Cover of reinforcement bar (between concrete surface and center of reinforcement bar)
Side wall Outside cm 6.0
Inside cm 6.0
Top slab Upper cm 6.0
Lower cm 6.0
Bottom slab Lower cm 6.0
Upper cm 6.0
2 Design Parameters
1/1 SingleBoxCulvert/01Summary
STRUCTURAL CALCULATION OF BOX CULVERT Type: B1.00m x H1.50m Class III Road
Soil Cover Depth: 3.0 m
1 Dimensions and Parameters
Basic Parameters asumsi
Ka: Coefficient of static earth pressure 0.5
w: Unit weight of water (t/m3) 1.00 t/m3
d: Unit weight of soil (dry) (t/m3) 1.80 t/m3
Gwd
s: Unit weight of soil (saturated) (t/m3) 2.00 t/m3
D
c: Unit weight of reinforced concrete (t/m3) 2.40 t/m3
ck: Concrete Design Strength 300 kgf/m2
ca Allowable Stress of Concrete 100 kgf/m2
t2
sa: Allowable Stress of Reinforcement Bar 2400 kgf/m2 400
a: Allowable Stress of Shearing (Concrete) 10 kgf/m2
sy: Yielding Point of Reinforcement Bar 5000 kgf/m2
n: Young's Modulus Ratio 8
H
Hf Fa: Safety factor against uplift 1.2
HT
Basic Dimensions
Hf
H: Internal Height of Box Culvert 3 1.50 m
t3 B: Internal Width of Box Culvert 4 1.00 m
t1 t1 Hf: Fillet Height 0.15 m
B t1: Thickness of Side Wall 5 0.25 m (> 0.25m)
t2: Thickness of Top Slab 6 0.25 m (> 0.25m)
BT t3: Thickness of Invert (Bottom Slab) 7 0.25 m (> 0.25m)
BT: Gross Width of Box Culvert 1.50 m
HT: Gross Height of Box Culvert 2.00 m
D: Covering Depth 8 3.00 m
Gwd: Underground Water Depth for Case 1, 2 3.00 m (= D)
hiw: Internal Water Depth for Case 1, 2 0.00 m
for Case 3, 4 1.50 m
Dimension of frame
t1 B t1
H0: Height of frame t2/2 + H + t3/2 1.750 m
D1 B0: Width of frame B + t1 1.250 m
t2 D1: Covering depth at middle of top slab D + t2/2 3.125 m
H H0
t3
B0
1/ 6 (1)SingleBoxCulvert, 02Load
Load distribution of truck tire
Case.L1: Pvt1 = 0.2664 tf/m2, B= 1.250 m Combination for Case.L2 (2) (2) (3) (3)
Pvt2 = 0.0000 tf/m2, B= 0.000 m a) + b) a) + c) a) + b) a) + c)
Case.L2: Pvt1 = 0.3330 tf/m2, B= 1.250 m Distributed load total 0.2664 0.3330 0.2664 0.2664
Pvt2 = 0.0000 tf/m2, B= 0.000 m Select the combination case of 0.3330 tf/m2,
for Case.L2, which is the largest load to the top slab.
In case of covering depth (D) is over 3.0m, uniform load of 1.0 tf/m2 is applied on the top slab of culvert instead of live load calculated above.
