Vous êtes sur la page 1sur 4
auxiliary quipment There is much to understand when studying a life cycle cost comparison for paper stock pumps CONSIDER THE TOTAL COST I ‘in tet pci conser btu ot fom omponensncaseinthe cxf nentip {ete ct nsalaton os opening ad ‘mdnenance st Ones segnet of ie cse eis mone fe cot eng ui Inga pump ite sei med ae wills ‘harespete sss cringe pumps ‘Aselng tod equ or mot pumps ‘acpi for magpetealy ive pumps and canto sealbenwente rotting adhe te sing ‘bare in lero preven pressing fom cining ‘Option Pking Fang the vga method Dowstine sealing pump The compres ers frmeo stub anlar space between he suing at core uth shat Peking requis raion and normally coment the pp ance 0 ‘the packng wth wnterandetet taro) tos dops per minute Packing ques aconsansyp- ‘lean waterand ped ateton fan peo psoas doublemecanical scale Mechanislaeisare spate mets afseaing {pup spa ateton ened toma paper Sek pump easing sea wil mos al ina ppersockenonmen wihouta can wate briston betwen teal crs Aaron Ton ‘oat bushing seat the boom ofthe sain Operation met cs Enory 3 oe Environment. me Init cost ‘a Pulp Paper ntrnatona PPH) Febusty 2013 3a4l boxcinerinonfeto prevents ber fom enter Inge el chambe Atha baring lone wl at reenter om eeneringthe sel chamber ‘Apo ate of thumbs manta atush water fw that provides 15sec vot cos he ‘tot ushinginodero kp tke oor elt migrating the weal chamber ‘Theoretealy $n. scl equi about 245 a! ‘nin fates toaintn Ute wot rough The bushing carer Somesea mapuhcaners recommend using! alin perinehof sel se ‘sare otthunh Ofer sal maniacres ave Inverted pei oat bushings wth spa ira poowsto emovesols to te sel canbe “Tyla tht ee a water requerent can be drastically rece by using such bushings One ‘sample ste Spine hy Enisea. Thesternal dean gl sho single sal iste feted a he PT Plan 722 or spy te Bsn Pan’. Asimple lan 2 const fa awe rnglating aetna piping Hy 0 lide opal pressure and temperate nog = ho nica ashutesf ale, andacheck va ‘Double mechanical ela suces- fut sein seling paper stock pumps A double methane sa costs of wo sng sss none ack back Pressurndbair is oui for ‘hedoube sel arangoment, therefore Hash Pan 4 or Pan59areusdinconunton with double se as Hannes piping and ings to Plan 32 requires a constant supply of pressurized water. Fw cnt ae Poneae t) — rma ry pn fnaeatr < sae — Bal fn Sere ran: i y ‘Clean Out ‘Check Valve a Tap | ‘Temperature | IndatorOptonay Gearance ran ie aE vow ona — wee) End View ‘© Quench Optional Febu2r) 2015 Pulp & Paper iterations PH) provide aie ldo thedoube mechanical se "may also nce the combination oa ow mete ‘owe presure cal vas and ainda. lsh Pn isthe esponsity oftecstore, han, normal thereby ofthe pump manufactur consis ofa presuriad estat ‘inal contains a duh a Geol est ans ‘uidor ytd However none ofthese ls eallwedinpaperstoc appease at “ntaninae sn enti choppers {ais Using pln wate asa bare us mighako be robe in uograpbicallcaons wher tbe am fentempertrecan ach blow teeing ‘Oplon Dynamic sels yo lee nother meansofsealngthut Mast water, Hye namic sealing a namie stl, wee developed in the 1940sbytheeding ump manufacturers othe hy kis aver sh ealing met for paper stock pumps hats now peered mary customers. naydiodyamlseingmtbod an expe rtp tated bende neler nie the cy ofamodied stinger cone and nama ‘separ ty backplate: During pam oper: ‘onthe pamplngacton othe expeller rece the preset the sting ove Dependlgon the Sucon psu beeen acon atthe expeller ‘emcresteasgh vars and daw sal aunt ‘fara ce epalr cv: Ashe asthe car ip the pumping ation reduced and equim ene ted a pase established yadynamicseaingis ony posse drog ‘he operon ofthe pump. During idle onion, ‘secondary sealing netiod mst be incre topreveatleatage fom theta pressure othe ston hed Tp stcondar selina nude ‘phy seal check sea peal ote ngs af sel ubrestng packing ‘Adynaneseal mints the nee fo eral ‘ash water Duis verted nealing higher suc Flush Gland Mechanical Seal Plan 32 Pine 58 ‘ump remotey located = Pumpieamataly ler casieeoreeel “Frecting problems. “Limitation of types of bore hid + rearing prolans {only water canbe used) * logsing problems ‘+ Cooaing problems, __« Gamprested ar cen contains moire +The rl wate outlet from doubles] “which can freeze ad block spy * Fucwaton ofa pressure “ifthe sel chomber pressure higher ‘hon apply er pressure, e presser rivogen bot wil be resued lp & Paper interatanal (9H) Fsbrsy 2012 Tormaly gost the den, Any wter hat before dlchaging orate (ve rk). 