Tabel 1

Data Curah Hujan


Curah Hujan (mm)
Tahun
Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Dec
1996 152.10 159.00 237.30 122.50 319.70 113.30 18.20 47.90 28.20 80.00 183.38 193.10
1997 42.40 42.80 22.60 127.90 213.60 202.80 153.00 91.70 220.60 165.30 266.82 133.80
1998 88.90 187.50 165.70 124.50 228.40 232.40 89.20 105.80 92.00 122.40 151.94 147.50
1999 319.90 237.40 279.80 237.40 226.30 319.70 75.60 45.00 42.00 139.20 273.91 312.70
2000 195.30 92.90 139.60 295.50 177.70 331.80 164.80 161.00 220.00 148.10 86.00 217.30
2001 240.00 275.50 126.10 152.10 252.70 227.90 91.60 258.70 159.00 251.10 121.23 290.00
2002 319.80 412.80 179.40 147.20 105.50 75.70 46.60 8.00 4.00 56.50 169.87 187.60
2003 421.75 297.63 0.00 224.10 76.20 262.10 191.80 182.20 122.30 241.10 197.81 338.00
2004 369.20 211.45 437.30 271.10 170.50 121.30 129.80 203.70 226.30 317.60 103.96 264.20
2005 141.70 230.79 320.79 211.46 249.40 279.60 118.20 101.00 209.10 175.30 185.04 168.70
2006 394.27 439.46 186.62 305.58 189.70 109.70 98.40 26.40 167.70 134.10 169.80 112.10
2007 245.91 170.25 381.77 322.07 130.00 180.60 76.40 32.70 73.50 140.10 101.70 181.00
2008 351.85 266.71 262.58 233.59 244.90 79.80 44.50 95.60 273.80 220.90 203.70 217.90
2009 285.03 189.17 481.71 417.12 367.60 55.40 100.10 0.00 236.70 2.10 300.90 178.30
2010 251.30 193.19 215.23 261.77 199.40 98.60 271.00 145.40 94.10 339.60 304.50 296.50
2011 219.40 184.67 366.31 291.73 306.50 184.60 24.40 97.50 107.70 69.90 190.60 110.00
2012 242.39 233.31 252.56 270.61 291.20 255.00 253.00 113.00 174.50 114.30 190.80 165.80
2013 190.70 205.70 194.55 139.00 125.75 156.50 - - - - - -

Tabel 2
Data Curah Hujan Harian
Data Curah Hujan Harian (mm/hari)
Tahun Maks Min
Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Dec
1996 7.61 9.35 12.49 6.45 11.42 6.66 2.02 5.99 4.70 5.33 9.17 16.09 16.09 2.02
1997 3.26 4.76 3.77 8.53 11.87 9.66 5.46 5.73 10.50 9.72 12.71 5.82 12.71 3.26
1998 6.35 11.72 9.21 7.78 11.42 11.62 8.11 11.76 5.41 7.20 7.24 6.41 11.76 5.41
1999 13.33 13.96 11.66 9.50 9.43 17.76 15.12 3.46 42.00 7.33 18.26 16.46 42.00 3.46
2000 19.53 5.81 7.35 15.55 8.89 13.83 6.87 5.96 11.58 6.44 3.19 8.05 19.53 3.19
2001 8.57 15.31 6.31 8.01 12.03 9.12 5.39 10.78 8.83 11.41 5.05 12.08 15.31 5.05
2002 15.23 20.64 8.54 7.75 6.59 8.41 4.66 8.00 1.33 4.35 11.32 12.51 20.64 1.33
2003 28.12 14.88 0.00 11.79 4.23 15.42 8.34 7.01 5.56 10.05 9.89 12.07 28.12 0.00
2004 14.77 8.13 18.22 13.56 7.10 6.07 4.48 7.02 10.78 11.76 5.47 12.58 18.22 4.48
2005 8.86 13.58 14.58 11.13 11.88 10.75 6.57 4.81 8.71 7.30 8.81 9.37 14.58 4.81
2006 15.77 23.13 9.82 11.75 9.49 6.86 5.79 6.60 7.29 6.71 8.94 7.47 23.13 5.79
2007 9.84 11.35 13.16 16.10 7.22 9.03 7.64 5.45 7.35 12.74 4.24 10.65 16.10 4.24
2008 14.07 11.11 9.73 11.12 13.61 4.69 2.47 5.98 13.69 11.05 10.19 10.90 14.07 2.47
2009 13.57 7.57 16.61 16.68 15.32 4.26 4.35 0.00 11.27 0.30 15.84 7.75 16.68 0.00
2010 8.11 8.05 9.78 9.70 9.06 4.29 12.32 11.18 7.24 14.77 11.71 11.86 14.77 4.29
2011 10.97 16.79 14.65 10.42 13.93 8.39 4.88 9.75 11.97 11.65 9.53 5.00 16.79 4.88
2012 7.82 8.97 8.71 12.89 97.07 63.75 63.25 56.50 87.25 57.15 63.60 55.27 97.07 7.82
2013 12.71 18.70 10.24 8.18 62.88 78.25 78.25 8.18
Maks 28.12 23.13 18.22 16.68 97.07 78.25 63.25 56.50 87.25 57.15 63.60 55.27
Min 3.26 4.76 0.00 6.45 4.23 4.26 2.02 0.00 1.33 0.30 3.19 5.00 -
Rata - rata 12.14 12.43 10.27 10.94 17.97 16.05 9.87 9.76 15.03 11.49 12.66 12.96

