TABLE OF CONTENTS
LIST OF TABLES............................................................................................................................ 7
3.5 Joint Reaction for Checking Bearing Capacity of the Foundation ........................................ 47
3.6.1 Calculation of Pier Head Part Which Resists Vertical Load .......................................... 49
3.6.2 Calculation of Pier Head Part Which Resists Horizontal Load ...................................... 52
2
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
3
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
LIST OF FIGURES
Figure 8 Response Spectrum Curve for Jakarta with Medium soil at Base ................................... 18
Figure 12 Axial, Shear & Moment Diagram of Pier-1 due to Gravity Load Respectively ................ 21
Figure 13 Axial, Shear & Moment Diagram of Pier-1 due to Gravity Load ..................................... 22
Figure 14 Axial, Shear & Moment Diagram of Pier-1 due to Seismic Load Respectively ............... 23
Figure 15 Axial, Shear & Moment Diagram of Pier-1 due to Seismic Load .................................... 23
Figure 16 Response Spectrum Curve for Jakarta with Medium soil at Base.................................. 28
Figure 20 Axial, Shear & Moment Diagram of Pier due to Gravity Load Respectively ................... 32
Figure 21 Axial, Shear & Moment Diagram of Pier-2 Supporting Girder due to Gravity Load ........ 32
Figure 22 Axial, Shear & Moment Diagram of Pier-2 due to Seismic Load .................................... 33
Figure 23 Axial, Shear & Moment Diagram of Pier-2 due to Seismic Load .................................... 33
Figure 24 Response Spectrum Curve for Jakarta with Medium soil at Base.................................. 38
4
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 28 Axial, Shear & Moment Diagram of Pier due to Gravity Load Respectively ................... 42
Figure 29 Axial, Shear & Moment Diagram of Pier-3 Supporting Girder due to Gravity Load ........ 42
Figure 30 Axial, Shear & Moment Diagram of Pier due to Seismic Load ....................................... 44
Figure 42 Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data ...................................... 61
Figure 43 Graphics of Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data ................... 62
Figure 48 Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data ...................................... 67
Figure 49 Graphics of Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data ................... 68
Figure 48 Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data ...................................... 73
Figure 49 Graphics of Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data ................... 74
5
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 54 Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data ...................................... 79
Figure 55 Graphics of Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data ................... 80
6
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
LIST OF TABLES
7
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
1. GENERAL DESCRIPTION
1.1 Introduction
Pedestrian Bridge 2 is located at Jl. TB. Simatupang at Sta. 2K+040 in front of BMW showroom.
The purpose of extension of Pedestrian Bridge 2 is to accommodate widening of Jl. TB.
Simatupang which is as National Road that requires 2 x 3.5 m width.
8
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Direktorat Bina Teknik, 1995, "Tata Cara Perencanaan Jembatan Penyeberangan untuk Pejalan
Kaki di Perkotaan", No. 027/T/Bt/1995, Direktorat Jenderal Bina Marga, Departemen Pekerjaan
Umum, Jakarta.
Badan Standardisasi Nasional, 2012, "Tata Cara Perencanaan Ketahanan Gempa untuk Struktur
Bangunan Gedung dan Non-gedung", SNI 1726-2012, Badan Standardisasi Nasional , Jakarta.
9
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
2. DESIGN PHILOSOPHY
For the cast-in-place reinforced concrete structure, method of analysis in this calculation is LRFD
Method based on ACI 318M-11, and the used load combinations are according to Direktorat
Jenderal Bina Marga (1995). Calculation of seismic forces is based on SNI 1726-2012. The
prestress girder of the bridge is chosen from manufacturer's brochure (WIKA Beton) considering its
given strength capacity.
Pier heads are free-ends, therefore girders and stairs are simply supported on pier heads.
Piers are modeled as single degree of freedom system, hence static equivalent procedure to
compute seismic forces can be applied.
Permanent loads consist of self-weight dead loads and superimposed dead loads (SIDL).
Self-weight dead loads consist of the weight of all construction materials of the bridge members
including girders, decks, piers, stairs, and foundation system. Stairs are assumed to have
additional dead load from architectural floor cover which is defined as 66 kg/m2 (equivalent to plain
concrete 3cm thick). The dead load from stair steps (aantrade = 30 cm, optrade = 18 cm) is
defined as 187.2 kg.m2 (equivalent to reinf. concrete 7.80 cm thick).
10
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
SIDL consist of all considered non-structural components that are attached on the bridge. They are
loads from utilities and initial wearing course (must be considered for future overlay).
Live loads refer to the loads produced by the use of the bridge or other structure that does not
include construction or environmental loads.
According to the document of Direktorat Bina Teknik (1995), wind load is calculated using the
following equation,
Vw = wind speed = 30 m/s (assuming the bridge location is more than 5 km far away from coast)
Ab = the side surface area of the bridge span where the wind load works (m2) = 1 m X 1.7 m.
The seismic load which is applied on pier head is calculated in the next chapter of this report
because it needs girder and pier section to be defined. A single degree of freedom model is utilized
to represent the pier. In single degree of freedom (SDOF) model using static equivalent procedure,
11
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
the seismic forces depend solely on the natural frequency of the structure whose parameters are
the lumped mass and pier stiffness. The lumped mass and pier stiffness will be obtained if the
member sections have been defined or assumed.
There are two directions considered in applying seismic load, X (parallel to the bridge span) and Y
(perpendicular to the bridge span) direction. The code requires the seismic load is considered
100% in one direction, in combination with 30% in another direction.
Where DL is dead load influence, SIDL is superimposed dead load influence, LL is pedestrian life
load influence, WL is wind load influence, Ex is seismic load influence parallel to the bridge span
(22 m), and Ey is seismic load influence perpendicular to the bridge span (22 m).
Load combination used to check service requirements and bearing capacity of the foundation,
12
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
The pedestrian bridge structural analysis and design are elaborated in several parts explained
below.
13
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Based on combination 1 which introduces significant gravity loads, the factored ultimate bending
moment on the slab in major direction 𝑀𝑢 = 18055.86 𝑘𝑔𝑚⁄𝑚 = 1.81 × 108 𝑁𝑚𝑚⁄𝑚 The
reinforcement calculation is as follows,
𝜌𝑓𝑦
𝑀𝑢 = 𝜙𝜌𝑓𝑦 𝑏𝑑2 (1 − )
1.7𝑓𝑐′
𝜌 × 390
1.81 × 108 = 0.9 × 𝜌 × 390 × 1000 × (150 − 50)2 (1 − )
1.7 × 32
𝜌 = 0.0144 while,
𝑓
(0.003 + 𝑦⁄𝐸 ) 𝜌𝑏 (0.003 + 390⁄
𝜌𝑚𝑎𝑥 =
𝑠
= 200000)0.0346 = 0.0214
0.008 0.008
𝐴𝑠 = 𝜌𝑏𝑑 = 0.0144 × 1000 × (250 − 50) = 2880 𝑚𝑚2 → 𝑠𝑙𝑎𝑏 𝑡ℎ𝑖𝑐𝑘𝑛𝑒𝑠𝑠 25 𝑐𝑚 𝑎𝑛𝑑 𝑐𝑜𝑣𝑒𝑟 5 𝑐𝑚)
𝑢𝑠𝑒 𝑫𝟏𝟔 − 𝟐𝟓𝟎 𝑓𝑜𝑟 𝑏𝑜𝑡ℎ 𝑡𝑜𝑝 𝑎𝑛𝑑 𝑏𝑜𝑡𝑡𝑜𝑚 𝑡𝑟𝑎𝑛𝑠𝑣𝑒𝑟𝑠𝑎𝑙 𝑟𝑒𝑖𝑛𝑓𝑜𝑟𝑐𝑒𝑚𝑒𝑛𝑡, 𝐴𝑠 = 804 𝑚𝑚2
𝜙 = 0.75
𝑉𝑢 ≤ 𝜙𝑉𝑐
231445.56 ≤ 375049.43 → 𝑂𝐾
The immediate deflection of the stair slab due to combination load 5 (at service condition) is limited
to L/360 as stipulated in ACI 318M-11. Hence the limit is7800⁄360 = 21.7 𝑚𝑚 . The calculated
maximum elastic deflection from the slab model is 13 mm for the thickness 25 cm and it satisfies
the requirement.
15
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Pier-3
Pier-2
Pier-1
3.3.1 Pier-1
Height of the designed pier is 4.2 m and it will support two concrete stairs, maximum length of the
stairs is 8,7 m. The assumed initial size of the pier section is 80 cm by 80 cm.
