Vous êtes sur la page 1sur 15

M/S.

KRIYA

TITLE PROPOSED FACTORY SHED PREPARED CHECKED

RAM JTP

1 PCC 14.93 m3

2 SHUTTERING AREA 421.38 m2

3 TOTAL CONCRETE - M25 96.38 m3

4 SHEETING AREA 2537.56 m2

5 FOUNDATION BOLTS (M20 Dia "U' bolt) 18 Nos.

6 FOUNDATION BOLTS (M24 Dia "U' bolt) 10 Nos.

7 REINFORCEMENT QUANTITIES

REINFORCEMENT in Kg
S.NO ITEMS
T8 T10 T12 T16 T20 TOTAL
1 F1&PD1 1173 879 1353 3151 922 0 0 0 0 0 7479
GROSS 7479

10 STRUCTURAL QUANTITIES

10.1 ISMC 150 11814.56 kgs.

10.2 ISMB 250 14323.20 kgs.

10.3 Z20220 16337.27 kgs.

10.4 ISMC 250 265.09 kgs.

10.5 ISA 75X75X8 1852.45 kgs.

10.6 5mm THICK PLATE 5631.28 kgs.

10.7 6mm THICK PLATE 6434.80 kgs.

10.8 10mm THICK PLATE 10366.71 kgs.

10.9 12mm THICK PLATE 6273.72 kgs.

10.10 ISMC 200 928.20 kgs.

10.11 16 DIA ROD 558.73 kgs.

TOTAL STRUCTURAL QUANTITIES 74786.01 kgs.


Adding 5 % for connections 313.686
Total structural quantities 75099.70 kgs.
JTP CONSULTING ENGINEERS PVT. LTD.
ULTRATECH CEMENTS-KCW (KOTPUTLI)
PROJECT: TPP PREPARED CHECKED
SHED FOR TRANSFORMER - 1
TITLE : PRELIMINARY BOQ/BUDGET COST - SUMMARY KARTHI NVK
ITEM DESCRIPTION QTY UNIT RATE (RS) AMOUNT (Rs.)
1 EARTHWORK EXCAVATION Err:509 m3 3000 Err:509
2 EARTH FILLING Err:509 m3 1000 Err:509

3 PCC Err:509 m3 4000 Err:509

4 TOTAL CONCRETE - M25 Err:508 m3 8000 Err:508

5 TOTAL REINFORCEMENT QUANTITIES Err:508 T 70000 Err:508

6 STRUCTURAL STEEL QUANTITIES #REF! T 90000 #REF!

7 G. I SHEET #REF! m2 600 #REF!

8 FOUNDATION BOLTS (M16) 8 Nos 1500 12000

9 HILTI HAS ANCHOR BOLT (Re 500) (M20) 8 Nos 2500 20000

TOTAL AMOUNT Err:509


JTP CONSULTING ENGINEERS PVT. LTD.
DOC . NO. DATE
PROJECT FACTORY SHED - M/S., KRIYA

TITLE CONCRETE QTY PREPARD CHECKED PAGE

DRG. NO. FS-01-100 RAM JTP

LENGT WIDTH HEIGHT VOLUME OF NO. OF


ITEM NO DESCRIPTION TOTAL REMARKS
H (m) (m) (m) ITEM (m3) PCE.

PCC-M10
FOOTING-F1 1.65 2.15 0.075 0.266 8 2.13
F2 2.15 2.15 0.075 0.347 8 2.78
F3 2.15 3.15 0.075 0.508 12 6.10
PB-1 27.50 0.32 0.075 0.650 3 1.95
PB-2 41.80 0.32 0.075 0.988 2 1.98

TOTAL PCC-M10 14.93 in m^3


CONCRETE-M25
FOOTING-F1 1.500 2.00 0.300 0.900 8 7.20
FOOTING-F2 2.000 2.00 0.300 1.200 8 9.60
FOOTING-F3 2.000 3.00 0.450 2.700 12 32.40
PEDESTAL - PD1 0.500 0.50 2.200 0.550 18 9.90
PEDESTAL-PD2 0.600 0.60 2.050 0.738 10 7.38
PB-1 27.50 0.30 0.600 4.950 3 14.85
PB-2 41.80 0.30 0.600 7.524 2 15.05