2/ 6 (1)SingleBoxCulvert, 02Load
3 Load calculation
Case 1: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L1
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.7632
Pvd=Gwd*gd+(D-Gwd)*gs Pvd= 5.4000
Pvt1 Pvt1= 0.2664
Pvt2 Pvt2= 0.0000
Pv1= 6.4296
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.7632
Wtop Wtop= 0.7632
Ws=Wsw*2/B0 Ws= 1.4400
Pvd Pvd= 5.4000
Pvt1 Pvt1= 0.2664
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 0.0000 hiw: internal water depth 0.00 m
Up=-U/B0 U= -2.4000
Q= 6.2328
3/ 6 (1)SingleBoxCulvert, 02Load
Case 2: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L2
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.7632
Pvd=Gwd*gd+(D-Gwd)*gs Pvd= 5.4000
Pvt1 Pvt1= 0.3330
Pvt2 Pvt2= 0.0000
Pv1= 6.4962
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.7632
Wtop Wtop= 0.7632
Ws=Wsw*2/B0 Ws= 1.4400
Pvd Pvd= 5.4000
Pvt1 Pvt1= 0.3330
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 0.0000 hiw: internal water depth 0.00 m
Up=-U/B0 U= -2.4000
Q= 6.2994
4/ 6 (1)SingleBoxCulvert, 02Load
Case 3: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L1
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.7632
Pvd=D*d Pvd= 5.4000
Pvt1 Pvt1= 0.2664
Pvt2 Pvt2= 0.0000
Pv1= 6.4296
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.7632
Wtop Wtop= 0.7632
Ws=Wsw*2/B0 Ws= 1.4400
Pvd Pvd= 5.4000
Pvt1 Pvt1= 0.2664
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 1.1640 hiw: internal water depth 1.500 m
Up=0 U= 0.0000
Q= 9.7968
5/ 6 (1)SingleBoxCulvert, 02Load
Case 4: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L2
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.7632
Pvd=D*d Pvd= 5.4000
Pvt1 Pvt1= 0.3330
Pvt2 Pvt2= 0.0000
Pv1= 6.4962
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.7632
Wtop Wtop= 0.7632
Ws=Wsw*2/B0 Ws= 1.4400
Pvd Pvd= 5.4000
Pvt1 Pvt1= 0.3330
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 1.1640 hiw: internal water depth 1.500 m
Up=0 U= 0.0000
Q= 9.8634
6/ 6 (1)SingleBoxCulvert, 02Load
4 Analysis of Plane Frame
Case 1: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L1
k1 = 1.0
k2 = H0t23/(B0t13) = 1.4000
k3 = H0t33/(B0t13) = 1.4000
A = -D B = -C R =0
A = 0.12505 C = 0.12706
B = -0.12706 D = -0.12505
1/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -1.1998 tf・m
MBA = k1(2B+A)+CBA = 1.0151 tf・m
MBC = k2(2B+C) - CBC = -1.0151 tf・m
MCB = k2(2C+B)+CCB = 1.0151 tf・m
MCD = k1(2C+D) - CCD = -1.0151 tf・m
MDC =k1 (2D+ C)+CDC = 1.1998 tf・m
MDA = k3(2D+A) - CDA = -1.1998 tf・m
MAD = k3(2A+D)+CAD = 1.1998 tf・m
c) Bending Moment
MA = MAB = -1.200 tf・m
MB = -MBA = -1.015 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 4.8450 -6.5832 x + 1.0000 x2 , x = 5.739
0.844
Bending moment at x = 0.8442 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = 0.745 tf・m
2/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -1.015 tf・m
MC = -MCB = -1.015 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 0.625 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.241 tf・m
3/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
c) Bending Moment
MC = MCD = -1.015 tf・m
MD = -MDC = -1.200 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 3.6131 -3.0832 x -1.0000 x2 , x = -3.989
0.906
Bending moment at x = 0.9058 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 0.74510 tf・m
c) Bending Moment
MD = MDA = -1.200 tf・m
MA = -MAD = -1.200 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 4.9185 -7.8696 x , x = 0.625
4/16 (2)SingleBoxCulvert03MSN
Case 2: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L2
k1 = 1.0
k2 = H0t23/(B0t13) = 1.40000
k3 = H0t33/(B0t13) = 1.40000
A = -D B = -C R =0
A = 0.12498 C = 0.12699
B = -0.12699 D = -0.12498
5/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -1.2083 tf・m
