Project Name : BLOCK A SITE DEVELOPMENT PROJECT

Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL

1
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO

Date : 19-Jul-2017 Wednesday


Daily Report No. : DR-JEC-MEP-0270

PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 916 1 917 M/H 9,108
Deputy Site Manager M/D 150 1 151 M/H 1,448
Construction Manager M/D 296 1 297 M/H 2,905
Deputy Construction Manager M/D 186 1 187 M/H 1,808

2
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 168 1 169 M/H 1,625
2 HSSE
HSSE M/D 9,673 11 9,684 M/H 21,077
HSSE Administration M/D 1,191 1 1,192 M/H 2,562
3 Quality Control
Field. QC Manager M/D 231 2 233 M/H 2,209
QC Coordinator-2 M/D 309 2 311 M/H 2,974
QC Engineer M/D 1,028 6 1,034 M/H 9,532
QC Admin M/D 141 2 143 M/H 1,315
Welding Tracking M/D 16 1 17 M/H 153
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 370 1 371 M/H 3,405
Electrical Superintendent M/D 348 1 349 M/H 3,251
ME Supervisor Temfac M/D 340 1 341 M/H 3,210
Civil Supervisor Temfac M/D 675 2 677 M/H 6,349
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 258 1 259 M/H 2,482

3
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 231 1 232 M/H 2,243
4.2 Civil
General Civil Superintendent M/D 266 1 267 M/H 2,578
Project Engineer M/D 198 4 202 M/H 1,913
Civil Engineer M/D 457 1 458 M/H 4,114
Civil Engineer M/D 390 1 391 M/H 3,562
Field Engineer M/D 190 1 191 M/H 1,842
Civil Construction M/D 297 1 298 M/H 2,850
Batching Plant Coordinator M/D 238 1 239 M/H 2,303
Surveyor M/D 490 1 491 M/H 4,470
Helper Surveyor M/D 461 1 462 M/H 4,142
Steel Structure Engineer M/D 169 1 170 M/H 1,635
4.3 Building
Building Superintendent M/D 450 1 451 M/H 4,071
Building Supervisor M/D 574 3 577 M/H 5,584
Surveyor M/D 368 4 372 M/H 2,050
Helper Surveyor M/D 341 2 343 M/H 3,308
4.4 Piping

4
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 225 1 226 M/H 2,186
Asst. Piping Superintendent M/D 207 1 208 M/H 2,015
Piping Engineer M/D 161 2 163 M/H 1,567
Technical Suport M/D 3 1 4 M/H 27
Supervisor M/D 259 3 262 M/H 2,449
CMS Operator M/D 68 1 69 M/H 640
Clerk M/D 166 1 167 M/H 1,620
4.5 Process
Process Superintendent M/D 233 1 234 M/H 2,257
Clerk M/D 3 1 4 M/H 27
4.6 Mechanical & Tank
Mechanical Superintendent M/D 75 1 76 M/H 698
4.6.1 Tank
Tank Field Engineer M/D 168 1 169 M/H 1,628
Tank Supervisor M/D 74 1 75 M/H 688
4.6.2 Static Mechanical
Static Field Engineer M/D 74 2 76 M/H 688
Preservation Technician M/D 138 - 138 M/H 1,310

5
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 71 1 72 M/H 661
4.6.4 Rotary
Field Engineer M/D 3 1 4 M/H 27
Supervisor M/D 3 1 4 M/H 27
4.6.5 Combation
Field Engineer M/D 3 1 4 M/H 27
4.7 General Contruction
General Superintendent M/D 240 1 241 M/H 2,348
Jr.Mechanical Engineer M/D 74 1 75 M/H 653
Mechanical Supervisor M/D 66 1 67 M/H 624
4.8 Electrical
Elecctrical Superintendent M/D 9 1 10 M/H 86
Field Engineer M/D 9 1 10 M/H 86
Lead Supervisor M/D 9 1 10 M/H 86
Engineer M/D 9 1 10 M/H 86
Supervisor M/D 27 3 30 M/H 258
Clerk M/D 9 1 10 M/H 86

6
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 9 1 10 M/H 86
Supervisor M/D 9 1 10 M/H 86
5 Preservation
Preservation Coordinator M/D 9 1 10 M/H 86
Preservation Eng M/D 9 1 10 M/H 86
Preservation Junior Eng M/D 36 4 40 M/H 344
6 Control
Project Control Manager M/D 197 1 198 M/H 1,919
Project Control M/D 235 1 236 M/H 2,142
Document Control M/D 263 1 264 M/H 2,547
Schedule Engineer M/D 198 4 202 M/H 1,919
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 397 5 402 M/H 3,807
Cost Control M/D 286 2 288 M/H 2,751
Subcontracting M/D 560 4 564 M/H 5,395
Material Control M/D 637 4 641 M/H 6,155
7 Administration

7
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 210 1 211 M/H 2,036
Administration M/D 2,210 18 2,228 M/H 21,106
Business Coordinator M/D 739 2 741 M/H 6,790
Project Support M/D 431 2 433 M/H 4,182
Finance M/D 233 1 234 M/H 2,257
Puchasing M/D 335 2 337 M/H 3,255
8 Public Relation
Public Affair M/D 1,107 3 1,110 M/H 10,216
Government Permit M/D 459 1 460 M/H 4,121
9 IT
IT Engineer M/D 864 4 868 M/H 8,254
10 Others
Security M/D 6,384 33 6,417 M/H 61,281
Rigging & Lifting / Operator M/D 2,759 12 2,771 M/H 26,863
Operator Genset M/D 486 2 488 M/H 4,714
Office Boy/Girl M/D 1,286 6 1,292 M/H 12,476
Paramedic M/D 2,660 12 2,672 M/H 25,782
Driver M/D 4,382 26 4,408 M/H 42,417

8
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 277 4 281 M/H 2,799
Rigger M/D 360 5 365 M/H 3,370
Skill M/D 1,113 8 1,121 M/H 10,390
Warehouse M/D 298 17 315 M/H 2,894
Total 53,646 281 53,927 431,433

2 PT. BANGUN NUSA PERSADA (TEMFAC SECTION A - BNP)


Total 9,955 - 9,955 88,084

3 PT. INDOTECH KARYA MANDIRI (TEMFAC SECTION B & C - IKM)


Total 103,539 - 103,539 153,750

4 PT. NAD JAYA (TEMFAC SECTION D - NAD)

9
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 20,435 - 20,435 185,652

5 PT. PELITA NUSA PERKASA (BATCHING PLANT - PNP)


INDIRECT MANPOWER
1 Site Manager M/D 119 1 120 M/H 1,015
2 HSE M/D 325 1 326 M/H 3,009
3 Safetyman M/D 163 163 M/H 1,608
4 Quality Control M/D 307 1 308 M/H 2,833
5 Supervisor M/D 1 - 1 M/H 8
6 Finance M/D 198 198 M/H 1,942
7 Public Affair M/D 261 1 262 M/H 2,473
8 Mechanic M/D 509 1 510 M/H 4,861
9 Logistic M/D 205 1 206 M/H 2,002
10 Security M/D 750 3 753 M/H 7,249
Sub Total 2,838 9 2,847 26,999

10
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 792 3 795 M/H 7,576
2 Lab M/D 458 1 459 M/H 4,451
3 Driver Truck Mixer M/D 942 5 947 M/H 9,170
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,630 3 1,633 M/H 14,023
Sub Total 3,942 12 3,954 36,147

Total 6,780 21 6,801 63,146

6 PT. PUALAM BANGUN CIPTA (FWBS 2000 : CONCRETE STRUCTURE


INDIRECT MANPOWER

1 Project Manager M/D 187 1 188 M/H 1,822

2 Project Control M/D 111 1 112 M/H 1,118

11
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Site Manager M/D 416 1 417 M/H 4,068

4 HSE M/D 1,595 8 1,603 M/H 15,764

5 Quality Control M/D 1,476 7 1,483 M/H 14,546

6 Assistant Lab Quality Control M/D 17 - 17 M/H 170

7 Engineering Manager M/D 207 1 208 M/H 2,011

8 Engineer M/D 230 1 231 M/H 2,310

9 Supervisor M/D 1,615 7 1,622 M/H 15,976

10 Assistant Supervisor M/D 133 1 134 M/H 1,330

11 Document Control M/D 433 1 434 M/H 4,249

12 Drafter M/D 567 3 570 M/H 5,564

13 Finance & GA M/D 231 1 232 M/H 2,256

14 Payroll / Accounting M/D 333 1 334 M/H 3,230

15 Admin M/D 207 1 208 M/H 2,083

12
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

16 Assitant GA M/D 53 1 54 M/H 530

17 Surveyor M/D 668 3 671 M/H 6,619

18 Assistant Surveyor M/D 871 4 875 M/H 8,660

19 Public Affair M/D 240 1 241 M/H 2,339

20 Logistic M/D 1,418 9 1,427 M/H 14,047

21 Security M/D 982 5 987 M/H 9,683

22 Driver M/D 1,189 4 1,193 M/H 11,621

Sub Total 13,179 62 13,241 129,993

DIRECT MANPOWER

1 Worker M/D 5,271 - 5,271 M/H 5,271

2 Foreman M/D 2,283 4 2,287 M/H 8,601

3 Carpenter M/D 18,518 20 18,538 M/H 66,488

13
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Rebar Man M/D 23,560 29 23,589 M/H 93,171

5 Masonry M/D 323 45 368 M/H 3,230

6 Scaffolder M/D 4,160 7 4,167 M/H 12,453

7 Helper M/D 19,085 39 19,124 M/H 59,572

8 Operator M/D 11,497 19 11,516 M/H 34,387

Sub Total 84,695 163 84,858 283,171

14
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

15
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 97,874 225 98,099 413,164

7 JEC-DIRECT HIRED (FWBS 2300 : FOUNDATION WORK)


INDIRECT MANPOWER

1 Project Manager M/D 61 - 61 M/H 610

2 Site Manager M/D 103 1 104 M/H 1,017

3 Project Control M/D 127 1 128 M/H 1,254

16
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Civil Engineer M/D 163 1 164 M/H 1,614

5 HSSE Coordinator M/D 134 1 135 M/H 1,330

6 HSSE Admin M/D 145 1 146 M/H 1,436

7 Material Control M/D 167 1 168 M/H 1,661

8 Quality Control M/D 215 2 217 M/H 2,141

9 Ass Quality Control M/D 148 1 149 M/H 1,468

10 HRD/ Personel M/D 94 1 95 M/H 937

11 Time Keeper M/D 196 1 197 M/H 1,939

12 Surveyor M/D 818 6 824 M/H 8,090

13 Drafter M/D 76 1 77 M/H 746

14 Procurement M/D 139 - 139 M/H 1,376

15 Site Environment Coordinator M/D 105 - 105 M/H 1,047

16 Tool Keeper M/D 403 1 404 M/H 4,016

17
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

17 Safetyman M/D 429 3 432 M/H 4,247

18 Mechanic M/D 64 - 64 M/H 634

19 Electrician M/D 220 1 221 M/H 2,175

20 Driver M/D 719 6 725 M/H 7,126

21 Security M/D 617 2 619 M/H 6,144

22 Office Boy M/D 124 - 124 M/H 1,235

Sub Total 5,267 31 5,298 52,243

DIRECT MANPOWER

1 Field Supervisor M/D 445 3 448 M/H 4,409

2 Foreman M/D 672 7 679 M/H 6,648

3 Carpenter M/D 942 10 952 M/H 9,365

4 Rebar Worker M/D 1,080 15 1,095 M/H 10,738

18
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

5 Concrete Worker M/D 550 11 561 M/H 5,411

6 Mason Worker M/D - - - M/H -

7 Scaffolder M/D 163 - 163 M/H 1,630

8 Welder SMAW M/D 1,285 10 1,295 M/H 12,689

9 Semi Skill M/D 1,936 13 1,949 M/H 19,216

10 Common Labor M/D 2,489 25 2,514 M/H 24,608

11 Operator Excavator M/D 278 2 280 M/H 2,748

12 Operator Boom Truck M/D 8 - 8 M/H 80

Sub Total 9,848 96 9,944 97,542

Total 15,115 127 15,242 149,785

19
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 JEC-DELTA (FWBS 2300 : FOUNDATION WORK)


INDIRECT MANPOWER

1 Coordinator M/D 30 - 30 M/H 300

2 Supervisor M/D 15 - 15 M/H 150

3 Jr. Civil Engineer M/D 129 - 129 M/H 1,288

4 Drafter M/D 146 1 147 M/H 1,458

- - - M/H -

Sub Total 320 1 321 3,196

DIRECT MANPOWER

1 Foreman M/D 138 1 139 M/H 1,380

2 Ass. Foreman M/D 397 2 399 M/H 3,970

3 Rebar Man M/D 1,493 12 1,505 M/H 14,930

20
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Mason M/D 1,443 22 1,465 M/H 14,430

5 Carpenter M/D 1,408 18 1,426 M/H 14,080

6 Finishing M/D 915 4 919 M/H 9,150

7 Semi Skill M/D 889 - 889 M/H 8,890

8 Skill Worker M/D 654 9 663 M/H 6,540

9 Helper M/D 5,491 55 5,546 M/H 54,910

Sub Total 12,828 123 12,951 128,280

21
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

22
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,148 124 13,272 131,476

9 PT. GUNA TEGUH ABADI (STEEL STRUCTURE ERECTION - GTA)


INDIRECT MANPOWER

1 Site Manager M/D 115 - 115 M/H 1,132

2 Construction Manager M/D 109 - 109 M/H 1,072

3 HSE Coordinator M/D 114 - 114 M/H 1,122

4 QC Coordinator M/D 116 - 116 M/H 1,142

5 Field Enginer Leader M/D 121 - 121 M/H 1,192

23
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Project Control M/D 114 - 114 M/H 1,122

