarães Rodrigues, “A Measurement
Healthcare
Statistical Analysis of ISO 9000-Related
Van Matre, Joseph G., and Karen E. Guimaraes, Tor, Curtis P. Armstrong,
Data for European Union Ultra-
Koch, “Understanding Healthcare and Brian M. Jones, “A New Approach
Peripheral and Portuguese Regions”
Clinical Process and Outcome to Measuring Information Systems
(vol. 16, no. 2): 44–58.
Measures and Their Use in the Quality” (vol. 16, no. 1): 42–54.
Baldrige Award Application Process” Kano Model Van Matre, Joseph G., and Karen E.
(vol. 16, no. 1): 18–28. Koch, “Understanding Healthcare
Mahanti, Rupa, “The Application of
Quality Function Deployment to User Clinical Process and Outcome
Human Resource Management Measures and Their Use in the
Interface Design” (vol. 16, no. 1):
Zu, Xingxing, and Lawrence D. 29–41. Baldrige Award Application Process”
Fredendall, “Enhancing Six Sigma (vol. 16, no. 1): 18–28.
Implementation Through Human Leadership
Resource Management” (vol. 16, Mortgage Crisis
Laohavichien, Tipparat, Lawrence D.
no. 4): 41–54. Kolesar, Peter, “A Quality Perspective
Fredendall, and R. Stephen Cantrell,
“The Effects of Transformational and on the Mortgage Crisis: More
Idea Systems Questions Than Answers” (vol. 16,
Transactional Leadership on Quality
Robinson, Alan G., “The Role Improvement” (vol. 16, no. 2): 7–24. no. 3): 30–34.
of Front-Line Ideas in Lean
Performance Improvement” (vol. 16, Latham, John R., “Complex System
Lean
no. 4): 27–40. Design: Creating Sustainable
Chakravorty, Satya S., “Process
Change in the Mortgage-Finance
Improvement: Using Toyota’s A3
System” (vol. 16, no. 3): 19–25.
Reports” (vol. 16, no. 4): 7–26.

www.asq.org 61
Subject Index
Stephens, Ken, “Quality Principles, Quality Function Deployment Statistical Analysis
Philosophies, and Methodologies Mahanti, Rupa, “The Application of Sampaio, Paulo, Pedro Saraiva, and
Applicable to the Mortgage-Finance Quality Function Deployment to User António Guimarães Rodrigues, “A
Supply Chain” (vol. 16, no. 3): Interface Design” (vol. 16, no. 1): Statistical Analysis of ISO 9000-Related
26–27. 29–41. Data for European Union Ultra-
Watson, Gregory H., “Time to Peripheral and Portuguese Regions”
Service Quality (vol. 16, no. 2): 44–58.
Sharpen These Blunt Instruments
Finch, Byron J., and Xiaowen Huang,
and Give Them to Some Living
Spirits!” (vol. 16, no. 3): 28–29.
“Predictability of Impending Online Teams
Auction Business Failure: A P-Chart Norton, William I. Jr., and Lyle
Zipkin, Paul, “Quality Snags in the Analysis” (vol. 16, no. 2): 25–33. Sussman, “Team Charters:
Mortgage-Finance Supply Chain” Theoretical Foundations and
Chakravorty, Satya S., “Process
(vol. 16, no. 3): 7–18. Practical Implications for Quality and
Improvement: Using Toyota’s A3
Reports” (vol. 16, no. 4): 7–26. Performance” (vol. 16, no. 1): 7–17.
Organizational Learning
Robinson, Alan G., “The Role Theory of Constraints
Six Sigma
of Front-Line Ideas in Lean Chakravorty, Satya S., “Process
Performance Improvement” (vol. 16, Chakravorty, Satya S., “Process
Improvement: Using Toyota’s A3 Improvement: Using Toyota’s A3
no. 4): 27–40. Reports” (vol. 16, no. 4): 7–26.
Reports” (vol. 16, no. 4): 7–26.
P-Charts Zu, Xingxing, and Lawrence D. User Interface Design
Finch, Byron J., and Xiaowen Huang, Fredendall, “Enhancing Six Sigma Mahanti, Rupa, “The Application of
“Predictability of Impending Online Implementation Through Human Quality Function Deployment to User
Auction Business Failure: A P-Chart Resource Management” (vol. 16, Interface Design” (vol. 16, no. 1):
Analysis” (vol. 16, no. 2): 25–33. no. 4): 41–54. 29–41.

Process Improvement Small and Medium Enterprise User Satisfaction


Chakravorty, Satya S., “Process (SME)
Guimaraes, Tor, Curtis P. Armstrong,
Improvement: Using Toyota’s A3 Rodchua, Suhansa, “Comparative and Brian M. Jones, “A New Approach
Reports” (vol. 16, no. 4): 7–26. Analysis of Quality Costs and to Measuring Information Systems
Organization Sizes in the Quality” (vol. 16, no. 1): 42–54.
Quality Costs Manufacturing Environment”
Rodchua, Suhansa, “Comparative (vol. 16, no. 2): 34–43.
Analysis of Quality Costs and
Organization Sizes in the
Manufacturing Environment”
(vol. 16, no. 2): 34–43.