MBA = k1(2B+A)+CBA = 1.0236 tf・m
MBC = k2(2B+C) - CBC = -1.0236 tf・m
MCB = k2(2C+B)+CCB = 1.0236 tf・m
MCD = k1(2C+D) - CCD = -1.0236 tf・m
MDC =k1 (2D+ C)+CDC = 1.2083 tf・m
MDA = k3(2D+A) - CDA = -1.2083 tf・m
MAD = k3(2A+D)+CAD = 1.2083 tf・m
c) Bending Moment
MA = MAB = -1.208 tf・m
MB = -MBA = -1.024 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 4.8741 -6.6165 x + 1.0000 x2 , x = 5.772
0.844
Bending moment at x = 0.8444 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = 0.749 tf・m
6/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -1.024 tf・m
MC = -MCB = -1.024 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 0.625 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.245 tf・m
7/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
(i) In case of x1 = 0.380 m
Sx1 = 2.314 tf
(ii) In case of x2 = 1.370 m
Sx2 = -2.504 tf
c) Bending Moment
MC = MCD = -1.024 tf・m
MD = -MDC = -1.208 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 3.6422 -3.1165 x -1.0000 x2 , x = -4.0221
0.9056
Bending moment at x = 0.9056 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 0.7493 tf・m
c) Bending Moment
MD = MDA = -1.208 tf・m
MA = -MAD = -1.208 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 4.9601 -7.9362 x , x = 0.6250
8/16 (2)SingleBoxCulvert03MSN
Case 3: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L1
k1 = 1.0
k2 = H0t23/(B0t13) = 1.40000
k3 = H0t33/(B0t13) = 1.40000
A = -D B = -C R =0
A = -0.09154 C = -0.04979
B = 0.04979 D = 0.09154
9/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -0.89653 tf・m
MBA = k1(2B+A)+CBA = 0.76747 tf・m
MBC = k2(2B+C) - CBC = -0.76747 tf・m
MCB = k2(2C+B)+CCB = 0.76747 tf・m
MCD = k1(2C+D) - CCD = -0.76747 tf・m
MDC =k1 (2D+ C)+CDC = 0.89653 tf・m
MDA = k3(2D+A) - CDA = -0.89653 tf・m
MAD = k3(2A+D)+CAD = 0.89653 tf・m
c) Bending Moment
MA = MAB = -0.897 tf・m
MB = -MBA = -0.767 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 2.6950 -3.0207 x + 0.0214 x2 , x = 140.068
0.898
Bending moment at x = 0.8979 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = 0.311 tf・m
10/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -0.767 tf・m
MC = -MCB = -0.767 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 0.625 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.488 tf・m
11/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
(i) In case of x1 = 0.380 m
Sx1 = 1.403 tf
(ii) In case of x2 = 1.370 m
Sx2 = -1.550 tf
c) Bending Moment
MC = MCD = -0.767 tf・m
MD = -MDC = -0.897 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 2.5256 -2.9457 x -0.0214 x2 , x = -138.32
0.852
Bending moment at x = 0.8521 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 0.311 tf・m
c) Bending Moment
MD = MDA = -0.897 tf・m
MA = -MAD = -0.897 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 4.9185 -7.8696 x , x = 0.625
12/16 (2)SingleBoxCulvert03MSN
Case 4: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L2
k1 = 1.0
k2 = H0t23/(B0t13) = 1.40000
k3 = H0t33/(B0t13) = 1.40000
A = -D B = -C R =0
A = -0.09161 C = -0.04987
B = 0.04987 D = 0.09161
13/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -0.90510 tf・m
MBA = k1(2B+A)+CBA = 0.77604 tf・m
MBC = k2(2B+C) - CBC = -0.77604 tf・m
MCB = k2(2C+B)+CCB = 0.77604 tf・m
MCD = k1(2C+D) - CCD = -0.77604 tf・m
MDC =k1 (2D+ C)+CDC = 0.90510 tf・m
MDA = k3(2D+A) - CDA = -0.90510 tf・m
MAD = k3(2A+D)+CAD = 0.90510 tf・m
c) Bending Moment
MA = MAB = -0.905 tf・m
MB = -MBA = -0.776 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 2.7241 -3.0540 x + 0.0214 x2 , x = 141.622
0.898
Bending moment at x = 0.8976 m is;
2 3
Mmax = SABx - w1x /2 - (w2-w1)x /(6L) + MAB = 0.315 tf・m
14/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -0.776 tf・m
