QUALITY MANUAL
06. PLANNING
TANDA TANGAN DIBAWAH INI MENJELASKAN PERSIAPAN DAN PERSETUJUAN DARI SEMUA HALAMAN DALAM
PROSEDUR INI DAN TERMASUK TANGGAL PERSETUJUAN
THIS SIGNATURE BELOW INDICATED PREPARATION AND APPROVAL OF ALL THE NUMBERED PAGES IN THIS
PROCEDURE UP TO AND INCLUDING THE DATE OF APPROVAL
TANGGAL
DATE 02 December 2017 02 December 2017
DOKUMENT INI TERDAFTAR DI MASTER LIST SISTEM DOKUMEN MANAJEMEN MUTU PERUSAHAAN YANG DI
KENDALIKAN OLEH MANAJER QHSE DARI PT. CAST INSPECTION AND ENGINEERING DAN MUNGKIN TIDAK
DAPAT DIUBAH, REVISI DAN ATAU DALAM BENTUK APAPUN TANPA SEIJIN YANG BERWENANG.
THIS DOCUMENT IS REGISTERED IN THE COMPANY QUALITY MANAGEMENT SYSTEM DOCUMENT MASTER LIST
THAT IS CONTROLLED BY QHSE MANAGER OF PT. CAST INSPECTION AND ENGINEERING AND MAY NOT BE
AMENDED, REVISED AND OR IN ANY WAY ALTERED WITHOUT HIS/HER AUTHORITY.
.
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
PT. Cast Inspection and Engineering Batam have considered the external
and internal issues and the requirements of interested parties when planning
its Quality Management System. PT. Cast Inspection and Engineering
Batam have also determined the risks and opportunities that need to be
addressed to:
a. Give assurance that the Quality Management System can achieve its
intended results
b. Enhance desirable effects
c. Reduce undesired effects
d. Achieve improvement
All Quality Objectives are reviewed monthly. Action plan and resource required to
achieve the objective shall be established and documented.
When planning the Quality Objective CAST/POL/DIR/02 PT. Cast Inspection and
Engineering Batam determines action required, resources required, responsible, due
date and evaluation.
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
PT. Cast Inspection and Engineering maintains a process for Planning of Change
(POC, Form No. CAST/IV/SM/QM06-01) to ensure that the integrity of the quality
management system is maintained when changes to the quality management system
are planned and implemented.