SAINT LOUIS UNIVERSITY

SCHOOL OF ENGINEERING AND ARCHITECTURE


DEPARTMENT OF MECHANICAL ENGINEERING

DESIGN OF A DIESEL ELECTRIC POWER PLANT

Group 2
BLANCHE, Alexis G.
MADARANG, Aidan Byrne C.
TIANGCO, James Aaron A.

Submitted to:
Engr. Marcelino Lunag, Jr.
CHAPTER A - LOAD CURVES
BASIC DAILY LOAD TABLE

Hours of the day Monday-Saturday (MW) Sunday (MW)


12:00 MN-1:00 AM 42.24 35.44
1:00 AM-2:00AM 42.09 35.14
2:00 AM-3:00 AM 42.61 34.94
3:00 AM- 4:00 AM 41.55 34.69
4:00 AM - 5:00 AM 42.21 34.98
5:00 AM - 6:00 AM 43.09 35.79
6:00 AM - 7:00 AM 46.98 37.57
7:00 AM - 8:00 AM 45.6 37.35
8:00 AM - 9:00 AM 45.31 37.49
9:00 AM - 10:00 AM 45.44 37.68
10:00 AM - 11:00 AM 45.8 37.84
11:00 AM - 12:00 NN 46.01 38.26
12:00 NN-1:00 PM 45.6 38.05
1:00 PM-2:00PM 45 37.43
2:00 PM-3:00 PM 44.6 37.21
3:00 PM- 4:00 PM 45 36.57
4:00 PM - 5:00 PM 46.74 37.38
5:00 PM - 6:00 PM 47.6 37.59
6:00 PM - 7:00 PM 48.11 38.33
7:00 PM - 8:00 PM 48.9 40.57
8:00 PM - 9:00 PM 48.91 40.86
9:00 PM - 10:00 PM 47.49 39.59
10:00 PM - 11:00 PM 46 38.64
11:00 PM - 12:00 MN 43.71 36.19
DAILY LOAD 1086.59 895.58
TOTAL LOAD FOR WEEKDAYS:
1086.59 MW-hr

TOTAL LOAD FOR SUNDAYS:


895.58 MW-hr

AREA OF LOAD WEEKDAYS:


Assume: 1 hr = 1cm
4MW = 1cm
1 𝑐𝑚2
AREA = (1086.59 MW-hr)((4𝑀𝑊)(1ℎ𝑟))
AREA = 271.6475 cm2

AREA OF LOAD SUNDAYS:


Assume: 1 hr = 1cm
4MW = 1cm
1 𝑐𝑚2
AREA = (895.58 MW-hr)((4𝑀𝑊)(1ℎ𝑟))
AREA = 223.895 cm2

ANNUAL KW-HR GENERATED:


Assume: 1 year = 52 weeks = 364 days
52 Sundays, 312 Weekdays
Annual KW-hr = 312(1086.59 MW-hr) + 52(895.58 MW-hr)
= 385586.24 MW-hr
Annual KW-hr Generated = 385,586,240 KW-hr