‘SITE ACCEPTANCE TEST FORMAT FOR SYNCHRO CHECK RELAY ~ RMS-2SY212
recieNT:
reece Gee Gerrteay WeseCemorten
(CONSULTANT:
iE
THAIN CONTRACTOR
SIEMENS
ENERGOPROJEKT
—
QATAR POWER TRANSMISSION SYSTEM EXPANSION | Contract No GroeKsA2016
PHASE 12 SUBSTATIONS - PACKAGES 1, 92, 86887 [paw 02012017
Name ofSubstaion > (9018/11 KVWAKRAH REPALCEMENT SS [Bay Number 415V LVAC = ABO
Name of Eaupreit 1 256-SVHHCH CHECK RELAY Manufactver = SIEWENS
List of Content
Sl.No Description Page No
1 Relay Oatalls 2
2 vrodtais 2
3 Wisval Check, 2
4 Watchdog Contact Checks. 2
s Measured Value Test. 3
5.4, VT Measurement 3
6 Synchro check test 3
6.1, LVAG-Synch Check Relay... 3
6.1.1 Voltage Difference 4
6.1.2 Phase Angle Difference 4
6.1.3 Frequency Difference 4
6.1.4 Energzation (Threshold) Check 5
6.1.5 Synchro Block Check. s
7 Binary Inputs Test 5
& Binary Outputs Test 6
LED Indication Test 6
10 Scheme Check 7
11 Instruments Used 7
SIEMENS ENERGOPROJEKT-ENTEL | KAHRAMAR
ete a4 sone |
Name M.Shaker - Name M.Umapathy.
Date (02/0172017 Date 02/0172017 |
DociNo. | PHI2 Vi (V)= 5.0 Setting Vi < Vs (V) =
0
Range: 2V to 4aV in 0.5 V steps
Bus i vokage | Une VEvaone | vag gee
vot (ots) (volts) Expected actual
av = 5 Since syne O«
Vi= 110 AV =5.2 ‘Sync Fail ‘Sync Fail
vis no a aa sync sync 0«
v= 10 aves syne Fil syneFeil
105.2 AV =4.8 Sync Ok ‘Sync Ok
“V.= 105 viento aves sync Fa syncFall
viens venta aves syne Ok sync Oe
1152 vente aves Sync Fi Smell
Acceptance Norm: Tolerance iV of AV
— SEMENS- ENERGOPROJEKT/ENTELT KAHRAWAA
Sonaure | > somue | po
[name | M.Shaker Name | M.Umapathy _
tate | e2nwa017 nie | e2nva017
Doc No. _| PHI2-3A-10-36-P041 Rev. 0 Annexure [1 Page No. 30f7SITE ACCEPTANCE TEST FORMAT FOR SYNCHRO CHI
|ECK RELAY ~ RMS-28Y212
ec [SONSULTANT: WAI CONTRACTOR
ramon Ul A Mapilenats gl ME ENERGOPROJEKT
wr esta nas EEN cam
QATAR POWER TRANSMISSION SYSTEM EXPANSION | Comtact No. Groiesaw2014
PHASE 12 SUBSTATIONS - PACKAGES 1, 82, 86&S7 [date (21012017
[Name of Substation 782165/11 KV WAKRAH REPALCEMENT SS Bay Number 415V LVAG - ABO.
Name ofEqupment ___258-SYNCH CHECK RELAY Monvlactuer SIEMENS
6.1.2, PHASE ANGLE DIFFERENCE (4a):
‘ba = function:
jetting 02 > a1 (°) = 20° Setting o2< a: (°)
20°
Range: 5° to 90° In 1* steps
Bee Vrsnole S| nev anale eae oid canki
(dearee/*) (deoree/*) (degree/*) ~[ Aetuat
o1=0° a2 = 20.6 ‘ha = 20.6 ‘Syne Ok
a2 = 20.7 ‘Sync Fal ‘Syne Fail
a2 = -19.2 | syne ok syne Ok
a2 = 19.4 Sync Fail ‘Syne Fail
a= 0 7 Syne Ok ‘Sync Ok
as= 0° ‘Syne Fail Sync Fall
a= 0 ‘syne Ok “sync Ok
re Syne Fail ‘Syne Fall
Acceptance Norm: Tolerance + 1¢ of Aa
6.1.3, FREQUENCY DIFFERENCE (Af)
‘Af = function setting fi > fr (Hz) =
A Setting f< fs (Hz) = 0.1
Range: 0.05 to 2.00Hz in 0.01Hz
rraquaney(tt) | Frequency (t2)_|_itterence (40 Swctonaises
(Hz) (Hz) (Hz) Expected Actual
f= 50.00 Hz f= 50.11 ‘Syne Ok Sync Ok
fi = 50.00 He fe =50.12 Syne Fall Syne Fall
fi = 50,00 Hz fo =49,89 syne Ok sync Ok
f= 50.00 Hz Syne Fail Syne Fal
fi =50.11 ‘Syne Ok Syne Ok
fz =50.12 ‘Sync Fail ‘Syne Fail
f2 =49.89 Sync Ok Syne Ok
f=49.88 Syne Fall Sync Fall
‘eceptance Norm: Tolerance 10.05Hz of AF
‘SIEMENS ENERGOPROJEKT-ENTEL / KAHRAMAA
Signature aan sonaure | Q-—
Name M Shaker Name MUmapathy.