135, Back Plate Repeller Zero Flush Water Carbide Seal Faces , Slurry Seal with hard Tungsten ‘ton pressure tbecomesimpactcal when the pump sped to kw raven aval equncy Arve [VPD Astana orite pump withedamic seal may devaterad dry between the sales ances Awash maybe requied duringa estat ‘ftbepump Hence pump wih damsel ‘syne considered completely ses sues ‘ih sh tern cogging and eeingrenain ‘concern. Inada, since the exper sie a smal Inpele abso power and therein operating ‘Option eNo-un nechanica seal vane arte fect In the early 18906 Goulds ‘imps dedopeda TaperBor™ PLUS eal chamber ‘wth ane aril ctr (VPE™ ig TheVPE ing irae fst vanes apt the ong sat The “tnevanerofthe VP ringinde tefd oe ‘scalchamberan eliminate sl pares vapor and slrbubbies ram it The process aso rfuries the seslchanber wih clean. With the sacs of he VP ing chemical and ener industry applications in 198 TT Goulds Pumps inte ess ofthe VPEsinginapape stock lation. S00 hour test as permed onan con pumpin Goulds Pumps RAD paper eke op “The pump itd thay a with ngs ste cide ces and aPE ing The et inched ‘Snulton of mi outage shuting down the amp binge ween andi on Monday mom Ing There was to vnalntage at ary point ase ‘es Thesel ws dsr ad under athoeaigh state seal veded sigs fabnarna wea pt yeas ga one pun athe fk purp- Ing paper soc wetted th hry Seal |Hotn Cane 7 andthe VP ing eye, seve pumps were converted wh te same sealing rangsment Te ognl pump sil unningaer ‘phyear The pups were oft ter ave now bon running frst years (Tes ear veges ot doe mean me between res (BATBP; most ofthe conversions reneclderthan sys) “compar the scones ofeach eating pe padas cath ene a inahod rohan mth Patented Vane Particle Ejector Springs notin fluid atod tox erect eel clne net 361 IFE CYCLE COST CALCULATION Angpower consumption andthe cos. ish ater device, any perio mmenance cass andthe + Selig comsan call for an endseon ‘con ofany spar ce elated deseling ump ath singe seal ands-in. seve OD. ets. + Pump operates 2s dey 7 ay pr week, + Aspoadsoe was rated ale the cost. Le ofthe pump 20 years 1 Aspe series esumed wou cling + Camulaivecosorleylesdefinedasthetnal _ theNerPnoent ae ofthe costs epensesreaed to sclgthe pump forthe20- «70 elieney was sumed forthe plant water ‘earesinsed le This inudesthelndaleostot alate pumptocaclate power consumption ‘hesmingdedce andi opertinaicossincad- for roduiag 0 PI sh wate METHODS ‘ab nudes the replacement costo te sealing | fesrusey 2013 Pulp & Paper international Pulp & Paper ternational (I) Febiusy 2013 137 + Mech was rated sing Years of Operation at ‘he horn and Cumulative Cosasthe| ‘ete ae "us inporant tbe open minds bout thse ‘est ssunpons Css can vary seating top ‘So manufacturer andcanomer cect il ‘ton tect water ond lier may vary om county to county stato stata plant plant "However the lve tend reve by tian peviiem cunts pine. ‘CONCLUSIONS + Ove20 yur pero ofopeatin manning single seal wh hoa bushing ond lan 2 the most, expense sealingmaiod. + Noincumuleie contforsingespe wid Spraic™ an Pa 3 + Although packing shows bina eostand ower operating cos pacing reques nna atenton ‘yr personne leaks continually and cates watlooringaround be pump. + Ia cot junc ea igh Dyan shoconsumeshighr pore Bute 20 ere ‘de costisacuallowe than sagesel end picking However theres imitations on scion res with dyin sea espe when the ump den by VED oratower ped + TaperBore™ PLUS Seal chamber wit Pangan Jet Cran 70 Cre Seal ques moderate Ina nvstnenc bute 20 year te ee costs lawer than the ober seating metiods “Taperore™ PLUS Sel chamber widhVPEing ‘and job CraneS67 carrie sea advantages + 20 yer cj costs ast among te oer sesingimetioce + Lower inal nvesment han dpa sat + High PV (resi elocy) Link Can bane rch higher con pret + Noss terequiement + Nbinsrumentirorniogenboteequiement + Punp can erenotl located witout oxy + Notoering or clogging ses elated tosh water + Macher pore eomemption han dale seal rsinginbigheronealpimpefcency + Nosecondary sealing. Nop sar estomene aphrg ea guts ofthe ariaton init ot french seaingmethod, power and water cos and seo ty fas ween the conf sealing nthe long "un Thats the uma lang his exe. 1 Spain” ate oF Enea 2 TaperBovePLS sa ademas of Gouhs Pumps NPE sa tndamarkof 1 Goulds Pamp wot Nec Zaman, Ser Prada Spi TT Industries, Goulds Paps, Seca Fall, NY Ugesc oa Monee pass deh at wa cot ‘ehnologyhannelamilmsintensnce F027) 2013. Pap & Paper interatona Pe

Vous aimerez peut-être aussi