TYPICAL CROSS SECTION FOR CONSTRUC

NEW FLEXIBLE PAVEMENT (As per IRC:S

Road Name- National Road 2

Slope 2 1

7.500
4.5% 3.5% 3.5%
1.875 3.75

0.170
Slope 2:1
0.175 4.05
0.300

Approved Soil

8.88

10.08

Sub Engineer S.D.O.


0 0
Note: All Dimensions in metre
Not to scale
CTION FORMAT - 4
SP:72)

DESIGN OF R
under MPW

Road Name- N
PMC 0.020 STATE: Ministr
G-3 Layer 0.075 DISTRICT: Takm
G-2 Layer 0.075 BLOCK : Takma
GSB 0.175
Subgrade 0.300
SUBMITTED
GROUP NO 2
4.5%
1.875

Hard Shoulder
2.215
2.065 Slope 2:1
2.415

Executive Engineer
0
RURAL ROAD
WT

National Road 2
ry of Public Works and Transportation
mao
ao

D BY -
2 ( AP16190-199)
EARTHWORK C
VOLUME REPORT (Based on autocad pr
NAME OF ROAD : National Road 1
LENGTH OF ROAD : 1,000.00 m
EARTHWORK
Description No
FOR UNLINED DRAIN
TWO SIDE : w=(0.9+0.45)/2 d=0.45 2.00
A TOTAL QUANTITY OF CUTTTING FROM DRAINS
B TOTAL QUANTITY OF EMB FILLING FROM EARTHWORK SHEET
C TOTAL QUANTITY OF EMB CUTTING FROM EARTHWORK SHEET
D TOTAL QUANTITY OF EXCAVATION IN ROAD
E QUANTITY OF EMB FILL FROM TOTAL EXCAVATED MATERIAL
F =(B-E) QUANTITY OF FILL FOR EMB CONSTRUCTION (BORROW SOIL)

Cut
Station Distance Cut Area Fill Area
Volume
- - 5.00 3.00 -
25.00 25.00 10.00 5.00 187.50
50.00 25.00 11.00 7.06 262.50
75.00 25.00 13.00 11.39 300.00
100.00 25.00 12.00 17.35 312.50
125.00 25.00 14.00 10.17 325.00
150.00 25.00 15.00 8.21 362.50
170.00 20.00 15.00 5.06 300.00
175.00 5.00 14.00 2.34 72.50
200.00 25.00 13.00 6.00 337.50
225.00 25.00 14.00 8.00 337.50
250.00 25.00 12.00 9.00 325.00
275.00 25.00 23.00 8.25 437.50
300.00 25.00 52.00 7.26 937.50
325.00 25.00 12.00 4.01 800.00
340.00 15.00 14.00 1.02 195.00
350.00 10.00 15.00 5.32 145.00
375.00 25.00 14.00 2.56 362.50
400.00 25.00 21.00 4.81 437.50
425.00 25.00 10.00 6.20 387.50
450.00 25.00 9.00 6.79 237.50
475.00 25.00 12.00 7.30 262.50
500.00 25.00 14.00 5.90 325.00
525.00 25.00 12.00 4.03 325.00
550.00 25.00 13.00 2.41 312.50
575.00 25.00 15.00 1.03 350.00
600.00 25.00 16.00 0.47 387.50
620.00 20.00 14.00 0.57 300.00
625.00 5.00 10.00 1.28 60.00
650.00 25.00 17.00 1.42 337.50
675.00 25.00 19.00 1.64 450.00
700.00 25.00 4.00 2.14 287.50
725.00 25.00 5.00 2.65 112.50
750.00 25.00 6.00 3.20 137.50
775.00 25.00 8.00 3.75 175.00
800.00 25.00 7.00 4.32 187.50
825.00 25.00 5.00 4.92 150.00
850.00 25.00 - 3.96 62.50
875.00 25.00 - 3.07 -
900.00 25.00 - 2.24 -
925.00 25.00 - 1.49 -
950.00 25.00 - 0.79 -
975.00 25.00 - 0.22 -
1,000.00 25.00 - - -

