ESTUDIO DE TOPOGRAFIA
EXPEDIENTE TECNICO:
UBICACION
DEPARTAMENTO : LIMA
MARZO 2018
INDICE
1. GENERALIDADES ................................................................................................... 2
1.1 INTRODUCCIÓN .................................................................................................. 2
1.2 FINALIDAD ........................................................................................................... 2
1.3 NORMATIVIDAD .................................................................................................. 2
1.4 UBICACIÓN.......................................................................................................... 2
2. OBJETIVOS ........................................................................................................... 23
3. LEVANTAMIENTO TOPOGRÁFICO ...................................................................... 23
4. NIVELACIÓN GEOMÉTRICA................................................................................. 26
5. RECURSOS UTILIZADOS ..................................................................................... 36
6. TRABAJO DE GABINETE ...................................................................................... 36
7. IDENTIFICACION DE ELEMENTOS, MOBILIARIO VIAL Y SIMBOLOGIA ............ 37
1. GENERALIDADES
1.1 INTRODUCCIÓN
El presente informe, se refiere a las actividades para el levantamiento Topográfico de La
Ciudad Satélite Canto Grande 2da 3era y 4ta Etapa de la Unidad 6, Comuna 10, Distrito de
San Juan de Lurigancho – Lima – Lima y contiene toda la documentación y detalles respecto
a la metodología aplicada en los trabajos de campo, laboratorio y gabinete del sector, y cuyo
objetivo principal es obtener las características geotécnicas con fines de pavimentación,
construcción de pistas y veredas en el terreno, teniendo como principales actividades la
excavación de calicatas, muestreo, análisis de laboratorio y el desarrollo del presente
informe.
1.2 FINALIDAD
El presente estudio tiene por finalidad de obtener planos topográficos detallados, teniendo
como principales actividades la Monumentación y Georeferenciación de la Poligonal de
Apoyo, el Levantamiento Topográfico y la Nivelación; los cuales han sido desarrollados y
concluidos de acuerdo al programa preestablecido sobre el cual se emplazará la
infraestructura que desarrolla el Estudio de preinversión a nivel de perfil del proyecto
“MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL, EN LA CIUDAD
SATELITE CANTO GRANDE 2DA 3ERA Y 4TA ETAPA DE LA UNIDAD 6, COMUNA 10 ,
DISTRITO DE SAN JUAN DE LURIGANCHO – PROVINCIA DE LIMA – DEPARTAMENTO
DE LIMA”, identificando todo tipo de estructura y mobiliario vial, las cuales servirán para el
diseño y la implementación de una adecuada señalización y seguridad vial.
1.3 NORMATIVIDAD
Las normas que enmarcan el desarrollo del presente estudio son las indicadas en Proyectos
de infraestructura vial del Ministerio de Transportes y Counicaciones.
1.4 UBICACIÓN
El proyecto se ubica en el departamento de Lima, Provincia de Lima, distrito de San Juan de
Lurigancho, el mismo que está Localizado en el área Este de Lima Metropolitana.
Coordenadas:
Norte : 8676503.240
Este : 282042.700
Coordenadas:
Norte : 8676239.103
Este : 281862.218
Coordenadas:
Norte : 8676447.880
Este : 282062.980
Coordenadas:
Norte : 8676370.190
Este : 282009.630
Coordenadas:
Norte : 8676436.130
Este : 282113.640
Coordenadas:
Norte : 8676268.780
Este : 281987.490
Coordenadas:
Norte : 8676384.890
Este : 282296.530
Coordenadas:
Norte : 8676074.730
Este : 282083.250
Coordenadas:
Norte : 8676422.320
Este : 282363.183
Coordenadas:
Norte : 8675998.313
Este : 282073.125
Coordenadas:
Norte : 8676358.375
Este : 282399.719
Coordenadas:
Norte : 8675995.723
Este : 282150.429
Coordenadas:
Norte : 8676341.375
Este : 282461.063
Coordenadas:
Norte : 8675956.166
Este : 282183.491
Coordenadas:
Norte : 8676366.307
Este : 282534.549
Coordenadas:
Norte : 8675879.188
Este : 282174.750
Coordenadas:
