Vous êtes sur la page 1sur 7

Document No:

NSN Network Planning

Drivetest Checklist and Report for


Site
GRW956
By Optimization Team

1|Page
Document No:
NSN Network Planning

1. Tools Used by the Drive Tester:


a. TEMS_10.0.3
b. 2 Sony Ericsson W995 Handsets
c. GPS
d. Sierra Wireless 312U Data Card
e. Laptop

2. Map Location

Site Name GRW956 Longitude 45.7116


Region QASSIM Latitude 25.512
Engineer AKHTAR Date 20-July-13

Sectors A B C
Antenna Orientation 0 160 260
Antenna Heights 60 60 60
Mechanical Tilts 0 0 0
Electrical Tilts 2 2 2
Scrambling Codes 417 425 433

The location of site GRW956.

2|Page
Document No:
NSN Network Planning

3. Functionality Test

DESCRIPTION CHECKED
No COMMENTS
YES NO


1 Check Call 3G – 3G voice


2 Check Call 3G – 2G voice bothway


3 Check Handover SHO 3G – 3G


4 Check Handover ISHO 3G – 2G


5 Check F1 Serving all sector


6 Check F2 Serving all sector


7 Check F3 Serving all sector


8 Check Throughput F1, CQI, Code Modulation


9 Check Throughput F2, CQI, Code Modulation


10 Check Throughput F3, CQI, Code Modulation

3|Page
Document No:
NSN Network Planning

4. Fact Finding Problem

DESCRIPTION CHECKED
No COMMENTS
YES NO


1 Call Setup Voice Problem

Call drop Due Inter HO in


2 Drop Call all Sector


3 Call Failure

Missing Inter frequency


4 Handover Failure 3G – 3G


5 Handover Failure 3G – 2G bothway


6 Throughput Data connection failure


7 Low Signal Streght ( CPICH RSCP )


8 Low Signal Quality (CPICH EcNO )


9 High Interference Level


10 Overshooting


11 Pilot Pollution


12 Coverage / SHO Overhead


13 Swap Feeder

4|Page
Document No:
NSN Network Planning

5. Result from Drivetest


RSCP ploting :
KPI Parameter Definition
Received Signal Code
Power, the received
power on one code
measured on the
Primary CPICH. The
CPICH RSCP
reference point for
the RSCP shall be the
antenna connector of
the UE.

EcNO ploting :

KPI
Definition
Parameter
The received energy
per chip on the
primary pilot channel
divided by the power
density in the band.
The Ec/lo is identical
to RSCP/RSSI.
CPICH Ec/No Measurement shall be
performed on the
Primary CPICH. The
reference point for the
CPICH Ec/No shall be
the antenna connector
of the UE.

SC ploting :

5|Page
Document No:
NSN Network Planning

Speed Test Results:

Total
Total Physical
Physical calculated
Avg. HS-SCCH Served
Served Throughput
Log # Site SC Reported Decoding throughput
Throughput Mbps from
CQI F2 F2 % with 100%
from TEMS Tabular
scheduling
CQI

A G24200 417 62 2.04Mb/s 1.70Mb/s


B G24200 425 62 1.50Mb/s 2.10Mb/s
C G24200 433 62 2.064Mb/s 2.10Mb/s

6|Page
Document No:
NSN Network Planning

KPIs:

Note :
1. No swap feeder, all sector serving properly
2. Based on antenna azimuth all sectors are working properly
3. Inter Handover Failure 3G To 3G

7|Page

Vous aimerez peut-être aussi