Subtotal 1,000.00 495.00 197.61 11,285.00


CACULATIONS
rofile taken from Autocad CIVIL 3D 2017)
DISTRICT Chamkarmorn
BLOCK PALKOT
K SUMMARY
L W D Quality (m3)

1,000.00 0.68 0.45 607.50


607.50
300,372.50
11,285.00
11,892.50
5,946.25
294,426.25

Fill Cum. Cut Cum. Fill


Remarks
Volume Volume Volume

100.04 187.50 100.04


150.79 450.00 250.83
230.59 750.00 481.42
359.16 1,062.50 840.58
343.94 1,387.50 1,184.52
229.74 1,750.00 1,414.25
132.71 2,050.00 1,546.96
18.50 2,122.50 1,565.46
104.25 2,460.00 1,669.71
175.00 2,797.50 1,844.71
212.50 3,122.50 2,057.21
215.63 3,560.00 2,272.84
193.88 4,497.50 2,466.71
140.88 5,297.50 2,607.59
37.73 5,492.50 2,645.31
31.70 5,637.50 2,677.01
98.51 6,000.00 2,775.52
92.13 6,437.50 2,867.66
137.66 6,825.00 3,005.32
162.48 7,062.50 3,167.79
176.14 7,325.00 3,343.93
164.90 7,650.00 3,508.84
124.09 7,975.00 3,632.92
80.55 8,287.50 3,713.47
42.98 8,637.50 3,756.45
18.71 9,025.00 3,775.16
10.38 9,325.00 3,785.54
4.62 9,385.00 3,790.16
33.80 9,722.50 3,823.96
38.32 10,172.50 3,862.29
47.26 10,460.00 3,909.55
59.83 10,572.50 3,969.38
73.10 10,710.00 4,042.48
86.85 10,885.00 4,129.33
100.92 11,072.50 4,230.25
115.58 11,222.50 4,345.82
111.09 11,285.00 4,456.92
87.89 11,285.00 4,544.81
66.38 11,285.00 4,611.19
46.71 11,285.00 4,657.90
28.59 11,285.00 4,686.49
12.64 11,285.00 4,699.13
2.71 11,285.00 4,701.84

4,701.84 300,372.50 131,419.26


(50% of excavated earthworked used for fill)
The Bills of Qualtifies Volume for the Road Thickness

Asphalt Road Base Sub Base Shoulder Subgrade Volume


No Station
Volume(m3) Volume(m3) Volume(m3) Volume(m3) (m3)
1.00 0+000 - - - - -
2.00 0+500 1,160.00 2,390.00 5,045.00 1,150.00 3,769.56
3.00 1+000 1,160.00 2,390.00 5,045.00 1,150.00 9,625.65
4.00 1+500 1,160.00 2,390.00 5,045.00 1,150.00 15,487.58
5.00 2+000 1,160.00 2,390.00 5,045.00 1,150.00 25,874.24
6.00 2+500 1,160.00 2,390.00 5,045.00 1,150.00 15,647.67
7.00 3+000 1,160.00 2,390.00 5,045.00 1,150.00 12,385.48
8.00 3+500 1,160.00 2,390.00 5,045.00 1,150.00 15,478.54
9.00 4+000 1,395.00 2,586.00 6,578.00 1,450.00 14,789.21
10.00 4+200 1,400.00 2,689.00 6,754.00 1,652.00 241,578.12