TOTAL CONCRETE M25 96.38 in m^3


SHUTTERING
FOOTING-F1 7.000 0.30 1.000 2.100 8 16.80
FOOTING-F2 8.000 0.30 1.000 2.400 8 19.20
FOOTING-F3 10.000 0.45 1.000 4.500 12 54.00
PEDESTAL - PD1 2.000 0.50 1.000 1.000 18 18.00
PEDESTAL-PD2 2.400 0.60 1.000 1.440 10 14.40
JTP CONSULTING ENGINEERS PVT. LTD.
DOC . NO. DATE
PROJECT FACTORY SHED - M/S., KRIYA

TITLE CONCRETE QTY PREPARD CHECKED PAGE

DRG. NO. FS-01-100 RAM JTP

LENGT WIDTH HEIGHT VOLUME OF NO. OF


ITEM NO DESCRIPTION TOTAL REMARKS
H (m) (m) (m) ITEM (m3) PCE.

PB-1 27.50 1.80 1.000 49.500 3 148.50


PB-2 41.80 1.80 1.000 75.240 2 150.48
TOTAL SHUTTERING AREA 421.38 in m2

FOUNDATION ANCHOR BOLT( in Nos.)


1 24 DIA BOLT 10 in Nos.
2 20 DIA BOLT 18 in Nos.
PROJECT FACTORY SHED - M/S., KRIYA

TITLE REINFORCEMENT QUANTITY


DRG. NO. FS-01-100
Type No. of Length of
No. of Shape
Member Bar mark and bars in Total no. each bar code
A* mm B* mm
mbrs
size each ** mm

FOOTING F B T10 8 10 80 1675 38 200 1400

B T10 8 10 80 1675 38 200 1400

PD

MAIN T16 2 8 16 2400 54 500 1700

TIES T8 2 36 72 1375 61 320 320

SUMMARY
d 8 10 12 13 16 20 25 28
Total length 99 268 0 0 38 0 0 0
Total weight 39 165 0 0 61 0 0 0
This schedule complies with BS 4466
* Specified in multiples of 5 mm ** Specified in multiples of 25 mm
DOC. NO. REV.0

PREPARED CHECKED
RAM JTP

E/R *
C* mm D* mm
mm .

200 /100

200 /100

350 /125

/24

/0
SUMMARY ###
32 40 mm
0 0 m
0 0 kg
DOC. NO. REV.0

PROJECT FACTORY SHED - M/S., KRIYA

TITLE REINFORCEMENT QUANTITY PREPARED CHECKE


DRG. NO. FS-01-100 RAM JTP
Length
Type No. of of each
and No. of bars in bar ** Shape B* C* D* E/R
Member Bar mark size mbrs each Total no. mm code A* mm mm mm mm mm

FOOTING F1 B T10 8 10 80 1675 38 200 1400 200

B T10 8 10 80 1675 38 200 1400 200

T T8 8 5 40 1625 38 150 1400 150

T T8 8 5 40 1625 38 150 1400 150

FOOTING F2 B T10 8 10 80 1675 38 200 1400 200

B T10 8 10 80 1675 38 200 1400 200

T T8 8 5 40 1625 38 150 1400 150

T T8 8 5 40 1625 38 150 1400 150

FOOTING F3 B T12 12 10 120 3175 38 200 2900 200

B T12 12 10 120 3175 38 200 2900 200

T T8 12 5 60 3125 38 150 2900 150

T T8 12 5 60 3125 38 150 2900 150


SUMMARY
d 8 10 12 16 20 25 28 32 mm
Total length 448 1425 1524 0 0 0 0 0 m
Total weight 177 879 1353 0 0 0 0 0 kg
This schedule complies with BS 4466
* Specified in multiples of 5 mm ** Specified in multiples of 25 mm

L:\k74500007\DOKUMENT\ARM-SPEC\381893887.xlsx
REV.0

CHECKED
JTP

*
.

