Académique Documents
Professionnel Documents
Culture Documents
Four-X Analyser™
The Milawa Algorithm® is a proprietary
Schedule to Maximise NPV algorithm which schedules the mining of each
Four-X Analyser is a suite of strategic mine
pushback over the life of the mine. It responds to
planning tools designed for professional mine
all production constraints, price and cost models
planners. There is a growing range of modules
within Four-X Analyser and also provides
which can be added to Analyser, further
additional controls over the schedule.
increasing its performance and utility.
Model manipulation
Discounted Pit Shells
Push Back Chooser
Express NPV Output
Advanced Analysis
Multi -analysis
Push Back 50
Mining Width
Pit optimization
Economic /
operational
modelling
strategic mine planning suite to adapt and evolve
Analysis and graphs with individual users requirements. A whole new
Data export range of mine planning analysis possibilities is now
3D interactive model
visualisation available to mine planning professionals.
Whittle
There are many technical papers and case studies on the use of Whittle software. Request literature from:
Whittle Programming Pty Ltd, Level 4, 1013 Whitehorse Road, Box Hill, Vic 3128, Australia
Telephone +613 9899 3799 Facsimile +613 9899 3755 email: info@whittle.com.au web: www.whittle.com.au ©2001 Whittle Programming Pty Ltd