Subtotal - 10,915.00 22,005.00 48,647.00 11,152.00 354,636.05


The Volume of Cuting and Filling

Length
No Station Cut Volume (m3) Fill Volume (m3)
(m)
1.00 0+000 - - -
2.00 0+500 500.00 450.00 250.83
3.00 1+000 500.00 1,062.50 840.58
4.00 1+500 500.00 1,750.00 1,414.25
5.00 2+000 500.00 2,460.00 1,565.46
6.00 2+500 500.00 3,122.50 1,669.71
7.00 3+000 500.00 4,497.50 2,057.21
8.00 3+500 500.00 5,637.50 2,677.01
9.00 4+000 500.00 6,437.50 3,167.79
10.00 4+200 500.00 6,825.00 3,632.92

Subtotal - 4,500.00 32,242.50 17,275.77


The size of work for Asphalt Concrete

No Describtion Size Width High

1.00 Preliminary Work


1.01 Clean and Grubbing work 3,600.00 10.00 2.00
1.02 Clearing in previous road 3,600.00 7.00 0.20
2.00 Work on Embankment
2.01 Commulative Cutting Volume - - -
2.02 Cummulative Filled Volume - - -
3.00 Work on Subgrade
3.01 Selected Subgrad - - -
4.00 The Volume of Aggregate ( M30 and M40 ) for filled
4.01 sub base layer - - -
4.02 Shoulder - - -
4.03 Road Base / Base Course - - -
5.00 Asphalt Concrete
5.01 Asphalt Volume - - -
5.02 Quality of Prime Coadt 3,600.00 19.00 -
5.03 Quality of Sand on prime coat 3,600.00 19.00 0.01
5.04 Quality of Tack Coat 3,600.00 19.00 -
5.05 Traffic sign and arrow works 3,600.00 6.00 0.10

Subtotal - 21,600.00 80.00 2.31

The coefficient of Prime Coat 1.10


Total Volume
(m3)

72,000.00
5,040.00

32,242.50
17,275.77

17,250.00
d
48,647.00
11,152.00
22,005.00

10,915.00
68,400.00
752.40
68,400.00
2,160.00

376,239.67
No. Work Type Unit Qualities of Work

1 Clean and Grubbing work m2 72,000.00

2 Clearing in previous road m3 5,040.00

3 Clearing and Cutting on Subgrade m3 32,242.50

4 Filled on Embankment layer m3 17,275.77

5 Compact in Embankment Layer m3 17,275.77

6 Filled on Selected Subgrade m3 17,250.00

7 Compact on Selected Subgrade m3 17,250.00

8 Filled the aggregate for Sub Base m3 48,647.00

9 Compact the aggregate for Sub Base m3 48,647.00

10 Filled the lateral layer for Shoulder m3 11,152.00

11 Compact the lateral later for Shoulder m3 11,152.00

12 Filling the aggregates for Road Base m3 22,005.00

13 Compact the aggregates for Road Base m3 22,005.00

14 Spray the Bituminous Prime Coat m2 752.40

15 Scatter the Sand on Pime Coat Layer m2 752.40

16 Asphalt Volume m3 10,915.00

17 Spray the Bituminous Tack Coat m2 68,400.00

18 Iron work on Bituminous Concrete m2 68,400.00

19 Sketch the work on Traffic Sign m2 68,400.00

20

21 Total Work lot 559,561.84


The Qualities Estimation

Clean and Grubbing work


Qualities of Work 72,000.00 m2 Unit on Determine 100 m3
Qualities of forest determine on
Payment
100m2 Implemenation Dialy Implementation
Spend Unit Require
I Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Construction Work Labour Person 1.85 1332 35 38.06 4 $ 5,328.00

Machinery

Smooth Machinery Time 0.05 36 35 1.03 211.2 $ 7,603.20

Subtotal $ 12,931.20

Clearing in previous road


Unit on Determine 100 m3
Qualities of Work 5,040.00 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
IV Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Labour Person 6.83 344.232 30 11.47 4 $ 1,376.93

Cutting the pile by Machinery


mchinery
Exvavator ≤ 1.25 m3 Time 0.68 34.272 30 1.14 144 $ 4,935.17

Budozer ≤ 110 CV Time 0.05 2.52 30 0.08 211.2 $ 532.22

Subtotal $ 6,844.32

Clearing and Cutting on Subgrade


Unit on Determine 100 m3
Qualities of Work 32,242.50 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
III Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Labour Person 6.83 2,202.16 30 73.41 4 $ 8,808.65