vate | ozoveor7 ee
Doone | PHI2-3A.1035 POH a oe Pages 4ot7ecienr car
sen Sin oo apr
ores Qua Gerlich se Conention
NSULTANT:
ENERGOPROJEKT
TWAIN CONTRACTOR:
SIEMENS
SITE ACCEPTANCE TEST FORMAT FOR SYNCHRO CHECK RELAY ~ RMS-2SY212
QATAR POWER TRANSMISSION SYSTEM EXPANSION eOMisaeR Os SIGINT
PHASE 12 SUBSTATIONS ~ PACKAGES S1,$2,$6&S7 | date 02012017
Name ofSubstaion 1328/11 KV WAKRAH REPALCEMENT SS [Bay Number 416V LVAG ABO
Name offquipment_- 256-SYNCH CHECK RELAY Manulactuer SIEMENS
6.1.4, ENERGIZATION CHECK:
Minimum Voltage for Synchronisation:
Setting of Threshold Vs, Vwithout vltage = 45 oy
Setting of Thresnold Vi, Vit voltage =v
vi v2 Test for Syne Condition
80 45 | viv anava< | live Bus - Dead tine Ok
45 a5 |_vicana vez | bead Bus - Dead Line Natok |
80 80 | Vir ond Var | Live Bus Line Line Ok
45 80 | Vieandva>_| Dead Bus Live Line Ok
6.1.5, Synchro Function Block
SL.No. _| Function Description Tested () | Remarks
B.L5.1 | Selected LVAC Line VT MCB Off /Trioned ao WA
5.1.5.2 | Selected LVAC Line VF in Test Postion og WA
5.15.3 | Selected LYAC Bus VT NCB Off / Tipped oO NA
5.1.5.4 | Selected LVAC Bus VT in Test Postion oa
5.1.5.5 _ | V1 Selection Switch S05 in IN Postion oD Wa
7, BINARY INPUT:
Binary Input check:
BE No, [oF Assigned woos por approved schematic @anings Tesiea(SS) | Remarks
1 Symchroriom check noble a _
2 Srochvoriem check Stat a
> Shnchvoritm check bypass ge enable a
4 emote reset Oo
SIEMENS ENERGOPROJEKT-ENTEL) KAHRAMAA
Sones ah sonave |
Nae | MShaker Wane | N.Umapathy
Dae [02012017 pate | oaoweorr
Doce | PHI2aA-1036POa1 nev [0 __[ Arnone wi B07SITE ACGEPTANGE TEST FORMAT FOR SYNCHRO CHECK RELAY ~ RMS-287212
ace SoEUTTANT: TI COMTARCTOR:
ENERGOPROJEKT
venous
no oe a | AE SIEMENS
QATAR POWER TRANSMISSION SYSTEM EXPANSION ‘Contract No. GTCIGASA/2014
PHASE 12 SUBSTATIONS - PACKAGES $1, S2, $6 & S7 Date 0210 1/2017
Narre of Subsaton 15268711 RV WAKRAH REPALGENENT SS Bay Number s18V LVAD
Nore of Equprert 266-6YNCII CHECK RELAY Warafucuror SIEMENS
8. BINARY OUTPUT:
Binary Output check:
BONe. __ | BO Assigned to as per approved Schematic drawings Tested (E2)
1 Synchronism check Close IC-1 a
Syachronism check Close 8C
‘Synchronism check Close IC-2
QN3 ACB test synch relay OK
QHZ ACE test synch relay OK
a
Ey
QUI ACB test syach relay OK a
a
a
a
wve Contact | Check Contact change over from NC to NO during Unhealthy
LED INDICATION:
LED Indication check:
LEO No. | LED Assigned to a3 per approved Schem: Tested (1) | Remarks
tne | check synch Cove
ze [Synch enabie a
RED | Synch bypass enabled &
4-RED Healthy Bw
S-RED ‘Synchronized a
ERED | Under votape cose Bozk B
rereen | Heatny
ened | senice
‘SIEMENS ENERGOPROJEKT-ENTEL/ KAHRAMAA
Sgnature a Sanave |
Name [ WShaker Name | MUmapathy
one | o2ov20W date | oaioveosr
DocNo | PH12-3A.10-36-P04T Rev Q Annexure [1 Page No 6of7‘CONSULTANT:
Fn A Mays | E ENERGOPROJEKT
TEE aHecined ck awe oprtin
SITE ACCEPTANCE TEST FORMAT FOR SYNCHRO CHECK RELAY ~ RMS-25Y212
WAINGONTRACTOR:
SIEMENS
QATAR POWER TRANSMISSION SYSTEM EXPANSION | Contact No.
PHASE 12 SUBSTATIONS - PACKAGES St, 82, 86&S7 [pate
Name of Substation 132/65/1KV WAKRAN REPALCEMENT SS [Bay Number: 416 LVAC-ABO
[name or Eavpment : 258-SYNCH CHECK RELAY Menvfadiwer SIEMENS
10, SCHEME CHECK:
Scheme Check:
St.No. | Function Description [Tested (21) | Remarks
10. MCB Operation checked for VT Teolation a
10. ‘Synch Check Enable in Auto/tanual a
10. Relay found healthy Ey
11, INSTRUMENTS USED:
sh Equipment Calibration due
Ag | Description | Make / Model pe Calibration date ues
4 rnjection e_| Omécran 256 Bu627F Isjt0/.6 141017
2 Mutimeter | Fluke 25100177, 20/09/16 27/08/17
Remarks: _ cn ne
SIEMENS ENERGOPROJEKT-ENTEL / KAHRAMAA
Signature ay sirawe |
Nane | WShaker Name | MiUmapathy.
bate _| 2012017 bate | 021012017 pn
Doe. | Pii23a 1036 POM a oo Baga Tol7