Norte : 8676223.063
Este : 282009.565
Coordenadas:
Norte : 8676159.700
Este : 281936.620
Coordenadas:
Norte : 8676480.600
Este : 282026.620
Coordenadas:
Norte : 8676336.621
Este : 282505.000
Coordenadas:
Norte : 8676369.958
Este : 282111.995
Coordenadas:
Norte : 8676348.660
Este : 282268.140
Coordenadas:
Norte : 8676385.050
Este : 282086.520
Coordenadas:
Norte : 8676173.419
Este : 282469.333
Coordenadas:
Norte : 8676170.688
Este : 282366.531
Coordenadas:
Norte : 8676127.688
Este : 282443.375
Coordenadas:
Norte : 8676126.625
Este : 282340.156
Coordenadas:
Norte : 8676077.250
Este : 282414.031
Coordenadas:
Norte : 8676084.625
Este : 282311.250
Coordenadas:
Norte : 8676028.063
Este : 282381.844
Coordenadas:
Norte : 8676394.350
Este : 281965.530
Coordenadas:
Norte : 8676252.820
Este : 282215.970
Coordenadas:
Norte : 8676301.268
Este : 282028.183
Coordenadas:
Norte : 8676210.455
Este : 282192.372
Coordenadas:
Norte : 8676239.030
Este : 282012.260
Coordenadas:
Norte : 8675980.313
Este : 282347.375
Coordenadas:
Norte : 8676334.010
Este : 281920.980
Coordenadas:
Norte : 8676117.730
Este : 282115.110
Coordenadas:
Norte : 8676282.770
Este : 281904.570
Coordenadas:
Norte : 8675925.813
Este : 282209.875 .
2. OBJETIVOS
Para el establecimiento de la Red Geodésica se formularon los siguientes objetivos:
Dichos hitos estarán ubicados en el terreno de tal forma que dos hitos consecutivos son
visibles entre sí.
Elaboración de fichas técnicas con la información que identifica al punto de cada vértice
obtenido con coordenadas UTM.
Realizar la nivelación geométrica que permita determinar las cotas de precisión para los
puntos de base referenciados, así como a los vértices que conforman las poligonales de
apoyo.
Procesar y generar los planos topográficos correspondientes incluyendo los modelos digitales
de terreno que sirvan como base para las actividades de diseño por parte de las diferentes
especialidades del proyecto.
3. LEVANTAMIENTO TOPOGRÁFICO
Este tipo de trabajo se realizó con equipos de última generación (estación total) y está referido a
trabajos de medición topográfica y correspondiente elaboración de planos.
Debido a la magnitud del proyecto antes de ejecutar los trabajos topográficos de campo se
planificó la metodología a ser empleada, considerando los objetivos del estudio, los lineamientos
típicos para estudios topográficos. Se realizó una inspección de campo teniendo en cuenta las
diferentes condiciones de la zona del proyecto.
El Levantamiento del área consiste de una serie de actividades llevadas a cabo con el propósito
de describir la composición de la superficie del terreno del proyecto. Incluye los detalles naturales
o artificiales permanentes.
Esta información es obtenida en parte al determinar la posición de los puntos del terreno, que
permiten obtener su forma, así como también las características de terreno. Permitiendo su
ubicación y descripción en la carta (planos topográficos); para lo cual hemos utilizado los puntos
de la poligonal que cuentan con los valores de Este, Norte y Elevación.
En el levantamiento topográfico del área se tomaron los datos necesarios para la representación
gráfica y/o elaboración de planos de estudio del terreno, por lo cual se hizo el levantamiento de
detalle, para llegar a la exactitud entre los planos y el terreno.
La poligonal Básica de apoyo considerada en la Ciudad Satelite Canto Grande 3era y 4ta Etapa
ha tomado como punto de partida la Estación BM-1.
A partir de la estación BM-1 se trazó la poligonal de apoyo que sirvió de referencia para el
levantamiento topográfico a detalle. En el siguiente cuadro se muestran los detalles de la
poligonal:
4. NIVELACIÓN GEOMÉTRICA
La nivelación geométrica aplicada al estudio topográfico, se ha referido a la obtención de cotas
sobre el nivel del mar de todos los Bms del Proyecto vial de la Avenida Principal en el distrito de
San Juan de Lurigancho.
Nivelación técnica cerrada con máxima distancia entre punto de estación y mira de 40m.
Modo de nivelación IDA y VUELTA.
