L-Joint- Additional Zero degree probe when any member thickness 15mm and
above 15mm.
T/L Joint-In accessible to carry out Normal probe scan for the detection of
lamellar tearing.
As per BS standard Must Need to Scan Both side of Weld, (If access from one
side then it will change Non Hok), Half skip or Full Skip/Upper of Lower/ depend
on thickness, Weld with sealing run consider as both side weld
Distance between two parallel weld less than 50mm, Detection of transverse
defect only,
Corner Joint-MT Technique sheet 01
Base On in UT worksheet when UT on fillet weld or out of 1714
Single bevel Butt Weld (Full Pen)& 8mm PPBW,
PPBW no need mansion in MT and VT
Shear stud- Stud welding WW/RF=N/A, Material= Shear Stud, Weld Type=Stud
weld, Welding Process=Drawn Arc Stud Welding with ceramic ferrule
Shear Stud: Visual Inspection carried out after strike and bend test on shear
stud, in accordance with C.O.P for SUOS 2011 Clause 14.3.7.3
LOSF= Lac of sidewall fusion,
Plug Weld= WW-N/A
BS=DAC+14db, DAC+8db
Chun Wo= Pipe Material-BS EN 10224:2002 Grade L275
H-Beam, V-column
BSEN 10210=Hollow structure (SHS, RHS), BSEN10219=CHS
BS standard- VT-C-Acc
Inaccessible to allow the flux pass in two direction at right angle to each other
T-Joint –Minimum one member should be Plate
Nozzle= Diameter of bracing should be equal to half or less than half of
diameter of chord
Nodes
Insufficient examination area
Flare V Fillet, Through thickness is half of Weld width,
Steel bar on plate use lap joint technique 02 for MT
Cruciform Joint- Inaccessible carried out both side scanning
Cruciform Joint write down one thickness only attaching members ,MAY be two,
In case heavy thickness could be 4 sites
T-joint normally write down two thickness even one of that not accessible
Partial Pen Less than 8mm issue Non Hok UT SUOS 2011
Partial Penetration and full penetration (Drawing or worksheet either one
should clearly mention which is Full and Which is Partial
Hollow section –Build-up section
T-Joint, T-Joint, Single Vee, during formal Report,
Hollow section to hollow section connection at corner Cross (Inside and outside
L should be fillet, and both side flush inaccessible area flush ground for UT)
Cruciform means both side must be welded if one side welded and other side
section consider as T- Joint or corner
SHS to SHS , OR RHS to RHS for approved operator consider as butt joint in plate,
butt joint in plate approved operator can to butt joint in SHS to SHS or RHS to
RHS
If same day different operator with one set of report keep same examination
Level (UT-A or B)
UT on steel lamination scan 10mm Diameter probe need 15 Minute per Meter
Square with 150mm per second speed
Photo Resolution size minimum should be 480x640
UT Technique EN ISO 2016-1 start use from 28 June 2016 \
Partial Penetration above 6 OR 8 mm can issue HOK\
T-Joint partial penetration need to scan from both side
Stud welding MT-Non Hok, Fillet weld can HOK but not recommended
Stud welding VT HOK, Crack detection only can add or not is depend on client
request
1ST June start add DAC Calibration block in check list
Shear Stud use SUOS if SUOS after Bend Test, if MTR use 5400 (ISO9934)
Shear Stud fillet weld or Stud weld as per SUOS NVI/NRI
Shear Stud as per 5400 if stud welding then No Crack for both MT, VT, if Fillet
Weld then NVI/NRI
True Copy start on 24/10/2016 date of report, Stop from 16/5/2017 Date of
report
T/L Joint fillet weld attachment member above 8mm need 0 degree scan if
accessible
Not enough space scan (only probe area cannot issue report) Hok Report
Cruciform rfgh SCAN .75 Skip Distance,
Cruciform joint add all three base metal thickness
Cruciform One side Butt other side Fillet weld consider to be T-joint