The calculation of gravity loads which are applied and work on pier head in load combination 3 and
4, from the stair,
1.3 DL
∎𝑆𝑡𝑎𝑖𝑟: 0.25 × 2.0 × 2400 × 1.3 = 1560 𝑘𝑔/𝑚 → (𝑠𝑙𝑎𝑏 𝑡ℎ𝑖𝑐𝑘𝑛𝑒𝑠𝑠 25 𝑐𝑚 𝑎𝑛𝑑 𝑤𝑖𝑑𝑡ℎ 2.0 𝑚)
∎𝐴𝑟𝑐ℎ𝑖𝑡𝑒𝑐𝑡𝑢𝑟𝑎𝑙 𝑓𝑙𝑜𝑜𝑟 𝑐𝑜𝑣𝑒𝑟: 2.0 × 66 × 1.3 = 171.6 𝑘𝑔⁄𝑚 → (𝑠𝑙𝑎𝑏 𝑠𝑝𝑎𝑛 𝑤𝑖𝑑𝑡ℎ 2.0 𝑚)
∎𝑆𝑡𝑎𝑖𝑟 𝑠𝑡𝑒𝑝: 0.078 × 2.0 × 2400 × 1.3 = 486.72 𝑘𝑔⁄𝑚 (𝑒𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 𝑠𝑡𝑒𝑝 𝑡ℎ𝑖𝑐𝑘𝑛𝑒𝑠𝑠 7.8 𝑐𝑚)
2.0 SIDL
16
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
2938.32×8.7
𝑉𝑢𝑠 = 2
= 12781.69 𝑘𝑔
𝑠 9.81 𝑁
𝑚𝐷𝐿+𝑆𝐷𝐿 = 𝑉𝑢𝑠 × = 12781.69 𝑁 𝑠 2 ⁄𝑚
9.81 𝑚⁄𝑠2
The lumped mass on pier head due to live load contribution (25%),
𝑠 8.7
𝑉𝐿𝐿 = 500 × 2.0 × 2
= 4350 𝑘𝑔
𝑠 𝑠 9.81 𝑁
𝑚𝐿𝐿 = 0.25 × 𝑉𝐿𝐿 × 9.81 𝑚⁄𝑠2 = 1087.5 𝑁 𝑠 2 ⁄𝑚
The bending stiffness of the pier, assuming support is fixed and pier head is free-end,
𝐿 = 4200 𝑚𝑚
1
𝐼 = 12 × 8004 = 3.41 × 1010 𝑚𝑚4
Bending stiffness,
3𝐸𝐼
𝐾𝑝 = 𝐿3
= 36711.4 𝑁⁄𝑚𝑚 = 0.36 × 108 𝑁⁄𝑚
𝐾
𝜔 = √𝑚 𝑝 = 34.09 𝑟𝑎𝑑⁄𝑠
𝑘𝑝
The generated response spectrum curve according to SNI 1726-2012 for Jakarta using medium
soil at base is shown below. The calculated parameters of the curve:
17
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
R 1.0
S DS 0.55
S D1 0.36
Ts 0.65
T0 0.13
0.6
Spektrum Respon Desain Jakarta, Tanah…
0.5
0.4
Sa (g)
0.3
0.2
0.1
0
0 0.5 1 1.5 2 2.5 3 3.5 4
T (detik)
Figure 8 Response Spectrum Curve for Jakarta with Medium soil at Base
Based on the curve, the period 0.19 s corresponds to spectral acceleration 0.55 g, therefore the
calculation of seismic forces applied on pier head using R (response modification factor) = 3 due to
plastic deformation at pier base,
The applied seismic forces along with all gravity loads (𝑉𝑢𝑠 + 𝑉𝑢𝑠 ) from spans on pier head is shown
below.
18
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 10 3D Model
19
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
20
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 12 Axial, Shear & Moment Diagram of Pier-1 due to Gravity Load Respectively
21
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 13 Axial, Shear & Moment Diagram of Pier-1 due to Gravity Load
22
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 14 Axial, Shear & Moment Diagram of Pier-1 due to Seismic Load Respectively
Figure 15 Axial, Shear & Moment Diagram of Pier-1 due to Seismic Load
23
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
24
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
25
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
After defining the seismic forces and all gravity loads which work on pier head, design of pier
section is conducted by the software using ACI 318-11 code. The design results are:
Pier section : 80 cm by 80 cm
Longitudinal reinf. : 16D25 (7853.98 mm2, the required reinf. 6400 mm2)
Transversal reinf. : D10-150 (this spacing is required to prevent buckling of long. reinf.)
3.3.2 Pier-2
Height of the designed pier is 7.7 m and it will support one concrete stair and one voided slab,
maximum length of the stairs is 8,7 m and voided slab 14.9 m. The assumed initial size of the pier
section is 80 cm by 80 cm.
The calculation of gravity loads which are applied and work on pier head in load combination 3 and
4, from the stair and voided slab,
1.3 DL
26
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
∎𝐶𝑎𝑠𝑡 − 𝑖𝑛 − 𝑠𝑖𝑡𝑢 𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒: 0.4 × 2400 × 1.3 = 1248 𝑘𝑔⁄𝑚 → (𝑡ℎ𝑒 𝑠𝑒𝑐𝑡𝑖𝑜𝑛 𝑎𝑟𝑒𝑎 0.4𝑚2 )
2.0 SIDL
The lumped mass due to gravity loads at each voided slab end,
9.81 𝑁
𝑚1𝐷𝐿+𝑆𝐷𝐿 = 𝑉𝑢1 × = 47326.5 𝑁 𝑠 2 ⁄𝑚
9.81 𝑚⁄𝑠2
𝑠 9.81 𝑁
𝑚𝐷𝐿+𝑆𝐷𝐿 = 𝑉𝑢𝑠 × 9.81 𝑚⁄𝑠2 = 12781.69 𝑁 𝑠 2 ⁄𝑚
The lumped mass on pier head due to live load contribution (25%),
1 15
𝑉𝐿𝐿 = 500 × 1.84 × = 6900 𝑘𝑔
2
𝑠 𝑠 9.81 𝑁
𝑚𝐿𝐿 = 0.25 × 𝑉𝐿𝐿 × 9.81 𝑚⁄𝑠2 = 1087.5 𝑁 𝑠 2 ⁄𝑚
The bending stiffness of the pier, assuming support is fixed and pier head is free-end,
𝐿 = 7700 𝑚𝑚
1
𝐼= × 8004 = 3.41 × 1010 𝑚𝑚4
12
Bending stiffness,
27
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
3𝐸𝐼
𝐾𝑝 = 𝐿3
= 5957.6 𝑁⁄𝑚𝑚 = 5.96 𝑁⁄𝑚
𝐾
𝜔 = √𝑚 𝑝 = 93.05 𝑟𝑎𝑑⁄𝑠
𝑘𝑝
The generated response spectrum curve according to SNI 1726-2012 for Jakarta using medium
soil at base is shown below. The calculated parameters of the curve:
R 1.0
S DS 0.55
S D1 0.36
Ts 0.65
T0 0.13
0.6
Spektrum Respon Desain Jakarta, Tanah…
0.5
0.4
Sa (g)
0.3
0.2
0.1
0
0 0.5 1 1.5 2 2.5 3 3.5 4
T (detik)
Figure 16 Response Spectrum Curve for Jakarta with Medium soil at Base
Based on the curve, the period 0.06 s corresponds to spectral acceleration 0.42 g, therefore the
calculation of seismic forces applied on pier head using R (response modification factor) = 3 due to
plastic deformation at pier base,
The applied seismic forces along with all gravity loads (𝑉𝑢𝑠 + 𝑉𝑢1 ) from spans on pier head is shown
below.
28
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 18 3D Model
29
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
30
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
31
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 20 Axial, Shear & Moment Diagram of Pier due to Gravity Load Respectively
Figure 21 Axial, Shear & Moment Diagram of Pier-2 Supporting Girder due to Gravity Load
32
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 22 Axial, Shear & Moment Diagram of Pier-2 due to Seismic Load
Figure 23 Axial, Shear & Moment Diagram of Pier-2 due to Seismic Load
33
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
34
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
35
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
After defining the seismic forces and all gravity loads which work on pier head, design of pier
section is conducted by the software using ACI 318-11 code. The design results are:
Pier section : 80 cm by 80 cm
Longitudinal reinf. : 16D25 (7853.98 mm2, the required reinf. 6400 mm2)
Transversal reinf. : D10-150 (this spacing is required to prevent buckling of long. reinf.)
3.3.3 Pier-3
Height of the designed pier is 7.7 m and it will support one voided slab and one PC I girder H-210,
maximum length of the voided slab is 14.9 m and girder 38 m. The assumed initial size of the pier
section is 150 cm by 150 cm.
The calculation of gravity loads which are applied and work on pier head in load combination 3 and
4, from the voided slab and girder,
1.3 DL
∎𝐴𝑟𝑐ℎ𝑖𝑡𝑒𝑐𝑡𝑢𝑟𝑎𝑙 𝑓𝑙𝑜𝑜𝑟 𝑐𝑜𝑣𝑒𝑟: 2.6 × 66 × 1.3 = 223.08 𝑘𝑔⁄𝑚 → (𝑃𝐶 𝐼 𝑔𝑖𝑟𝑑𝑒𝑟 𝑠𝑝𝑎𝑛 𝑤𝑖𝑑𝑡ℎ 1.84 𝑚)
∎𝐶𝑎𝑠𝑡 − 𝑖𝑛 − 𝑠𝑖𝑡𝑢 𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒: 0.52 × 2400 × 1.3 = 1622.4 𝑘𝑔⁄𝑚 → (𝑡ℎ𝑒 𝑠𝑒𝑐𝑡𝑖𝑜𝑛 𝑎𝑟𝑒𝑎 0.52𝑚2 )
36
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
2.0 SIDL
2 9.81 𝑁
𝑚𝐷𝐿+𝑆𝐷𝐿 = 𝑉𝑢2 × 9.81 𝑚⁄𝑠2 = 140246.22 𝑁 𝑠 2 ⁄𝑚
The lumped mass due to gravity loads at each voided slab end,
9.81 𝑁
𝑚1𝐷𝐿+𝑆𝐷𝐿 = 𝑉𝑢1 × 9.81 𝑚⁄𝑠2 = 47326.5 𝑁 𝑠 2 ⁄𝑚
The lumped mass on pier head due to live load contribution (25%),
2 38
𝑉𝐿𝐿 = 500 × 2.6 × 2
= 24700 𝑘𝑔
2 2 9.81 𝑁
𝑚𝐿𝐿 = 0.25 × 𝑉𝐿𝐿 × 9.81 𝑚⁄𝑠2 = 6175 𝑁 𝑠 2 ⁄𝑚
The bending stiffness of the pier, assuming support is fixed and pier head is free-end,
𝐿 = 6600 𝑚𝑚
1
𝐼= × 15004 = 4.22 × 1011 𝑚𝑚4
12
Bending stiffness,
3𝐸𝐼
𝐾𝑝 = 𝐿3
= 117076.2 𝑁⁄𝑚𝑚 = 1.17 × 108 𝑁⁄𝑚
𝐾𝑝
𝜔 = √𝑚 = 23.4 𝑟𝑎𝑑⁄𝑠
𝑘𝑝
The generated response spectrum curve according to SNI 1726-2012 for Jakarta using medium
soil at base is shown below. The calculated parameters of the curve:
R 1.0
S DS 0.55
S D1 0.36
Ts 0.65
T0 0.13
0.6
Spektrum Respon Desain Jakarta, Tanah…
0.5
0.4
Sa (g)
0.3
0.2
0.1
0
0 0.5 1 1.5 2 2.5 3 3.5 4
T (detik)
Figure 24 Response Spectrum Curve for Jakarta with Medium soil at Base
Based on the curve, the period 0.27 s corresponds to spectral acceleration 0.55 g, therefore the
calculation of seismic forces applied on pier head using R (response modification factor) = 3 due to
plastic deformation at pier base,
The applied seismic forces along with all gravity loads (𝑉𝑢1 + 𝑉𝑢2 ) from spans on pier head is shown
below.