7 ADM. Coordinator M/D 107 - 107 M/H 1,052

8 Superintendent M/D 147 - 147 M/H 1,440

9 Supervisor M/D 205 - 205 M/H 2,008

10 Safetyman M/D 329 2 331 M/H 3,236

11 Safety Officer M/D 186 4 190 M/H 1,836

12 QC M/D 152 - 152 M/H 1,484

13 Finance M/D 215 2 217 M/H 2,114

14 Procurement M/D 41 - 41 M/H 404

15 Adm. Staff M/D 203 - 203 M/H 1,994

16 Material Control M/D 318 - 318 M/H 3,123

17 Mechanical / Electrical M/D 379 4 383 M/H 3,730

18 Document Control M/D 94 - 94 M/H 934

24
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

19 Security M/D 205 - 205 M/H 2,008

20 Driver M/D 172 - 172 M/H 1,678

21 Opr. Leader M/D 39 - 39 M/H 390

22 Office Boy/Girl M/D 120 - 120 M/H 1,188

23 Engineer Staff M/D 81 1 82 M/H 789

Sub Total 3,682 13 3,695 36,190

DIRECT MANPOWER

1 Foreman M/D 530 4 534 M/H 5,210

2 Operator M/D 1,642 19 1,661 M/H 16,030

3 Rigger M/D 1,590 9 1,599 M/H 15,453

4 Millwright M/D 819 8 827 M/H 8,040

5 Scafolder M/D 1,603 11 1,614 M/H 15,694

25
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Welder M/D 299 9 308 M/H 2,927

7 Helper M/D 2,815 18 2,833 M/H 27,562

Sub Total 9,298 78 9,376 90,916

26
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 12,980 91 13,071 127,106

10 PT. BANGUN NUSA PERSADA (MAIN BUILDING - BNP)


INDIRECT MANPOWER

27
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Site Manager M/D 250 - 250 M/H 2,368

2 HSE M/D 687 3 690 M/H 6,732

3 Quality Control M/D 691 2 693 M/H 6,658

4 Site Engineering Manager M/D 75 - 75 M/H 686

5 Engineer M/D 497 1 498 M/H 4,856

6 Drafter M/D 593 5 598 M/H 5,920

7 Supervisor M/D 1,077 9 1,086 M/H 10,650

8 Surveyor M/D 1,034 3 1,037 M/H 9,922

9 Administration M/D 390 2 392 M/H 3,688

11 Logistic M/D 917 3 920 M/H 8,928

13 Driver M/D 262 2 264 M/H 2,508

14 Purchasing M/D 49 1 50 M/H 490

15 Delivery M/D 37 - 37 M/H 370

28
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 6,559 31 6,590 63,774

DIRECT MANPOWER

1 Finishing Worker M/D 2,350 27 2,377 M/H 22,946

2 Worker Site Temporary M/D 185 - 185 M/H 1,633

3 Operator Excavator M/D 183 - 183 M/H 1,778

4 Driver Dump Truck M/D 130 - 130 M/H 1,205

5 Operator Crane M/D 197 - 197 M/H 1,912

6 Rigger Crane M/D 389 - 389 M/H 3,797

7 Helper Crane M/D 197 - 197 M/H 1,918

8 Carpenter M/D 1,421 - 1,421 M/H 13,900

9 Rebar Man M/D 2,067 2 2,069 M/H 20,225

10 Digger M/D 421 1 422 M/H 4,158

29
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

11 Masonry & Concrete worker M/D 4,302 23 4,325 M/H 42,888

12 Mechanical M/D 47 - 47 M/H 470

13 Pipe M/D - - - M/H -

14 Scaffolder M/D 2,078 14 2,092 M/H 20,529

15 Steel worker M/D 1,715 - 1,715 M/H 17,012

16 Mechanic M/D 684 1 685 M/H 6,617

17 Teknisi Plumbing M/D 406 3 409 M/H 4,060

18 Teknisi Electrical M/D 1,816 22 1,838 M/H 18,160

19 General Worker M/D 693 - 693 M/H 6,536

Sub Total 19,281 93 19,374 189,741

30
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 25,840 124 25,964 253,515

11 PT. GUNA TEGUH ABADI (MECHANICAL WORK - GTA)


INDIRECT MANPOWER

31
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Site Manager M/D 42 1 43 M/H 404

2 Construction Manager M/D 43 1 44 M/H 414

3 HSE Coordinator M/D 43 1 44 M/H 414

4 QC Coordinator M/D 43 1 44 M/H 414

5 Inspector Welder M/D 43 1 44 M/H 414

6 Field Enginer Leader M/D 43 1 44 M/H 414

7 Project Control M/D 43 1 44 M/H 414

8 ADM. Coordinator M/D 42 1 43 M/H 404

9 Superintendent M/D 70 1 71 M/H 668

10 Supervisor M/D 209 8 217 M/H 2,035

11 Safety Officer M/D 42 1 43 M/H 404

12 Finance M/D 43 1 44 M/H 414

13 Procurement M/D - - - M/H -

32
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

14 Adm. Staff M/D 116 3 119 M/H 1,112

15 Mechanic / Electrical M/D 43 1 44 M/H 414

16 Document Control M/D 42 1 43 M/H 404

17 Security M/D 215 5 220 M/H 2,070

18 Opr. Leader M/D - - - M/H -

19 Office Boy/Girl M/D 43 1 44 M/H 414

Sub Total 1,165 30 1,195 11,227

DIRECT MANPOWER

1 Foreman M/D 139 6 145 M/H 1,353

2 Millwright M/D 476 14 490 M/H 4,644

3 Fitter M/D 179 17 196 M/H 1,769

4 Operator M/D 90 6 96 M/H 900

33
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

5 Helper M/D 740 34 774 M/H 7,263

6 Rigger M/D 300 11 311 M/H 2,930

7 Scaffolder M/D 100 8 108 1,000

Sub Total 2,024 96 2,120 19,859

Total 3,189 126 3,315 31,086

34
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

12 PT. BARATA INDONESIA (FIELD ERECTED TANK - BRT)


INDIRECT MANPOWER

1 Project Manager M/D 68 1 69 M/H 677

2 Construction Manager M/D 183 1 184 M/H 1,824

3 Project Control M/D 86 1 87 M/H 857

4 HSE Officer M/D 133 1 134 M/H 1,327

5 Safety Man M/D 160 2 162 M/H 1,584

6 Engineer M/D 84 1 85 M/H 837

7 Supervisor M/D 353 4 357 M/H 3,508

8 QC Manager M/D 78 1 79 M/H 777

9 QC Dimensional M/D 118 1 119 M/H 1,177

10 Material Control M/D 61 1 62 M/H 607

11 Drafter M/D 61 1 62 M/H 607

35
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

12 Surveyor M/D 133 1 134 M/H 1,327

13 NDE Coordinator M/D 153 3 156 M/H 1,521

14 Welding Inspector M/D 120 1 121 M/H 1,197

15 Scaffolding Inspector M/D - - - M/H -

16 Purchasing M/D 51 1 52 M/H 507

17 Logistic M/D 59 1 60 M/H 587

18 GA & Finance M/D 129 1 130 M/H 1,287

19 Admin 74 1 75 737

20 Public Affair M/D 284 2 286 M/H 2,814

21 Tools & Consumable Keeper M/D 197 2 199 M/H 1,964

22 House keeping M/D 129 2 131 M/H 1,264

23 Office Boy M/D 180 2 182 M/H 1,784

24 Security M/D 347 4 351 M/H 3,448

36
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

25 Driver M/D 68 1 69 M/H 657

Sub Total 3,309 37 3,346 32,876

DIRECT MANPOWER

1 Operator M/D 233 3 236 M/H 2,318

2 Rigger M/D 222 1 223 M/H 2,205

3 Foreman M/D 262 4 266 M/H 2,588

4 Fitter M/D 1,742 16 1,758 M/H 17,338

5 Scaffolder M/D 138 2 140 M/H 1,374

6 Welder M/D 1,231 11 1,242 M/H 12,222

7 Helper M/D 1,309 17 1,326 M/H 12,969

8 Technician M/D 271 3 274 M/H 2,702

Sub Total 5,408 57 5,465 53,716

37
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 8,717 94 8,811 86,592

13 PT. ISMA TIUR (PIPING FIELD INSTALLATION AND PAINTING WORK


INDIRECT MANPOWER

1 Site Manager M/D 162 1 163 M/H 1,620

2 Construction Manager M/D 151 1 152 M/H 1,510

3 Engineering Coordinator M/D 162 1 163 M/H 1,620

4 Project Control Coordinator M/D 163 1 164 M/H 1,630

5 HSE Coordinator M/D 162 1 163 M/H 1,620

6 Checker / Drafter Piping M/D 212 2 214 M/H 2,120

7 Material Control M/D 153 1 154 M/H 1,530

38
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 QC/Admin QC M/D 658 7 665 M/H 6,580

9 Store Keeper M/D 160 1 161 M/H 1,600

10 Surveyor M/D 294 4 298 M/H 2,940

11 Supervisor PTW M/D 99 1 100 M/H 990

12 Safety Officer/ HSE Man M/D 175 2 177 M/H 1,750

13 Safety Supervisor M/D 169 1 170 M/H 1,690

14 First Aids M/D 128 1 129 M/H 1,280

15 General Affair M/D 153 1 154 M/H 1,530

16 Superintendent M/D 49 1 50 M/H 490

17 Supervisor HDPE M/D 261 2 263 M/H 2,610

18 Supervisor CS, LTCS & Nace M/D 405 3 408 M/H 4,050

19 Humas M/D 564 4 568 M/H 5,640

20 Document Control M/D 153 1 154 M/H 1,530

39
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

21 HRD M/D 140 1 141 M/H 1,400

22 Admin M/D 588 5 593 M/H 5,880

23 Driver M/D 214 3 217 M/H 2,140

24 Supervisor Scaffolding M/D 97 1 98 M/H 970

25 Time Keeper M/D 111 2 113 M/H 1,110

26 Material Handling M/D 60 1 61 M/H 600

27 Security M/D 198 2 200 M/H 1,980

Sub Total 5,841 52 5,893 58,410

DIRECT MANPOWER

1 Operator M/D 486 7 493 M/H 4,860

2 Foreman Pipe Fitter M/D 361 4 365 M/H 3,610

3 Pipe Fitter I M/D 1,280 15 1,295 M/H 12,800

40
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Pipe Fitter II M/D 196 2 198 M/H 1,960

5 Foreman Welder M/D 3 - 3 M/H 30

6 Welder M/D 556 6 562 M/H 5,560

7 Rigger M/D 389 5 394 M/H 3,890

8 Painter M/D 168 2 170 M/H 1,680

9 Mechanic / Electrical M/D 259 2 261 M/H 2,590

10 Scaffolder 295 4 299 M/H 2,950

11 Hydrotest Skill M/D 84 1 85 M/H 840

12 Ware House 63 1 64 M/H 630

13 Helper M/D 3,236 37 3,273 M/H 32,360

Sub Total 7,376 86 7,462 73,760

41
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,217 138 13,355 132,170

14 PT. SWADAYA GRAHA (PIPING FIELD INSTALLATION AND PAINTING


INDIRECT MANPOWER

1 Project Manager M/D 32 1 33 M/H 320

2 Site Manager M/D 211 2 213 M/H 2,061

3 QC Manager M/D 138 1 139 M/H 1,357

4 QC Inspector M/D 249 3 252 M/H 2,426

5 HSE Manager M/D 123 1 124 M/H 1,207

6 Safety Officer M/D 121 - 121 M/H 1,194

7 Safety Man M/D 145 1 146 M/H 1,425

8 Material Control M/D 215 2 217 M/H 2,097

9 PPC Manager M/D 58 1 59 M/H 569

42
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

10 Daily Reporter M/D 205 2 207 M/H 2,003

11 Spool Control M/D 127 2 129 M/H 1,244

12 Engineering Manager M/D 8 1 9 M/H 80

13 Field Engineer M/D 198 2 200 M/H 1,940

14 Welding Tracker M/D 113 1 114 M/H 1,108

15 Document Control M/D 123 1 124 M/H 1,208

16 HRD M/D 179 2 181 M/H 1,757

17 Supervisor M/D 440 8 448 M/H 4,272

18 Driver M/D 383 5 388 M/H 3,708

19 Scurity M/D 335 4 339 M/H 3,242

20 Public Relations M/D 209 2 211 M/H 2,040

21 Logistik M/D 213 3 216 M/H 2,065

22 Surveyor M/D 90 1 91 M/H 882

43
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

23 Manager Operator M/D 87 1 88 M/H 848

24 Operator Forklif M/D 82 1 83 M/H 800

25 Operator Trailer M/D 159 2 161 M/H 1,549

26 Operator TMC M/D 84 1 85 M/H 820

27 Operator Crane M/D 443 8 451 M/H 4,262

28 General Support adm M/D 197 2 199 1,920

29 Painting Inspector M/D 135 2 137 1,329

30 Operator PWHT M/D 13 2 15 130

Sub Total 5,115 65 5,180 49,863

DIRECT MANPOWER

1 Operator HDPE M/D 72 - 72 M/H 720

2 Foreman Pipe M/D 298 4 302 M/H 2,879

44
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Pipe Fitter M/D 822 13 835 M/H 7,879

4 Welder M/D 383 6 389 M/H 3,668

5 Rigger M/D 382 5 387 M/H 3,684

6 Scaffolder M/D 297 4 301 M/H 2,864

7 Mechanic M/D 272 4 276 M/H 2,624

8 Werehouse M/D 317 4 321 M/H 3,077

9 Helper M/D 310 4 314 M/H 2,994

10 Office Boy M/D 130 1 131 M/H 1,273

11 Painting M/D 123 1 124 M/H 1,177

Sub Total 3,406 46 3,452 32,839

Total 8,521 111 8,632 82,702

45
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

15 PT. WIJAYA ENGINDO NUSA (ELECTRICAL - WEN)


INDIRECT MANPOWER

1 Site Manager M/D 181 1 182 M/H 1,788

2 E/I Construction Coord M/D 76 1 77 M/H 728

3 Finance/ Acctg M/D 68 1 69 M/H 660

4 Administration Coord M/D 192 1 193 M/H 1,904

5 Engineering Material M/D 64 1 65 M/H 622

6 QA/ QC Electrical M/D 76 1 77 M/H 728

7 Supervisor Electrical M/D 257 3 260 M/H 2,504

8 Superisor Material Control M/D 57 1 58 M/H 552

9 HSE Coord M/D 130 1 131 M/H 1,266

10 HSE/ Scaffolding Inspector M/D 54 1 55 M/H 522

46
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

11 Project Control M/D 104 1 105 M/H 1,014

12 Administration Staff M/D 119 1 120 M/H 1,164

13 Security M/D 86 1 87 M/H 836

14 Office Girl M/D 82 1 83 M/H 798

15 Housekeeping M/D 79 1 80 M/H 768

16 Cleaning Service M/D 113 2 115 M/H 1,096

17 Time Keeper/ Adm Staff M/D 48 1 49 M/H 462

Sub Total 1,786 20 1,806 17,412

DIRECT MANPOWER

1 QA/ QC Technician M/D 76 1 77 M/H 738

2 Scaffolder Foreman M/D 66 1 67 M/H 630

3 Scaffolder M/D 52 2 54 M/H 508

47
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Technician M/D 201 6 207 M/H 1,950