62 QMJ VOL. 16, no. 4/© 2009, ASQ


Guidelines for Authors

To receive a sample issue of the Quality Management Journal, contact:


Periodicals Coordinator, ASQ
P.O. Box 3005, 600 N. Plankinton Ave., Milwaukee, WI 53201-3005
414-272-8575 • E-mail: vfunk@asq.org

Quality Management Journal (QMJ) is a quarterly, peer-reviewed journal published by ASQ. Its mission is to
publish significant research relevant to quality management practice and to provide a forum for discussion of
such research by both academics and practitioners. Since its launch in 1993, QMJ has sustained a circulation of
approximately 14,000. QMJ readers are predominately quality management practitioners. Many have training
responsibilities. Some are college professors. Most have senior responsibilities within their organizations. They
represent a variety of industries, most often, manufacturing. Approximately 10 percent reside outside of the
United States.

suitable articles
Quality Management Journal is foremost a research journal. To be appropriate for QMJ, an article should be
grounded in research and theory. QMJ publishes only original work, not work previously published or under review
by another publication. Types of articles suitable for publication in QMJ include the following:
Empirical articles that provide objective evidence concerning actual quality management practice and its effectiveness.
These articles should be written in a manner that emphasizes the managerial implications of the research results and
the rationale for the study. Articles should demonstrate use of accepted methods for empirical research.
Research case studies that consider either a single application or a small number of cases. These articles should
include a structured approach for comparison of the cases and should lead to a set of propositions. Either quantitative
or qualitative comparison is appropriate. For a helpful description of research case studies, see K. M. Eisenhardt’s 1989
article, “Building Theories from Case Study Research,” in Academy of Management Review 14, no. 4:532–550.
Management theory articles that present significant new insight and demonstrated practice. These articles should
include testable propositions and should offer a foundation for future empirical research.
Review articles that create links to the existing academic literature and aid in the development of an identifiable
quality management academic literature. Such articles should represent a synthesis of existing literature and should
demonstrate an understanding of quality management theory and practice.

Articles should emphasize application and implications. Language usage similar to that found in Harvard
Business Review is appropriate. Use the early paragraphs to emphasize the significance of the research. Make the
opening interesting; use the introduction to answer the “so what” question. Spell out the practical implications
for those involved in quality management. These things concern all readers. Detailed technical description of the
research methods is important, but not necessarily of interest to everyone. Place this description of methods and
analysis at the end of the article, preferably in an appendix. Throughout the article, keep sentence structure and
word choice clear and direct. Citations, for example, should not distract from readability. As much as possible, limit
citations to one or two per key idea; use only the most recent or most widely accepted. Avoid acronyms and jargon
that are industry- or organization-specific. Try not to use variable names and other abbreviations that are specific
to the research. Restrict the use of acronyms to those that most readers recognize. Authors for whom English is not
their native language are encouraged to have their articles reviewed and edited first by a professional writer versed
in English grammar and style.
Prospective authors should review the description of the refereeing process and expectations for submissions that
are described in the introduction to volume 15, issue 1.

www.asq.org 63
Special Issue
Research in Healthcare Operations and Quality Management
Guest Editors: aging populations. The challenge today is to deliver these
Victor Prybutok, Ph.D., CQE, CQA, CQMgr. services in a safe and cost-effective manner while meeting
Regents Professor of Decision Sciences organizational financial and quality standards. The intent
Fellow in the Texas Center for Digital Knowledge of this call is to disseminate healthcare delivery research
Doctoral Program Coordinator, that is relevant to practitioners and that identifies ways to
Information Technology and Decision Sciences Department improve operations, financial management, and quality
University of North Texas management associated with healthcare delivery in both
inpatient and outpatient environments. Appropriate topics
Xiaoni Zhang, Ph.D.
include but are not limited to:
Associate Professor of Business Informatics
1. Improvements in the safety of healthcare delivery
Northern Kentucky University
2. Maximizing revenues via improved compliance with
The special issue on Research in Healthcare reimbursement criteria
Operations and Quality Management aims to publish
3. Quality improvement in healthcare settings
papers that provide greater insights into healthcare
4. Measurement of healthcare quality
services, operations, quality management, decision mak-
ing, and performance improvement. This special issue 5. Tools for effective managerial decision making in
seeks conceptual or empirical papers that pursue either healthcare settings
theory building or theory testing. Papers based on empiri- 6. Organizational culture and quality improvement
cal methodologies (for example, case research, survey 7. Use of technology to improve service delivery
research, and so on) that fulfill the mission of the QMJ Manuscripts must be submitted by September 30,
to encourage research that is relevant to practitioners are 2009, and conform to QMJ requirements. It is important
encouraged. This special issue also welcomes interdisci- for authors to clearly state that the submission is for
plinary papers that fulfill the same mission. this special issue. Manuscripts will undergo a double-
Healthcare is an essential and growing component of blind review and the review process will adhere to all
the economies in many countries. The increase in demand QMJ procedures. The guest editors in consultation with
that is spurring the growth in healthcare is the result of the editor of QMJ will make all final decisions as to the
evolving technology in medicine and the growing needs of suitability of manuscripts for the special issue.

64 QMJ VOL. 16, no. 4/© 2009, ASQ

Vous aimerez peut-être aussi