38
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 26 3D Model
39
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
40
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
41
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 28 Axial, Shear & Moment Diagram of Pier due to Gravity Load Respectively
Figure 29 Axial, Shear & Moment Diagram of Pier-3 Supporting Girder due to Gravity Load
42
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
43
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Figure 30 Axial, Shear & Moment Diagram of Pier due to Seismic Load
44
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
45
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
46
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
After defining the seismic forces and all gravity loads which work on pier head, design of pier
section is conducted by the software using ACI 318-11 code. The design results are:
Longitudinal reinf. : 48D25 (25512.5 mm2, the required reinf. 22500 mm2)
Transversal reinf. : D10-150 (this spacing is required to prevent buckling of long. reinf.)
Pier-2 that supports stairs and voided slab with height = 7.7 m
47
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Pier-3 that supports voided slab and I girder with height = 6.6 m
In the method, equivalent truss system for the pier head has to be defined prior to the analysis.
After that, truss element which is under tension or compression can be determined. Element that is
under tension is called tie, and element that is under compression is called strut. Each type of the
elements is designed according to the code.
There are two parts of the pier head to be designed: one which resists horizontal load Hu due
seismic influence, and another which resists vertical load Vu mostly due to gravity loads applied on
the bridge spans.
48
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
1859794.10 ≤ 2662172.18 𝑂𝐾
49
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Calculation of member's axial force of equivalent truss model for load Vu,
Σ𝑉 = 0
𝑉𝑢 − 𝐹𝑐 sin 59.52 = 0
𝑉
𝑢 1859794.10
𝐹𝑐 = sin 59.52 = sin 59.52
= 2158018.76 𝑁 (𝑐𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑖𝑜𝑛, 𝑢𝑠𝑒𝑑 𝑡𝑜 𝑐ℎ𝑒𝑐𝑘 𝑠𝑡𝑟𝑢𝑡)
Σ𝐻 = 0
𝐹𝑡 + 𝐹𝑐 cos 59.52 = 0
𝐹𝑐 ≤ 𝜙𝑁𝑛
2158018.76 ≤ 2158065 → 𝑂𝐾
𝑢𝑠𝑒 𝑫𝟏𝟔 𝑤𝑖𝑡ℎ 𝐴𝑣 = 1005.31 𝑚𝑚2 𝒑𝒆𝒓 𝑠 = 200 𝑚𝑚 𝑎𝑛𝑑 𝒑𝒆𝒓 𝑏𝑤 = 1050 𝑚𝑚
𝑢𝑠𝑒 𝑫𝟏𝟔 𝑤𝑖𝑡ℎ 𝐴𝑣 = 1005.31 𝑚𝑚2 𝒑𝒆𝒓 𝑠 = 200 𝑚𝑚 𝑎𝑛𝑑 𝒑𝒆𝒓 𝑏𝑤 = 1050 𝑚𝑚
𝐴 1005.31
(𝑏 𝑠𝑖𝑠) sin 𝛾 = (700×200) sin 30.48 = 0.0036 (𝑓𝑜𝑟 ℎ𝑜𝑟𝑖𝑧𝑜𝑛𝑡𝑎𝑙 𝑟𝑒𝑖𝑛𝑓𝑜𝑟𝑐𝑒𝑚𝑒𝑛𝑡)
𝑤
𝐴
Σ (𝑏 𝑠𝑖𝑠) sin 𝛾 = 0.0062 + 0.0036 = 0.098 ≥ 0.003 → 𝑂𝐾
𝑤
𝐹𝑡 = −1094628.18 𝑁
𝐹𝑡 1094628.18
𝐴𝑠 = = = 3742.318 𝑚𝑚2 𝑝𝑒𝑟 𝑏𝑤 = 700 𝑚𝑚
𝜙𝑓𝑦 0.75×390
51
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
270598.22 ≤ 9117939.71 → 𝑂𝐾
52
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
Calculation of member's axial force of equivalent truss model for load Hu,
Σ𝐻 = 0
𝐻𝑢 − 𝐹𝑐 sin 74.69 = 0
−𝐻𝑢 −270598.22
𝐹𝑐 = = = −280554.73 𝑁 (𝑐𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑖𝑜𝑛, 𝑢𝑠𝑒𝑑 𝑡𝑜 𝑐ℎ𝑒𝑐𝑘 𝑠𝑡𝑟𝑢𝑡)
sin 74.69 sin 74.69
Σ𝑉 = 0
𝐹𝑡 + 𝐹𝑐 cos 74.69 = 0
𝐹𝑐 ≤ 𝜙𝑁𝑛
280554.73 ≤ 280602 → 𝑂𝐾
𝑢𝑠𝑒 𝑫𝟏𝟔 𝑤𝑖𝑡ℎ 𝐴𝑣 = 603.18 𝑚𝑚2 𝒑𝒆𝒓 𝑠 = 300 𝑚𝑚 𝑎𝑛𝑑 𝒑𝒆𝒓 𝑏𝑤 = 700 𝑚𝑚
𝑢𝑠𝑒 𝑫𝟏𝟔 𝑤𝑖𝑡ℎ 𝐴𝑣 = 603.18 𝑚𝑚2 𝒑𝒆𝒓 𝑠 = 300 𝑚𝑚 𝑎𝑛𝑑 𝒑𝒆𝒓 𝑏𝑤 = 700 𝑚𝑚
53
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
𝐴 603.17
(𝑏 𝑠𝑖𝑠) sin 𝛾 = (700×300) sin 74.69 = 0.0027 (𝑓𝑜𝑟 ℎ𝑜𝑟𝑖𝑧𝑜𝑛𝑡𝑎𝑙 𝑟𝑒𝑖𝑛𝑓𝑜𝑟𝑐𝑒𝑚𝑒𝑛𝑡)
𝑤
𝐴 603.17
(𝑏 𝑠𝑖𝑠) sin 𝛾 = (700×300) sin 15.31 = 0.0008 (𝑓𝑜𝑟 ℎ𝑜𝑟𝑖𝑧𝑜𝑛𝑡𝑎𝑙 𝑟𝑒𝑖𝑛𝑓𝑜𝑟𝑐𝑒𝑚𝑒𝑛𝑡)
𝑤
𝐴
Σ (𝑏 𝑠𝑖𝑠) sin 𝛾 = 0.0027 + 0.0008 = 0.0035 ≥ 0.003 → 𝑂𝐾
𝑤
𝐹𝑡 = 74078.06 𝑁
𝐹𝑡 74078.06
𝐴𝑠 = = = 253.26 𝑚𝑚2 𝑝𝑒𝑟 𝑏𝑤 = 700 𝑚𝑚
𝜙𝑓𝑦 0.75×390
4. FOUNDATION DESIGN
According to structure analysis result on previous chapter, the resume of structure analysis can be
seen below:
54
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
56
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
57
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
According to structure analysis result on piers that support stair, the foundation will use 1 Bore-pile
Ø600 mm with length (L) = 19 m. Foundation model and analysis is also performed by Group 8
software.
