Vous êtes sur la page 1sur 2

Mediclinic Parkview Hospital – Site 289

REF : ASGC289/HSSE/MCPVH/EE/006

TO : Sr. Project Manager: Mr. Rajput Singh

FROM : HSSE Department

DATE : 17th Februaryuay 2018

SUBJECT: EMERGENCY EVACUATION DRILL -006

CC : Construction Manager - All Engineers – Stantec

Dear Sir,

This is to inform you the results of the Emergency Evacuation Drill conducted at
Mediclinic Parkview Hospital Project-289, on 09th March 2017. The drill was conducted
for the Project Site. (Photograph attached)

The evacuation drill successfully completed without any incidents, the workforce
gathered at the Assembly area near Site Clinic, within the expected time. A toolbox talk
was given to the operatives to refresh the emergency procedures.

EMERGENCY EVACUATION DRILL RESULTS

HEADING DAY SHIFT


Time Start 08:35 am
Alarm Duration 04 Minutes 15 secound
Time Stop 08:40: 10 am
Evacuation Time 05 Minutes 10 second
Total Time 15 Minutes

MANPOWER DAY SHIFT


Construction Manager 01
Project safety Manager 01
ASU & ASGC Project engineers 05
ASGC & ASU Site Engineers 12
ASGC - Civil 239
ASU-Plumbers & fire Fihghting 179
ASU-Electrical & BMS 248
ASU-HVAC Department 152
ASGC & ASU -Safety Team 9
ASGC OPRETOR 12
Al Shirawi(False Ceiling works) 306
Al Fayha aluminium 119
Al shafar interior (ASI) 58
National Paint 46
IN OUT Concept 14
AMC Form Concrete 17
Al Alfy 09
Page 1 of 2
FSIME Construction L.L.C 05
Nine Leaves 18
Advanced System 04
OTIS 12
Kamal kamel Tec Service L.L.C 03
TOTAL NUMBER EVACUATED 1469

This is for your information and records

Kind Regards;

Sameer Shamsudeen
Project HSSE Manager

Page 2 of 2