5 Helper M/D 156 13 169 M/H 1,508

6 Mechanic M/D 309 9 318 M/H 3,004

7 Warehouse M/D 84 1 85 M/H 816

8 Welder M/D 84 1 85 M/H 816

9 TMC Operator M/D 215 4 219 M/H 2,088

10 TMC Operator M/D 69 1 70 M/H 670

11 Rigger M/D 76 1 77 M/H 738

Sub Total 1,388 40 1,428 13,466

Total 3,174 60 3,234 30,878

48
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

16 PT. WIJAYA ENGINDO NUSA (INSTRUMENT - WEN)


INDIRECT MANPOWER

1 Supervisor Instrument M/D 195 2 197 M/H 1,938

Sub Total 195 2 197 1,938

DIRECT MANPOWER

1 Instrument Foreman M/D 7 1 8 M/H 70

2 Instrument Technician M/D 120 3 123 M/H 1,170

Sub Total 127 4 131 1,240

49
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 322 6 328 3,178

17 PT. TERAS TEKNIK PERDANA (INSULATION /SCAFFOLDING - TTP)


INDIRECT MANPOWER

1 Site Manager M/D 108 1 109 M/H 1,045

2 Construction Manager M/D 108 1 109 M/H 1,045

3 HSSE Coordinator M/D 108 1 109 M/H 1,045

4 Supv Scaffolding M/D 106 1 107 M/H 1,025

5 Inspector Scaffolding M/D 108 1 109 M/H 1,045

6 Material Control M/D 108 1 109 M/H 1,045

7 Ass Material Control M/D 54 1 55 M/H 508

50
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 Admin M/D 105 1 106 M/H 1,015

9 Public Relations M/D 108 - 108 M/H 1,045

10 HSSE Administration M/D 53 1 54 M/H 498

11 PPC M/D 51 - 51 M/H 478

12 Driver M/D 205 1 206 M/H 2,003

13 Timekeeper M/D 94 1 95 M/H 905

14 Office Boy M/D 77 1 78 M/H 745

15 Security Officer M/D 7 1 8 M/H 67

Sub Total 1,400 13 1,413 13,514

DIRECT MANPOWER

1 Foreman M/D 181 2 183 M/H 1,760

2 Lead Worker M/D 214 2 216 M/H 2,090

51
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Skilled Worker M/D 854 10 864 M/H 8,290

5 Helper M/D 411 7 418 M/H 3,953

Sub Total 1,660 21 1,681 16,093

Total 3,060 34 3,094 29,607

18 PT. THAI NDT INDONESIA (NON-DESTRUCTIVE TESTING - TNDT)


INDIRECT MANPOWER

1 Site Manager M/D 6 - 6 M/H 60

2 Supervisor M/D 71 1 72 M/H 710

3 Document Control M/D 73 1 74 M/H 730

4 Interpreter Radiography M/D 73 1 74 M/H 730

52
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 223 3 226 2,230

DIRECT MANPOWER

1 Operator Radiography M/D 139 3 142 M/H 1,390

2 RPO M/D 148 1 149 M/H 1,480

3 Driver M/D 69 1 70 M/H 690

4 PT Technician M/D 96 2 98 M/H 960

M/H

Sub Total 452 7 459 4,520

Total 675 10 685 6,750

53
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

19 PT. MI ENERGI (FUEL SUPPLY - MIE)


INDIRECT MANPOWER

1 Coordinator Manager M/D 205 1 206 M/H 2,031

2 Public Affair M/D 185 1 186 M/H 1,846

Sub Total 390 2 392 3,877

DIRECT MANPOWER

1 Driver M/D 201 1 202 M/H 2,002

2 Security M/D 383 2 385 M/H 3,835

3 Helper M/D 583 3 586 M/H 5,833

Sub Total 1,167 6 1,173 11,669

54
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 1,557 8 1,565 15,546

20 PT. MEULIGO (CONSTRUCTION OF JETTY AT KUALA GEULUMPANG


Total 197 - 197 1,957

21 PT. TAKA HYDROCORE INDONESIA (DEEP WELL WORK - THI) - NO W


Total 4,309 - 4,309 33,568

22 PT. BERDIKARI PONDASI PERKASA (PILING WORK - BPP) - NO WOR


Total 2,501 - 2,501 21,007.0

23 PT. SWING INDONESIA (WASTE WATER TREATMENT - SWI)

55
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 298 - 298 2,652

24 PT. MITRA USAHA KREASINDO (PLN SCOPE - MUK) - NO WORK


Total 153 - 153 1,288.5

25 PT. EQUINE GLOBAL (NETWORK CABLE DATA - EGL)


Total 254 - 254 2,378

26 PT. BAASITHU BOGA SERVICES (RECEPTIONIST & ROOM BOY/ROO


INDIRECT MANPOWER

1 Site Manager M/D 162 1 163 M/H 1,620

2 F&B Supervisor M/D - - - M/H -

3 Housekeeping SPV M/D 162 1 163 M/H 1,620

56
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Storeman M/D - - - M/H -

5 Japanesse Cook M/D 162 1 163 M/H 1,620

6 Receptionist / ADM M/D 162 1 163 M/H 1,620

Sub Total 648 4 652 6,480

DIRECT MANPOWER

1 Camp Boss M/D 162 1 163 M/H 1,620

2 Housekeeping SPV M/D 162 1 163 M/H 1,620

3 Bakery M/D 162 1 163 M/H 1,620

4 Cook M/D 324 2 326 M/H 3,240

5 Cook Helper M/D 324 2 326 M/H 3,240

6 Kitchen Boy M/D 486 3 489 M/H 4,860

7 Receptionist M/D 162 1 163 M/H 1,620

57
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 Room Boy M/D 2,240 14 2,254 M/H 22,400

9 Room Maid Medco M/D 1,440 9 1,449 M/H 14,400

10 Office Boy / Girl M/D 800 5 805 M/H 8,000

11 Waitress M/D 486 3 489 M/H 4,860

12 Laundry M/D 480 3 483 M/H 4,800

13 Driver M/D 324 2 326 M/H 3,240

Sub Total 7,552 47 7,599 75,520

Total 8,200 51 8,251 82,000

TOTAL M/D 417,655 1,631 419,286 M/H 2,560,468

JEC PERSONNEL
58
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
Quality Control

59
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
1 Zulfikar Said IT Engineer

60
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent

61
DAILY REPORT

P
JGC ENC

PORARY FACILITY SECTION A


PORARY FACILITY SECTION B & C
PORARY FACILITY SECTION D
CHING PLANT
BS 2000 (CONCRETE STRUCTURE) & FWBS 1000 (SEWER AND DRAINAGE)
2300 (FOUNDATION WORK)
2300 (FOUNDATION WORK)
EL STRUCTURE ERECTION
N BULDING
AHANICAL WORK
D ERECTED TANK
NG FIELD INSTALLATION AND PAINTING WORK UTILITY AREA
NG FIELD INSTALLATION AND PAINTING WORK PROCESS AREA
CTRICAL

62
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID

ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,845
10 9,118
10 1,458
10 2,915
10 1,818

63
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,635

110 21,187
10 2,572

20 2,229
20 2,994
60 9,592
20 1,335
10 163

10 3,415
10 3,261
10 3,220
20 6,369
- 158
10 2,492

64
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,253

10 2,588
40 1,953
10 4,124
10 3,572
10 1,852
10 2,860
10 2,313
10 4,480
10 4,152
10 1,645

10 4,081
30 5,614
40 2,090
20 3,328

65
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,196
10 2,025
20 1,587
10 37
30 2,479
10 650
10 1,630

10 2,267
10 37

10 708

10 1,638
10 698
-
20 708
- 1,310

66
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 671

10 37
10 37

10 37

10 2,358
10 663
10 634

10 96
10 96
10 96
10 96
30 288
10 96

67
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 96
10 96

10 96
10 96
40 384

10 1,929
10 2,152
10 2,557
40 1,959
980
50 3,857
20 2,771
40 5,435
40 6,195

68
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,046
180 21,286
20 6,810
20 4,202
10 2,267
20 3,275

30 10,246
10 4,131

40 8,294

330 61,611
120 26,983
20 4,734
60 12,536
120 25,902
260 42,677

69
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
40 2,839
50 3,420
80 10,470
170 3,064
2,810 434,243

- 88,084

& C - IKM)
- 153,750

70
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 185,652

10 1,025 1 Ready Mix Concrete Production


10 3,019 2 Ready Mix Concrete Production (Batching Plant II)
- 1,608
10 2,843
- 8
- 1,942
10 2,483
10 4,871
10 2,012
30 7,279
90 27,089

71
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 7,606
10 4,461
50 9,220
- 928
30 14,053
120 36,267

210 63,356

E STRUCTURE & FWBS 1000 : SEWER AND DRAINAGE - PBC)

10 1,832 - FWBS 2000

10 1,128 A Utility Area

72
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 4,078 1 Neutralization Pit

80 15,844 - Continue Rebar Installation for Top Slab

70 14,616

- 170 B Process Area

10 2,021 1 Equipment Structure A2ST02

10 2,320 - Concrete Footing Line A, B No. 3, 4

70 16,046

10 1,340 C Offsite Area

10 4,259 1 Concrete Dike for Condensate Tank C

30 5,594 - Continue Formwork Installation for Wall at North

10 2,266 - Continue Formwork Installation for Wall at East

10 3,240

10 2,093 2 Concrete Dike for Produced Water Tank

73
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 540 - Continue Formwork Installation for Wall at North

30 6,649

40 8,700 3 Sulfur Waste Pit

10 2,349 - Setting PERI Formwork

90 14,137

50 9,733 - FWBS 1000

40 11,661 1 Krueng Meureudu Road

620 130,613 - Continue Installation Rip-Rap Stone for V-Ditch

2 Kuta Binjai Road

- 5,271 - Continue Installation Rip-Rap Stone for V-Ditch

40 8,641

200 66,688 3 Product Silo Road

74
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

290 93,461 - Spreading Geotex and Sub Base Course

450 3,680

70 12,523 - Equipment Structure A2ST02 1 m³

390 59,962 - Junction Box 1.5 m³

190 34,577

1,630 284,801

75
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

76
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Total Concrete = 2.5 m³

2,250 415,414

- 610 1 Workshop

10 1,027 - Installation Formwork lighting pole

10 1,264 - Pouring Concrete lighting pole : 11 m3

77
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,624 - Installation formwork in Manhole

10 1,340 - Installation Rebar in Manhole

10 1,446

10 1,671 2 Area A-400

20 2,161 - Backfill in A4ST04 F3 and F2

10 1,478 - Joing Survey in A4ST04

10 947 - Installation Rebar A4ST04 F4

10 1,949 - Installation Formwork A4ST04 F4

60 8,150 - Installation Formwork Pedestal In A4PR02

10 756 - Setting Anchor Bolt In A4PR02

- 1,376 - Curing Concrete Footing In A4SN02

- 1,047 - Excavation In Proses Air Blower

10 4,026 - Prepare Lean Concrete In Proses Air Blower

78
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 4,277 - Cutting Tie Rod in Sulfur Pipe Trench

- 634 - Finishing in Sulfur Pipe Trench

10 2,185

60 7,186 3 Area B-500

20 6,164 - Backfill in B5ST07 F1B

- 1,235 - Excavation in B5ST07 F1A

310 52,553 - Lean Concrete in B5ST07 F1A : 1 m3

- Installation Rebar Pedestal in B5ST07 F2A

- Backfill in B5ST07 F1B

30 4,439 - Installation Formwork in B5ST07

70 6,718

100 9,465 4 Area B-600

150 10,888 - Installation Rebar in Water Treatment Package

79
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

110 5,521 - Installation Formwork in Water Treatment Package

- - - Finishing Pipe Sleeper

- 1,630

100 12,789

130 19,346 Total Concrete K125 : 1 m³

250 24,858 Total Concrete K300 : 11 m³

20 2,768

- 80

960 98,502

1,270 151,055

80
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 300 1 Area Neutralization Pit (48-ABH-402)

- 150 - Rebat Install for Top Slab

- 1,288

10 1,468 2 Area Equipment Structure A6ST07

- - - Pouring Concrete for LC ( 2 m3)

10 3,206

3 Area Equipment Structure A6ST08

- Formwork Install for Pedestal

10 1,390

20 3,990 4 Area Misc. Proses Area A200

120 15,050 - Continuing Formwork Install for Footing

81
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

220 14,650

180 14,260 5 Area Sulfur Pit (35-ZMB-551)

40 9,190 - Formwork Removal and Repairing

- 8,890

90 6,630 6 Area Piperack A7PR01

550 55,460 - Pouring Concrete for Footing at GL-5,6 /ABC ( 5 m3)

1,230 129,510 -

7 Area Pipe Sleeper 040-SLP-001-068

- Formwork Install for Pedestal

8 Area Workshop JEC

- Continuing Rebar Fabrication for Sleeper

82
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

9 Area Temporary New for Precast

- Formwork Install for Precast Sleeper

83
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Total concrete = 7 m³

1,240 132,716

ON - GTA)

- 1,132 PIPERACK

- 1,072 - B2PR01

- 1,122 Attch Clip Grating

- 1,142 Arrangement Grating : 93

- 1,192 - B2PR02

84
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,122 Cont. Install Accessories member

- 1,052 Adjusting Plumbness

- 1,440 - D3PR01

- 2,008 Joint inspection for Tightening Bolt D3PR01

20 3,256 Welding Washer Plate

40 1,876

- 1,484 EQUIPMENT SUPPORT

20 2,134 A3ST01

- 404 Check Plumbness Internal

- 1,994 Cont. Install Main member :

- 3,123 Beam : 14 V.Brace : 2

40 3,770 Girder :2 H.Brace : 4

- 934 A4ST01

85
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,008 Transport Material + Cont. Install

- 1,678

- 390

- 1,188

10 799

130 36,320

40 5,250

190 16,220

90 15,543

80 8,120

110 15,804

86
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

90 3,017

180 27,742

780 91,696 PIPERACK Today ((Ton)

A1PR01A 0.0

A1PR01B 0.0

A1PR02A 0.0

A1PR02B 0.0

A1PR03A 0.0

A1PR03B 0.0

A2PR01 0.0

D1PR01 0.0

A6PR01 0.0

B2PR01 3.1

87
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

B2PR02 0.0

D3PR02 0.0

D3PR01 0.0

D3BG01 0.0

A6ST01 0.0

A4ST01 0.0

A3ST01 1.0

Total 4.1

910 128,016

88
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,368 1 Main Substation Building