Tabel 3
Curah Hujan Rencana (CHR)
Periode Ulang Hujan Yt Curah Hujan Rencana
2 0.37 23.93
3 0.90 32.68
4 1.25 38.28
5 1.50 42.42
10 2.25 54.66
Tabel 4
Falling Head
DATA "FALLING HEAD TEST"

Nama Sumur Uji : FH 01 Kedalaman Sumur Uji : 150 cm


Lokasi Target
Radius lubang bor :
Radius pipa Saringan :
Tebal Lapisan yang diuji (cm) 32
Kedalaman MAT Statis (Hw) : 118 cm
Pelaksana : Agriandi Tinggi Penambahan MAT cm
Deskripsi : Pasir
Koordinat :

Penambahan MAT
Waktu (T) Kedalaman MAT (he)
No ht = Hw - he ht/hw Keterangan
(menit) (cm)
( cm)
1 1 18.4 99.6 0.844 60
2 2 19.7 98.3 0.833 120
3 3 22.3 95.7 0.811 180
4 4 23.7 94.3 0.799 240
5 5 24.0 94.0 0.797 300
6 6 29.1 88.9 0.753 360
7 7 29.2 88.8 0.752 420
8 8 29.3 88.7 0.752 480
9 9 29.7 88.3 0.748 540
10 10 29.8 88.2 0.747 600
11 12 29.9 88.1 0.747 720
12 14 30.1 87.9 0.745 840
13 16 30.1 87.9 0.745 960
14 18
15 20
16 25
17 30
Falling Head 1
0.86
0.85
0.84
0.83
0.82
0.81
0.8
Ht / Hw

0.79
0.78
0.77
0.76
0.75
0.74
0.73
0.72
0 50 1001502002503003504004505005506006507007508008509009501000
1050
Waktu (Detik)
Tabel 5
Falling Head
DATA "FALLING HEAD TEST"

Nama Sumur Uji : FH 02 Kedalaman Sumur Uji : 112 cm


Lokasi Target
Radius lubang bor :
Radius pipa Saringan :
Tebal Lapisan yang diuji (cm) 70
Kedalaman MAT : Statis (Hw) : 95 cm
Pelaksana : Hendra Tinggi Penambahan MAT : cm
Deskripsi : Pasir
Koordinat :