Cierre de nivelación efectuada cada 500m (entre cada BM)
Máximo error permitido en metros, según formula:
CUADRO DE BM'S
Nº PUNTO ELEVACION DESCRIPCION
1 258.9671 BM-1
2 258.7671 BM-2
158 260.4132 BM-3
258 258.6291 BM-4
259 258.6291 BM-5
435 259.569 BM-6
436 259.3653 BM-7
437 259.0662 BM-8
459 258.2049 BM-9
812 260.8148 BM-10
1098 261.0496 BM-11
DESCRIPCION DE BM’s
BM –1 - 2
BM - 1 BM - 2
BM –3
BM - 3
BM –4 BM 4
BM –10
BM - 10
BM – 11
BM - 11
El BM – 11 se encuentra ubicado a 4.55M. del buzon existente entre la Calle Hortencias y las
Gardenias al borde de la pista.
BM – 14
BM 14
El BM – 14 se encuentra ubicado en el martillo de la vereda a 7.45 m.. del buzon que esta en la
interseccion de las Calles Las Gardenias y Las Madreselvas.
BM – 21
BM - 21
BM – 37
BM 37
BM – 39
BM 39
El BM – 39 se encuentra ubicado en la pista del Parque Hiromoto a 0.61 m.. del buzon que esta
en la interseccion de las Calles Las Marturanas y Las Madreselvas.
BM – 40
BM 40
El BM – 40 se encuentra ubicado en la vereda perimetral del Parque Hiromoto a 6.95 m.. del
buzon que esta en la Calle Las Marturanas.
BM – 48
BM 48
El BM – 48 se encuentra ubicado en la pista del Parque Jose Carlos Mariategui a 5.58 m.. del
buzon que esta en la interseccion de las Calles Los Gladiolos y Las Hortencias.
BM – 51
BM 51
BM – 52
BM 52
BM – 61
BM 61
El BM – 61 se encuentra ubicado en la pista del Parque Don Bosco a 12.38 m.. del buzon que
esta en la Calle Las Hortencias.
BM – 68
BM 68
El BM – 68 se encuentra ubicado en la pista del Parque Hiromoto a 32.36 m.. del buzon que esta
en la interseccion de las Calles Las Gardenias y Las Madreselvas.
5. RECURSOS UTILIZADOS
Para la ejecución de trabajos de topografía se consideraron los siguientes recursos que a
continuación se detallan:
6. TRABAJO DE GABINETE
El trabajo de gabinete consistió en el procesamiento de la información llevada en campo. El
ingeniero responsable del área constantemente dirigía, coordinaba y supervisaba los trabajos que
se realizaron, tanto en campo como en gabinete, como resultado de todo esto, se obtuvieron los
correspondientes planos de los levantamientos topográficos realizados con todos los detalles y
curvas de nivel.
DESCRIPCION
Calles en el lado derecho
Calles en lado izquierdo
Viviendas en el lado derecho
Viviendas en el lado izquierdo
Medidor de agua de conexión domiciliaria
Buzones
Postes de Luz
Postes de Media tensión
Longitud de veredas
Longitud de sardinel en berma central
Estación de bombeo - Sedapal
SIMBOLOGIA
se ha desarrollado la siguiente simbología:
COORDENADAS TOPOGRAFICAS
2399 281789.062 8676023.48 265.5432 ARB 6979 281656.284 8675771.76 261.45 RMP
2400 281792.274 8676025.05 265.5657 PTT 6980 281656.756 8675773.09 261.63 RMP
2401 281793.808 8676026.68 265.6184 A 6981 281653.969 8675773.86 261.643 RMP
2402 281795.617 8676027.12 265.6257 B 6982 281668.154 8675767.42 261.373 RMP
2403 281797.276 8676025.95 265.6044 ARB 6983 281668.741 8675768.94 261.511 RMP
2404 281798.968 8676026.36 265.6129 ARB 6984 281671.632 8675767.83 261.497 RMP
2405 281801.256 8676027.65 265.6371 PTL 6985 281671.307 8675766.38 261.361 RMP