30 6,762 - Installation scaffolding (4)

20 6,678 - Installation pipe EMT (7)

- 686 - Installation lamp (2)

10 4,866 - Installation Panel (3)

50 5,970 - aplication epoxy top coat (6)

90 10,740 - Installation skirting (5)

30 9,952 - Installation tray for Hvac (4)

20 3,708

30 8,958 2 Main Control Room

20 2,528 - Installation ceramic for toilet (2)

10 500 - Repair plafond (2)

- 370 - Finishing wall (8)

89
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

310 64,084 - Polling cable (4)

- Installation pipe PVC line lamp (2)

- Test meger (4)

270 23,216 - Installation raised floor (4)

- 1,633 - Polling cable for conduit 2)

- 1,778 - Fabrication suport longdrat (2)

- 1,205 - Fabrication UNP for suport outdoor HVAC (4)

- 1,912 - Installation pipe flordrain and pipe ven (5)

- 3,797

- 1,918 3 Chemical Storage

- 13,900 - Removal scaffolding (4)

20 20,245

10 4,168 4 Waste Storage

90
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

230 43,118 - Installation additional purlin (3)

- 470 - Installation suport tray (3)

- -

140 20,669 5 GEG Building

- 17,012 - Installation perimeter scaffolding (6)

10 6,627

30 4,090 6 Shelter Building

220 18,380 - Installation precast foundation for nitrogen bootle (6)

- 6,536 - Excavation for clarifier shelter

930 190,671

91
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,240 254,755

STATIC EQUIPMENT

92
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 414 - 46-MBM-106 LP Condensate Flash Drum

10 424 Installation of Platform

10 424 - 39-MAJ-103 AGE Solvent Carbon Filter

10 424 Finishing Foundation + Welding Washer

10 424 - 39-HBG-201 B AGE Lean/Rich Exchanger

10 424 Installation of Equipment

10 424 - 31-MBD-101A Production Separatorion

10 414 Installation of Equipment

10 678 - 32-MAF-101 AGR Absorber

80 2,115 Check Plumbness and Attch Formwork

10 414 - 36-HBG-203 Produced Water Heater

10 424 Leveling of equipment

- - ROTARY EQUIPMENT

93
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 1,142 - 46-PBE-332 A/B Steam Condensate Pump

10 424 Full Grouting on foundation

10 414 - 46-PBE-333 A/B LP Boiler Feed Water Pump

50 2,120 Full Grouting on foundation

- - - 44-PBM-333 A/B Utility Water Transfer Pumps

10 424 Pre-Alignment

300 11,527 - 44-PBM-334 A/B Potable Water Pumps

Pre-Alignment

- 36-PAT-331 A/B Produced Water Booster Pumps

60 1,413 Joint Inspection Pre-Alignment

140 4,784 - 36-PBA-333 A/B Produced water Recycle pump

170 1,939 Chipping on foundation

60 960 PACKAGE EQUIPMENT

94
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

340 7,603 - 33-ZZZ-502 (EG Regeneration Package Skid)

110 3,040 Cont. Chipping + Padding on Foundation

80 1,080 - 46-ZBE-501 A/B BOILER PACKAGE A/B

960 20,819 Finishing foundation FD Fan Boiler A

Install Duct Boiler A/B to Economizer A/B

Install Duct Economizer to Stack A/B

Impact Bolt Structure FD Fan Boiler B

Cont. Identify + Transport Material Structure Boiler A/B

- 35-KZZ-701 (Incenerator Stack)

Chipping on foundation

1,260 32,346

95
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 687 1 PURE SOLVENT TANK

10 1,834 - Welding frame for platform

10 867

10 1,337 2 CONDENSATE A

20 1,604 - Continue fit up platform

10 847 - Fit up midrail and toe plate

40 3,548

10 787 3 CONDENSATE B

10 1,187 - Continue fit up platform

10 617 - Fit up midrail and toe plate

10 617

96
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,337 4 Condensate C Tank

30 1,551 - Fit up shell plate course 3

10 1,207

- -

10 517

10 597

10 1,297

10 747

20 2,834

20 1,984

20 1,284

20 1,804

40 3,488

97
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 667

370 33,246

30 2,348

10 2,215

40 2,628

160 17,498

20 1,394

110 12,332

170 13,139

30 2,732

570 54,286

98
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

940 87,532

NTING WORK UTILITY AREA - ISTI)

10 1,630 A Welding Progress

10 1,520 Underground (16475.4)

10 1,630 1 Pipe HDPE 34

10 1,640 2 Low Temp Carbon Steel (LTCS) 0

10 1,630 3 Carbon Steel (CS) 108

20 2,140 Total 142

10 1,540

99
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

70 6,650 Above ground (61350.4)

10 1,610 1 Low Temp Carbon Steel (LTCS) 0

40 2,980 2 Carbon Steel (CS) 0

10 1,000 3 Stainless Steel (SS) 0

20 1,770 4 Duplex Stainless Steel 0

10 1,700 5 ALLOY 825 0

10 1,290 Total 0

10 1,540

10 500 B Support Progress

20 2,630 1 CS 0

30 4,080 2 LTCS 0

40 5,680 3 Stainless Steel 0

10 1,540 4 DUPLEX SS 0

100
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,410 5 Cold Shoe Support 0

50 5,930 6 Spring Support 0

30 2,170 Total 0

10 980

20 1,130

10 610

20 2,000

520 58,930

C Other Progress

1 Borrow Sand 0

70 4,930 2 Coating 0

40 3,650 3 Post Heat Treatment 0

150 12,950 4 Finish Painting 0

101
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 1,980 5 Lettering/Marking 0

- 30 6 Pressure Test (STM) 0

60 5,620 Total 0

50 3,940

20 1,700

20 2,610

40 2,990

10 850

10 640

370 32,730

860 74,620

102
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,380 133,550

ND PAINTING WORK PROCESS AREA - SWG)

10 330 A Welding Progress

20 2,081 Under Ground (5929.60)

10 1,367 1 HDPE 0

30 2,456 2 LTCS INCL GALV 12

10 1,217 3 Carbon Steel INCL GALV 28

- 1,194 Total 40

10 1,435

20 2,117 Above ground (61182.00)

10 579 1 LTCS INCL GALV 4

103
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,023 2 Carbon Steel INCL GALV 0

20 1,264 3 Staniless Steel 0

10 90 4 Duplex Stainless Steel 0

20 1,960 Total 4

10 1,118

10 1,218 B Support Progress (121.17)

20 1,777 1 CS (Ton) 0

80 4,352 2 LTCS (Ton) 0

50 3,758 3 Stainless Steel (Ton) 0

40 3,282 4 DUPLEX SS (Ton) 0

20 2,060 5 Cold shoe support (qty) 0

30 2,095 6 Spring Support (qty) 0

10 892 Total 0

104
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 858

10 810 C Other Progress

20 1,569 1 Borrow Sand (M3) 0

10 830 2 Post Heat Treatment (ID) 0

80 4,342 3 Coating & Finish Paninting ( M2) 0

20 1,940 4 Lettering/Marking (pnt) 0

20 1,349 5 Steam Tracing 0

20 150 6 Pressure Test (STM) 0

650 50,513 Total 0

- 720

40 2,919

105
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

130 8,009

60 3,728

50 3,734

40 2,904

40 2,664

40 3,117

40 3,034

10 1,283

10 1,187

460 33,299

1,110 83,812

106
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Unit Today

10 1,798 1 Glandbox Fabrication

10 738 2 Bus bar installation at 43-SWG-1101E

10 670 3 Install Support for PVC 2" ea 33

10 1,914 4 Install PVC 2" for grounding cable m 8

10 632 5 Grounding cable pulling m 96

10 738 6 Install Cathodic - Anode ea 6

30 2,534 7 Install Cathodic - Wiring m 20

10 562 8 Install Cathodic - Connection to piping pnt 2

10 1,276 9 Instal Cathodic - splicing/ connection pnt 3

10 532 10 Setting Panel 43-SWG-1203E

107
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,024

10 1,174

10 846

10 808

10 778

20 1,116

10 472

200 17,612

10 748

10 640

20 528

108
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 2,010

130 1,638

90 3,094

10 826

10 826

40 2,128

10 680

10 748

400 13,866

600 31,478

109
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Unit Today

20 1,958 1 Fabrication tray ea

2 Install Tray at SS m 2

3 Install Tray 300W at Main Pipe Rack m 18

20 1,958 4 Install outside riser tray 300W m 1.5

5 Install Channel support for tray ea 3

10 80 6 Install Panel at MCR pnl 18

30 1,200 7 Loading panel at MCR pnl 8

40 1,280

110
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 3,238

LDING - TTP)

10 1,055 1 JEC MCS Yard

10 1,055 - Modification Scaffolding at JEC MCS Yard

10 1,055 for Material Warehouse

10 1,035 (Supporting Manpower)

10 1,055

10 1,055

10 518

111
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,025

- 1,045

10 508

- 478

10 2,013

10 915

10 755

10 77

130 13,644

20 1,780

20 2,110

112
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

100 8,390

70 4,023

210 16,303

340 29,947

NG - TNDT)

- 60 1 Stand By

10 720

10 740

10 740

113
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 2,260

30 1,420

10 1,490

10 700

20 980

70 4,590

100 6,850

114
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Fuel Supply

10 2,041

10 1,856

20 3,897

10 2,012

20 3,855

30 5,863

60 11,729

115
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

80 15,626

GEULUMPANG - MEULIGO)
- 1,957

K - THI) - NO WORK
- 33,568

BPP) - NO WORK
- 21,007.0

116
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,652

NO WORK
- 1,288.5

- 2,378

OOM BOY/ROOM MAID - BBS)


Ready

10 1,630

- -

10 1,630

117
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- -

10 1,630

10 1,630

40 6,520

10 1,630

10 1,630

10 1,630

20 3,260

20 3,260

30 4,890

10 1,630

118
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

140 22,540

90 14,490

50 8,050

30 4,890

30 4,830

20 3,260

470 75,990

510 82,510

16,310 2,576,778

OTHER
119
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
WEATHE
Condition From To

CLEAR 7.00 18.00


CLOUDY
RAINY

HEAVY
RAIN

120
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

INSU, CERTIFICATION)

121
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish

HIGHLIG

122
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA

123
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
2
3
4
5
6

124
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8

125
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

126
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

127
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

128
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

129
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

130
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

131
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5

132
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- FWBS 2000 2

A Utility Area 3

133
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Neutralization Pit 4

- Preparation Concrete for Top Slab 5

B Process Area 7

1 AGR Lean Amine Booster Pump A 8

- Lean Concrete 9

10

2 Equipment Structure A2ST02 11

- Installation Formwork for Pedestal Line A, B No. 3, 4 12

13

C Offsite Area 14

1 Sulfur Waste Pit 15

- Continue Setting PERI Formwork for Wall 16

134
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

16

2 Concrete Dike for Produced Water Tank 17

- Formwork Installation for Wall at North 18

19

3 Concrete Dike for Condensate Tank C 20

- Preparation Concrete Wall at East

- Continue Installation Formwork for Wall at North

- FWBS 1000

1 Lhokseumawe Road

- Continue Installation Rip-Rap Stone for V-Ditch

2 Krueng Meureudu Road

135
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Continue Installation Rip-Rap Stone for V-Ditch

1 m³ 3 Kuta Binjai Road

1.5 m³ - Continue Installation Rip-Rap Stone for V-Ditch

4 Product Silo Road

- Spreading Sub Base Course

136
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

137
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total Concrete = 0 m³

1 Area A-400 1

- Installation Rebar For valve pit 104 2

- Repair Concrete in Feed Acid Gas KO Drum 3

138
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Curing Concrete In Provulsion Vessel 4

- Backfill In A4ST04 F3 and F2 5

- BAckfill In A4SN04 F4 6

- Installation Formwork Pedestal In A4SN02 7

- Lean Concrete In Proses Air Blower 8

- Installation Rebar In Proses Air Blower 9

- Installation Anchor Bolt In A4PR02 10


- Pouring Concrete In A4PR02 11

2 Area B-500

- Backfill in B5ST07 F1B

- Lean Concrete in B5ST07 F1A

- pouring Concrete in B5ST07 F2A

139
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Backfill in B5ST07 F1A

- Installation Formwork in B5ST07

3 Area B-600

- Joint Survey And Inspaction in Water Treatment Package

- Pouring Concrete in Water Treatment Package

: 1 m3

4 Area B-700

- Repair Concrete in Pipe Sleeper

- Backfill in Pipe Sleeper

140
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total concrete = 0 m³

141
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Area Pipe Sleeper 040-SLP-001-068 1

- Pouring Cncrete for Footing and Pedestal ( 6 m3) 2

- 3

2 Area Equipment Structure A6ST07 4

- Formwork Install for Footing

3 Area Equipment Structure A6ST08

- Continuing Formwork Install for Pedestal

4 Area Neutralization Pit (48-ABH-402)

- Continuing Rebar Install

142
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Area Misc. Foundation A200

- Pouring Concrete for Footing ( 3.5 m3)

6 Area Piperack A7PR01

- Formwork Install for Pedestal at GL-5,6 /ABC

7 Area Workshop JEC

- Rebar Fabrication for Sleeper All Foundation

8 Area Sulfur Pit (35-ZMB-551)

- Continuing Formwork Removal and Repairing

143
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

9 Area Temporary New for Precast

- Contining Formwork Install for Precast Sleeper

144
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total concrete = 9.5 m³

PIPERACK 1

- B2PR01 2

Cont. Attch Clip Grating 3

- B2PR02 4

Joint inspection for Plumbness 5

145
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Cont. Install Accessories member 6

- D3PR01 7

Cont. Welding Washer Plate 8

10

11

EQUIPMENT SUPPORT 12

- A3ST01 13

Cont. Install Main member

Adjusting Plumbness

- A4ST01

Cont. Install Main member

146
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

147
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

148
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Main Substation Building 1

149
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Aplication epoxy 2

2 Main Control Room 7

- Installation PVC Conduit 8

- Installation raisefloor 9

- Repair wall EPS 10

- Check Plafond 11

12

13

3 Mechanical WE WS & WH 14

150
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Not Activity 15

16

4 Chemical Storage 17

- Excavation for ground elevation 18

19

20

5 Waste Storage 21

22

23

6 GEG Building

- Installation perimeter scaffolding

151
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

152
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

STATIC EQUIPMENT

153
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- 46-MBM-106 LP Condensate Flash Drum