0.9 m
0.9 m
0.6 m 0.6 m
58
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
From the result above, maximum reaction at two pile can be known
60
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP10 (Jl. TB Simatupang)
The Axial pile bearing capacity analysis result can be seen below
L DL (S/C) 3.00 4.00 0.60 0.80 adhesion 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80
0.00 0.00
1.00 1.00 1.00 C 4 4.00 4.00 5.00 5.00 2.60 0.99 9.90 17.59 0.40 0.70 36.76 65.35 1.72 3.05 4.04 5.39 0.81 1.08 40.80 70.74 2.52 4.13 13.94 22.98 1.20 1.78
2.00 2.00 1.00 C 4 5.00 5.00 5.63 5.63 2.60 0.99 19.79 35.19 0.79 1.41 36.76 65.35 1.72 3.05 8.09 10.78 1.62 2.16 44.84 76.13 3.33 5.21 27.88 45.97 2.41 3.56
3.00 3.00 1.00 C 7 5.63 5.63 6.10 6.10 4.55 0.80 29.69 52.78 1.19 2.11 64.32 114.35 3.00 5.34 13.77 18.36 2.75 3.67 78.09 132.71 5.76 9.01 43.46 71.14 3.94 5.78
4.00 4.00 1.00 C 7.5 6.63 6.10 6.58 6.58 4.88 0.76 39.58 70.37 1.58 2.81 68.92 122.52 3.22 5.72 19.61 26.14 3.92 5.23 88.53 148.67 7.14 10.95 59.19 96.51 5.50 8.04
5.00 5.00 1.00 C 8 7.88 7.10 7.07 7.07 5.20 0.73 49.48 87.96 1.98 3.52 73.51 130.69 3.43 6.10 25.57 34.09 5.11 6.82 99.08 164.78 8.54 12.92 75.05 122.06 7.09 10.34
6.00 6.00 1.00 C 9 8.63 8.30 7.56 7.56 5.85 0.67 59.38 105.56 2.38 4.22 82.70 147.03 3.86 6.86 31.68 42.24 6.34 8.45 114.38 189.27 10.20 15.31 91.06 147.80 8.71 12.67
7.00 7.00 1.00 C 10 9.50 9.10 8.56 8.06 6.50 0.60 69.27 123.15 2.77 4.93 91.89 163.36 4.29 7.62 37.81 50.41 7.56 10.08 129.70 213.77 11.85 17.71 107.08 173.56 10.33 15.01
8.00 8.00 1.00 C 11 10.50 10.00 9.81 9.17 7.15 0.54 79.17 140.74 3.17 5.63 101.08 179.70 4.72 8.39 43.82 58.42 8.76 11.68 144.90 238.12 13.48 20.07 122.98 199.16 11.93 17.31
9.00 9.00 1.00 C 12 11.75 11.20 10.88 10.44 7.80 0.50 89.06 158.34 3.56 6.33 110.27 196.04 5.15 9.15 49.94 66.59 9.99 13.32 160.21 262.62 15.13 22.47 139.01 224.93 13.55 19.65
10.00 10.00 1.00 C 14 13.13 12.50 13.61 12.93 9.10 0.50 98.96 175.93 3.96 7.04 128.65 228.71 6.00 10.67 57.09 76.12 11.42 15.22 185.74 304.83 17.42 25.90 156.05 252.05 15.38 22.26
11.00 11.00 1.00 C 16 17.72 16.37 17.83 16.73 10.08 0.50 108.86 193.52 4.35 7.74 142.47 253.28 6.65 11.82 65.00 86.67 13.00 17.33 207.48 339.96 19.65 29.15 173.86 280.19 17.36 25.08
12.00 12.00 1.00 C 32 25.15 22.52 21.78 20.36 19.08 0.50 118.75 211.12 4.75 8.44 269.79 479.63 12.59 22.38 79.99 106.66 16.00 21.33 349.78 586.28 28.59 43.71 198.74 317.77 20.75 29.78
13.00 13.00 1.00 C 48 31.80 28.24 25.48 23.76 27.13 0.50 128.65 228.71 5.15 9.15 383.60 681.95 17.90 31.82 101.30 135.07 20.26 27.01 484.90 817.02 38.16 58.84 229.95 363.78 25.41 36.16
14.00 14.00 1.00 C 49 37.83 33.36 28.86 26.87 26.39 0.50 138.54 246.30 5.54 9.85 373.02 663.15 17.41 30.95 122.03 162.70 24.41 32.54 495.05 825.85 41.81 63.49 260.57 409.00 29.95 42.39
15.00 15.00 1.00 C 50 40.00 37.87 31.93 29.72 25.75 0.50 148.44 263.89 5.94 10.56 364.07 647.24 16.99 30.20 142.25 189.67 28.45 37.93 506.32 836.91 45.44 68.14 290.69 453.56 34.39 48.49
16.00 16.00 1.00 C 50 38.72 39.32 34.60 32.32 24.72 0.50 158.34 281.49 6.33 11.26 349.50 621.33 16.31 29.00 161.67 215.56 32.33 43.11 511.17 836.89 48.64 72.11 320.01 497.05 38.67 54.37
17.00 17.00 1.00 C 50 37.41 38.05 36.94 34.56 23.81 0.50 168.23 299.08 6.73 11.96 336.54 598.30 15.71 27.92 180.37 240.49 36.07 48.10 516.91 838.79 51.78 76.02 348.60 539.57 42.80 60.06
18.00 18.00 1.00 C 50 36.06 36.77 37.42 36.53 22.98 0.50 178.13 316.67 7.13 12.67 324.93 577.65 15.16 26.96 198.42 264.56 39.68 52.91 523.35 842.21 54.85 79.87 376.55 581.23 46.81 65.58
19.00 19.00 1.00 C 50 34.85 35.48 36.23 36.85 22.24 0.50 188.02 334.27 7.52 13.37 314.44 559.01 14.67 26.09 215.89 287.85 43.18 57.57 530.33 846.86 57.85 83.66 403.91 622.11 50.70 70.94
20.00 20.00 1.00 C 50 33.75 34.32 35.08 35.69 21.57 0.50 197.92 351.86 7.92 14.07 304.91 542.06 14.23 25.30 232.83 310.44 46.57 62.09 537.74 852.50 60.79 87.38 430.75 662.29 54.48 76.16
21.00 21.00 1.00 C 50 32.75 33.27 33.95 34.58 20.95 0.50 207.82 369.45 8.31 14.78 296.19 526.57 13.82 24.57 249.28 332.38 49.86 66.48 545.48 858.94 63.68 91.05 457.10 701.83 58.17 81.25
22.00 22.00 1.00 C 50 31.83 32.31 32.92 33.49 20.38 0.50 217.71 387.04 8.71 15.48 288.18 512.33 13.45 23.91 265.29 353.72 53.06 70.74 553.48 866.05 66.51 94.65 483.00 740.77 61.77 86.23
23.00 23.00 1.00 C 50 30.99 31.43 31.98 32.50 19.86 0.50 227.61 404.64 9.10 16.19 280.79 499.19 13.10 23.30 280.89 374.52 56.18 74.90 561.68 873.71 69.28 98.20 508.50 779.16 65.28 91.09
24.00 24.00 1.00 C 50 30.21 30.62 31.12 31.59 19.38 0.50 237.50 422.23 9.50 16.89 273.94 487.01 12.78 22.73 296.11 394.81 59.22 78.96 570.05 881.82 72.01 101.69 533.61 817.04 68.72 95.85
25.00 25.00 1.00 C 50 29.49 29.86 30.32 30.76 18.93 0.50 247.40 439.82 9.90 17.59 267.57 475.68 12.49 22.20 310.98 414.63 62.20 82.93 578.54 890.31 74.68 105.12 558.38 854.46 72.09 100.52
26.00 26.00 1.00 C 50 28.82 29.16 29.59 29.99 18.51 0.50 257.30 457.42 10.29 18.30 261.62 465.10 12.21 21.70 325.51 434.01 65.10 86.80 587.13 899.12 77.31 108.51 582.81 891.43 75.39 105.10
27.00 27.00 1.00 C 50 28.19 28.51 28.90 29.27 18.11 0.50 267.19 475.01 10.69 19.00 256.05 455.20 11.95 21.24 339.73 452.98 67.95 90.60 595.79 908.18 79.90 111.84 606.93 927.99 78.63 109.60
28.00 28.00 1.00 C 50 27.60 27.90 28.26 28.60 17.74 0.50 277.09 492.60 11.08 19.70 250.82 445.91 11.71 20.81 353.67 471.56 70.73 94.31 604.49 917.47 82.44 115.12 630.76 964.16 81.82 114.02
29.00 29.00 1.00 C 50 27.03 27.32 27.65 27.97 17.39 0.50 286.98 510.19 11.48 20.41 245.91 437.16 11.48 20.40 367.33 489.77 73.47 97.95 613.24 926.94 84.94 118.36 654.32 999.97 84.95 118.36
30.00 1.00 1.00 S 50 26.49 26.76 27.07 27.38 - - 296.88 527.79 11.88 21.11 28.29 38.11 5.78 7.80 375.56 500.75 75.11 100.15 403.85 538.87 80.90 107.95 672.44 1028.54 86.99 121.26
31.00 2.00 1.00 S 50 25.96 26.23 26.52 26.81 - - 306.78 545.38 12.27 21.82 55.46 74.70 11.33 15.27 383.63 511.51 76.73 102.30 439.09 586.21 88.06 117.58 690.41 1056.89 89.00 124.12
32.00 3.00 1.00 S 50 25.45 25.71 26.00 26.28 - - 316.67 562.97 12.67 22.52 81.56 109.86 16.66 22.45 391.55 522.06 78.31 104.41 473.10 631.92 94.97 126.87 708.22 1085.03 90.98 126.93
33.00 4.00 1.00 S 50 24.97 25.22 25.50 25.76 - - 326.57 580.57 13.06 23.22 106.69 143.66 21.79 29.35 399.31 532.42 79.86 106.48 506.01 676.08 101.65 135.84 725.88 1112.99 92.93 129.71
34.00 5.00 1.00 S 50 24.52 24.75 25.02 25.28 - - 336.46 598.16 13.46 23.93 130.94 176.25 26.73 36.00 406.94 542.59 81.39 108.52 537.89 718.84 108.12 144.52 743.41 1140.75 94.85 132.44
35.00 6.00 1.00 S 50 24.09 24.31 24.57 24.81 - - 346.36 615.75 13.85 24.63 154.38 207.72 31.49 42.40 414.44 552.59 82.89 110.52 568.82 760.31 114.38 152.92 760.80 1168.34 96.74 135.15
36.00 7.00 1.00 S 50 23.68 23.89 24.13 24.36 - - 356.26 633.35 14.25 25.33 177.06 238.17 30.93 48.58 421.82 562.42 84.36 112.48 598.88 800.59 115.30 161.06 778.07 1195.77 98.61 137.82
37.00 8.00 1.00 S 50 23.29 23.49 23.72 23.94 - - 366.15 650.94 14.65 26.04 199.04 267.65 30.40 54.55 429.07 572.10 85.81 114.42 628.11 839.75 116.22 168.97 795.22 1223.03 100.46 140.46
38.00 9.00 1.00 S 50 22.92 23.11 23.33 23.54 - - 376.05 668.53 15.04 26.74 220.37 296.25 29.90 53.63 436.21 581.62 87.24 116.32 656.59 877.87 117.15 169.96 812.26 1250.15 102.28 143.07
39.00 10.00 1.00 S 50 22.57 22.75 23.13 23.33 - - 385.94 686.12 15.44 27.44 241.10 324.03 29.65 53.16 443.25 591.00 88.65 118.20 684.35 915.03 118.30 171.36 829.19 1277.12 104.09 145.64
40.00 11.00 1.00 S 50 22.40 22.57 22.94 23.13 - - 395.84 703.72 15.83 28.15 263.15 353.61 29.40 52.71 450.18 600.24 90.04 120.05 713.34 953.85 119.44 172.76 846.02 1303.96 105.87 148.20
Figure 42 Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data
61
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP10 (Jl. TB Simatupang)
-1 -1
-2 -2
-3 -3
-4 -4
-5 -5
-6 -6
-7 -7
-8 -8
-9 -9
Depth (m)
Depth (m)
-10 -10
-11 -11
-12 -12
-13 -13
-14 -14
-15 -15
-16 -16
-17 -17
-18 -18
-19 -19
-20 -20
Bored-Pile Diameters (m) Bored-Pile Diameters (m)
3.00 4.00
3.00 4.00 0.60 0.80
0.60 0.80
Figure 43 Graphics of Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data
62
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
According to pile analysis result, maximum pile lateral force is 14.427 ton and maximum top pile
deflection is 0.072 cm.