2406 281802.212 8676028.94 265.6366 A 6986 281683.97 8675763.52 261.422 RMP
2407 281804.996 8676029.81 265.6438 B 6987 281683.54 8675761.99 261.265 RMP
2408 281807.206 8676030.32 265.6524 A 6988 281688.733 8675760.21 261.242 RMP
2409 281807.937 8676028.77 265.6273 ARB 6989 281689.369 8675761.64 261.375 RMP
2410 281808.931 8676029.04 265.6138 ARB 6990 281686.673 8675752.78 261.353 VR
2411 281810.86 8676029.47 265.5713 ARB 6991 281679.489 8675755.48 261.383 VR
2412 281813.271 8676030.07 265.5715 ARB 6992 281680.326 8675756.57 261.395 VR
2413 281814.746 8676032.33 265.6884 A 6993 281678.267 8675755.91 261.424 VR
2414 281813.696 8676032.01 265.6751 B 6994 281678.627 8675757.07 261.409 VR
2415 281821.529 8676034.31 265.6877 B 6995 281659.521 8675762.48 261.516 VR
2416 281822.657 8676034.63 265.6957 A 6996 281660.468 8675763.7 261.493 VR
2417 281821.525 8676032.48 265.5535 ARB 6997 281652.266 8675766.46 261.512 VR
2418 281837.51 8676036.56 265.7258 ARB 6998 281652.065 8675765.06 261.572 VR
2419 281831.085 8676037.13 265.7328 A 6999 281651.795 8675765.06 261.555 JRD
2420 281836.859 8676038.23 265.7487 B 7000 281652.325 8675766.36 261.52 JRD
2421 281838.24 8676038.7 265.7451 A 7001 281648.269 8675767.83 261.552 JRD
2422 281838.877 8676038.08 265.7517 PTL 7002 281647.577 8675766.71 261.609 JRD
2423 281842.541 8676039.91 265.7564 A 7003 281640.534 8675770.75 261.669 JRD
2424 281846.107 8676039.64 265.7727 PTT 7004 281639.963 8675769.45 261.665 JRD
2425 281853.58 8676037.12 265.6369 BZ 7005 281639.985 8675769.4 261.664 JRD
2426 281856.287 8676035.81 265.5732 BM 7006 281640.517 8675770.65 261.658 JRD
2427 281848.587 8676032.68 265.7517 VR 7007 281622.891 8675775.24 261.791 JRD
2428 281767.552 8676009.63 265.5014 PTT 7008 281623.952 8675776.3 261.751 JRD
2429 281766.848 8676009.04 265.5256 VR 7009 281618.822 8675778.19 261.825 JRD
2430 281759.746 8676005.95 265.5037 A 7010 281618.735 8675777 261.829 JRD
2431 281753.088 8676004.25 265.4917 A 7011 281607.782 8675780.83 261.923 JRD
2432 281751.466 8676003.78 265.5 A 7012 281608.501 8675781.69 261.879 JRD
2433 281751.403 8676003.8 265.4997 A 7013 281706.183 8675757.28 261.132 JRD
2434 281749.223 8676003.24 265.506 A 7014 281841.093 8675709.96 260.254 VR
2435 281746.065 8676002.46 265.4871 B 7015 281840.142 8675707.17 260.22 VR
2436 281735.685 8675999.58 265.4761 A 7016 281841.709 8675706.99 260.21 VR
2437 281731.68 8675998.49 265.453 A 7017 281843.007 8675707.59 260.251 VR
2438 281721.671 8675997.49 265.525 ARB 7018 281843.962 8675708.87 260.243 VR
2439 281720.19 8675995.4 265.4394 A 7019 281807.14 8675771.52 261.437 PTL
2440 281709.496 8675998.17 265.3388 BZ 7020 281770.932 8675770.67 261.414 PTL
2441 281710.562 8675992.87 265.4306 A 7021 281754.576 8675770.02 261.386 PTT
2442 281699.973 8675990.15 265.41 A 7022 281735.75 8675770.07 261.37 PTL
2443 281698.326 8675991.41 265.3403 ARB 7023 281708.692 8675769.15 261.304 PTT
2444 281678.206 8675985.2 265.3844 VR 7024 281704.579 8675769.24 261.38 PTL
2445 281677.783 8675986.57 265.4409 VR 7025 281692.988 8675766.32 261.366 RMP
2446 281675.888 8675985.15 265.4144 VR 7026 281693.771 8675764.59 261.263 RMP