Cont. Installation of Platform

- 35-EBN-201 Thermal Reactor Waste Heat Boiler

Install of Equipment

- 35-SRF-501 Thermal Reactor Chamber

Install of Equipment

- 31-MBD-101A Production Separatorion

Leveling of Equipment

- 32-MAF-101 AGR Absorber

Grouting on foundation

- 36-HBG-203 Produced Water Heater

Grouting on foundation

ROTARY EQUIPMENT

154
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- 44-PBM-333 A/B Utility Water Transfer Pumps

Cont. Pre-Alignment

- 44-PBM-334 A/B Potable Water Pumps

Cont. Pre-Alignment

- 36-PAX-332 A/B

Install of Pump

- 36-PBA-333 A/B Produced water Recycle pump

Padding on Foundation

- 46-PBE-332 A/B Steam Condensate Pump

Finishing on foundation

- 46-PBE-333 A/B LP Boiler Feed Water Pump

Finishing on foundation

PACKAGE EQUIPMENT

155
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- 33-ZZZ-502 (EG Regeneration Package Skid)

Cont. Chipping + Padding on Foundation

- 35-KZZ-701 (Incenerator Stack)

Chipping and Padding on foundation

- 35-TTO-501 (Incenerator Combustion)

Chipping and Padding on foundation

- 44-ZBM-504 (Clarifier System Package)

Chipping and Padding on foundation

- 46-ZBE-501 A/B BOILER PACKAGE A/B

Finishing foundation FD Fan Boiler B

156
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Tangki Condensate A 1

- Fit up shell plate course 6 2

2 Condensate B Tank

- Eksternal welding Vertical shell plate course 4 to course 5

3 Condensate C Tank 4

- Fit up shell plate course 3 5

4 Demin Water Tank 7

- inspection shell plate course 6 8

157
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Potable Water Tank

- Instalation Accessories

6 Utility Water Tank

- Fit up top angel

7 Fire Water Tank

-Inspection shell plate course 4

8 EG Make-Up Tank

- Instalation Accessories

158
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

9 Diesel Fuel Tank

- welding shell plate to top angel

159
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Underground (16475.4) 2

1 Pipe HDPE 62 3

2 Low Temp Carbon Steel (LTCS) 4 4

3 Carbon Steel (CS) 52 5

Total 118 6

160
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Above ground (61350.4) 8

1 Low Temp Carbon Steel (LTCS) 0 9

2 Carbon Steel (CS) 0 10

3 Stainless Steel (SS) 0 11

4 Duplex Stainless Steel 0 12

5 ALLOY 825 0 13

Total 0 14

15

B Support Progress

1 CS 0

2 LTCS 0

3 Stainless Steel 0

4 DUPLEX SS 0

161
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Cold Shoe Support 0

6 Spring Support 0

Total 0

C Other Progress

1 Borrow Sand 0

2 Coating 0

3 Post Heat Treatment 0

4 Finish Painting 0

162
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Lettering/Marking 0

6 Pressure Test (STM) 0

Total 0

163
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Under Ground (5929.60) 2

1 HDPE 0 3

2 LTCS INCL GALV 0 4

3 Carbon Steel INCL GALV 16 5

Total 16 6

Above ground (61182.00) 8

1 LTCS INCL GALV 0 9

164
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Carbon Steel INCL GALV 14 10

3 Stainless Steel 0 11

4 Duplex Stainless Steel 0 12

Total 14 13

14

B Support Progress (121.17) 15

1 CS (Ton) 0 16

2 LTCS (Ton) 0 17

3 Stainless Steel (Ton) 0 18

4 DUPLEX SS (Ton) 0 19

5 Cold shoe support (qty) 0 20

6 Spring Support (qty) 0 21

Total 0 22

165
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

23

C Other Progress 24

1 Borrow Sand (M3) 0 25

2 Coating ( M2) 0

3 Post Heat Treatment (ID) 0

4 Finish Painting (M2) 0

5 Lettering/Marking (pnt) 0

6 Pressure Test (STM) 0

Total 0

166
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

167
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Glandbox fabrication 1

2 Setting panel 2

3 Pulingg Grounding cable at SS 3

4 Install PVC conduit 2" for grounding at SS 4

Transfer Cable drum to SS area 5

10

10

168
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

11

12

13

14

15

15

15

16

17

18

19

20

169
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

170
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Setting panel at MCR

2 Tray Support Fabrication at Pipe Rack

3 Install Tray at mian pipe rack

4 Install tray support at MCR

171
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 JEC MCS Yard

- Modification Scaffolding at JEC MCS Yard

for Material Warehouse

(Supporting Manpower)

172
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

173
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Swadaya Workshop Area 1

- Radiography Inspection 2

2 Isma Tiur Workshop Area 4

174
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Radiography Inspection 5

10

11

12

13

14

175
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Fuel Supply 1

176
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

177
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Ready

178
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

179
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

OTHERS
180
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
WEATHER
Remark

181
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

182
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

WORKING HOUR

HIGHLIGHT

183
184
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Genset 10 KVA unit 1
Genset 25 KVA unit 1
Excavator unit 1
Buldozer unit 1
Crane 25T unit 1

185
EQUIPMENT
Equipment & Tools Unit QTY

Crane 55T unit 1


Trailler unit 1

186
EQUIPMENT
Equipment & Tools Unit QTY

187
EQUIPMENT
Equipment & Tools Unit QTY

188
EQUIPMENT
Equipment & Tools Unit QTY

189
EQUIPMENT
Equipment & Tools Unit QTY

190
EQUIPMENT
Equipment & Tools Unit QTY

191
EQUIPMENT
Equipment & Tools Unit QTY

192
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Generator Set unit 2
Truck Mixer unit 3
Wheel Loader unit 1
Batching Plant unit 2

193
EQUIPMENT
Equipment & Tools Unit QTY

Theodolite Unit 3

Total Station Set 3

Waterpass Unit 3

194
EQUIPMENT
Equipment & Tools Unit QTY

Excavator Unit 5

Dumptruck Unit 6

Bar Cutter Unit 2

Bar Bending Unit 2

Bulldozer Unit 1

Mesin Vibrator Unit 2

Plate Stamper Unit 4

Stamper Rammer Unit 2

Scaffolding Set 200

Genset Unit 4

Grader Unit 1

Water Compressor Unit 2

Vibro Roller Unit 1

195
EQUIPMENT
Equipment & Tools Unit QTY

Vibro Roller Unit 1

Air Compressor Unit 1

Water Pump Unit 5

Crane Unit 1

Baby Roller Unit 1

196
EQUIPMENT
Equipment & Tools Unit QTY

197
EQUIPMENT
Equipment & Tools Unit QTY

198
EQUIPMENT
Equipment & Tools Unit QTY

Excavator PC-200 Unit 2

Dump Truck Unit 2

Mini Bus Unit 3

199
EQUIPMENT
Equipment & Tools Unit QTY

Genset 30 KVA Unit 1

Genset 6,5 KVA Unit 1

Bar Cutter Unit 2

Bar Bending Unit 2

Submersible Water Pump Unit 1

Concrete Vibrator Unit 4

Compactor (Hand) Unit 2

Pick up/ Light Truck Unit 2

200
EQUIPMENT
Equipment & Tools Unit QTY

201
EQUIPMENT
Equipment & Tools Unit QTY

202
EQUIPMENT
Equipment & Tools Unit QTY

Excavator unit 1

Water Jump unit 1

Fibrator unit 1

Mixer DT 03 unit 1

203
EQUIPMENT
Equipment & Tools Unit QTY

204
EQUIPMENT
Equipment & Tools Unit QTY

205
EQUIPMENT
Equipment & Tools Unit QTY

R. Crane 80 Ton Unit 1

R. Crane 50 Ton Unit 1

R. Crane 25 Ton Unit 1

Unic Crane 5 T Unit 1

Trailler Truck Unit 1

206
EQUIPMENT
Equipment & Tools Unit QTY

Genset 150 kVA Unit 2

Genset 125 kVA Unit 1

Genset 25 kVA Unit 1

Compressor PDS 175 Unit 1

Welding Engine Unit 2

Scaffolding M 17020

Forklift 10 Ton Unit 1

Skylift Unit 3

207
EQUIPMENT
Equipment & Tools Unit QTY

208
EQUIPMENT
Equipment & Tools Unit QTY

209
EQUIPMENT
Equipment & Tools Unit QTY

Auto Level Unit 1

210
EQUIPMENT
Equipment & Tools Unit QTY

Tripod Unit 2

Cutting Concrete Unit 1

Hammer 5 kg Unit 1

Excavator Unit 2

water pump Unit 1

Cutting well Unit 3

Genset unit 1

Bar Bender unit 1

Bar Cutter unit 1

Submersible pump unit 1

Hammer Drill unit 1

Welding Machine unit 1

Hammer Drill unit 1

211
EQUIPMENT
Equipment & Tools Unit QTY

Welding Machine unit 1

Concrete Vibrator unit 1

Dump truck unit 2

Vehicle unit 1

Lampu Halogen unit 15

Stamper unit 1

Bucket unit 1

Crane unit 1

Coring Mechine Unit 1

212
EQUIPMENT
Equipment & Tools Unit QTY

213
EQUIPMENT
Equipment & Tools Unit QTY

214
EQUIPMENT
Equipment & Tools Unit QTY

Crawler Crane 550 Ton unit 1

Crawler Crane 250 Ton unit 1

Rough Crane 50 Ton unit 1

Flat Bed Trailler unit 1

Low bed Trailler unit 1

215
EQUIPMENT
Equipment & Tools Unit QTY

216
EQUIPMENT
Equipment & Tools Unit QTY

217
EQUIPMENT
Equipment & Tools Unit QTY

Oven Unit 2

Grinda

a. 4" Unit 13

b. 6" Unit 8

c. 7" Unit 3

Drayer Unit 24

Trapo Unit 26

Crane 25 ton Unit 1

Vacuum Box Set 1

Miller Unit 2

Cutting Touch Unit 3

218
EQUIPMENT
Equipment & Tools Unit QTY

Generator

a. 18 KVA Unit 1

b. 150 KVA Unit 1

c. 175 KVA Unit 1

d. 200 KVA Unit 1

219
EQUIPMENT
Equipment & Tools Unit QTY

220
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Set 3

Carry Pick-up Unit 1

Generator 100Kva Unit 2

Welding Travo Unit 5

Handryer Unit 5

Chain Saw Unit 1

Grinder Machine 7" Unit 5

221
EQUIPMENT
Equipment & Tools Unit QTY

Grinder Machine 4" Unit 5

Welding Machine Unit 4

TMC 9Ton Unit 1

Double Cabin Unit 2

Vehicle Unit 2

Generator 10-40Kva Unit 2

Water Pump Unit 2

Crane 35 Ton Unit 1

222
EQUIPMENT
Equipment & Tools Unit QTY

223
EQUIPMENT
Equipment & Tools Unit QTY

224
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Unit 1

Pick-up Unit 4

Vehicle Unit 2

Generator 6 A Unit 0

Generator 150 KVA Unit 2

Generator 100 KVA Unit 1

Grinder Machine 7" Unit 2

Grinder Machine 5" Unit 6

Grinder Machine 4" Unit 10

225
EQUIPMENT
Equipment & Tools Unit QTY

Cutting Wheel 14" Unit 2

Cutting Torch & accessories Unit 1

Chain Saw Unit 0

Crane HTC 85 ton Unit 1

Crawler Crane 80 ton Unit 1

Crane HTC 50 ton Unit 1

Crane HTC 20 ton Unit 1

TMC 7 ton Unit 1

Trailer Unit 2

Forklif Unit 1

Inventer Welding Machine Unit 1

TRAVO 400 A Unit 11

Chain Block 3 Ton Unit 8

226
EQUIPMENT
Equipment & Tools Unit QTY

Chain Block 2 Ton Unit 6

Level Block 1,5 Ton Unit 8

Compressor 175 CFM Unit 1

227
EQUIPMENT
Equipment & Tools Unit QTY

228
EQUIPMENT
Equipment & Tools Unit QTY

Light Vehicle 4x4 (LV) set 1

TMC 11T set 1

Mini Loader set 1

Power Generator set 2

Gasoline Generator Set 1

Welding Machine set 2

Welding Transformer set 4

Cable Jack set 4

Cable Roll Set 30

Cable Roll Set 30

229
EQUIPMENT
Equipment & Tools Unit QTY

Electric Bench Drill set 4

Electric Drilling Press Machine set 3

Electric High Speed Cutter set 1

Electric Hand Grinder & Cutter set 15

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hot Marker Machine set 2

Stamp Marker Machine set 1

Chain Block 2T set 3

Radio HT Comm set 15

Hot Gun set 3

230
EQUIPMENT
Equipment & Tools Unit QTY

231
EQUIPMENT
Equipment & Tools Unit QTY

232
EQUIPMENT
Equipment & Tools Unit QTY

233
EQUIPMENT
Equipment & Tools Unit QTY

234
EQUIPMENT
Equipment & Tools Unit QTY

Sentinel 880 Ir-192 Unit 1

Vehicle Toyota Hillux Unit 1

Collimator Unit 1

Barricade Roll 1

235
EQUIPMENT
Equipment & Tools Unit QTY

Megaphone Unit 1

Sign Board Unit 4

Radiation Flag Pcs 30

Crank Cable Unit 1

Source Cable Unit 1

Survey Meter Unit 1

Warning Light Unit 1

MC Cleaner Can 1

MC Penetrant Can 1

MC Developer Can 1

236
EQUIPMENT
Equipment & Tools Unit QTY

Container Office Unit 1

Fuel Tank 50 Unit 1

Fuel Truck Unit 1

Suction Pump Unit 1

Dispenser Unit 1

Fire Extinguisher 9 kg Unit 4

237
EQUIPMENT
Equipment & Tools Unit QTY

238
EQUIPMENT
Equipment & Tools Unit QTY

239
EQUIPMENT
Equipment & Tools Unit QTY

240
EQUIPMENT
Equipment & Tools Unit QTY

241
EQUIPMENT
Equipment & Tools Unit QTY

242
EQUIPMENT
Equipment & Tools Unit QTY

243
EQUIPMENT
Equipment & Tools Unit QTY

244
Project Name : BLOCK A SITE DEVELOPMENT PROJECT
Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL

249
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO

Date : 20-Jul-2017 Thursday


Daily Report No. : DR-JEC-MEP-0271

PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 917 1 918 M/H 9,118
Deputy Site Manager M/D 151 1 152 M/H 1,458
Construction Manager M/D 297 1 298 M/H 2,915
Deputy Construction Manager M/D 187 1 188 M/H 1,818

