Calculations for VE Cost advantage note

VE / note no. VE by Change of Norms / Specifications mpc:


Date of Audit (dd/mm/yy)
Before VE After VE

Item cat. No. & description QTY Cost / Unit Rs. Total Cost Rs. Item cat. No. & description QTY Cost / Unit Rs.
Q1 C1 Q1*C1 Q2 C2
P442-( relay 21) 2 179750 359500 P442-( relay 21) 0 179750
P141- check zone relay 4 85000 340000 P141- check zone relay 3 85000
Towers 4 344387.7675 1377551.07 Towers 0 344387.7675
Girders 2 121045.5 242091 Girders 0 121045.5

Construction Civil(tower) 4 140720.4648 562881.8592 Construction Civil(tower) 0 140720.4648

Total A 2882023.9292 Total A1


Cost advantage Rs. B= A-A1 2627023.93
Annual
Quantity Q 1 Signature : VE co-ordinator
Annualised Cost D=
advantage Rs. Lakh QxB/100000 26.27 Signature : VE Verifier & Auditor
F: EVER : 005 `
ESP-ACB / PPA
mpc:
Date of Audit (dd/mm/yy)
Date:
VE

Total Cost Rs.


Q2*C2
0
255000
0
0

255000