63
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
The model SAP 2000 with structure from joint reactions F-2;
According to structure analysis result on piers that support stair, the foundation will use 4 Bore-pile
Ø600 mm with length (L) = 19 m. Foundation model and analysis is also performed by Group 8
software.
0.6 m
1.8 m
0.6 m
64
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
65
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
From the result above, maximum reaction at four pile can be known
66
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP10 (Jl. TB Simatupang)
The Axial pile bearing capacity analysis result can be seen below
L DL (S/C) 3.00 4.00 0.60 0.80 adhesion 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80
0.00 0.00
1.00 1.00 1.00 C 4 4.00 4.00 5.00 5.00 2.60 0.99 9.90 17.59 0.40 0.70 36.76 65.35 1.72 3.05 4.04 5.39 0.81 1.08 40.80 70.74 2.52 4.13 13.94 22.98 1.20 1.78
2.00 2.00 1.00 C 4 5.00 5.00 5.63 5.63 2.60 0.99 19.79 35.19 0.79 1.41 36.76 65.35 1.72 3.05 8.09 10.78 1.62 2.16 44.84 76.13 3.33 5.21 27.88 45.97 2.41 3.56
3.00 3.00 1.00 C 7 5.63 5.63 6.10 6.10 4.55 0.80 29.69 52.78 1.19 2.11 64.32 114.35 3.00 5.34 13.77 18.36 2.75 3.67 78.09 132.71 5.76 9.01 43.46 71.14 3.94 5.78
4.00 4.00 1.00 C 7.5 6.63 6.10 6.58 6.58 4.88 0.76 39.58 70.37 1.58 2.81 68.92 122.52 3.22 5.72 19.61 26.14 3.92 5.23 88.53 148.67 7.14 10.95 59.19 96.51 5.50 8.04
5.00 5.00 1.00 C 8 7.88 7.10 7.07 7.07 5.20 0.73 49.48 87.96 1.98 3.52 73.51 130.69 3.43 6.10 25.57 34.09 5.11 6.82 99.08 164.78 8.54 12.92 75.05 122.06 7.09 10.34
6.00 6.00 1.00 C 9 8.63 8.30 7.56 7.56 5.85 0.67 59.38 105.56 2.38 4.22 82.70 147.03 3.86 6.86 31.68 42.24 6.34 8.45 114.38 189.27 10.20 15.31 91.06 147.80 8.71 12.67
7.00 7.00 1.00 C 10 9.50 9.10 8.56 8.06 6.50 0.60 69.27 123.15 2.77 4.93 91.89 163.36 4.29 7.62 37.81 50.41 7.56 10.08 129.70 213.77 11.85 17.71 107.08 173.56 10.33 15.01
8.00 8.00 1.00 C 11 10.50 10.00 9.81 9.17 7.15 0.54 79.17 140.74 3.17 5.63 101.08 179.70 4.72 8.39 43.82 58.42 8.76 11.68 144.90 238.12 13.48 20.07 122.98 199.16 11.93 17.31
9.00 9.00 1.00 C 12 11.75 11.20 10.88 10.44 7.80 0.50 89.06 158.34 3.56 6.33 110.27 196.04 5.15 9.15 49.94 66.59 9.99 13.32 160.21 262.62 15.13 22.47 139.01 224.93 13.55 19.65
10.00 10.00 1.00 C 14 13.13 12.50 13.61 12.93 9.10 0.50 98.96 175.93 3.96 7.04 128.65 228.71 6.00 10.67 57.09 76.12 11.42 15.22 185.74 304.83 17.42 25.90 156.05 252.05 15.38 22.26
11.00 11.00 1.00 C 16 17.72 16.37 17.83 16.73 10.08 0.50 108.86 193.52 4.35 7.74 142.47 253.28 6.65 11.82 65.00 86.67 13.00 17.33 207.48 339.96 19.65 29.15 173.86 280.19 17.36 25.08
12.00 12.00 1.00 C 32 25.15 22.52 21.78 20.36 19.08 0.50 118.75 211.12 4.75 8.44 269.79 479.63 12.59 22.38 79.99 106.66 16.00 21.33 349.78 586.28 28.59 43.71 198.74 317.77 20.75 29.78
13.00 13.00 1.00 C 48 31.80 28.24 25.48 23.76 27.13 0.50 128.65 228.71 5.15 9.15 383.60 681.95 17.90 31.82 101.30 135.07 20.26 27.01 484.90 817.02 38.16 58.84 229.95 363.78 25.41 36.16
14.00 14.00 1.00 C 49 37.83 33.36 28.86 26.87 26.39 0.50 138.54 246.30 5.54 9.85 373.02 663.15 17.41 30.95 122.03 162.70 24.41 32.54 495.05 825.85 41.81 63.49 260.57 409.00 29.95 42.39
15.00 15.00 1.00 C 50 40.00 37.87 31.93 29.72 25.75 0.50 148.44 263.89 5.94 10.56 364.07 647.24 16.99 30.20 142.25 189.67 28.45 37.93 506.32 836.91 45.44 68.14 290.69 453.56 34.39 48.49
16.00 16.00 1.00 C 50 38.72 39.32 34.60 32.32 24.72 0.50 158.34 281.49 6.33 11.26 349.50 621.33 16.31 29.00 161.67 215.56 32.33 43.11 511.17 836.89 48.64 72.11 320.01 497.05 38.67 54.37
17.00 17.00 1.00 C 50 37.41 38.05 36.94 34.56 23.81 0.50 168.23 299.08 6.73 11.96 336.54 598.30 15.71 27.92 180.37 240.49 36.07 48.10 516.91 838.79 51.78 76.02 348.60 539.57 42.80 60.06
18.00 18.00 1.00 C 50 36.06 36.77 37.42 36.53 22.98 0.50 178.13 316.67 7.13 12.67 324.93 577.65 15.16 26.96 198.42 264.56 39.68 52.91 523.35 842.21 54.85 79.87 376.55 581.23 46.81 65.58
19.00 19.00 1.00 C 50 34.85 35.48 36.23 36.85 22.24 0.50 188.02 334.27 7.52 13.37 314.44 559.01 14.67 26.09 215.89 287.85 43.18 57.57 530.33 846.86 57.85 83.66 403.91 622.11 50.70 70.94
20.00 20.00 1.00 C 50 33.75 34.32 35.08 35.69 21.57 0.50 197.92 351.86 7.92 14.07 304.91 542.06 14.23 25.30 232.83 310.44 46.57 62.09 537.74 852.50 60.79 87.38 430.75 662.29 54.48 76.16
21.00 21.00 1.00 C 50 32.75 33.27 33.95 34.58 20.95 0.50 207.82 369.45 8.31 14.78 296.19 526.57 13.82 24.57 249.28 332.38 49.86 66.48 545.48 858.94 63.68 91.05 457.10 701.83 58.17 81.25
22.00 22.00 1.00 C 50 31.83 32.31 32.92 33.49 20.38 0.50 217.71 387.04 8.71 15.48 288.18 512.33 13.45 23.91 265.29 353.72 53.06 70.74 553.48 866.05 66.51 94.65 483.00 740.77 61.77 86.23
23.00 23.00 1.00 C 50 30.99 31.43 31.98 32.50 19.86 0.50 227.61 404.64 9.10 16.19 280.79 499.19 13.10 23.30 280.89 374.52 56.18 74.90 561.68 873.71 69.28 98.20 508.50 779.16 65.28 91.09
24.00 24.00 1.00 C 50 30.21 30.62 31.12 31.59 19.38 0.50 237.50 422.23 9.50 16.89 273.94 487.01 12.78 22.73 296.11 394.81 59.22 78.96 570.05 881.82 72.01 101.69 533.61 817.04 68.72 95.85
25.00 25.00 1.00 C 50 29.49 29.86 30.32 30.76 18.93 0.50 247.40 439.82 9.90 17.59 267.57 475.68 12.49 22.20 310.98 414.63 62.20 82.93 578.54 890.31 74.68 105.12 558.38 854.46 72.09 100.52
26.00 26.00 1.00 C 50 28.82 29.16 29.59 29.99 18.51 0.50 257.30 457.42 10.29 18.30 261.62 465.10 12.21 21.70 325.51 434.01 65.10 86.80 587.13 899.12 77.31 108.51 582.81 891.43 75.39 105.10
27.00 27.00 1.00 C 50 28.19 28.51 28.90 29.27 18.11 0.50 267.19 475.01 10.69 19.00 256.05 455.20 11.95 21.24 339.73 452.98 67.95 90.60 595.79 908.18 79.90 111.84 606.93 927.99 78.63 109.60
28.00 28.00 1.00 C 50 27.60 27.90 28.26 28.60 17.74 0.50 277.09 492.60 11.08 19.70 250.82 445.91 11.71 20.81 353.67 471.56 70.73 94.31 604.49 917.47 82.44 115.12 630.76 964.16 81.82 114.02
29.00 29.00 1.00 C 50 27.03 27.32 27.65 27.97 17.39 0.50 286.98 510.19 11.48 20.41 245.91 437.16 11.48 20.40 367.33 489.77 73.47 97.95 613.24 926.94 84.94 118.36 654.32 999.97 84.95 118.36
30.00 1.00 1.00 S 50 26.49 26.76 27.07 27.38 - - 296.88 527.79 11.88 21.11 28.29 38.11 5.78 7.80 375.56 500.75 75.11 100.15 403.85 538.87 80.90 107.95 672.44 1028.54 86.99 121.26
31.00 2.00 1.00 S 50 25.96 26.23 26.52 26.81 - - 306.78 545.38 12.27 21.82 55.46 74.70 11.33 15.27 383.63 511.51 76.73 102.30 439.09 586.21 88.06 117.58 690.41 1056.89 89.00 124.12
32.00 3.00 1.00 S 50 25.45 25.71 26.00 26.28 - - 316.67 562.97 12.67 22.52 81.56 109.86 16.66 22.45 391.55 522.06 78.31 104.41 473.10 631.92 94.97 126.87 708.22 1085.03 90.98 126.93
