Vous êtes sur la page 1sur 10

Project: PUSRI – STG & BOILER PROJECT

APPLICABLE STANDARDS 6/1/2015

IEC
Low voltage switchgear and controlgear assemblies 60439-1
60439-2
60439-3
Semi-conductor converters 60146-1-1
60146-1-3
60146-2
Degree of protection provided by enclosure (Ipcode) 60529
Power transformers - Dry type transformers 60076-11
Low voltage switchgear and controlgear
- Circuit breakers 60947-2
- Low voltage switches 60947-3
- Contactors 60947-4
- Low-voltage fuses 60269-2
Wires 60332-1-1 / 2-1
Direct acting indicating analogue electrical measuring instruments 60051-1
Information technology equipment - Safety 60950
General and safety requirements for UPS used in restricted access locations 62040-1
UPS - Electro magnetic compatibility requirements 62040-2
UPS - Method of specifying the performance and test requirements 62040-3

DS-140251TO-PUSRI – STG & BOILER PROJECT-Rev6 Page 1


DATASHEET
Project: PUSRI – STG & BOILER PROJECT
Chloride CP-70R RECTIFIER - CHARGER - DC UPS

Item description

1 x system of: 125 V - 320 A - 60 min - Chloride CP-70R DC UPS system

* installation is not part of Chloride scope of supply

System general data

Configuration

Environment

Control and Monitoring


Local (System front panel)

Remote

Isolators and protections


DATASHEET
Project: PUSRI – STG & BOILER PROJECT
Chloride CP-70R RECTIFIER - CHARGER - DC UPS

System detailed technical data

Rectifier / Charger
Rectifier / Charger features

Rectifier / Charger input

Rectifier / Charger output

Battery
Battery features Please refer to battery manufacturer's technical specification for full details.

DC voltage regulator
Dropping diodes
DATASHEET
Project: PUSRI – STG & BOILER PROJECT
Chloride CP-70R RECTIFIER - CHARGER - DC UPS

Distribution
DC distribution board

Distribution main isolator:

Distribution Feeders:

Mechanical, manufacturing and installation data


Charger cabinet features:

System dimensions - per system (to be confirmed at engineering stage)

Overall footprint per unitary system 3600 808 1170


(battery installation footprint excluded, if offered) 2.9088
402
DATASHEET
Project: PUSRI – STG & BOILER PROJECT
CP-70Z AC UPS

Item description

1 x system of: 75.0 kVA - Single phase output - 60 min - Chloride CP-70Z AC UPS system

* installation is not part of Chloride scope of supply

System general data

Configuration

Environment

Control and Monitoring


Local (System front panel)

Remote
DATASHEET
Project: PUSRI – STG & BOILER PROJECT
CP-70Z AC UPS

Isolators and protections

System detailed technical data

Charger
Charger features

Charger input

Charger output

Battery
Battery features Please refer to battery manufacturer's technical specification for full details.
DATASHEET
Project: PUSRI – STG & BOILER PROJECT
CP-70Z AC UPS

Inverter, static switch & manual bypass


Inverter, static switch & bypass features

Inverter input

Inverter output

Reserve
Reserve static switch

Reserve transformer
DATASHEET
Project: PUSRI – STG & BOILER PROJECT
CP-70Z AC UPS

Reserve automatic voltage regulator

Distribution
AC distribution board

Distribution main isolator:

Distribution Feeders:

Mechanical, manufacturing and installation data


UPS cabinet features:

System dimensions - per system (to be confirmed at engineering stage)

Overall footprint per unitary system 8,800 808 4,075


(battery installation footprint excluded, if offered) 7.11
573
PAINTING SPECIFICATION 6/1/2015

Epoxy/Polyester Powder

1. Application

This painting specification is applicable for all standard CHLORIDE boxes or cubicles.

2. Surface preparation

The pretreatment involves the following operations:

- Degreasing and phosphatising )


- Rinsing ) by spray (150 bars) in a three stages tunnel
- Passivation )

Then drying with hot air (60°C)

- Results : Weight of the phosphor coating: 0.3 to 0.5 g/m² approx.


- Test Phosphatising : Visual and touch inspection (by sampling)

3. Build coat

The epoxy polyester powder is sprayed by means of electrostatic spray equipment.

- Drying time : 10 to 30 minutes at 200°C


- Standard finish colour : textured finish Munsell N7 (except specified in product datasheet)
- Thickness : film 50 microns approx. (except specified in Product datasheet)
- Thickness test : Instrument used to measure the thickness (by sampling)

4. Characteristics

- Shock resistance : 50 in accordance with NFT 30039 standard


- Hardness : 300 seconds in accordance with NFT 30016 standard
- Salty smog : 500 hours in accordance with NFX 41002 standard
- Good resistance to handling

DS-140251TO-PUSRI – STG & BOILER PROJECT-Rev6 Page 1