/100

/100

/64

/64

/100

/100

/64

/64

/100

/100

/64

/64

L:\k74500007\DOKUMENT\ARM-SPEC\381893887.xlsx
DOC. NO. REV.0

PROJECT FACTORY SHED - M/S., KRIYA

TITLE REINFORCEMENT QUANTITY PREPARED CHECKE


DRG. NO. FS-01-100 RAM JTP
Length
Type No. of of each
and No. of bars in bar ** Shape B* C* D* E/R
Member Bar mark size mbrs each Total no. mm code A* mm mm mm mm mm

T T8 12 5 60 3125 38 150 2900 150

PEDESTAL V T20 18 4 72 2350 38 400 1750 400

PD1 TIES T8 18 13 234 1700 61 400 400

PEDESTAL V T20 10 8 80 2550 38 500 1750 500

PD2 TIES T8 10 13 130 2100 61 500 500

PB1 T T16 3 3 9 29625 38 500 28780 500

B T16 3 3 9 58750 61 500 28780 500

S T8 3 185 555 1500 61 200 500

0 0

PB2 T T16 3 3 9 44575 38 500 43720 500

B T16 3 3 9 88625 61 500 43720 500

S T8 3 185 555 1500 61 200 500

SUMMARY
d 8 10 12 16 20 25 28 32 mm
Total length 2523 0 0 1994 373 0 0 0 m
Total weight 997 0 0 3151 922 0 0 0 kg
This schedule complies with BS 4466
L:\k74500007\DOKUMENT\ARM-SPEC\381893887.xlsx
* Specified in multiples of 5 mm ** Specified in multiples of 25 mm

L:\k74500007\DOKUMENT\ARM-SPEC\381893887.xlsx
REV.0

CHECKED
JTP

*
.

/64

/160

/24

/160

/24

/125

/48

/24

/125

/48

/24

L:\k74500007\DOKUMENT\ARM-SPEC\381893887.xlsx
JTP CONSULTING ENGINEERS PVT. LTD.
DOC. NO. DATE

PROJECT: FACTORY SHED - M/S., KRIYA

TITLE : STRUCTURAL QUANTITY PREPARD CHECKED PAGE

DRG. NO. FS-01-100 KARTHI NVK

LENGTH UNIT WT. kg/m NO. OF WT. OF ONE NOS. & WT. OF ALL IN MATL
ITEM NO. DESCRIPTION WIDTH (m) REMARKS
(m) OR m2 PCE. IN kg. Kg/m2 Kg. SPEC.

PG1 10mm THICK PLATE 4.300 0.300 78.50 5 506.33 4 2025.30


5mm THICK PLATE 4.300 0.400 39.25 5 337.55 2 675.10
PG2 12mm THICK PLATE 3.500 0.300 94.20 5 494.55 4 1978.20
6mm THICK PLATE 3.500 0.700 47.10 5 576.98 2 1153.95
PG3 12mm THICK PLATE 3.800 0.300 94.20 5 536.94 4 2147.76
6mm THICK PLATE 3.800 0.700 47.10 5 626.43 2 1252.86
PG4 10mm THICK PLATE 7.600 0.300 78.50 5 894.90 4 3579.60
5mm THICK PLATE 7.600 0.500 39.25 5 745.75 2 1491.50
PG5 12mm THICK PLATE 3.800 0.300 94.20 5 536.94 4 2147.76
6mm THICK PLATE 3.800 1.000 47.10 5 894.90 2 1789.80
PG6 6mm THICK PLATE 7.800 0.200 47.10 3 220.43 4 881.71
5mm THICK PLATE 7.800 0.325 39.25 3 298.50 2 596.99
PG7 6mm THICK PLATE 6.000 0.200 47.10 3 169.56 4 678.24
5mm THICK PLATE 6.000 0.325 39.25 3 229.61 2 459.23
PG8 6mm THICK PLATE 6.000 0.200 47.10 3 169.56 4 678.24
5mm THICK PLATE 6.000 0.288 39.25 3 203.47 2 406.94
PG9 10mm THICK PLATE 3.000 0.200 78.50 3 141.30 4 565.20
5mm THICK PLATE 3.000 0.325 39.25 3 114.81 2 229.61
PROP ISMB 250 8.000 37.30 12 3580.80 4 14323.20
CROSS BEAM PG1010mm THICK PLATE 29.700 0.225 78.50 2 1049.15 4 4196.61
5mm THICK PLATE 29.700 0.380 39.25 2 885.95 2 1771.90
JTP CONSULTING ENGINEERS PVT. LTD.
DOC. NO. DATE

PROJECT: FACTORY SHED - M/S., KRIYA

TITLE : STRUCTURAL QUANTITY PREPARD CHECKED PAGE

DRG. NO. FS-01-100 KARTHI NVK

LENGTH UNIT WT. kg/m NO. OF WT. OF ONE NOS. & WT. OF ALL IN MATL
ITEM NO. DESCRIPTION WIDTH (m) REMARKS
(m) OR m2 PCE. IN kg. Kg/m2 Kg. SPEC.