Penambahan MAT
No Waktu (T) (menit) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
( cm)
1 1 7.06 87.94 0.926 60
2 2 8.36 86.64 0.912 120
3 3 9.56 85.44 0.899 180
4 4 11.36 83.64 0.880 240
5 5 15.46 79.54 0.837 300
6 6 19.76 75.24 0.792 360
7 7 22.56 72.44 0.763 420
8 8 24.46 70.54 0.743 480
9 9 25.26 69.74 0.734 540
10 10 26.36 68.64 0.723 600
11 12 27.26 67.74 0.713 720
12 14 27.36 67.64 0.712 840
13 16 27.36 67.64 0.712 960
14 18 27.36 67.64 0.712 1080
15 20
16 25
17 30
Falling Head 2
1.1
1
0.9
0.8
0.7
Ht / Hw

0.6
0.5
0.4
0.3
0.2
0.1
0
0 501001502002503003504004505005506006507007508008509009501000
1050
1100
1150
Waktu (Detik)
Tabel 6
Falling Head
DATA "FALLING HEAD TEST"

Nama Sumur Uji : FH 03 Kedalaman Sumur Uji : 90 cm


Lokasi Target
Radius lubang bor :
Radius pipa Saringan :
Tebal Lapisan yang diuji 70
Kedalaman MAT : Statis (Hw) : 89 cm
Pelaksana : Hendra Tinggi Penambahan MAT : cm
Deskripsi : Pasir
Koordinat :

Waktu Penambahan MAT


No (T) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
(menit) ( cm)
1 1 20.3 68.7 0.772 60
2 2 17 72 0.809 120
3 3 21.8 67.2 0.755 180
4 4 23.1 65.9 0.740 240
5 5 25.9 63.1 0.709 300
6 6 29.2 59.8 0.672 360
7 7 32 57 0.640 420
8 8 32.2 56.8 0.638 480
9 9 32.5 56.5 0.635 540
10 10 32.7 56.3 0.633 600
11 12 42.9 46.1 0.518 720
12 14 45.85 43.15 0.485 840
13 16 45.9 43.1 0.484 960
14 18 45.9 43.1 0.484 1080
15 20
16 25
17 30
0.950
0.900
0.850
0.800
0.750
0.700
0.650
0.600
0.550
Ht / Hw

0.500
0.450
0.400
0.350
0.300
0.250
0.200
0.150
0.100
0.050
0.000
0 50 1001502002503003504004505005506006507007508008509009501000
1050
1100
1150
Waktu (Detik)
Tabel 7
Falling Head
DATA "FALLING HEAD TEST"

Nama Sumur Uji : FH 04 Kedalaman Sumur Uji : 88 cm


Lokasi Target
Radius lubang bor :
Radius pipa Saringan :
Tebal Lapisan yang diuji 30
Kedalaman MAT : Statis (Hw) : 52 cm
Pelaksana : Hendra & Torik Tinggi Penambahan MAT : cm
Deskripsi : Pasir
Koordinat :

Penambahan MAT
No Waktu (T) (menit) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
( cm)
1 1 4.2 47.8 0.543 60
2 2 4.7 47.3 0.538 120
3 3 4.8 47.2 0.536 180
4 4 4.9 47.1 0.535 240
5 5 5.3 46.7 0.531 300
6 6 5.6 46.4 0.527 360
7 7 5.8 46.2 0.525 420
8 8 6.1 45.9 0.522 480
9 9 6.3 45.7 0.519 540
10 10 6.5 45.5 0.517 600
11 12 7.0 45 0.511 720
12 14 7.5 44.5 0.506 840
13 16 7.8 44.2 0.502 960
14 18 8.3 43.7 0.497 1080
15 20 10.4 41.6 0.473 1200
16 25 10.4 41.6 0.473 1500
17 30 10.4 41.6 0.473 1800
Falling Head 4
0.57
0.56
0.55
0.54
0.53
Ht / Hw

0.52
0.51
0.5
0.49
0.48
0.47
0.46
0 100 200 300 400 500 600 700 800 9001000110012001300140015001600170018001900
Waktu (Detik)
Tabel 8
Falling Head
DATA "FALLING HEAD TEST"

