MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.

PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)

SUBMISSION REVIEW RESPONSE (SRR) SHEET

To : SN Akmida Holdings Sdn Bhd Date Review : 29/01/2018

WPC Submission : Material Submission Approval for Fire Door


Ref. SSP-SNAA-ADV08-OVPR-REP-00124 –REV.01 SRR Ref. : SSP-PDP2-ADV08-OVPR-SRR-00275– REV.01

Your Ref : SSP-SNAA-TRANSMIT-002867


WF- 161834 Final Code Code – 1 / 2 / 3
MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.
PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)

SUBMISSION REVIEW RESPONSE (SRR) SHEET

To : SN Akmida Holdings Sdn Bhd Date Review : 29/01/2018

Reviewer : Muhd Azri Aznam Verified : Mohd Izzat Endorsed : Zamri Bin Abdul Muthalib
Ahmad Syahid
Rozaidi Md. Sharip
Rofi Romli
MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.
PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)

SUBMISSION REVIEW RESPONSE (SRR) SHEET

Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)
SSP-SNAA-ADV08-OVPR-
REP-00124 –REV.00

1 General 1. Dimension on the Bomba Cert is not Azri 2 1. Will provide the actual cert, once the Open
tally with the drawing. Rofi material already been tested.
2. To provide full test result as per Attached certificate only to show the
mentioned in the Bomba cert. company’s previous record with
3. SNAH to briefly mention details of JBPM
material to be used (dimension, 2. Will provide the actual cert, once the
MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.
PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)

SUBMISSION REVIEW RESPONSE (SRR) SHEET

Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)
material code, type) in the ‘Proposed material already been tested.
Material Table’ Attached certificate only to show the
4. Is Zakhiri still review the MSA? company’s previous record with
5. Please coordinate/synchronized your JBPM
documents ie: 3. Please refer to Proposed Material Closed
i) Material Submission Approval Table
Form. 4. No. Closed
ii) Proposed Material Table Form. 5. i) Please refer to Material Closed
iii) Door & Window Schedule. Submission Approval Form
MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.
PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)

SUBMISSION REVIEW RESPONSE (SRR) SHEET

Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)
 Information between ii) Please refer to Proposed Material
documents not tally. Table Form
 Justify the status of FDU. iii) Please refer to Door and Window
 Justify the status of FD4. Schedule
 Status of Rain Water 6. Will provide the actual cert, once the Open
Harvesting Tank's door. material already been tested.
 Status of Suction/Wet Riser Attached certificate only to show the
Tank Room's door. company’s previous record with
 Wet Riser's door status. JBPM
MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.
PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)

SUBMISSION REVIEW RESPONSE (SRR) SHEET

Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)
6. JBPM Certificates are out of context. 7. Please refer to Proposed Material Closed
Sizes given are not related at all. Table.
7. Which specification selected for
frame?
I. Zincalume vs Galvanised
II. Thickness 0.8 vs Thickness 1.0
vs Thickness 1.2?
MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.
PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)

SUBMISSION REVIEW RESPONSE (SRR) SHEET

Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)

1 SSP-SNAA-ADV08-OVPR- 1. Approval subject to latest valid Azri 2


REP-00124 –REV.01 Bomba Certification
2. Provide SIRIM Certificate for both Rofi
door leaves & door frames
3. Provide Test Report for fire
resistance for both door leaves &
door frames
4. Consider to have different door lever
MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.
PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)

SUBMISSION REVIEW RESPONSE (SRR) SHEET

Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)
handle & door plate for Entrance Unit
Door compared to Common Areas
Door

Note: Comment Code 1 - Approved. SSP-PDP2-GENE-OVPR-TMP-00001_03


MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.
PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)

SUBMISSION REVIEW RESPONSE (SRR) SHEET

Comment Code 2 - Approved with comment.


Comment Code 3 - Rejected