33.00 4.00 1.00 S 50 24.97 25.22 25.50 25.76 - - 326.57 580.57 13.06 23.22 106.69 143.66 21.79 29.35 399.31 532.42 79.86 106.48 506.01 676.08 101.65 135.84 725.88 1112.99 92.93 129.71
34.00 5.00 1.00 S 50 24.52 24.75 25.02 25.28 - - 336.46 598.16 13.46 23.93 130.94 176.25 26.73 36.00 406.94 542.59 81.39 108.52 537.89 718.84 108.12 144.52 743.41 1140.75 94.85 132.44
35.00 6.00 1.00 S 50 24.09 24.31 24.57 24.81 - - 346.36 615.75 13.85 24.63 154.38 207.72 31.49 42.40 414.44 552.59 82.89 110.52 568.82 760.31 114.38 152.92 760.80 1168.34 96.74 135.15
36.00 7.00 1.00 S 50 23.68 23.89 24.13 24.36 - - 356.26 633.35 14.25 25.33 177.06 238.17 30.93 48.58 421.82 562.42 84.36 112.48 598.88 800.59 115.30 161.06 778.07 1195.77 98.61 137.82
37.00 8.00 1.00 S 50 23.29 23.49 23.72 23.94 - - 366.15 650.94 14.65 26.04 199.04 267.65 30.40 54.55 429.07 572.10 85.81 114.42 628.11 839.75 116.22 168.97 795.22 1223.03 100.46 140.46
38.00 9.00 1.00 S 50 22.92 23.11 23.33 23.54 - - 376.05 668.53 15.04 26.74 220.37 296.25 29.90 53.63 436.21 581.62 87.24 116.32 656.59 877.87 117.15 169.96 812.26 1250.15 102.28 143.07
39.00 10.00 1.00 S 50 22.57 22.75 23.13 23.33 - - 385.94 686.12 15.44 27.44 241.10 324.03 29.65 53.16 443.25 591.00 88.65 118.20 684.35 915.03 118.30 171.36 829.19 1277.12 104.09 145.64
40.00 11.00 1.00 S 50 22.40 22.57 22.94 23.13 - - 395.84 703.72 15.83 28.15 263.15 353.61 29.40 52.71 450.18 600.24 90.04 120.05 713.34 953.85 119.44 172.76 846.02 1303.96 105.87 148.20
Figure 48 Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data
67
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP10 (Jl. TB Simatupang)
-1 -1
-2 -2
-3 -3
-4 -4
-5 -5
-6 -6
-7 -7
-8 -8
-9 -9
Depth (m)
Depth (m)
-10 -10
-11 -11
-12 -12
-13 -13
-14 -14
-15 -15
-16 -16
-17 -17
-18 -18
-19 -19
-20 -20
Bored-Pile Diameters (m) Bored-Pile Diameters (m)
3.00 4.00
3.00 4.00 0.60 0.80
0.60 0.80
Figure 49 Graphics of Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data
68
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
According to pile analysis result, maximum pile lateral force is 6.82 ton and maximum top pile
deflection is 0.002 cm.
69
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
The model SAP 2000 with structure from joint reactions F-3;
According to structure analysis result on piers that support stair, the foundation will use 4 Bore-pile
Ø600 mm with length (L) = 19 m. Foundation model and analysis is also performed by Group 8
software.
0.6 m
1.8 m
0.6 m
70
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
71
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
From the result above, maximum reaction at four pile can be known
72
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP10 (Jl. TB Simatupang)
The Axial pile bearing capacity analysis result can be seen below
L DL (S/C) 3.00 4.00 0.60 0.80 adhesion 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80
0.00 0.00
1.00 1.00 1.00 C 4 4.00 4.00 5.00 5.00 2.60 0.99 9.90 17.59 0.40 0.70 36.76 65.35 1.72 3.05 4.04 5.39 0.81 1.08 40.80 70.74 2.52 4.13 13.94 22.98 1.20 1.78
2.00 2.00 1.00 C 4 5.00 5.00 5.63 5.63 2.60 0.99 19.79 35.19 0.79 1.41 36.76 65.35 1.72 3.05 8.09 10.78 1.62 2.16 44.84 76.13 3.33 5.21 27.88 45.97 2.41 3.56
3.00 3.00 1.00 C 7 5.63 5.63 6.10 6.10 4.55 0.80 29.69 52.78 1.19 2.11 64.32 114.35 3.00 5.34 13.77 18.36 2.75 3.67 78.09 132.71 5.76 9.01 43.46 71.14 3.94 5.78
4.00 4.00 1.00 C 7.5 6.63 6.10 6.58 6.58 4.88 0.76 39.58 70.37 1.58 2.81 68.92 122.52 3.22 5.72 19.61 26.14 3.92 5.23 88.53 148.67 7.14 10.95 59.19 96.51 5.50 8.04
5.00 5.00 1.00 C 8 7.88 7.10 7.07 7.07 5.20 0.73 49.48 87.96 1.98 3.52 73.51 130.69 3.43 6.10 25.57 34.09 5.11 6.82 99.08 164.78 8.54 12.92 75.05 122.06 7.09 10.34
6.00 6.00 1.00 C 9 8.63 8.30 7.56 7.56 5.85 0.67 59.38 105.56 2.38 4.22 82.70 147.03 3.86 6.86 31.68 42.24 6.34 8.45 114.38 189.27 10.20 15.31 91.06 147.80 8.71 12.67
7.00 7.00 1.00 C 10 9.50 9.10 8.56 8.06 6.50 0.60 69.27 123.15 2.77 4.93 91.89 163.36 4.29 7.62 37.81 50.41 7.56 10.08 129.70 213.77 11.85 17.71 107.08 173.56 10.33 15.01
8.00 8.00 1.00 C 11 10.50 10.00 9.81 9.17 7.15 0.54 79.17 140.74 3.17 5.63 101.08 179.70 4.72 8.39 43.82 58.42 8.76 11.68 144.90 238.12 13.48 20.07 122.98 199.16 11.93 17.31
9.00 9.00 1.00 C 12 11.75 11.20 10.88 10.44 7.80 0.50 89.06 158.34 3.56 6.33 110.27 196.04 5.15 9.15 49.94 66.59 9.99 13.32 160.21 262.62 15.13 22.47 139.01 224.93 13.55 19.65
10.00 10.00 1.00 C 14 13.13 12.50 13.61 12.93 9.10 0.50 98.96 175.93 3.96 7.04 128.65 228.71 6.00 10.67 57.09 76.12 11.42 15.22 185.74 304.83 17.42 25.90 156.05 252.05 15.38 22.26
11.00 11.00 1.00 C 16 17.72 16.37 17.83 16.73 10.08 0.50 108.86 193.52 4.35 7.74 142.47 253.28 6.65 11.82 65.00 86.67 13.00 17.33 207.48 339.96 19.65 29.15 173.86 280.19 17.36 25.08
12.00 12.00 1.00 C 32 25.15 22.52 21.78 20.36 19.08 0.50 118.75 211.12 4.75 8.44 269.79 479.63 12.59 22.38 79.99 106.66 16.00 21.33 349.78 586.28 28.59 43.71 198.74 317.77 20.75 29.78
13.00 13.00 1.00 C 48 31.80 28.24 25.48 23.76 27.13 0.50 128.65 228.71 5.15 9.15 383.60 681.95 17.90 31.82 101.30 135.07 20.26 27.01 484.90 817.02 38.16 58.84 229.95 363.78 25.41 36.16
14.00 14.00 1.00 C 49 37.83 33.36 28.86 26.87 26.39 0.50 138.54 246.30 5.54 9.85 373.02 663.15 17.41 30.95 122.03 162.70 24.41 32.54 495.05 825.85 41.81 63.49 260.57 409.00 29.95 42.39
15.00 15.00 1.00 C 50 40.00 37.87 31.93 29.72 25.75 0.50 148.44 263.89 5.94 10.56 364.07 647.24 16.99 30.20 142.25 189.67 28.45 37.93 506.32 836.91 45.44 68.14 290.69 453.56 34.39 48.49
16.00 16.00 1.00 C 50 38.72 39.32 34.60 32.32 24.72 0.50 158.34 281.49 6.33 11.26 349.50 621.33 16.31 29.00 161.67 215.56 32.33 43.11 511.17 836.89 48.64 72.11 320.01 497.05 38.67 54.37
17.00 17.00 1.00 C 50 37.41 38.05 36.94 34.56 23.81 0.50 168.23 299.08 6.73 11.96 336.54 598.30 15.71 27.92 180.37 240.49 36.07 48.10 516.91 838.79 51.78 76.02 348.60 539.57 42.80 60.06
18.00 18.00 1.00 C 50 36.06 36.77 37.42 36.53 22.98 0.50 178.13 316.67 7.13 12.67 324.93 577.65 15.16 26.96 198.42 264.56 39.68 52.91 523.35 842.21 54.85 79.87 376.55 581.23 46.81 65.58
19.00 19.00 1.00 C 50 34.85 35.48 36.23 36.85 22.24 0.50 188.02 334.27 7.52 13.37 314.44 559.01 14.67 26.09 215.89 287.85 43.18 57.57 530.33 846.86 57.85 83.66 403.91 622.11 50.70 70.94
20.00 20.00 1.00 C 50 33.75 34.32 35.08 35.69 21.57 0.50 197.92 351.86 7.92 14.07 304.91 542.06 14.23 25.30 232.83 310.44 46.57 62.09 537.74 852.50 60.79 87.38 430.75 662.29 54.48 76.16