MC = -MCB = -0.776 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 0.625 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.493 tf・m
15/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
(i) In case of x1 = 0.380 m
Sx1 = 1.4196 tf
(ii) In case of x2 = 1.370 m
Sx2 = -1.5667 tf
c) Bending Moment
MC = MCD = -0.776 tf・m
MD = -MDC = -0.905 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 2.5547 -2.9790 x -0.0214 x2 , x = -139.9
0.852
Bending moment at x = 0.8524 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 0.315 tf・m
c) Bending Moment
MD = MDA = -0.905 tf・m
MA = -MAD = -0.905 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 4.9601 -7.9362 x , x = 0.625
16/16 (2)SingleBoxCulvert03MSN
Summary of Internal forces
Check M N S (tf)
Member Case
Point (tf・m) (tf) at joint at 2d
Side wall A -1.200 4.918 4.845 2.488
(left) Case.1 Middle 0.745 4.484 0.000 -
B -1.015 4.018 -3.613 -2.297
A -1.208 4.960 4.874 2.504
Case.2 Middle 0.749 4.526 0.000 -
B -1.024 4.060 -3.642 -2.314
A -0.897 4.918 2.695 1.550
Case.3 Middle 0.311 4.457 0.000 -
B -0.767 4.018 -2.526 -1.403
A -0.905 4.960 2.724 1.567
Case.4 Middle 0.315 4.498 0.000 -
B -0.776 4.060 -2.555 -1.420
Top slab B -1.015 3.613 4.018 1.575
Case.1 Middle 0.241 3.613 0.000 -
C -1.015 3.613 -4.018 -1.575
B -1.024 3.642 4.060 1.592
Case.2 Middle 0.245 3.642 0.000 -
C -1.024 3.642 -4.060 -1.592
B -0.767 2.526 4.018 1.575
Case.3 Middle 0.488 2.526 0.000 -
C -0.767 2.526 -4.018 -1.575
B -0.776 2.555 4.060 1.592
Case.4 Middle 0.493 2.555 0.000 -
C -0.776 2.555 -4.060 -1.592
Side wall C -1.015 4.018 3.613 2.297
(right) Case.1 Middle 0.745 4.484 0.000 -
D -1.200 4.918 -4.845 -2.488
C -1.024 4.060 3.642 2.314
Case.2 Middle 0.749 4.526 0.000 -
D -1.208 4.960 -4.874 -2.504
C -0.767 4.018 2.526 1.403
Case.3 Middle 0.311 4.457 0.000 -
D -0.897 4.918 -2.695 -1.550
C -0.776 4.060 2.555 1.420
Case.4 Middle 0.315 4.498 0.000 -
D -0.905 4.960 -2.724 -1.567
Invert D -1.200 4.845 4.918 1.928
Case.1 Middle 0.337 4.845 0.000 -
A -1.200 4.845 -4.918 -1.928
D -1.208 4.874 4.960 1.944
Case.2 Middle 0.342 4.874 0.000 -
A -1.208 4.874 -4.960 -1.944
D -0.897 2.695 4.918 1.928
Case.3 Middle 0.640 2.695 0.000 -
A -0.897 2.695 -4.918 -1.928
D -0.905 2.724 4.960 1.944
Case.4 Middle 0.645 2.724 0.000 -
A -0.905 2.724 -4.960 -1.944
Case.2
M= 1.2083 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 4.9601 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 4.8741 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 2.5043 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 24.36 cm
Solving the formula shown below, c = 56.497 kgf/cm2 ( 4.5E-07 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +437.28 c^2 -7632.5 c -1144871.29
s = nc/(nc+sa) = 0.1585
Asreq = (c*s/2 - N/(bd))bd/sa = 1.4774 cm2
Case.3
M= 0.8965 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 4.9185 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 2.6950 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 1.5502 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 18.23 cm
Solving the formula shown below, c = 49.738 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +439.89 c^2 -6064.3 c -909649.47
s = nc/(nc+sa) = 0.1422
Asreq = (c*s/2 - N/(bd))bd/sa = 0.7506 cm2
Case.4
M= 0.9051 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 4.9601 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 2.7241 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 1.5667 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 18.25 cm
Solving the formula shown below, c = 49.991 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +439.8 c^2 -6120.6 c -918083.08
s = nc/(nc+sa) = 0.1428
Asreq = (c*s/2 - N/(bd))bd/sa = 0.7598 cm2
The maximum requirement of reinforcement bar is 1.4774 cm2 in Case. 2 from above calculation.