ISMC 150 29.700 16.40 2 974.16 1 974.16


ISMC 150 5.000 16.40 4 328.00 1 328.00
HANGING ISMC 150 5.000 16.40 35 2870.00 2 5740.00
TIE ISMC 150 46.000 16.40 3 2263.20 2 4526.40
PURLINS Z20220 46.000 1.000 5.24 1 241.04 25 6026.00
" Z20220 1.000 1.000 5.24 3 15.72 25 393.00
16 DIA ROD 1.200 1.58 24 45.46 12 545.47
SIDE RUNNERS Z20220 46.000 1.000 5.24 2 482.08 7 3374.56
" Z20220 1.000 1.000 5.24 6 31.44 7 220.08
STAGING AREA ISMC 200 7.000 22.10 3 464.10 2 928.20
ISMC 150 2.500 16.40 3 123.00 2 246.00
PURLINS Z20220 13.600 1.000 5.24 1 71.26 3 213.79
" Z20220 1.000 1.000 5.24 1 5.24 3 15.72
16 DIA ROD 1.200 1.58 3 5.68 2 11.36
SIDE RUNNERS Z20220 18.600 1.000 5.24 1 97.46 6 584.78
" Z20220 1.000 1.000 5.24 1 5.24 6 31.44
CANOPY
ISMC250 ISMC 250 2.180 1.000 30.40 2 132.54 2 265.09
PURLINS Z20220 6.800 1.000 5.24 1 35.63 3 106.90
16 DIA ROD 1.200 1.58 1 1.89 1 1.89
PURLINS INSIDE Z20220 41.000 1.000 5.24 1 214.84 25 5371.00
JTP CONSULTING ENGINEERS PVT. LTD.
DOC. NO. DATE

PROJECT: FACTORY SHED - M/S., KRIYA

TITLE : STRUCTURAL QUANTITY PREPARD CHECKED PAGE

DRG. NO. FS-01-100 KARTHI NVK

LENGTH UNIT WT. kg/m NO. OF WT. OF ONE NOS. & WT. OF ALL IN MATL
ITEM NO. DESCRIPTION WIDTH (m) REMARKS
(m) OR m2 PCE. IN kg. Kg/m2 Kg. SPEC.

BRACINGS ISA 75X75X8 21.210 1.000 8.90 4 755.08 2 1510.15


ISA 75X75X8 9.615 1.000 8.90 2 171.15 2 342.30

TOTAL 74786.01
SHEETING AREA
ROOF SHEET 31.000 47.000 1457.00 1 1457.00 1 1457.00
ROOF SHEET 2.600 13.600 35.36 1 35.36 1 35.36
SIDE SHEET 47.000 6.700 314.90 1 314.90 2 629.80
FRONT SHEET 31.000 6.700 207.70 1 207.70 2 415.40
TOTAL SHEETING AREA 2537.56
ACP PANEL AREA
FRONT 31.000 6.700 207.70 1 207.70 1 207.70
TOTAL ACP PANEL AREA 207.70

MEMBER WEIGHT (kg)


ISMC 150 11814.56
ISMB 250 14323.20
Z20220 16337.27
ISMC 250 265.09
ISA 75X75X8 1852.45
5mm THICK PLATE 5631.28
6mm THICK PLATE 6434.80
JTP CONSULTING ENGINEERS PVT. LTD.
DOC. NO. DATE

PROJECT: FACTORY SHED - M/S., KRIYA

TITLE : STRUCTURAL QUANTITY PREPARD CHECKED PAGE

DRG. NO. FS-01-100 KARTHI NVK

LENGTH UNIT WT. kg/m NO. OF WT. OF ONE NOS. & WT. OF ALL IN MATL
ITEM NO. DESCRIPTION WIDTH (m) REMARKS
(m) OR m2 PCE. IN kg. Kg/m2 Kg. SPEC.

10mm THICK PLATE 10366.71


12mm THICK PLATE 6273.72
ISMC 200 928.20
16 DIA ROD 558.73

Total weigth in kg 74786.01

Vous aimerez peut-être aussi