Vous êtes sur la page 1sur 4

AUTOMOTIVE COACHES AND COMPONENTS LIMITED

DEPT: QUALITY TEN TANK PROCESS AUDIT -CHECKLIST


↓↓↓ DATE ↓ ↓↓ MONTH:
Sl. No.

PROCESS SPECIFICATION

Temp - 60° to 80°C


1 Degreasing
Point - 65 to 75 ML
Cold water
2 PH value - 6 to 7
rinse

3 Derust Strength - 15%

Cold water PH value - 6 to 7


4
rinse
PH value - 6 to 7
Cold water
5 PH value - 6 to 7
rinse

Temp - 60° to 80°C


Zinc
6
phosphate
Point - 30 to 35 ML
Sta
rch
7 Toner Positive (+ ve) pap
er
Cold water
8 PH value - 6 to 7
rinse

Temp - 60° to 80°C


9 Passivation
PH value - 5.5 to
6.5

10 Air drying Dry time :10mins

Primer Dip time : 2 to 3


11
dipping mins
AUTOMOTIVE COACHES AND COMPONENTS LIMITED
DEPT :QA ( M / C SHOP ) PRETREATMENT PROCESS (TEN TANK ) EQUIPMENT WORKING / NON WORKING / INEFFECTIVE CHECK LIST
SL. ↓↓↓↓ DATE ↓↓↓↓ MONTH :
PROCESS SPECIFICATION
NO.

Temp. Indicator

Burner

1 Degreasing Oil circulating pump


Skimmer motor

Blower

Blower
2 Derust

Temp. Indicator

Sloshing pump
Zinc
3 Burner
phosphate

Blower

Temp. Indicator

Burner
4 Passivation
Blower

5 Air drying

INSPECTED BY

SR. EXECUTIVE - QA

SR. MANAGER - QA

MANAGER - MAINTENANCE
LEGEND: ü - Working condition X - Not working × - Ineffective
AUTOMOTIVE COACHES AND COMPONENTS LIMITED
DEPT :QA ( M / C SHOP ) PRETREATMENT PROCESS (TEN TANK ) CHEMICAL STORE STOCK DETAILS

SL. QTY. IN ↓↓↓↓ DATE ↓↓↓↓ MONTH :


CHEMICALS
NO. SPC.

CHEMELINE 1D KGS

CHEMEDINE 170 Lits.

1 CHEMPHOS 20 Lits.

CHEMTONER 25 Lits.

CHEMLITY 10 Lits.

INSPECTED BY

SR. EXECUTIVE - QA

SR. MANAGER - QA

MANAGER - MAINTENANCE

Vous aimerez peut-être aussi