250
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 169 1 170 M/H 1,635
2 HSSE
HSSE M/D 9,684 11 9,695 M/H 21,187
HSSE Administration M/D 1,192 1 1,193 M/H 2,572
3 Quality Control
Field. QC Manager M/D 233 2 235 M/H 2,229
QC Coordinator-2 M/D 311 2 313 M/H 2,994
QC Engineer M/D 1,034 6 1,040 M/H 9,592
QC Admin M/D 143 2 145 M/H 1,335
Welding Tracking M/D 17 1 18 M/H 163
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 371 1 372 M/H 3,415
Electrical Superintendent M/D 349 1 350 M/H 3,261
ME Supervisor Temfac M/D 341 1 342 M/H 3,220
Civil Supervisor Temfac M/D 677 2 679 M/H 6,369
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 259 1 260 M/H 2,492

251
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 232 1 233 M/H 2,253
4.2 Civil
General Civil Superintendent M/D 267 1 268 M/H 2,588
Project Engineer M/D 202 4 206 M/H 1,953
Civil Engineer M/D 458 1 459 M/H 4,124
Civil Engineer M/D 391 1 392 M/H 3,572
Field Engineer M/D 191 1 192 M/H 1,852
Civil Construction M/D 298 1 299 M/H 2,860
Batching Plant Coordinator M/D 239 1 240 M/H 2,313
Surveyor M/D 491 1 492 M/H 4,480
Helper Surveyor M/D 462 1 463 M/H 4,152
Steel Structure Engineer M/D 170 1 171 M/H 1,645
4.3 Building
Building Superintendent M/D 451 1 452 M/H 4,081
Building Supervisor M/D 577 3 580 M/H 5,614
Surveyor M/D 372 4 376 M/H 2,090
Helper Surveyor M/D 343 2 345 M/H 3,328
4.4 Piping

252
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 226 1 227 M/H 2,196
Asst. Piping Superintendent M/D 208 1 209 M/H 2,025
Piping Engineer M/D 163 2 165 M/H 1,587
Technical Suport M/D 4 1 5 M/H 37
Supervisor M/D 262 3 265 M/H 2,479
CMS Operator M/D 69 1 70 M/H 650
Clerk M/D 167 1 168 M/H 1,630
4.5 Process
Process Superintendent M/D 234 1 235 M/H 2,267
Clerk M/D 4 1 5 M/H 37
4.6 Mechanical & Tank
Mechanical Superintendent M/D 76 1 77 M/H 708
4.6.1 Tank
Tank Field Engineer M/D 169 1 170 M/H 1,638
Tank Supervisor M/D 75 1 76 M/H 698
4.6.2 Static Mechanical
Static Field Engineer M/D 76 2 78 M/H 708
Preservation Technician M/D 138 - 138 M/H 1,310

253
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 72 1 73 M/H 671
4.6.4 Rotary
Field Engineer M/D 4 1 5 M/H 37
Supervisor M/D 4 1 5 M/H 37
4.6.5 Combation
Field Engineer M/D 4 1 5 M/H 37
4.7 General Contruction
General Superintendent M/D 241 1 242 M/H 2,358
Jr.Mechanical Engineer M/D 75 1 76 M/H 663
Mechanical Supervisor M/D 67 1 68 M/H 634
4.8 Electrical
Elecctrical Superintendent M/D 10 1 11 M/H 96
Field Engineer M/D 10 1 11 M/H 96
Lead Supervisor M/D 10 1 11 M/H 96
Engineer M/D 10 1 11 M/H 96
Supervisor M/D 30 3 33 M/H 288
Clerk M/D 10 1 11 M/H 96

254
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 10 1 11 M/H 96
Supervisor M/D 10 1 11 M/H 96
5 Preservation
Preservation Coordinator M/D 10 1 11 M/H 96
Preservation Eng M/D 10 1 11 M/H 96
Preservation Junior Eng M/D 40 4 44 M/H 384
6 Control
Project Control Manager M/D 198 1 199 M/H 1,929
Project Control M/D 236 1 237 M/H 2,152
Document Control M/D 264 1 265 M/H 2,557
Schedule Engineer M/D 202 4 206 M/H 1,959
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 402 5 407 M/H 3,857
Cost Control M/D 288 2 290 M/H 2,771
Subcontracting M/D 564 4 568 M/H 5,435
Material Control M/D 641 4 645 M/H 6,195
7 Administration

255
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 211 1 212 M/H 2,046
Administration M/D 2,228 18 2,246 M/H 21,286
Business Coordinator M/D 741 2 743 M/H 6,810
Project Support M/D 433 2 435 M/H 4,202
Finance M/D 234 1 235 M/H 2,267
Puchasing M/D 337 2 339 M/H 3,275
8 Public Relation
Public Affair M/D 1,110 3 1,113 M/H 10,246
Government Permit M/D 460 1 461 M/H 4,131
9 IT
IT Engineer M/D 868 4 872 M/H 8,294
10 Others
Security M/D 6,417 33 6,450 M/H 61,611
Rigging & Lifting / Operator M/D 2,771 12 2,783 M/H 26,983
Operator Genset M/D 488 2 490 M/H 4,734
Office Boy/Girl M/D 1,292 6 1,298 M/H 12,536
Paramedic M/D 2,672 12 2,684 M/H 25,902
Driver M/D 4,408 26 4,434 M/H 42,677

256
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 281 4 285 M/H 2,839
Rigger M/D 365 5 370 M/H 3,420
Skill M/D 1,121 8 1,129 M/H 10,470
Warehouse M/D 315 17 332 M/H 3,064
Total 53,927 281 54,208 434,243

2 PT. BANGUN NUSA PERSADA (TEMFAC SECTION A - BNP)


Total 9,955 - 9,955 88,084

3 PT. INDOTECH KARYA MANDIRI (TEMFAC SECTION B & C - IKM)


Total 103,539 - 103,539 153,750

4 PT. NAD JAYA (TEMFAC SECTION D - NAD)

257
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 20,435 - 20,435 185,652

5 PT. PELITA NUSA PERKASA (BATCHING PLANT - PNP)


INDIRECT MANPOWER
1 Site Manager M/D 120 1 121 M/H 1,025
2 HSE M/D 326 1 327 M/H 3,019
3 Safetyman M/D 163 1 164 M/H 1,608
4 Quality Control M/D 308 1 309 M/H 2,843
5 Supervisor M/D 1 - 1 M/H 8
6 Finance M/D 198 - 198 M/H 1,942
7 Public Affair M/D 262 1 263 M/H 2,483
8 Mechanic M/D 510 1 511 M/H 4,871
9 Logistic M/D 206 1 207 M/H 2,012
10 Security M/D 753 3 756 M/H 7,279
Sub Total 2,847 10 2,857 27,089

258
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 795 3 798 M/H 7,606
2 Lab M/D 459 1 460 M/H 4,461
3 Driver Truck Mixer M/D 947 5 952 M/H 9,220
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,633 3 1,636 M/H 14,053
Sub Total 3,954 12 3,966 36,267

Total 6,801 22 6,823 63,356

6 PT. PUALAM BANGUN CIPTA (FWBS 2000 : CONCRETE STRUCTURE


INDIRECT MANPOWER

1 Project Manager M/D 188 1 189 M/H 1,832

2 Project Control M/D 112 1 113 M/H 1,128

259
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Site Manager M/D 417 1 418 M/H 4,078

4 HSE M/D 1,603 8 1,611 M/H 15,844

5 Quality Control M/D 1,483 7 1,490 M/H 14,616

6 Assistant Lab Quality Control M/D 17 - 17 M/H 170

7 Engineering Manager M/D 208 1 209 M/H 2,021

8 Engineer M/D 231 1 232 M/H 2,320

9 Supervisor M/D 1,622 7 1,629 M/H 16,046

10 Assistant Supervisor M/D 134 1 135 M/H 1,340

11 Document Control M/D 434 1 435 M/H 4,259

12 Drafter M/D 570 3 573 M/H 5,594

13 Finance & GA M/D 232 1 233 M/H 2,266

14 Payroll / Accounting M/D 334 1 335 M/H 3,240

15 Admin M/D 208 1 209 M/H 2,093

260
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

16 Assitant GA M/D 54 1 55 M/H 540

17 Surveyor M/D 671 3 674 M/H 6,649

18 Assistant Surveyor M/D 875 4 879 M/H 8,700

19 Public Affair M/D 241 1 242 M/H 2,349

20 Logistic M/D 1,427 9 1,436 M/H 14,137

21 Security M/D 987 5 992 M/H 9,733

22 Driver M/D 1,193 4 1,197 M/H 11,661

Sub Total 13,241 62 13,303 130,613

DIRECT MANPOWER

1 Worker M/D 5,271 - 5,271 M/H 5,271

2 Foreman M/D 2,287 4 2,291 M/H 8,641

3 Carpenter M/D 18,538 7 18,545 M/H 66,688

261
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Rebar Man M/D 23,589 10 23,599 M/H 93,461

5 Masonry M/D 368 20 388 M/H 3,680

6 Scaffolder M/D 4,167 7 4,174 M/H 12,523

7 Helper M/D 19,124 29 19,153 M/H 59,962

8 Operator M/D 11,516 15 11,531 M/H 34,577

Sub Total 84,858 92 84,950 284,801

262
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

263
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 98,099 154 98,253 415,414

7 JEC-DIRECT HIRED (FWBS 2300 : FOUNDATION WORK)


INDIRECT MANPOWER

1 Project Manager M/D 61 - 61 M/H 610

2 Site Manager M/D 104 1 105 M/H 1,027

3 Project Control M/D 128 1 129 M/H 1,264

264
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Civil Engineer M/D 164 1 165 M/H 1,624

5 HSSE Coordinator M/D 135 1 136 M/H 1,340

6 HSSE Admin M/D 146 1 147 M/H 1,446

7 Material Control M/D 168 1 169 M/H 1,671

8 Quality Control M/D 217 2 219 M/H 2,161

9 Ass Quality Control M/D 149 1 150 M/H 1,478

10 HRD/ Personel M/D 95 1 96 M/H 947

11 Time Keeper M/D 197 1 198 M/H 1,949

12 Surveyor M/D 824 6 830 M/H 8,150

13 Drafter M/D 77 1 78 M/H 756

14 Procurement M/D 139 - 139 M/H 1,376

15 Site Environment Coordinator M/D 105 - 105 M/H 1,047

16 Tool Keeper M/D 404 1 405 M/H 4,026

265
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

17 Safetyman M/D 432 2 434 M/H 4,277

18 Mechanic M/D 64 - 64 M/H 634

19 Electrician M/D 221 1 222 M/H 2,185

20 Driver M/D 725 5 730 M/H 7,186

21 Security M/D 619 2 621 M/H 6,164

22 Office Boy M/D 124 - 124 M/H 1,235

Sub Total 5,298 29 5,327 52,553

DIRECT MANPOWER

1 Field Supervisor M/D 448 3 451 M/H 4,439

2 Foreman M/D 679 7 686 M/H 6,718

3 Carpenter M/D 952 10 962 M/H 9,465

4 Rebar Worker M/D 1,095 12 1,107 M/H 10,888

266
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

5 Concrete Worker M/D 561 10 571 M/H 5,521

6 Mason Worker M/D - - - M/H -

7 Scaffolder M/D 163 - 163 M/H 1,630

8 Welder SMAW M/D 1,295 10 1,305 M/H 12,789

9 Semi Skill M/D 1,949 12 1,961 M/H 19,346

10 Common Labor M/D 2,514 22 2,536 M/H 24,858

11 Operator Excavator M/D 280 2 282 M/H 2,768

12 Operator Boom Truck M/D 8 - 8 M/H 80

Sub Total 9,944 88 10,032 98,502

Total 15,242 117 15,359 151,055

267
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 JEC-DELTA (FWBS 2300 : FOUNDATION WORK)


INDIRECT MANPOWER

1 Coordinator M/D 30 - 30 M/H 300

2 Supervisor M/D 15 - 15 M/H 150

3 Jr. Civil Engineer M/D 129 - 129 M/H 1,288

4 Drafter M/D 147 1 148 M/H 1,468

- - - M/H -

Sub Total 321 1 322 3,206

DIRECT MANPOWER

1 Foreman M/D 139 1 140 M/H 1,390

2 Ass. Foreman M/D 399 2 401 M/H 3,990

3 Rebar Man M/D 1,505 12 1,517 M/H 15,050

268
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Mason M/D 1,465 22 1,487 M/H 14,650

5 Carpenter M/D 1,426 18 1,444 M/H 14,260

6 Finishing M/D 919 4 923 M/H 9,190

7 Semi Skill M/D 889 889 M/H 8,890

8 Skill Worker M/D 663 9 672 M/H 6,630

9 Helper M/D 5,546 55 5,601 M/H 55,460

Sub Total 12,951 123 13,074 129,510

269
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

270
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,272 124 13,396 132,716

9 PT. GUNA TEGUH ABADI (STEEL STRUCTURE ERECTION - GTA)


INDIRECT MANPOWER

1 Site Manager M/D 115 - 115 M/H 1,132

2 Construction Manager M/D 109 - 109 M/H 1,072

3 HSE Coordinator M/D 114 - 114 M/H 1,122

4 QC Coordinator M/D 116 - 116 M/H 1,142

5 Field Enginer Leader M/D 121 - 121 M/H 1,192

271
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Project Control M/D 114 - 114 M/H 1,122

7 ADM. Coordinator M/D 107 - 107 M/H 1,052

8 Superintendent M/D 147 - 147 M/H 1,440

9 Supervisor M/D 205 - 205 M/H 2,008

10 Safetyman M/D 331 2 333 M/H 3,256

11 Safety Officer M/D 190 4 194 M/H 1,876

12 QC M/D 152 - 152 M/H 1,484

13 Finance M/D 217 2 219 M/H 2,134

14 Procurement M/D 41 - 41 M/H 404

15 Adm. Staff M/D 203 - 203 M/H 1,994

16 Material Control M/D 318 - 318 M/H 3,123

17 Mechanical / Electrical M/D 383 4 387 M/H 3,770

18 Document Control M/D 94 - 94 M/H 934

272
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

19 Security M/D 205 - 205 M/H 2,008

20 Driver M/D 172 - 172 M/H 1,678

21 Opr. Leader M/D 39 - 39 M/H 390

22 Office Boy/Girl M/D 120 - 120 M/H 1,188

23 Engineer Staff M/D 82 1 83 M/H 799

Sub Total 3,695 13 3,708 36,320

DIRECT MANPOWER

1 Foreman M/D 534 4 538 M/H 5,250

2 Operator M/D 1,661 19 1,680 M/H 16,220

3 Rigger M/D 1,599 9 1,608 M/H 15,543

4 Millwright M/D 827 8 835 M/H 8,120

5 Scafolder M/D 1,614 11 1,625 M/H 15,804

273
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Welder M/D 308 9 317 M/H 3,017