2447 281675.635 8675982.77 265.3677 VR 7027 281695.217 8675767.36 261.314 RMP
2448 281677.037 8675983.12 265.3777 VR 7028 281695.157 8675768.79 261.391 RMP
2449 281678.443 8675983.74 265.3926 VR 7029 281695.38 8675768.91 261.389 RMP
2450 281678.443 8675983.74 265.3925 LT 7030 281695.423 8675767.52 261.303 RMP
2451 281678.022 8675980.03 265.2953 PTL 7031 281696.705 8675767.51 261.253 RMP
2452 281679.61 8675976.31 265.1981 A 7032 281696.799 8675768.99 261.376 RMP
2453 281680.824 8675966.95 264.9945 A 7033 281698.613 8675767.56 261.233 RMP
2454 281680.834 8675965.64 264.9579 B 7034 281700.64 8675767.67 261.235 RMP
2455 281679.05 8675972.92 265.1162 VR 7035 281700.629 8675769 261.39 RMP
2513 281670.211 8675943.81 264.4108 PTT 7093 281725.422 8675768.89 261.35 JRD
2514 281668.601 8675943.15 264.5204 VR 7094 281720.966 8675769.4 261.363 JRD
2515 281669.981 8675943.12 264.5232 VR 7095 281721.007 8675768.23 261.364 JRD
2516 281669.252 8675949.61 264.6645 VR 7096 281701.177 8675769.03 261.375 JRD
2517 281670.622 8675949.56 264.6568 VR 7097 281700.888 8675769.05 261.36 JRD
2518 281669.645 8675949.94 264.6729 A 7098 281700.788 8675767.94 261.335 JRD
2519 281669.66 8675951.77 264.7158 A 7099 281701.095 8675767.79 261.349 JRD
2520 281669.806 8675959.72 264.8751 VR 7100 281701.398 8675767.27 261.394 VR
2521 281671.175 8675959.82 264.8646 VR 7101 281705.701 8675767.46 261.352 VR
2522 281669.97 8675954.24 264.7667 B 7102 281705.643 8675769.16 261.357 VR
2523 281670.05 8675962.36 264.9337 A 7103 281701.286 8675769.13 261.375 VR
2524 281670.116 8675962.84 264.9373 A 7104 281707.213 8675769.19 261.352 A
2525 281669.986 8675963.54 264.9422 A 7105 281697.316 8675767.75 261.288 ARB
2526 281669.611 8675963.86 264.9712 VR 7106 281701.438 8675767.8 261.241 ARB
2527 281670.995 8675963.81 264.9413 VR 7107 281692.946 8675764.44 261.221 ARB
2528 281668.745 8675971.91 265.1426 VR 7108 281717.543 8675768.44 261.209 ARB
2529 281670.103 8675972.14 265.1371 VR 7109 281720.14 8675768.87 261.187 ARB
2530 281667.671 8675977.56 265.2882 VR 7110 281722.774 8675768.78 261.363 ARB
2531 281669.01 8675977.82 265.28 VR 7111 281727.666 8675768.93 261.395 ARB
2532 281666.903 8675980.59 265.3776 VR 7112 281733.022 8675768.94 261.384 ARB
2533 281666.903 8675980.59 265.3776 LT 7113 281779.999 8675769.95 261.391 ARB
2534 281668.318 8675980.75 265.3574 VR 7114 281683.53 8675762.16 261.265 R
2535 281669.727 8675981.22 265.3474 VR 7115 281683.659 8675763.52 261.332 R
2536 281668.465 8675982.95 265.376 VR 7116 281680.091 8675764.83 261.285 R
2537 281665.942 8675983.34 265.3742 VR 7117 281679.299 8675762.44 261.279 R
2538 281666.335 8675981.92 265.3633 VR 7118 281678.692 8675760.36 261.258 R
2539 281668.422 8675980.79 265.2164 R 7119 281674.663 8675766.71 261.341 R
2540 281669.619 8675980.94 265.2988 R 7120 281673.45 8675764.05 261.31 R
2541 281668.227 8675983.3 265.1976 R 7121 281671.781 8675767.76 261.436 R
2542 281669.801 8675981.08 265.1384 R 7122 281671.376 8675766.46 261.347 R
2543 281667.637 8675986.99 265.2361 R 7123 281670.725 8675764.16 261.344 R
2544 281667.169 8675988.48 265.243 R 7124 281666.353 8675765.29 261.367 R
