CG-1/GF
Sl.No Room Name SQFT
Ground floor
1 Reception 80.7 81
3 Ex.toilet 0
Stair case space - GF 59.18 59
Stair case space - FF 112
Change room corridor 100
6 Male change room 262 262
7 Female change room 262 262
8 RM Storage 538
9 Re agent room 72.63
10 Label store room 72.63
11 Engg.store 121.05
12 Transit damage 86.5104
13 Sampling booth 72.63
14 Rejected material store 72.63
15 WH office 86.08
16 Dedusting area(Include RM staging ) 56
17 inventory space for molding area 473
20 Corridor-2 20
21 Assembly room 3213
22 Air lock room - 3Nos 193.68
23 Re agent mixing room 73.168
24 Blood collection assembly 929.0896
26 Secondary packing 790
27 Prod. office with Mgr. cabin 0
28 Sterlization 859.724
30 FG released 490
34 Material corridor 683
35 Men corridor 505
38 Pallet storage area (External shed) 66
39 Fork lift charging area (External shed) 0
40 Sterlization utility (External shed) 147
42 RM staging area (External shed) 0
10496.702
First floor
43 Quality lab 790
44 Micro Lab 250
46 UPS room 252
47 MCC room 414
48 AHU shed 1015
Admin
49 PM Office 43
50 CEO Office 43
51 Office area 151
First floor corridor 263
Second floor corridor 223
52 Toilets 56
54 Server room 0
55 Board meeting room 65
56 Multi purpose room 99
Pump house 3664
58 fire & raw water reservoir 1640
59 water treatment palnt 246
60 substation 712
61 DG set 246
62 transformer 250
63 Security/ohc/potable toilet 250
64 Ht yard 129
65 canteen 498
66 recreation 260
creche 129
maintenance shed 200
67 trcuk parking 162
68 scrap yard 602
69 stp 245
70 0 344
5913 664
20073.702
112
100
538
73
73
121
87
73
73
86
56
473
20
3213
194
73
929
790
860
490
683
505
66
147
252
414
1015
43
43
151
263
223
56
65
99
1640
246
712
246
250
250
129
498
260
129
200
162
602
245
344
1544 5079 251 5406 1015 4409 666
790
250
0 1040
Total
-
-
-
-
-
-
-
-
-
-
-
-
-
-