7 Helper M/D 2,833 18 2,851 M/H 27,742

Sub Total 9,376 78 9,454 91,696

274
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,071 91 13,162 128,016

10 PT. BANGUN NUSA PERSADA (MAIN BUILDING - BNP)


INDIRECT MANPOWER

275
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Site Manager M/D 250 1 251 M/H 2,368

2 HSE M/D 690 3 693 M/H 6,762

3 Quality Control M/D 693 2 695 M/H 6,678

4 Site Engineering Manager M/D 75 - 75 M/H 686

5 Engineer M/D 498 1 499 M/H 4,866

6 Drafter M/D 598 5 603 M/H 5,970

7 Supervisor M/D 1,086 9 1,095 M/H 10,740

8 Surveyor M/D 1,037 3 1,040 M/H 9,952

9 Administration M/D 392 2 394 M/H 3,708

11 Logistic M/D 920 4 924 M/H 8,958

13 Driver M/D 264 2 266 M/H 2,528

14 Purchasing M/D 50 1 51 M/H 500

15 Delivery M/D 37 - 37 M/H 370

276
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 6,590 33 6,623 64,084

DIRECT MANPOWER

1 Finishing Worker M/D 2,377 27 2,404 M/H 23,216

2 Worker Site Temporary M/D 185 - 185 M/H 1,633

3 Operator Excavator M/D 183 - 183 M/H 1,778

4 Driver Dump Truck M/D 130 - 130 M/H 1,205

5 Operator Crane M/D 197 - 197 M/H 1,912

6 Rigger Crane M/D 389 - 389 M/H 3,797

7 Helper Crane M/D 197 - 197 M/H 1,918

8 Carpenter M/D 1,421 - 1,421 M/H 13,900

9 Rebar Man M/D 2,069 2 2,071 M/H 20,245

10 Digger M/D 422 1 423 M/H 4,168

277
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

11 Masonry & Concrete worker M/D 4,325 24 4,349 M/H 43,118

12 Mechanical M/D 47 - 47 M/H 470

13 Pipe M/D - - - M/H -

14 Scaffolder M/D 2,092 14 2,106 M/H 20,669

15 Steel worker M/D 1,715 9 1,724 M/H 17,012

16 Mechanic M/D 685 1 686 M/H 6,627

17 Teknisi Plumbing M/D 409 5 414 M/H 4,090

18 Teknisi Electrical M/D 1,838 26 1,864 M/H 18,380

19 General Worker M/D 693 - 693 M/H 6,536

Sub Total 19,374 109 19,483 190,671

278
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 25,964 142 26,106 254,755

11 PT. GUNA TEGUH ABADI (MECHANICAL WORK - GTA)


INDIRECT MANPOWER

279
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Site Manager M/D 43 1 44 M/H 414

2 Construction Manager M/D 44 1 45 M/H 424

3 HSE Coordinator M/D 44 1 45 M/H 424

4 QC Coordinator M/D 44 1 45 M/H 424

5 Inspector Welder M/D 44 1 45 M/H 424

6 Field Enginer Leader M/D 44 1 45 M/H 424

7 Project Control M/D 44 1 45 M/H 424

8 ADM. Coordinator M/D 43 1 44 M/H 414

9 Superintendent M/D 71 1 72 M/H 678

10 Supervisor M/D 217 8 225 M/H 2,115

11 Safety Officer M/D 43 1 44 M/H 414

12 Finance M/D 44 1 45 M/H 424

13 Procurement M/D - - - M/H -

280
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

14 Adm. Staff M/D 119 3 122 M/H 1,142

15 Mechanic / Electrical M/D 44 1 45 M/H 424

16 Document Control M/D 43 1 44 M/H 414

17 Security M/D 220 5 225 M/H 2,120

18 Opr. Leader M/D - - - M/H -

19 Office Boy/Girl M/D 44 1 45 M/H 424

Sub Total 1,195 30 1,225 11,527

DIRECT MANPOWER

1 Foreman M/D 145 6 151 M/H 1,413

2 Millwright M/D 490 14 504 M/H 4,784

3 Fitter M/D 196 17 213 M/H 1,939

4 Operator M/D 96 6 102 M/H 960

281
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

5 Helper M/D 774 34 808 M/H 7,603

6 Rigger M/D 311 11 322 M/H 3,040

7 Scaffolder M/D 108 8 116 1,080

Sub Total 2,120 96 2,216 20,819

Total 3,315 126 3,441 32,346

282
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

12 PT. BARATA INDONESIA (FIELD ERECTED TANK - BRT)


INDIRECT MANPOWER

1 Project Manager M/D 69 1 70 M/H 687

2 Construction Manager M/D 184 1 185 M/H 1,834

3 Project Control M/D 87 1 88 M/H 867

4 HSE Officer M/D 134 1 135 M/H 1,337

5 Safety Man M/D 162 2 164 M/H 1,604

6 Engineer M/D 85 1 86 M/H 847

7 Supervisor M/D 357 4 361 M/H 3,548

8 QC Manager M/D 79 1 80 M/H 787

9 QC Dimensional M/D 119 1 120 M/H 1,187

10 Material Control M/D 62 1 63 M/H 617

11 Drafter M/D 62 1 63 M/H 617

283
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

12 Surveyor M/D 134 1 135 M/H 1,337

13 NDE Coordinator M/D 156 3 159 M/H 1,551

14 Welding Inspector M/D 121 1 122 M/H 1,207

15 Scaffolding Inspector M/D - - - M/H -

16 Purchasing M/D 52 1 53 M/H 517

17 Logistic M/D 60 1 61 M/H 597

18 GA & Finance M/D 130 1 131 M/H 1,297

19 Admin 75 1 76 747

20 Public Affair M/D 286 2 288 M/H 2,834

21 Tools & Consumable Keeper M/D 199 2 201 M/H 1,984

22 House keeping M/D 131 2 133 M/H 1,284

23 Office Boy M/D 182 2 184 M/H 1,804

24 Security M/D 351 4 355 M/H 3,488

284
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

25 Driver M/D 69 1 70 M/H 667

Sub Total 3,346 37 3,383 33,246

DIRECT MANPOWER

1 Operator M/D 236 3 239 M/H 2,348

2 Rigger M/D 223 1 224 M/H 2,215

3 Foreman M/D 266 4 270 M/H 2,628

4 Fitter M/D 1,758 16 1,774 M/H 17,498

5 Scaffolder M/D 140 2 142 M/H 1,394

6 Welder M/D 1,242 11 1,253 M/H 12,332

7 Helper M/D 1,326 17 1,343 M/H 13,139

8 Technician M/D 274 3 277 M/H 2,732

Sub Total 5,465 57 5,522 54,286

285
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 8,811 94 8,905 87,532

13 PT. ISMA TIUR (PIPING FIELD INSTALLATION AND PAINTING WORK


INDIRECT MANPOWER

1 Site Manager M/D 163 1 164 M/H 1,630

2 Construction Manager M/D 152 1 153 M/H 1,520

3 Engineering Coordinator M/D 163 1 164 M/H 1,630

4 Project Control Coordinator M/D 164 1 165 M/H 1,640

5 HSE Coordinator M/D 163 1 164 M/H 1,630

6 Checker / Drafter Piping M/D 214 2 216 M/H 2,140

7 Material Control M/D 154 1 155 M/H 1,540

286
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 QC/Admin QC M/D 665 7 672 M/H 6,650

9 Store Keeper M/D 161 1 162 M/H 1,610

10 Surveyor M/D 298 4 302 M/H 2,980

11 Supervisor PTW M/D 100 1 101 M/H 1,000

12 Safety Officer/ HSE Man M/D 177 2 179 M/H 1,770

13 Safety Supervisor M/D 170 1 171 M/H 1,700

14 First Aids M/D 129 1 130 M/H 1,290

15 General Affair M/D 154 1 155 M/H 1,540

16 Superintendent M/D 50 1 51 M/H 500

17 Supervisor HDPE M/D 263 2 265 M/H 2,630

18 Supervisor CS, LTCS & Nace M/D 408 3 411 M/H 4,080

19 Humas M/D 568 4 572 M/H 5,680

20 Document Control M/D 154 1 155 M/H 1,540

287
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

21 HRD M/D 141 1 142 M/H 1,410

22 Admin M/D 593 5 598 M/H 5,930

23 Driver M/D 217 3 220 M/H 2,170

24 Supervisor Scaffolding M/D 98 1 99 M/H 980

25 Time Keeper M/D 113 2 115 M/H 1,130

26 Material Handling M/D 61 1 62 M/H 610

27 Security M/D 200 2 202 M/H 2,000

Sub Total 5,893 52 5,945 58,930

DIRECT MANPOWER

1 Operator M/D 493 7 500 M/H 4,930

2 Foreman Pipe Fitter M/D 365 4 369 M/H 3,650

3 Pipe Fitter I M/D 1,295 15 1,310 M/H 12,950

288
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Pipe Fitter II M/D 198 2 200 M/H 1,980

5 Foreman Welder M/D 3 - 3 M/H 30

6 Welder M/D 562 6 568 M/H 5,620

7 Rigger M/D 394 5 399 M/H 3,940

8 Painter M/D 170 2 172 M/H 1,700

9 Mechanic / Electrical M/D 261 2 263 M/H 2,610

10 Scaffolder 299 4 303 M/H 2,990

11 Hydrotest Skill M/D 85 1 86 M/H 850

12 Ware House 64 1 65 M/H 640

13 Helper M/D 3,273 37 3,310 M/H 32,730

Sub Total 7,462 86 7,548 74,620

289
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,355 138 13,493 133,550

14 PT. SWADAYA GRAHA (PIPING FIELD INSTALLATION AND PAINTING


INDIRECT MANPOWER

1 Project Manager M/D 33 - 33 M/H 330

2 Site Manager M/D 213 2 215 M/H 2,081

3 QC Manager M/D 139 1 140 M/H 1,367

4 QC Inspector M/D 252 3 255 M/H 2,456

5 HSE Manager M/D 124 1 125 M/H 1,217

6 Safety Officer M/D 121 - 121 M/H 1,194

7 Safety Man M/D 146 1 147 M/H 1,435

8 Material Control M/D 217 2 219 M/H 2,117

9 PPC Manager M/D 59 1 60 M/H 579

290
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

10 Daily Reporter M/D 207 2 209 M/H 2,023

11 Spool Control M/D 129 2 131 M/H 1,264

12 Engineering Manager M/D 9 1 10 M/H 90

13 Field Engineer M/D 200 2 202 M/H 1,960

14 Welding Tracker M/D 114 1 115 M/H 1,118

15 Document Control M/D 124 1 125 M/H 1,218

16 HRD M/D 181 2 183 M/H 1,777

17 Supervisor M/D 448 7 455 M/H 4,352

18 Driver M/D 388 5 393 M/H 3,758

19 Scurity M/D 339 4 343 M/H 3,282

20 Public Relations M/D 211 2 213 M/H 2,060

21 Logistik M/D 216 3 219 M/H 2,095

22 Surveyor M/D 91 1 92 M/H 892

291
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

23 Manager Operator M/D 88 1 89 M/H 858

24 Operator Forklif M/D 83 1 84 M/H 810

25 Operator Trailer M/D 161 2 163 M/H 1,569

26 Operator TMC M/D 85 1 86 M/H 830

27 Operator Crane M/D 451 8 459 M/H 4,342

28 General Support adm M/D 199 2 201 1,940

29 Painting Inspector M/D 137 1 138 1,349

30 Operator PWHT M/D 15 2 17 150

Sub Total 5,180 62 5,242 50,513

DIRECT MANPOWER

1 Operator HDPE M/D 72 - 72 M/H 720

2 Foreman Pipe M/D 302 4 306 M/H 2,919

292
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Pipe Fitter M/D 835 13 848 M/H 8,009

4 Welder M/D 389 6 395 M/H 3,728

5 Rigger M/D 387 5 392 M/H 3,734

6 Scaffolder M/D 301 4 305 M/H 2,904

7 Mechanic M/D 276 4 280 M/H 2,664

8 Werehouse M/D 321 4 325 M/H 3,117

9 Helper M/D 314 4 318 M/H 3,034

10 Office Boy M/D 131 1 132 M/H 1,283

11 Painting M/D 124 1 125 M/H 1,187

Sub Total 3,452 46 3,498 33,299

Total 8,632 108 8,740 83,812

293
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

15 PT. WIJAYA ENGINDO NUSA (ELECTRICAL - WEN)


INDIRECT MANPOWER

1 Site Manager M/D 182 1 183 M/H 1,798

2 E/I Construction Coord M/D 77 1 78 M/H 738

3 Finance/ Acctg M/D 69 1 70 M/H 670

4 Administration Coord M/D 193 1 194 M/H 1,914

5 Engineering Material M/D 65 1 66 M/H 632

6 QA/ QC Electrical M/D 77 1 78 M/H 738

7 Supervisor Electrical M/D 260 3 263 M/H 2,534

8 Superisor Material Control M/D 58 1 59 M/H 562

9 HSE Coord M/D 131 1 132 M/H 1,276

10 HSE/ Scaffolding Inspector M/D 55 1 56 M/H 532

294
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

11 Project Control M/D 105 1 106 M/H 1,024

12 Administration Staff M/D 120 1 121 M/H 1,174

13 Security M/D 87 1 88 M/H 846

14 Office Girl M/D 83 1 84 M/H 808

15 Housekeeping M/D 80 1 81 M/H 778

16 Cleaning Service M/D 115 2 117 M/H 1,116

17 Time Keeper/ Adm Staff M/D 49 1 50 M/H 472

Sub Total 1,806 20 1,826 17,612

DIRECT MANPOWER

1 QA/ QC Technician M/D 77 1 78 M/H 748

2 Scaffolder Foreman M/D 67 1 68 M/H 640

3 Scaffolder M/D 54 2 56 M/H 528

295
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Technician M/D 207 6 213 M/H 2,010