Nama Sumur Uji : FH 05 Kedalaman Sumur Uji : 109 cm


Lokasi Target
Radius lubang bor :
Radius pipa Saringan :
Tebal Lapisan yang diuji 44
Kedalaman MAT : Statis (Hw) : 87 cm
Pelaksana : Torik Tinggi Penambahan MAT : cm
Deskripsi : Pinggir singkapan (Pasir, lempung)
Koordinat

Penambahan MAT
No Waktu (T) (menit) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
( cm)
1 1 19.1 67.9 0.780 60
2 2 19.92 67.08 0.771 120
3 3 22.4 64.6 0.743 180
4 4 23.4 63.6 0.731 240
5 5 23.7 63.3 0.728 300
6 6 27.6 59.4 0.683 360
7 7 27.9 59.1 0.679 420
8 8 29.4 57.6 0.662 480
9 9 29.7 57.3 0.659 540
10 10 29.9 57.1 0.656 600
11 12 30.5 56.5 0.649 720
12 14 30.7 56.3 0.647 840
13 16 31 56 0.644 960
14 18 31.3 55.7 0.640 1080
15 20 31.6 55.4 0.637 1200
16 25
17 30
Falling Head 5
0.85
0.8
0.75
0.7
0.65
0.6
Ht / Hw

0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 50100150200250300350400450500550600650700750800850900950
1000
1050
1100
1150
1200
1250
1300
Waktu (Detik)
Tabel 9
Falling Head
Lokasi Target
Radius lubang bor :
Radius pipa Saringan : 20 cm
Tebal Lapisan yang diuji :
Kedalaman MAT : 11 Statis (Hw) : 40 cm
Pelaksana : Yuliadi, Iqbal, Hendra Tinggi Penambahan MAT : cm
Deskripsi : Sand
Koordinat

Penambahan MAT
No Waktu (T) (menit) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
( cm)
1 1 1.4 38.6 0.965 60
2 2 1.6 38.4 0.960 120
3 3 1.7 38.3 0.958 180
4 4 1.8 38.2 0.955 240
5 5 2 38 0.950 300
6 6 2.1 37.9 0.948 360
7 7 2.2 37.8 0.945 420
8 8 2.4 37.6 0.940 480
9 9 2.6 37.4 0.935 540
10 10 2.8 37.2 0.930 600
11 12 3.1 36.9 0.923 720
12 14 3.4 36.6 0.915 840
13 16 3.5 36.5 0.913 960
14 18 3.8 36.2 0.905 1080
15 20 4.4 35.6 0.890 1200
16 25 5.2 34.8 0.870 1500
17 30 6.3 33.7 0.843 1800
Falling Head 8
1.02
1
0.98
0.96
0.94
Ht / Hw

0.92
0.9
0.88
0.86
0.84
0.82
0 100 200 300 400 500 600 700 800 9001000110012001300140015001600170018001900
Waktu (Detik)
Tabel 10
Falling Head
Lokasi Target
Radius lubang bor :
Radius pipa Saringan : 20 cm
Tebal Lapisan yang diuji :
Kedalaman MAT : 66 Statis (Hw) : 114 cm
Pelaksana : Yuliadi, Iqbal, Hendra Tinggi Penambahan MAT : cm
Deskripsi : Sand
Koordinat

Penambahan MAT
No Waktu (T) (menit) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
( cm)
1 1 16 98 0.899 60
2 2 21 93 0.853 120
3 3 22 92 0.844 180
4 4 23 91 0.835 240
5 5 23 91 0.835 300
6 6 24 90 0.826 360
7 7 25 89 0.817 420
8 8 27 87 0.798 480
9 9 29 85 0.780 540
10 10 29 85 0.780 600
11 12 30 84 0.771 720
12 14 31 83 0.761 840
13 16 31 83 0.761 960
14 18 31.2 82.8 0.760 1080
15 20 31.4 82.6 0.758 1200
16 25 31.5 82.5 0.757 1500
17 30 31.8 82.2 0.754 1800
Falling Head 9
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
0 100 200 300 400 500 600 700 800 900 1000110012001300140015001600170018001900
Tabel 11
Falling Head
DATA "FALLING HEAD TEST"