2545 281667.003 8675989.94 265.2145 R 7125 281667.886 8675767.54 261.373 R
2546 281666.656 8675991.33 265.2562 R 7126 281683.948 8675755.56 261.233 R
2547 281671.639 8675992.66 265.3163 R 7127 281684.705 8675757.7 261.234 R
2548 281671.846 8675991.42 265.3278 R 7128 281677.884 8675761.47 261.288 R
2549 281671.856 8675991.17 265.289 R 7129 281676.911 8675758.04 261.283 R
2550 281672.156 8675989.39 265.2038 R 7130 281668.477 8675761 261.349 R
2551 281673.722 8675985.03 265.2337 R 7131 281668.428 8675763.46 261.336 R
2552 281675.705 8675984.93 265.2464 R 7132 281660.378 8675763.77 261.425 R
2553 281674.275 8675982.47 265.1757 R 7133 281661.291 8675765.85 261.398 R
2554 281675.592 8675982.63 265.2039 R 7134 281661.911 8675767.54 261.398 R
2555 281677.018 8675983.02 265.367 R 7135 281662.441 8675769.35 261.403 R
2556 281676.145 8675980.45 265.1185 R 7136 281654.872 8675772.17 261.467 R
2557 281677.459 8675980.93 265.2966 R 7137 281654.4 8675770.1 261.439 R
2558 281677.456 8675980.94 265.2964 R 7138 281653.757 8675768.33 261.416 R
2559 281676.382 8675980.28 265.3124 R 7139 281652.942 8675766.51 261.473 R
2560 281679.032 8675972.99 265.1262 R 7140 281646.596 8675768.71 261.513 R
2561 281677.721 8675972.68 265.0954 R 7141 281647.762 8675771.4 261.52 R
2562 281677.573 8675972.75 264.945 R 7142 281648.885 8675773.34 261.496 R
2563 281675.953 8675972.57 264.9785 R 7143 281649.626 8675775.24 261.513 R
2564 281674.015 8675972.24 264.9593 R 7144 281642.304 8675777.98 261.713 R
2565 281671.994 8675971.81 264.9221 R 7145 281641.725 8675775.75 261.495 R
2566 281670.322 8675971.6 265.1008 R 7146 281640.866 8675773.17 261.536 R
2567 281671.123 8675962.22 264.8142 R 7147 281640.195 8675770.85 261.586 R
2568 281672.295 8675962.15 264.8476 R 7148 281624.172 8675776.38 261.686 R
2569 281672.646 8675962.22 264.7435 R 7149 281625.411 8675778.39 261.634 R
2684 281861.684 8675883.89 263.0669 ARB 7264 281595.758 8675785.49 262.107 SRD
2685 281861.606 8675885.97 263.0967 ARB 7265 281590.099 8675787 262.113 SRD
2686 281862.037 8675894.28 263.2771 ARB 7266 281590.177 8675786.86 262.126 SRD
2687 281859.899 8675887.19 263.2155 A 7267 281589.836 8675785.54 262.091 SRD
2688 281859.596 8675893.13 263.3261 A 7268 281589.928 8675785.54 262.077 SRD
2689 281860.751 8675904.94 263.5009 PTT 7269 281585.699 8675786.23 262.087 SRD
2690 281861.056 8675905.51 263.4554 ARB 7270 281585.796 8675786.19 262.087 SRD
2691 281860.959 8675913.91 263.5548 ARB 7271 281585.901 8675787.52 262.097 SRD
2692 281859.345 8675912.33 263.667 A 7272 281585.991 8675787.63 262.074 SRD
2693 281860.132 8675915.46 263.7235 PTL 7273 281580.591 8675786.91 262.123 SRD
2694 281860.144 8675917.73 263.7679 VR 7274 281580.836 8675788.34 262.106 SRD
2695 281861.653 8675917.86 263.7634 VR 7275 281580.906 8675788.27 262.105 SRD
2696 281861.244 8675919.48 263.7832 VR 7276 281580.722 8675787.03 262.12 SRD
2697 281858.509 8675920.86 263.8007 VR 7277 281579.232 8675787.13 262.142 SRD
2698 281858.484 8675919.41 263.7993 VR 7278 281579.335 8675787.06 262.141 SRD
2699 281858.828 8675917.9 263.7921 VR 7279 281579.474 8675788.29 262.117 SRD
