Method Statement
1
Method Statement
DEMOLITION OF CONCRETE SLAB
Table of Contents
Sr. No. Contents Page
02 References 2
03 Responsibilities/ Supervision 3
06 Manpower Requirement 6
07 Housekeeping 7
Control of Safety & Health
08 7
Hazards
09 Training 8
10 Documentation 8
11 Distribution 8
12 Attachments 9
2
Method Statement
DEMOLITION OF CONCRETE SLAB
This method statement covers the detailed procedure for the demolition of
concrete slab. This procedure defines the method used to ensure that the
demolition of concrete slab have been carried out as per the contract
specification, relevant standards and approved shop drawings.
2.0. References
The Shop Drawings and contract documents should provide enough details for
the demolition of concrete slab to be carried out. In the absence of any
information the above documents should be referred.
3
Method Statement
DEMOLITION OF CONCRETE SLAB
3.4 Supervisor/ Charge Hand shall be directly responsible for the day-to-day
job at site, for coordinating of work with skilled and unskilled labor or any
other staff assigned in his area.
3.6 Safety Officer shall be responsible for the health & safety aspects on site
as per the Main contractor and safety Manual.
4.2 METHOD
Method
a) Preparation :
ii) Location / Area is cordoned off and ready demolition of concrete slab.
i) The area where dismantling is planned, will be cordoned off properly and warning
signs will be kept to caution the un authorized persons from entering the area.
ii) It will be ensured that the area to be dismantled is cleared of all existing electrical
iii) All electrical appliances to be used for the demolition of block work will be
checked and all connecting wires and sockets will be checked to confirm their
iv) All the work men will be made aware of the safety procedures to be adopted while
working at heights and it will be ensured all safety norms like using of helmets,
protective goggles, safety gloves, safety shoes, safety belts and the availability of
v) The slab will be dismantled with pneumatically operated hand held breakers.
vi) Any reinforcement, if come across while dismantling, will be cut with gas cutters.
vii) All the dismantled concrete and debris will be collected and transported to the
5
Method Statement
DEMOLITION OF CONCRETE SLAB
3) Coveralls
4) Masks
5) Hand Gloves
7.0. Housekeeping
All work places where our personnel are working will be cleaned from the
scrap materials derived from their work ensuring clean and healthy work
environment as well as to maintain free access and egress in the event of
emergency.
6
Method Statement
DEMOLITION OF CONCRETE SLAB
9.0 Training
Tradesmen performing the described work will be experienced technicians. If
deemed necessary specific team/ Individuals will undergo further training and
awareness programs for this activity by the Project/ QA-QC
Departments. Toolbox talks will provide general training and awareness for
each activity and also in health & safety matters and precautions.
11.0 Distribution
The copy of this method statement shall be issued to the following:
a) Consultants
b) Project Manager
c) Project/ Site Engineer
d) QA/QC Engineer
e) Safety Officer
12.0 Attachments
The following documents are enclosed with this method statement:
a) Risk Assessment Form – Using Hand Tools
b) Risk assessment Form – Disposal of Waste Material
******************************