Vous êtes sur la page 1sur 3

1of 3

ISTARU-BOONI HYDROPOWER PROJECT (72 MW)


CALCULATION SHEET No. of sheets: 3 Rev:0

Contract:Feasibilty Study of
52 MW Istaru-Booni
Hydropower Project By: Qurat-ul-Ain Date:15-08-2013

Component: INTAKE/INLET

Feature:Determination of Inlet
size, submegence and top & Checked: M.Iqbal
invert levels Gill Date:15-8-2013

INPUT DATA Symbol Units References


Hydrographic
River Bed Level R.B.L 2090 m survey

Dead storage level D.S.L 2099 m


Transition zone level=Min. Area capacity
operating level Min.O.L 2106 m curve
Live storage level=Max.
operating level Max.O.L 2113 m

Optimized
Design Discharge for Power Qdesign 94 Cumecs Discharge

Discharge for flushing Qflushing 20 % of Qdesign

18.8 Cumecs

Qtotal=Qdesign
Total Discharge Qtotal 112.8 Cumecs +Qflushing

Velocity in the inlet must be Vinlet 3 m/sec


2of 3

ISTARU-BOONI HYDROPOWER PROJECT (72 MW)


CALCULATION SHEET No. of sheets: 3 Rev:0

Contract:Feasibilty Study of
52 MW Istaru-Booni
Hydropower Project By: Qurat-ul-Ain Date:15-08-2013

Component: INTAKE/INLET

Feature:Determination of Inlet
size, submegence and top & Checked: M.Iqbal
invert levels Gill Date:15-8-2013

INPUT DATA Symbol Units References

Total Area for one Inlet Atotal 37.60 m2 Atotal=Q/V

Let the No. of inlets N 2

Area of one Inlet Ainlet 18.8 m2

Let the Ht of Inlet H 3 m

Hence Width of Inlet W 6.27 m

Say W 6.3 m

Total area for one Inlet Aone inlet 18.9 m2

No. of inlets N 2.0 OK N=Atotal/Aone inlet

Hence the Size of inlet:

Ht of Inlet H 3 m

Width of Inlet W 6.3 m

Discharge in the Inlet Qinlet 56.4 Cumecs Qinlet=Qdesign /2

Vinlet=Qinlet/Aone
Velocity in one inlet=Q/A Vinlet 2.98 m/sec inlet
3of 3

ISTARU-BOONI HYDROPOWER PROJECT (72 MW)


CALCULATION SHEET No. of sheets: 3 Rev:0

Contract:Feasibilty Study of
52 MW Istaru-Booni
Hydropower Project By: Qurat-ul-Ain Date:15-08-2013

Component: INTAKE/INLET

Feature:Determination of Inlet
size, submegence and top & Checked: M.Iqbal
invert levels Gill Date:15-8-2013

INPUT DATA Symbol Units References

Submergence required to
prevent Vortex formation

C' for lateral approach flow 2.2

Froude number F 0.550 F=V/√gd

S/d 1.21
S/d=C'(V/√gd)=
C'F

ASCE/EPRI
Submergence S 3.63 m Guides 1989

Say 3.70 m

River Bed Level R.B.L 2090 m

Dead storage level D.S.L 2099 m


Transition zone level=Min.
operating level Min.O.L 2106 m
Top
Intake level (Top level) 2102.30 m level=M.O.L-S

Say Intake level (Top level) 2102.00 m

Hence Invert level of inlet be 2099.00 m

Vous aimerez peut-être aussi