Cutting the pile by
Machinery Time
mchinery
Budozer ≤ 1.25 m3 Time 0.88 283.73 30 9.46 211.2 $ 59,924.62

Subtotal $ 68,733.27

Filled on Embankment layer


Qualities of Work 17,275.77 m3 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
II Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Labour Person 12.08 2,086.91 60 34.78 4 $ 8,347.65

Cutting the pile by Machinery Time -


mchinery
Exvavator ≤ 1.25 m3 Time 0.735 126.98 60 2.12 144 $ 18,284.68

Budozer ≤ 1.25 m3 Time 1.04 179.67 60 2.99 101.76 $ 18,283.02

Subtotal $ 44,915.35

Compact in Embankment Layer


Qualities of Work 17,275.77 m3 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
I Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Embankment m3 130 22,458.50 60 374.31 4 $ 89,834.01

Labour Person 11.87 2,050.63 60 34.18 4 $ 8,202.54

Machinery Time -

Budozer ≤ 110 CV Time 0.41 70.83 60 1.18 101.76 $ 7,207.73


Cutting the pile by
Nivealor 110 CV Time 0.42 72.56 60 1.21 101.76 $ 7,383.53
mchinery
Water Car Time 0.21 36.28 60 0.60 144 $ 5,224.19

Roller Time 1.3 224.59 60 3.74 101.76 $ 22,853.77

Other Machinery % 0.5 86.38 60 1.44 144 $ 12,438.55

Subtotal $ 63,310.31

Filled on Selected Subgrade


Qualities of Work 17,250.00 m3 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
1II Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Labour Person 130 22,425.00 40 560.63 4 $ 89,700.00


Cutting the pile by
Excavator Time 11.87 2,047.58
mchinery
Vehical 12t Time 0.68 117.30 40 2.93 144 $ 16,891.20

Subtotal $ 106,591.20
Compact on Selected Subgrade
Qualities of Work 17,250.00 m3 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
I Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Materials lot 130 22,458.50 60 374.31 4 $ 89,834.01

Embankment m3 130 22,458.50 60 374.31 4 $ 89,834.01

Labour Person 11.87 2,050.63 60 34.18 4 $ 8,202.54

Machinery Time -
Cutting the pile by
Budozer ≤ 110 CV Time 0.41 70.83 60 1.18 101.76 $ 7,207.73
mchinery
Nivealor 110 CV Time 0.42 72.56 60 1.21 101.76 $ 7,383.53

Water Car Time 0.21 36.28 60 0.60 144 $ 5,224.19

Roller Time 1.3 224.59 60 3.74 101.76 $ 22,853.77

Other Machinery % 0.5 86.38 60 1.44 144 $ 12,438.55

Subtotal $ 89,834.01 $ 63,310.31

Filled the aggregate for Sub Base


Qualities of Work 48,647.00 m3 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
1II Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Labour Person 130 22,425.00 40 560.63 4 $ 89,700.00


Cutting the pile by
Excavator 1m3 Time 11.87 2,047.58 40 51.19 4 $ 8,190.30
mchinery
Vehical 12t Time 0.68 117.30 40 2.93 144 $ 16,891.20

Subtotal $ 114,781.50

Compact the lateral later for Shoulder


Qualities of Work 48,647.00 m3 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
I Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Materials lot

Aggragate M30 m3 130 63,241.10 60 1,054.02 4 $ 252,964.40 $ 252,964.40

Labour Person 11.87 5,774.40 60 96.24 4 $ 23,097.60

Machinery Time - $ -
Cutting the pile by
Budozer ≤ 110 CV Time 0.41 199.45 60 3.32 101.76 $ 20,296.31
mchinery
Nivealor 110 CV Time 0.42 204.32 60 3.41 101.76 $ 20,791.34