Case. 1 2 3 4
Requirement 1.4680 1.4774 0.7506 0.7598 (cm2)
Case.2
M= 1.0236 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 4.0601 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 3.6422 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 2.3136 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 25.21 cm
Solving the formula shown below, c = 51.326 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +439.3 c^2 -6419.9 c -962989.44
s = nc/(nc+sa) = 0.1461
Asreq = (c*s/2 - N/(bd))bd/sa = 1.2764 cm2
Case.4
M= 0.7760 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 4.0601 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 2.5547 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 1.4196 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 19.11 cm
Solving the formula shown below, c = 45.641 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +441.36 c^2 -5185.4 c -777803.53
s = nc/(nc+sa) = 0.1320
Asreq = (c*s/2 - N/(bd))bd/sa = 0.6939 cm2
The maximum requirement of reinforcement bar is 1.2764 cm2 in Case. 2 from above calculation.
Case. 1 2 3 4
Requirement 1.2672 1.2764 0.6848 0.6939 (cm2)
Case.4
M= 0.7760 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 2.5547 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 4.0601 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 1.5916 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 30.38 cm
Solving the formula shown below, c = 43.244 kgf/cm2 ( 3.1E-06 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +442.17 c^2 -4697.5 c -704619.96
s = nc/(nc+sa) = 0.1260
Asreq = (c*s/2 - N/(bd))bd/sa = 1.0921 cm2
The maximum requirement of reinforcement bar is 1.3864 cm2 in Case. 2 from above calculation.
Case. 1 2 3 4
Requirement 1.3739 1.3864 1.0798 1.0921 (cm2)
Case.2
M= 1.2083 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 4.8741 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 4.9601 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 1.9444 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 24.79 cm
Solving the formula shown below, c = 56.382 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +437.33 c^2 -7604.6 c -1140691.07
s = nc/(nc+sa) = 0.1582
Asreq = (c*s/2 - N/(bd))bd/sa = 1.4999 cm2
Case.3
M= 0.8965 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 2.6950 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 4.9185 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 1.9281 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 33.27 cm
Solving the formula shown below, c = 46.399 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +441.09 c^2 -5343.7 c -801553.46
s = nc/(nc+sa) = 0.1339
Asreq = (c*s/2 - N/(bd))bd/sa = 1.3372 cm2
Case.4
M= 0.9051 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 2.7241 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 4.9601 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 1.9444 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 33.23 cm
Solving the formula shown below, c = 46.646 kgf/cm2 ( 2.1E-05 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +441.01 c^2 -5395.9 c -809380.01
s = nc/(nc+sa) = 0.1346
Asreq = (c*s/2 - N/(bd))bd/sa = 1.3496 cm2
The maximum requirement of reinforcement bar is 1.4999 cm2 in Case. 2 from above calculation.
Case. 1 2 3 4
Requirement 1.4872 1.4999 1.3372 1.3496 (cm2)
Case.2
M= 0.7493 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 4.5258 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 16.56 cm
Solving the formula shown below, c = 45.725 kgf/cm2 ( 0.0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +441.33 c^2 -5202.8 c -780412.90
s = nc/(nc+sa) = 0.1323
Asreq = (c*s/2 - N/(bd))bd/sa = 0.5080 cm2 Tensile is on inside of member
The maximum requirement of reinforcement bar is 0.5092 cm2 in Case. 1 from above calculation.