21.00 21.00 1.00 C 50 32.75 33.27 33.95 34.58 20.95 0.50 207.82 369.45 8.31 14.78 296.19 526.57 13.82 24.57 249.28 332.38 49.86 66.48 545.48 858.94 63.68 91.05 457.10 701.83 58.17 81.25
22.00 22.00 1.00 C 50 31.83 32.31 32.92 33.49 20.38 0.50 217.71 387.04 8.71 15.48 288.18 512.33 13.45 23.91 265.29 353.72 53.06 70.74 553.48 866.05 66.51 94.65 483.00 740.77 61.77 86.23
23.00 23.00 1.00 C 50 30.99 31.43 31.98 32.50 19.86 0.50 227.61 404.64 9.10 16.19 280.79 499.19 13.10 23.30 280.89 374.52 56.18 74.90 561.68 873.71 69.28 98.20 508.50 779.16 65.28 91.09
24.00 24.00 1.00 C 50 30.21 30.62 31.12 31.59 19.38 0.50 237.50 422.23 9.50 16.89 273.94 487.01 12.78 22.73 296.11 394.81 59.22 78.96 570.05 881.82 72.01 101.69 533.61 817.04 68.72 95.85
25.00 25.00 1.00 C 50 29.49 29.86 30.32 30.76 18.93 0.50 247.40 439.82 9.90 17.59 267.57 475.68 12.49 22.20 310.98 414.63 62.20 82.93 578.54 890.31 74.68 105.12 558.38 854.46 72.09 100.52
26.00 26.00 1.00 C 50 28.82 29.16 29.59 29.99 18.51 0.50 257.30 457.42 10.29 18.30 261.62 465.10 12.21 21.70 325.51 434.01 65.10 86.80 587.13 899.12 77.31 108.51 582.81 891.43 75.39 105.10
27.00 27.00 1.00 C 50 28.19 28.51 28.90 29.27 18.11 0.50 267.19 475.01 10.69 19.00 256.05 455.20 11.95 21.24 339.73 452.98 67.95 90.60 595.79 908.18 79.90 111.84 606.93 927.99 78.63 109.60
28.00 28.00 1.00 C 50 27.60 27.90 28.26 28.60 17.74 0.50 277.09 492.60 11.08 19.70 250.82 445.91 11.71 20.81 353.67 471.56 70.73 94.31 604.49 917.47 82.44 115.12 630.76 964.16 81.82 114.02
29.00 29.00 1.00 C 50 27.03 27.32 27.65 27.97 17.39 0.50 286.98 510.19 11.48 20.41 245.91 437.16 11.48 20.40 367.33 489.77 73.47 97.95 613.24 926.94 84.94 118.36 654.32 999.97 84.95 118.36
30.00 1.00 1.00 S 50 26.49 26.76 27.07 27.38 - - 296.88 527.79 11.88 21.11 28.29 38.11 5.78 7.80 375.56 500.75 75.11 100.15 403.85 538.87 80.90 107.95 672.44 1028.54 86.99 121.26
31.00 2.00 1.00 S 50 25.96 26.23 26.52 26.81 - - 306.78 545.38 12.27 21.82 55.46 74.70 11.33 15.27 383.63 511.51 76.73 102.30 439.09 586.21 88.06 117.58 690.41 1056.89 89.00 124.12
32.00 3.00 1.00 S 50 25.45 25.71 26.00 26.28 - - 316.67 562.97 12.67 22.52 81.56 109.86 16.66 22.45 391.55 522.06 78.31 104.41 473.10 631.92 94.97 126.87 708.22 1085.03 90.98 126.93
33.00 4.00 1.00 S 50 24.97 25.22 25.50 25.76 - - 326.57 580.57 13.06 23.22 106.69 143.66 21.79 29.35 399.31 532.42 79.86 106.48 506.01 676.08 101.65 135.84 725.88 1112.99 92.93 129.71
34.00 5.00 1.00 S 50 24.52 24.75 25.02 25.28 - - 336.46 598.16 13.46 23.93 130.94 176.25 26.73 36.00 406.94 542.59 81.39 108.52 537.89 718.84 108.12 144.52 743.41 1140.75 94.85 132.44
35.00 6.00 1.00 S 50 24.09 24.31 24.57 24.81 - - 346.36 615.75 13.85 24.63 154.38 207.72 31.49 42.40 414.44 552.59 82.89 110.52 568.82 760.31 114.38 152.92 760.80 1168.34 96.74 135.15
36.00 7.00 1.00 S 50 23.68 23.89 24.13 24.36 - - 356.26 633.35 14.25 25.33 177.06 238.17 30.93 48.58 421.82 562.42 84.36 112.48 598.88 800.59 115.30 161.06 778.07 1195.77 98.61 137.82
37.00 8.00 1.00 S 50 23.29 23.49 23.72 23.94 - - 366.15 650.94 14.65 26.04 199.04 267.65 30.40 54.55 429.07 572.10 85.81 114.42 628.11 839.75 116.22 168.97 795.22 1223.03 100.46 140.46
38.00 9.00 1.00 S 50 22.92 23.11 23.33 23.54 - - 376.05 668.53 15.04 26.74 220.37 296.25 29.90 53.63 436.21 581.62 87.24 116.32 656.59 877.87 117.15 169.96 812.26 1250.15 102.28 143.07
39.00 10.00 1.00 S 50 22.57 22.75 23.13 23.33 - - 385.94 686.12 15.44 27.44 241.10 324.03 29.65 53.16 443.25 591.00 88.65 118.20 684.35 915.03 118.30 171.36 829.19 1277.12 104.09 145.64
40.00 11.00 1.00 S 50 22.40 22.57 22.94 23.13 - - 395.84 703.72 15.83 28.15 263.15 353.61 29.40 52.71 450.18 600.24 90.04 120.05 713.34 953.85 119.44 172.76 846.02 1303.96 105.87 148.20
Figure 54 Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data
73
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP10 (Jl. TB Simatupang)
-1 -1
-2 -2
-3 -3
-4 -4
-5 -5
-6 -6
-7 -7
-8 -8
-9 -9
Depth (m)
Depth (m)
-10 -10
-11 -11
-12 -12
-13 -13
-14 -14
-15 -15
-16 -16
-17 -17
-18 -18
-19 -19
-20 -20
Bored-Pile Diameters (m) Bored-Pile Diameters (m)
3.00 4.00
3.00 4.00 0.60 0.80
0.60 0.80
Figure 55 Graphics of Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data
74
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
According to pile analysis result, maximum pile lateral force is 0.325 ton and maximum top pile
deflection is 0.0035 cm.
75
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
The model SAP 2000 with structure from joint reactions F-4;
According to structure analysis result on piers that support stair, the foundation will use 9 Bore-pile
Ø600 mm with length (L) = 19 m. Foundation model and analysis is also performed by Group 8
software.
0.6 m
1.8 m
1.8 m
0.5 m
76
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
From the result above, maximum reaction at single pile can be known
78
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP10 (Jl. TB Simatupang)
The Axial pile bearing capacity analysis result can be seen below
L DL (S/C) 3.00 4.00 0.60 0.80 adhesion 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80 3.00 4.00 0.60 0.80
0.00 0.00
1.00 1.00 1.00 C 4 4.00 4.00 5.00 5.00 2.60 0.99 9.90 17.59 0.40 0.70 36.76 65.35 1.72 3.05 4.04 5.39 0.81 1.08 40.80 70.74 2.52 4.13 13.94 22.98 1.20 1.78
2.00 2.00 1.00 C 4 5.00 5.00 5.63 5.63 2.60 0.99 19.79 35.19 0.79 1.41 36.76 65.35 1.72 3.05 8.09 10.78 1.62 2.16 44.84 76.13 3.33 5.21 27.88 45.97 2.41 3.56
3.00 3.00 1.00 C 7 5.63 5.63 6.10 6.10 4.55 0.80 29.69 52.78 1.19 2.11 64.32 114.35 3.00 5.34 13.77 18.36 2.75 3.67 78.09 132.71 5.76 9.01 43.46 71.14 3.94 5.78
4.00 4.00 1.00 C 7.5 6.63 6.10 6.58 6.58 4.88 0.76 39.58 70.37 1.58 2.81 68.92 122.52 3.22 5.72 19.61 26.14 3.92 5.23 88.53 148.67 7.14 10.95 59.19 96.51 5.50 8.04
5.00 5.00 1.00 C 8 7.88 7.10 7.07 7.07 5.20 0.73 49.48 87.96 1.98 3.52 73.51 130.69 3.43 6.10 25.57 34.09 5.11 6.82 99.08 164.78 8.54 12.92 75.05 122.06 7.09 10.34
6.00 6.00 1.00 C 9 8.63 8.30 7.56 7.56 5.85 0.67 59.38 105.56 2.38 4.22 82.70 147.03 3.86 6.86 31.68 42.24 6.34 8.45 114.38 189.27 10.20 15.31 91.06 147.80 8.71 12.67
7.00 7.00 1.00 C 10 9.50 9.10 8.56 8.06 6.50 0.60 69.27 123.15 2.77 4.93 91.89 163.36 4.29 7.62 37.81 50.41 7.56 10.08 129.70 213.77 11.85 17.71 107.08 173.56 10.33 15.01
8.00 8.00 1.00 C 11 10.50 10.00 9.81 9.17 7.15 0.54 79.17 140.74 3.17 5.63 101.08 179.70 4.72 8.39 43.82 58.42 8.76 11.68 144.90 238.12 13.48 20.07 122.98 199.16 11.93 17.31
9.00 9.00 1.00 C 12 11.75 11.20 10.88 10.44 7.80 0.50 89.06 158.34 3.56 6.33 110.27 196.04 5.15 9.15 49.94 66.59 9.99 13.32 160.21 262.62 15.13 22.47 139.01 224.93 13.55 19.65