2700 281858.829 8675917.88 263.7921 LT 7280 281579.539 8675788.36 262.126 SRD
2701 281858.311 8675928.39 263.9257 VR 7281 281575.747 8675787.43 262.174 SRD
2702 281858.517 8675926.84 263.9296 VR 7282 281575.905 8675787.43 262.171 SRD
2703 281860.681 8675927.85 263.9227 VR 7283 281576.04 8675788.78 262.172 SRD
2704 281861.269 8675930.11 263.9362 VR 7284 281575.935 8675788.9 262.181 SRD
2705 281859.973 8675930.03 263.972 VR 7285 281607.862 8675780.68 261.943 SRD
2706 281858.411 8675929.97 263.9768 VR 7286 281607.743 8675780.69 261.943 SRD
2707 281858.422 8675929.96 263.9765 LT 7287 281608.223 8675781.78 261.918 SRD
2708 281864.49 8675924.01 263.7131 BZ 7288 281608.384 8675781.7 261.918 SRD
2709 281867.341 8675930.25 263.9318 VR 7289 281618.524 8675776.85 261.822 SRD
2710 281868.935 8675930.26 263.9078 VR 7290 281618.673 8675776.82 261.836 SRD
2711 281868.192 8675928.19 263.8866 VR 7291 281618.835 8675778.17 261.837 SRD
2712 281870.596 8675927.21 263.8824 VR 7292 281618.742 8675778.11 261.849 SRD
2713 281870.549 8675928.74 263.8981 VR 7293 281622.779 8675775.36 261.782 SRD
2714 281870.458 8675930.15 263.9276 VR 7294 281622.858 8675775.31 261.79 SRD
2715 281870.458 8675930.14 263.9275 LT 7295 281623.891 8675776.16 261.801 SRD
2716 281868.474 8675957.59 264.4354 PTL 7296 281623.928 8675776.29 261.801 SRD
2717 281869.619 8675960.26 264.4809 VR 7297 281640.053 8675769.51 261.668 SRD
2718 281868.364 8675955.86 264.3859 VR 7298 281639.915 8675769.54 261.652 SRD
2719 281857.902 8675955.67 264.4528 VR 7299 281640.251 8675770.65 261.653 SRD
2720 281859.429 8675951.91 264.3687 VR 7300 281640.449 8675770.8 261.652 SRD
2721 281859.757 8675948.19 264.1371 PTT 7301 281631.066 8675772.57 261.704 SRD
2722 281859.518 8675952.66 264.1977 R 7302 281631.155 8675772.56 261.704 SRD
2723 281860.941 8675952.69 264.2053 R 7303 281631.644 8675773.62 261.725 SRD
2724 281862.879 8675953.37 264.227 R 7304 281631.555 8675773.68 261.726 SRD
2725 281864.412 8675953.72 264.2428 R 7305 281610.432 8675787.52 261.733 PT
2726 281868.285 8675953.74 264.3366 R 7306 281608.804 8675781.9 261.768 PT
2727 281868.299 8675939.7 264.0712 ARB 7307 281595.615 8675792.2 261.867 PT
2728 281868.368 8675937.52 264.0599 ARB 7308 281594.591 8675786.07 261.86 PT
2729 281868.144 8675935.4 264.0113 ARB 7309 281575.954 8675795.08 262.026 PT
2730 281868.279 8675931.28 263.9103 ARB 7310 281575.806 8675789.02 262.018 PT
2731 281868.647 8675935.07 264.0108 R 7311 281563.924 8675795.63 262.143 PT
2732 281867.264 8675935.16 263.9087 R 7312 281563.75 8675789.69 262.056 PT
2733 281868.673 8675935.26 264.0083 R 7313 281564.071 8675793.15 262.076 R
2734 281867.572 8675935.43 264.0146 R 7314 281563.969 8675791.81 262.079 R
2735 281864.685 8675935.18 263.865 R 7315 281563.879 8675795.53 262.134 R
2736 281862.933 8675935.19 263.8634 R 7316 281563.766 8675789.89 262.076 R
2737 281861.426 8675935.28 263.8889 R 7317 281563.944 8675797.01 262.18 R
2738 281859.835 8675935.12 263.8544 R 7318 281570.604 8675789.55 262.07 R
2739 281860.031 8675930.78 263.7691 R 7319 281570.825 8675791.99 262.107 R
2740 281861.475 8675930.19 263.7896 R 7320 281570.594 8675796.88 262.222 R