Water Car Time 0.21 102.16 60 1.70 144 $ 14,710.85

Roller Time 1.3 632.41 60 10.54 101.76 $ 64,354.14

Other Machinery % 0.5 243.24 60 4.05 144 $ 35,025.84

- $ -

Subtotal $ 252,964.40 $ 178,276.08

Filled the lateral layer for Shoulder

Qualities of Work 11,152.00 m3 Unit on Determine 100 m3


Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
1II Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Labour Person 130 14,497.60 40 362.44 4 $ 57,990.40


Cutting the pile by
Excavator 1m3 Time 11.87 1,323.74 40 33.09 4 $ 5,294.97
mchinery
Vehical 12t Time 0.68 75.83 40 1.90 144 $ 10,920.04

Subtotal $ 74,205.41

Compact the lateral later for Shoulder

Qualities of Work 11,152.00 m3 Unit on Determine 100 m3


Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
I Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Materials lot

Embankment m3 130 14,497.60 60 241.63 4 $ 57,990.40 $ 57,990.40

Labour Person 11.87 1,323.74 60 22.06 4 $ 5,294.97

Machinery Time -
Cutting the pile by
Budozer ≤ 110 CV Time 0.41 45.72 60 0.76 101.76 $ 4,652.79
mchinery
Nivealor 110 CV Time 0.42 46.84 60 0.78 101.76 $ 4,766.28

Water Car Time 0.21 23.42 60 0.39 144 $ 3,372.36

Roller Time 1.3 144.98 60 2.42 101.76 $ 14,752.76

Other Machinery % 0.5 55.76 60 0.93 144 $ 8,029.44

Subtotal $ 57,990.40 $ 40,868.60


Filling the aggregates for Road Base
Qualities of Work 22,005.00 m3 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
1II Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Labour Person 130 28,606.50 40 715.16 4 $ 114,426.00


Cutting the pile by
Excavator 1m3 Time 11.87 2,611.99 40 65.30 4 $ 10,447.97
mchinery
Vehical 12t Time 0.68 149.63 40 3.74 144 $ 21,547.30

Subtotal $ 146,421.27

Compact the aggregates for Road Base

Qualities of Work 22,005.00 m3 Unit on Determine 100 m3


Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
I Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Materials lot

Aggragate M30 m3 130 28,606.50 60 476.78 4 $ 114,426.00 $ 114,426.00

Labour Person 11.87 2,611.99 60 43.53 4 $ 10,447.97

Machinery Time -
Cutting the pile by
Budozer ≤ 110 CV Time 0.41 90.22 60 1.50 101.76 $ 9,180.84
mchinery
Nivealor 110 CV Time 0.42 92.42 60 1.54 101.76 $ 9,404.76

Water Car Time 0.21 46.21 60 0.77 144 $ 6,654.31

Roller Time 1.3 286.07 60 4.77 101.76 $ 29,109.97

Other Machinery % 0.5 110.03 60 1.83 144 $ 15,843.60

Subtotal $ 114,426.00 $ 80,641.46

Spray the Bituminous Prime Coat


Qualities of Work 752.40 m3 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
I Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Materials lot

mulsion Axit Type 60% kg 130 978.12 60 16.30 4 $ 3,912.48 $ 3,912.48

Labour Person 11.87 89.31 60 1.49 4 $ 357.24

Cutting the pile by Machinery Time -


mchinery 0.41
ar for Spray Bituminou Time 3.08 60 0.05 101.76 $ 313.91

Tractor for Clear soil Time 0.42 3.16 60 0.05 101.76 $ 321.57

achine Bom Air 600m3 Time 0.21 1.58 60 0.03 144 $ 227.53

Other Machinery % 0.5 3.76 60 0.06 144 $ 541.73

Subtotal $ 3,912.48 $ 1,761.98

Scatter the Sand on Pime Coat Layer


Qualities of Work 752.40 m3 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
I Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Materials lot