Nama Sumur Uji : FH 10 Sand Kedalaman Sumur Uji : 108 cm


Lokasi Target
Radius lubang bor :
Radius pipa Saringan : 20 cm
Tebal Lapisan yang diuji :
Kedalaman MAT : 44 Statis (Hw) : 78 cm
Pelaksana : Yuliadi, Iqbal, Hendra Tinggi Penambahan MAT : cm
Deskripsi : Sand
Koordinat

Penambahan MAT
No Waktu (T) (menit) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
( cm)
1 1 2 76 0.974 60
2 2 2.6 75.4 0.967 120
3 3 3.2 74.8 0.959 180
4 4 4.3 73.7 0.945 240
5 5 5.1 72.9 0.935 300
6 6 6 72 0.923 360
7 7 6.5 71.5 0.917 420
8 8 7.1 70.9 0.909 480
9 9 8 70 0.897 540
10 10 8.5 69.5 0.891 600
11 12 10 68 0.872 720
12 14 11 67 0.859 840
13 16 11.8 66.2 0.849 960
14 18 12.5 65.5 0.840 1080
15 20 14.2 63.8 0.818 1200
16 25 15.8 62.2 0.797 1500
17 30 17.5 60.5 0.776 1800
Falling Head 10
1.1
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
0 100 200 300 400 500 600 700 800 900 1000110012001300140015001600170018001900
Waktu (Detik)
Tabel 12
Falling Head
DATA "FALLING HEAD TEST"

Nama Sumur Uji : FH 11 Sand Kedalaman Sumur Uji : 56 cm


Lokasi Target
Radius lubang bor :
Radius pipa Saringan : 20 cm
Tebal Lapisan yang diuji
:
Kedalaman MAT : 42 Statis (Hw) : 43 cm
Pelaksana : Yuliadi, Iqbal, Hendra Tinggi Penambahan MAT : cm
Deskripsi : Sand
Koordinat

Waktu Penambahan MAT


No (T) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
(menit) ( cm)
1 1 5 38 0.884 60
2 2 5.1 37.9 0.881 120
3 3 5.2 37.8 0.879 180
4 4 5.2 37.8 0.879 240
5 5 5.2 37.8 0.879 300
6 6 5.2 37.8 0.879 360
7 7 5.2 37.8 0.879 420
8 8 5.2 37.8 0.879 480
9 9 5.2 37.8 0.879 540
10 10 5.3 37.7 0.877 600
11 12 5.3 37.7 0.877 720
12 14 5.4 37.6 0.874 840
13 16 5.5 37.5 0.872 960
14 18 5.5 37.5 0.872 1080
15 20 5.5 37.5 0.872 1200
16 25 5.7 37.3 0.867 1500
17 30 5.9 37.1 0.863 1800
Falling Head 11
0.888
0.886
0.884
0.882
0.880
0.878
Ht / Hw

0.876
0.874
0.872
0.870
0.868
0.866
0.864
0.862
0.860
0 100 200 300 400 500 600 700 800 9001000110012001300140015001600170018001900
Waktu (Detik)
Tabel 13
Falling Head
DATA "FALLING HEAD TEST"

Nama Sumur Uji : FH 12 Silt Stone Kedalaman Sumur Uji : 132 cm


Lokasi Target
Radius lubang bor :
Radius pipa Saringan : 20 cm
Tebal Lapisan yang diuji
:
Kedalaman MAT : 67 Statis (Hw) : 112 cm
Pelaksana : Yuliadi, Iqbal, Hendra Tinggi Penambahan MAT : cm
Deskripsi : Silt Stone
Koordinat