Case. 1 2 3 4
Requirement 0.5092 0.5080 0.0000 0.0000 (cm2)
Side inside inside inside inside
Case.2
M= 0.3417 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 4.8741 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 7.01 cm
Solving the formula shown below, c = 35.629 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +444.53 c^2 -3283.5 c -492528.33
s = nc/(nc+sa) = 0.1062
Asreq = (c*s/2 - N/(bd))bd/sa = 0.0000 cm2 Tensile is on inside of member
Case.3
M= 0.6405 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 2.6950 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 23.77 cm
Solving the formula shown below, c = 39.989 kgf/cm2 ( 3.3E-08 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +443.22 c^2 -4067.1 c -610058.67
s = nc/(nc+sa) = 0.1176
Asreq = (c*s/2 - N/(bd))bd/sa = 0.7388 cm2 Tensile is on inside of member
Case.4
M= 0.6449 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 2.7241 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 23.67 cm
Solving the formula shown below, c = 40.156 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +443.17 c^2 -4098.6 c -614793.69
s = nc/(nc+sa) = 0.1181
Asreq = (c*s/2 - N/(bd))bd/sa = 0.7414 cm2 Tensile is on inside of member
The maximum requirement of reinforcement bar is 0.7414 cm2 in Case. 4 from above calculation.
Case. 1 2 3 4
Requirement 0.0000 0.0000 0.7388 0.7414 (cm2)
Side inside inside inside inside
Required reinforcement for design is the maximum required reinforcement calculated above in 1) - 4).
Item Side wall Side wall Top slab Invert Side wall Top slab Invert
Point bottom top end end middle middle middle
Side outside outside outside outside inside inside inside
Calculation 1) 2) 3) 4) 5) 6) 7)
Requirement 1.477 1.276 1.386 1.500 0.509 0.433 0.741 (cm2)
Required R-bar Asreq cm2 1.48 0.51 1.28 1.39 0.43 1.50 0.74
Compressive stress c kgf/cm2 29.7 20.4 25.2 25.5 11.7 29.7 15.2
Allowable stress ca kgf/cm2 100.0 100.0 100.0 100.0 100.0 100.0 100.0
ok ok ok ok ok ok ok
Tensile stress s kgf/cm2 504.7 356.2 437.1 465.4 171.1 510.5 237.8
Allowable stress sa kgf/cm2 2400.0 2400.0 2400.0 2400.0 2400.0 2400.0 2400.0
ok ok ok ok ok ok ok
Shearing stress at joint kgf/cm2 2.57 0.00 1.92 2.14 0.00 2.61 0.00
Allowable stress a kgf/cm2 20.00 20.00 20.00 20.00 20.00 20.00 20.00
ok ok ok ok ok ok ok
Shearing stress at 2d 2d kgf/cm2 1.32 - 1.22 0.84 - 1.02 -
Allowable stress 2da kgf/cm2 10.00 - 10.00 10.00 - 10.00 -
ok - ok ok - ok -
Resisting Moment Mr kgfcm 385,268 290,719 384,272 383,844 382,840 385,168 400,920
Mr for compression Mrc kgfcm 385,268 307,349 384,272 383,844 382,840 385,168 400,920
x for Mrc cm 4.799 3.795 4.712 4.673 4.571 4.791 4.813
s for Mrc kgf/cm2 2367.4 3205.6 2425.6 2452.9 2525.1 2372.9 2358.1
Mr for tensile Mrs kgfcm 490,237 290,719 475,145 468,176 450,155 488,790 509,160
x for Mrs cm 5.543 4.407 5.439 5.390 5.261 5.533 5.564
c for Mrs kgf/cm2 123.6 90.6 120.3 118.8 114.9 123.3 124.2
Distribution bar (>As/6 and >Asmin) 12@250 12@250 12@250 12@250 12@250 12@250 12@250
Reinforcement As cm2 4.52 4.52 4.52 4.52 4.52 4.52 4.52
ok ok ok ok ok ok ok
Reinforcement bar for fillet 12@250 12@250
Reinforcement As cm2 4.52 4.52