10.00 10.00 1.00 C 14 13.13 12.50 13.61 12.93 9.10 0.50 98.96 175.93 3.96 7.04 128.65 228.71 6.00 10.67 57.09 76.12 11.42 15.22 185.74 304.83 17.42 25.90 156.05 252.05 15.38 22.26
11.00 11.00 1.00 C 16 17.72 16.37 17.83 16.73 10.08 0.50 108.86 193.52 4.35 7.74 142.47 253.28 6.65 11.82 65.00 86.67 13.00 17.33 207.48 339.96 19.65 29.15 173.86 280.19 17.36 25.08
12.00 12.00 1.00 C 32 25.15 22.52 21.78 20.36 19.08 0.50 118.75 211.12 4.75 8.44 269.79 479.63 12.59 22.38 79.99 106.66 16.00 21.33 349.78 586.28 28.59 43.71 198.74 317.77 20.75 29.78
13.00 13.00 1.00 C 48 31.80 28.24 25.48 23.76 27.13 0.50 128.65 228.71 5.15 9.15 383.60 681.95 17.90 31.82 101.30 135.07 20.26 27.01 484.90 817.02 38.16 58.84 229.95 363.78 25.41 36.16
14.00 14.00 1.00 C 49 37.83 33.36 28.86 26.87 26.39 0.50 138.54 246.30 5.54 9.85 373.02 663.15 17.41 30.95 122.03 162.70 24.41 32.54 495.05 825.85 41.81 63.49 260.57 409.00 29.95 42.39
15.00 15.00 1.00 C 50 40.00 37.87 31.93 29.72 25.75 0.50 148.44 263.89 5.94 10.56 364.07 647.24 16.99 30.20 142.25 189.67 28.45 37.93 506.32 836.91 45.44 68.14 290.69 453.56 34.39 48.49
16.00 16.00 1.00 C 50 38.72 39.32 34.60 32.32 24.72 0.50 158.34 281.49 6.33 11.26 349.50 621.33 16.31 29.00 161.67 215.56 32.33 43.11 511.17 836.89 48.64 72.11 320.01 497.05 38.67 54.37
17.00 17.00 1.00 C 50 37.41 38.05 36.94 34.56 23.81 0.50 168.23 299.08 6.73 11.96 336.54 598.30 15.71 27.92 180.37 240.49 36.07 48.10 516.91 838.79 51.78 76.02 348.60 539.57 42.80 60.06
18.00 18.00 1.00 C 50 36.06 36.77 37.42 36.53 22.98 0.50 178.13 316.67 7.13 12.67 324.93 577.65 15.16 26.96 198.42 264.56 39.68 52.91 523.35 842.21 54.85 79.87 376.55 581.23 46.81 65.58
19.00 19.00 1.00 C 50 34.85 35.48 36.23 36.85 22.24 0.50 188.02 334.27 7.52 13.37 314.44 559.01 14.67 26.09 215.89 287.85 43.18 57.57 530.33 846.86 57.85 83.66 403.91 622.11 50.70 70.94
20.00 20.00 1.00 C 50 33.75 34.32 35.08 35.69 21.57 0.50 197.92 351.86 7.92 14.07 304.91 542.06 14.23 25.30 232.83 310.44 46.57 62.09 537.74 852.50 60.79 87.38 430.75 662.29 54.48 76.16
21.00 21.00 1.00 C 50 32.75 33.27 33.95 34.58 20.95 0.50 207.82 369.45 8.31 14.78 296.19 526.57 13.82 24.57 249.28 332.38 49.86 66.48 545.48 858.94 63.68 91.05 457.10 701.83 58.17 81.25
22.00 22.00 1.00 C 50 31.83 32.31 32.92 33.49 20.38 0.50 217.71 387.04 8.71 15.48 288.18 512.33 13.45 23.91 265.29 353.72 53.06 70.74 553.48 866.05 66.51 94.65 483.00 740.77 61.77 86.23
23.00 23.00 1.00 C 50 30.99 31.43 31.98 32.50 19.86 0.50 227.61 404.64 9.10 16.19 280.79 499.19 13.10 23.30 280.89 374.52 56.18 74.90 561.68 873.71 69.28 98.20 508.50 779.16 65.28 91.09
24.00 24.00 1.00 C 50 30.21 30.62 31.12 31.59 19.38 0.50 237.50 422.23 9.50 16.89 273.94 487.01 12.78 22.73 296.11 394.81 59.22 78.96 570.05 881.82 72.01 101.69 533.61 817.04 68.72 95.85
25.00 25.00 1.00 C 50 29.49 29.86 30.32 30.76 18.93 0.50 247.40 439.82 9.90 17.59 267.57 475.68 12.49 22.20 310.98 414.63 62.20 82.93 578.54 890.31 74.68 105.12 558.38 854.46 72.09 100.52
26.00 26.00 1.00 C 50 28.82 29.16 29.59 29.99 18.51 0.50 257.30 457.42 10.29 18.30 261.62 465.10 12.21 21.70 325.51 434.01 65.10 86.80 587.13 899.12 77.31 108.51 582.81 891.43 75.39 105.10
27.00 27.00 1.00 C 50 28.19 28.51 28.90 29.27 18.11 0.50 267.19 475.01 10.69 19.00 256.05 455.20 11.95 21.24 339.73 452.98 67.95 90.60 595.79 908.18 79.90 111.84 606.93 927.99 78.63 109.60
28.00 28.00 1.00 C 50 27.60 27.90 28.26 28.60 17.74 0.50 277.09 492.60 11.08 19.70 250.82 445.91 11.71 20.81 353.67 471.56 70.73 94.31 604.49 917.47 82.44 115.12 630.76 964.16 81.82 114.02
29.00 29.00 1.00 C 50 27.03 27.32 27.65 27.97 17.39 0.50 286.98 510.19 11.48 20.41 245.91 437.16 11.48 20.40 367.33 489.77 73.47 97.95 613.24 926.94 84.94 118.36 654.32 999.97 84.95 118.36
30.00 1.00 1.00 S 50 26.49 26.76 27.07 27.38 - - 296.88 527.79 11.88 21.11 28.29 38.11 5.78 7.80 375.56 500.75 75.11 100.15 403.85 538.87 80.90 107.95 672.44 1028.54 86.99 121.26
31.00 2.00 1.00 S 50 25.96 26.23 26.52 26.81 - - 306.78 545.38 12.27 21.82 55.46 74.70 11.33 15.27 383.63 511.51 76.73 102.30 439.09 586.21 88.06 117.58 690.41 1056.89 89.00 124.12
32.00 3.00 1.00 S 50 25.45 25.71 26.00 26.28 - - 316.67 562.97 12.67 22.52 81.56 109.86 16.66 22.45 391.55 522.06 78.31 104.41 473.10 631.92 94.97 126.87 708.22 1085.03 90.98 126.93
33.00 4.00 1.00 S 50 24.97 25.22 25.50 25.76 - - 326.57 580.57 13.06 23.22 106.69 143.66 21.79 29.35 399.31 532.42 79.86 106.48 506.01 676.08 101.65 135.84 725.88 1112.99 92.93 129.71
34.00 5.00 1.00 S 50 24.52 24.75 25.02 25.28 - - 336.46 598.16 13.46 23.93 130.94 176.25 26.73 36.00 406.94 542.59 81.39 108.52 537.89 718.84 108.12 144.52 743.41 1140.75 94.85 132.44
35.00 6.00 1.00 S 50 24.09 24.31 24.57 24.81 - - 346.36 615.75 13.85 24.63 154.38 207.72 31.49 42.40 414.44 552.59 82.89 110.52 568.82 760.31 114.38 152.92 760.80 1168.34 96.74 135.15
36.00 7.00 1.00 S 50 23.68 23.89 24.13 24.36 - - 356.26 633.35 14.25 25.33 177.06 238.17 30.93 48.58 421.82 562.42 84.36 112.48 598.88 800.59 115.30 161.06 778.07 1195.77 98.61 137.82
37.00 8.00 1.00 S 50 23.29 23.49 23.72 23.94 - - 366.15 650.94 14.65 26.04 199.04 267.65 30.40 54.55 429.07 572.10 85.81 114.42 628.11 839.75 116.22 168.97 795.22 1223.03 100.46 140.46
38.00 9.00 1.00 S 50 22.92 23.11 23.33 23.54 - - 376.05 668.53 15.04 26.74 220.37 296.25 29.90 53.63 436.21 581.62 87.24 116.32 656.59 877.87 117.15 169.96 812.26 1250.15 102.28 143.07
39.00 10.00 1.00 S 50 22.57 22.75 23.13 23.33 - - 385.94 686.12 15.44 27.44 241.10 324.03 29.65 53.16 443.25 591.00 88.65 118.20 684.35 915.03 118.30 171.36 829.19 1277.12 104.09 145.64
40.00 11.00 1.00 S 50 22.40 22.57 22.94 23.13 - - 395.84 703.72 15.83 28.15 263.15 353.61 29.40 52.71 450.18 600.24 90.04 120.05 713.34 953.85 119.44 172.76 846.02 1303.96 105.87 148.20
Figure 60 Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data
79
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP10 (Jl. TB Simatupang)
-1 -1
-2 -2
-3 -3
-4 -4
-5 -5
-6 -6
-7 -7
-8 -8
-9 -9
Depth (m)
Depth (m)
-10 -10
-11 -11
-12 -12
-13 -13
-14 -14
-15 -15
-16 -16
-17 -17
-18 -18
-19 -19
-20 -20
Bored-Pile Diameters (m) Bored-Pile Diameters (m)
3.00 4.00
3.00 4.00 0.60 0.80
0.60 0.80
Figure 61 Graphics of Axial Pile Bearing Capacity Based on 2ABH-5 Bore Log Data
80
TOKYU-WIKA JOINT OPERATION Design Report of Pedestrian Bridge 2
Jakarta Mass Rapid Transit Project CP101 & CP102 (Jl. TB Simatupang)
According to pile analysis result, maximum pile lateral force is 0.195 ton and maximum top pile
deflection is 0.0011 cm.
81