Waktu Penambahan MAT


No (T) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
(menit) ( cm)
1 1 30 82 0.732 60
2 2 48 64 0.571 120
3 3 50 62 0.554 180
4 4 65 47 0.420 240
5 5 65.3 46.7 0.417 300
6 6 65.6 46.4 0.414 360
7 7 65.9 46.1 0.412 420
8 8 66.2 45.8 0.409 480
9 9 66.5 45.5 0.406 540
10 10 66.8 45.2 0.404 600
11 12 67.1 44.9 0.401 720
12 14 67.4 44.6 0.398 840
13 16 67.7 44.3 0.396 960
14 18 68 44 0.393 1080
15 20 68.3 43.7 0.390 1200
16 25 68.6 43.4 0.388 1500
17 30 68.9 43.1 0.385 1800
Falling Head 12
0.8
0.75
0.7
0.65
0.6
0.55
0.5
Ht / Hw

0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 100 200 300 400 500 600 700 800 9001000110012001300140015001600170018001900
Waktu (Detik)
Tabel 14
Falling Head
DATA "FALLING HEAD TEST"

Nama Sumur Uji : FH 13 Pasir Halus Kedalaman Sumur Uji : 98 cm


Lokasi Target
Radius lubang bor :
Radius pipa Saringan : 20 cm
Tebal Lapisan yang diuji :
Kedalaman MAT : 50 Statis (Hw) : 86 cm
Pelaksana : Yuliadi, Iqbal, Hendra Tinggi Penambahan MAT : cm
Deskripsi : Pasir Halus
Koordinat

Penambahan MAT
No Waktu (T) (menit) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
( cm)
1 1 8.5 77.5 0.901 60
2 2 15 71 0.826 120
3 3 22 64 0.744 180
4 4 28 58 0.674 240
5 5 33 53 0.616 300
6 6 38 48 0.558 360
7 7 40 46 0.535 420
8 8 45 41 0.477 480
9 9 48 38 0.442 540
10 10 50 36 0.419 600
11 12 55 31 0.360 720
12 14 57 29 0.337 840
13 16 59 27 0.314 960
14 18 60 26 0.302 1080
15 20 61 25 0.291 1200
16 25 63 23 0.267 1500
17 30 65 21 0.244 1800
Falling Head 13
1.000

0.800
Ht / Hw

0.600

0.400

0.200

0.000
0 100 200 300 400 500 600 700 800 9001000110012001300140015001600170018001900
Waktu (Detik)
Tabel 15
Falling Head
DATA "FALLING HEAD TEST"

Nama Sumur Uji : FH 14 Pasir Halus Kedalaman Sumur Uji : 143 cm


Lokasi Target
Radius lubang bor :
Radius pipa Saringan : 20 cm
Tebal Lapisan yang diuji 78
Kedalaman MAT : 55 Statis (Hw) : 112 cm
Pelaksana : Yuliadi, Iqbal, Hendra Tinggi Penambahan MAT : cm
Deskripsi : Pasir Halus
Koordinat

Penambahan MAT
No Waktu (T) (menit) Kedalaman MAT (he) (cm) ht = Hw - he ht/hw Keterangan
( cm)
1 1 49 63 0.563 60
2 2 55 57 0.509 120
3 3 58 54 0.482 180
4 4 63 49 0.438 240
5 5 63.3 48.7 0.435 300
6 6 63.6 48.4 0.432 360
7 7 63.9 48.1 0.429 420
8 8 64.2 47.8 0.427 480
9 9 64.5 47.5 0.424 540
10 10 64.8 47.2 0.421 600
11 12 65.1 46.9 0.419 720
12 14 65.4 46.6 0.416 840
13 16 65.7 46.3 0.413 960
14 18 66 46 0.411 1080
15 20 66.3 45.7 0.408 1200
16 25 66.6 45.4 0.405 1500
17 30 66.9 45.1 0.403 1800
Falling Head 14
0.600
0.500
0.400
Axis Title

0.300
0.200
0.100
0.000
0 100 200 300 400 500 600 700 800 9001000110012001300140015001600170018001900
Axis Title

Vous aimerez peut-être aussi