Fine Sand m2 130 978.12 60 16.30 4 $ 3,912.48 $ 3,912.48

Labour Person 11.87 89.31 60 1.49 4 $ 357.24


Cutting the pile by
mchinery
Machinery -

Car for get Sand in 12t Time 0.41 3.08 60 0.05 101.76 $ 313.91

Other Machinery % 0.5 3.76 60 0.06 144 $ 541.73

Subtotal $ 3,912.48 $ 1,212.88

Spray the Bituminous Tack Coat


Qualities of Work 68,400.00 m2 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
I Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Materials lot

mulsion Axit Type 60% kg 130 978.12 60 16.30 4 $ 3,912.48 $ 3,912.48

Labour Person 11.87 89.31 60 1.49 4 $ 357.24


Cutting the pile by
Machinery -
mchinery
ar for Spray Bituminou Time 0.41 3.08 60 0.05 101.76 $ 313.91

achine Bom Air 600m3 Time 0.5 3.76 60 0.06 144 $ 541.73

Other Machinery % 0.5 3.76 60 0.06 144 $ 541.73

Subtotal $ 3,912.48 $ 1,754.61


Iron work on Bituminous Concrete
Qualities of Work 68,400.00 m2 Unit on Determine 100 m3
Soil Type Payment
Implemenation Dialy Implementation
Construction Work Spend Unit Require
I Time (day) (Person)
Unit (USA) Material (USA) Labour (USA)

Materials lot

Asphalt Concrete Ton 130 978.12 60 16.30 4 $ 3,912.48 $ 3,912.48

Labour Person 11.87 89.31 60 1.49 4 $ 357.24

Cutting the pile by Machinery -


mchinery 0.41
achine Bom Air 600m3 Time 3.08 60 0.05 101.76 $ 313.91

chine for spray 130-140 Time 0.5 3.76 60 0.06 144 $ 541.73

ler Bituminous Wheel Time 0.5 3.76 60 0.06 144 $ 541.73

Other Machinery % 0.5 3.76 60 0.06 144 $ 541.73

Subtotal $ 3,912.48 $ 2,296.34


S.No. Description Unit Quantity Length (m)
1 Aluminium Sheet (2mm thick) sqm 0.98 1000
2 Paints
2.1 Enamel Paint sqm 1.09 1000
2.2 Epoxy Paint sqm 0.635 1000
3 Morum cum
4 Aggregate
4.1 Stone Aggregate (90 mm thick) sqm 1.1 303
4.2 Stone Aggregate (63 mm thick) sqm 0.65 303
4.3 Stone Aggregate (53 mm thick) sqm 0.25 303
5 Aggregate
5.1 Stone Aggregate (90 mm thick) sqm 1.1 281.25
5.2 Stone Aggregate (63 mm thick) sqm 0.65 281.25
5.3 Stone Aggregate (53 mm thick) sqm 0.25 281.25
6 Aggregate
6.1 Stone Aggregate (90 mm thick) sqm 0.05 281.25
6.2 Stone Aggregate (63 mm thick) sqm 0.3 281.25
6.3 Stone Aggregate (53 mm thick) sqm 0.65 281.25
7 Bitumen
7.1 Bitumen sqm 0.075 3750
7.2 Steam Coal sqm 0.15 3750
7.3 Bitumen sqm 0.025 3750
8 Bitumen
8.1 Bitumen sqm 0.144 3750
8.2 Stone Chipping sqm 1.8 3750
8.3 Steam Coal sqm 0.288 3750
9 Bitumen
9.1 Bitumen sqm 0.098 3750
9.2 Stone Aggregate sqm 0.9 3750
9.3 Steam Coal sqm 1.9 3750
Total
980

1090
635
22.5

333.3
196.95
75.75

309.375
182.8125
70.3125

14.0625
84.375
182.8125

281.25
562.5
93.75

540
6750
1080

367.5
3375
7125