5 Helper M/D 169 13 182 M/H 1,638

6 Mechanic M/D 318 9 327 M/H 3,094

7 Warehouse M/D 85 1 86 M/H 826

8 Welder M/D 85 1 86 M/H 826

9 TMC Operator M/D 219 4 223 M/H 2,128

10 TMC Operator M/D 70 1 71 M/H 680

11 Rigger M/D 77 1 78 M/H 748

Sub Total 1,428 40 1,468 13,866

Total 3,234 60 3,294 31,478

296
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

16 PT. WIJAYA ENGINDO NUSA (INSTRUMENT - WEN)


INDIRECT MANPOWER

1 Supervisor Instrument M/D 197 2 199 M/H 1,958

Sub Total 197 2 199 1,958

DIRECT MANPOWER

1 Instrument Foreman M/D 8 1 9 M/H 80

2 Instrument Technician M/D 123 3 126 M/H 1,200

Sub Total 131 4 135 1,280

297
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 328 6 334 3,238

17 PT. TERAS TEKNIK PERDANA (INSULATION /SCAFFOLDING - TTP)


INDIRECT MANPOWER

1 Site Manager M/D 109 1 110 M/H 1,055

2 Construction Manager M/D 109 1 110 M/H 1,055

3 HSSE Coordinator M/D 109 1 110 M/H 1,055

4 Supv Scaffolding M/D 107 1 108 M/H 1,035

5 Inspector Scaffolding M/D 109 1 110 M/H 1,055

6 Material Control M/D 109 1 110 M/H 1,055

7 Ass Material Control M/D 55 1 56 M/H 518

298
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 Admin M/D 106 1 107 M/H 1,025

9 Public Relations M/D 108 - 108 M/H 1,045

10 HSSE Administration M/D 54 1 55 M/H 508

11 PPC M/D 51 1 52 M/H 478

12 Driver M/D 206 1 207 M/H 2,013

13 Timekeeper M/D 95 1 96 M/H 915

14 Office Boy M/D 78 1 79 M/H 755

15 Security Officer M/D 8 1 9 M/H 77

Sub Total 1,413 14 1,427 13,644

DIRECT MANPOWER

1 Foreman M/D 183 2 185 M/H 1,780

2 Lead Worker M/D 216 2 218 M/H 2,110

299
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Skilled Worker M/D 864 10 874 M/H 8,390

5 Helper M/D 418 7 425 M/H 4,023

Sub Total 1,681 21 1,702 16,303

Total 3,094 35 3,129 29,947

18 PT. THAI NDT INDONESIA (NON-DESTRUCTIVE TESTING - TNDT)


INDIRECT MANPOWER

1 Site Manager M/D 6 - 6 M/H 60

2 Supervisor M/D 72 1 73 M/H 720

3 Document Control M/D 74 1 75 M/H 740

4 Interpreter Radiography M/D 74 1 75 M/H 740

300
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 226 3 229 2,260

DIRECT MANPOWER

1 Operator Radiography M/D 142 3 145 M/H 1,420

2 RPO M/D 149 1 150 M/H 1,490

3 Driver M/D 70 1 71 M/H 700

4 PT Technician M/D 98 2 100 M/H 980

M/H

Sub Total 459 7 466 4,590

Total 685 10 695 6,850

301
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

19 PT. MI ENERGI (FUEL SUPPLY - MIE)


INDIRECT MANPOWER

1 Coordinator Manager M/D 206 1 207 M/H 2,041

2 Public Affair M/D 186 1 187 M/H 1,856

Sub Total 392 2 394 3,897

DIRECT MANPOWER

1 Driver M/D 202 1 203 M/H 2,012

2 Security M/D 385 2 387 M/H 3,855

3 Helper M/D 586 3 589 M/H 5,863

Sub Total 1,173 6 1,179 11,729

302
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 1,565 8 1,573 15,626

20 PT. MEULIGO (CONSTRUCTION OF JETTY AT KUALA GEULUMPANG


Total 197 - 197 1,957

21 PT. TAKA HYDROCORE INDONESIA (DEEP WELL WORK - THI) - NO W


Total 4,309 - 4,309 33,568

22 PT. BERDIKARI PONDASI PERKASA (PILING WORK - BPP) - NO WOR


Total 2,501 - 2,501 21,007.0

23 PT. SWING INDONESIA (WASTE WATER TREATMENT - SWI)

303
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 298 - 298 2,652

24 PT. MITRA USAHA KREASINDO (PLN SCOPE - MUK) - NO WORK


Total 153 - 153 1,288.5

25 PT. EQUINE GLOBAL (NETWORK CABLE DATA - EGL)


Total 254 - 254 2,378

26 PT. BAASITHU BOGA SERVICES (RECEPTIONIST & ROOM BOY/ROO


INDIRECT MANPOWER

1 Site Manager M/D 163 1 164 M/H 1,630

2 F&B Supervisor M/D - - - M/H -

3 Housekeeping SPV M/D 163 1 164 M/H 1,630

304
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Storeman M/D - - - M/H -

5 Japanesse Cook M/D 163 1 164 M/H 1,630

6 Receptionist / ADM M/D 163 1 164 M/H 1,630

Sub Total 652 4 656 6,520

DIRECT MANPOWER

1 Camp Boss M/D 163 1 164 M/H 1,630

2 Housekeeping SPV M/D 163 1 164 M/H 1,630

3 Bakery M/D 163 1 164 M/H 1,630

4 Cook M/D 326 2 328 M/H 3,260

5 Cook Helper M/D 326 2 328 M/H 3,260

6 Kitchen Boy M/D 489 3 492 M/H 4,890

7 Receptionist M/D 163 1 164 M/H 1,630

305
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 Room Boy M/D 2,254 14 2,268 M/H 22,540

9 Room Maid Medco M/D 1,449 9 1,458 M/H 14,490

10 Office Boy / Girl M/D 805 5 810 M/H 8,050

11 Waitress M/D 489 3 492 M/H 4,890

12 Laundry M/D 483 3 486 M/H 4,830

13 Driver M/D 326 2 328 M/H 3,260

Sub Total 7,599 47 7,646 75,990

Total 8,251 51 8,302 82,510

TOTAL M/D 419,286 1,567 420,853 M/H 2,576,778

JEC PERSONNEL
306
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
Quality Control

307
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
1 Zulfikar Said IT Engineer

308
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent

309
DAILY REPORT

P
JGC ENC

PORARY FACILITY SECTION A


PORARY FACILITY SECTION B & C
PORARY FACILITY SECTION D
CHING PLANT
BS 2000 (CONCRETE STRUCTURE) & FWBS 1000 (SEWER AND DRAINAGE)
2300 (FOUNDATION WORK)
2300 (FOUNDATION WORK)
EL STRUCTURE ERECTION
N BULDING
AHANICAL WORK
D ERECTED TANK
NG FIELD INSTALLATION AND PAINTING WORK UTILITY AREA
NG FIELD INSTALLATION AND PAINTING WORK PROCESS AREA
CTRICAL

310
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID

ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,845
10 9,128
10 1,468
10 2,925
10 1,828

311
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,645

110 21,297
10 2,582

20 2,249
20 3,014
60 9,652
20 1,355
10 173

10 3,425
10 3,271
10 3,230
20 6,389
- 158
10 2,502

312
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,263

10 2,598
40 1,993
10 4,134
10 3,582
10 1,862
10 2,870
10 2,323
10 4,490
10 4,162
10 1,655

10 4,091
30 5,644
40 2,130
20 3,348

313
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,206
10 2,035
20 1,607
10 47
30 2,509
10 660
10 1,640

10 2,277
10 47

10 718

10 1,648
10 708
-
20 728
- 1,310

314
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 681

10 47
10 47

10 47

10 2,368
10 673
10 644

10 106
10 106
10 106
10 106
30 318
10 106

315
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 106
10 106

10 106
10 106
40 424

10 1,939
10 2,162
10 2,567
40 1,999
980
50 3,907
20 2,791
40 5,475
40 6,235

316
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,056
180 21,466
20 6,830
20 4,222
10 2,277
20 3,295

30 10,276
10 4,141

40 8,334

330 61,941
120 27,103
20 4,754
60 12,596
120 26,022
260 42,937

317
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
40 2,879
50 3,470
80 10,550
170 3,234
2,810 437,053

- 88,084

& C - IKM)
- 153,750

318
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 185,652

10 1,035 1 Ready Mix Concrete Production


10 3,029 2 Ready Mix Concrete Production (Batching Plant II)
10 1,618
10 2,853
- 8
- 1,942
10 2,493
10 4,881
10 2,022
30 7,309
100 27,189

319
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 7,636
10 4,471
50 9,270
- 928
30 14,083
120 36,387

220 63,576

E STRUCTURE & FWBS 1000 : SEWER AND DRAINAGE - PBC)

10 1,842 - FWBS 2000

10 1,138 A Utility Area

320
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 4,088 1 Neutralization Pit

80 15,924 - Preparation Concrete for Top Slab

70 14,686

- 170 B Offsite Area

10 2,031 1 Sulfur Waste Pit

10 2,330 - Setting PERI Formwork

70 16,116

10 1,350 - FWBS 1000

10 4,269 1 Krueng Meureudu Road

30 5,624 - Continue Installation Rip-Rap Stone for V-Ditch

10 2,276

10 3,250 2 Kuta Binjai Road

10 2,103 - Spreading Sub Base Course

321
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 550

30 6,679 3 Product Silo Road

40 8,740 - Spreading Sub Base Course

10 2,359

90 14,227 4 Krueng Tawang Road

50 9,783 - Installation RCP 600

40 11,701

620 131,233 5 Takengon Road

- Installation RCP 600

- 5,271

40 8,681 - Junction Box 17.5 m³

70 66,758

322
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

100 93,561

200 3,880

70 12,593

290 60,252

150 34,727

920 285,721

323
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

324
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Total Concrete = 17.5 m³

1,540 416,954

- 610 1 Area A-400

10 1,037 - Setting Anchor Bolt in A4ST04

10 1,274 - Installation Formwork Pedestal In A4PR02

325
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,634 - Setting Anchor Bolt In A4PR02

10 1,350 - Prepare to Lean Concrete In Proses Air Blower

10 1,456

10 1,681 2 Area B-500

20 2,181 - Backfill in B5ST07 F1B

10 1,488 - Installation Rebar Footing in B5ST07 F1 A

10 957 - Installation Formwork Footing in B5ST07 F1 A

10 1,959 - Pouring Concrete Footing in B5ST07 F1A

60 8,210 - Installation Formwork Pedestal in B5ST07 F2A

10 766 - Backfill in B5ST07 F1A

- 1,376 - Installation Formwork Pedestal in B5ST07 F1A

- 1,047

10 4,036 3 Area B-600

326
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 4,297 - Install Rebar Footing in Water Treatment Package F8 , F9 AB

- 634 - Pouring Concrete in Water Treatment Package F8, F9 AB

10 2,195 - Finishing Pipe Sleeper

50 7,236

20 6,184

- 1,235

290 52,843

30 4,469

70 6,788

100 9,565

120 11,008

327
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

100 5,621

- -

- 1,630

100 12,889

120 19,466 Total Concrete K125 : 0 m³

220 25,078 Total Concrete K300 : 9 m³

20 2,788

- 80

880 99,382

1,170 152,225

328
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 300 1 Area Neutralization Pit (48-ABH-402)

- 150 - Rebat Install for Top Slab

- 1,288

10 1,478 2 Area Equipment Structure A6ST07

- - - Formwork Install for Footing

10 3,216 -

3 Area Equipment Structure A6ST08

- Continuing Formwork Install for Pedestal

10 1,400

20 4,010 4 Area Misc. Proses Area A200

120 15,170 - Continuing Formwork Install for Pedestal

329
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

220 14,870

180 14,440 5 Area Sulfur Pit (35-ZMB-551)

40 9,230 - Formwork Removal and Repairing

- 8,890

90 6,720 6 Area Piperack A7PR01

550 56,010 - Pouring Concrete for Pedestal (0,5 m3)

1,230 130,740 -

7 Area Pipe Sleeper 040-SLP-001-068

- Formwork Install for Pedestal

8 Area Workshop JEC

- Continuing Rebar Fabrication for Sleeper

330
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

9 Area Temporary New for Precast

- Formwork Install for Precast Sleeper

331
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Total concrete = 0.5 m³

1,240 133,956

ON - GTA)

- 1,132 PIPERACK

- 1,072 - B2PR01

- 1,122 Attch Clip Grating

- 1,142 Install Handrail 12

- 1,192 - B2PR02

332
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,122 Joint Inspection for plumbness

- 1,052 - D3PR01

- 1,440 Welding Washer Plate

- 2,008

20 3,276 EQUIPMENT SUPPORT

40 1,916 A3ST01

- 1,484 Check Plumbness Internal

20 2,154 Cont. Install Main member :

- 404 - Beam :4

- 1,994 - Handrail : 13

- 3,123 A4ST01

40 3,810 Transport Material + Cont. Install

- 934 - Beam :7 V. Brace :6

333
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,008 - Girder :9 S. Column :4

- 1,678

- 390

- 1,188

10 809

130 36,450

40 5,290

190 16,410

90 15,633

80 8,200

110 15,914

334
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

90 3,107

180 27,922

780 92,476 PIPERACK Today ((Ton)

A1PR01A 0.0

A1PR01B 0.0

A1PR02A 0.0

A1PR02B 0.0

A1PR03A 0.0

A1PR03B 0.0

A2PR01 0.0

D1PR01 0.0

A6PR01 0.0

B2PR01 0.5

335
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

B2PR02 0.0

D3PR02 0.0

D3PR01 0.0

D3BG01 0.0

A6ST01 0.0

A4ST01 5.0

A3ST01 1.3

Total 6.8

910 128,926

336
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 2,378 1 Main Substation Building

30 6,792 - Installation pipe EMT (4)

20 6,698 - Installation lamp (2)

- 686 - Installation suport busduck and finishing pedestal (8)

10 4,876 - Finishing compone for wall (1)

50 6,020

90 10,830

30 9,982

20 3,728

40 8,998 2 Main Control Room

20 2,548 - Installation tray and conduti (6)

10 510 - Finishing defuser (3)

- 370 - Fabrication suport for hvac (4)

337
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

330 64,414 - Polling cable Lamp a and power lamp (5)

- Installation PVC for airlock and toilet (4)

- Polling cable fire alarm (2)

270 23,486 - Polling cable telephone (3)

- 1,633 - Installation pipe ven (3)

- 1,778 - Finishing wall and repair plafond (9 and (2)

- 1,205 - Installation cover for stell (2)

- 1,912 - Installation ceramic (4)

- 3,797

- 1,918 3 Chemical Storage

- 13,900 - Installation flashing (9)

20 20,265 - Installation pipe roofdrain (2)

10 4,178 4 Waste Storage

338
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

240 43,358 - Installation suport tray and fabrication (6)

- 470 - Installation suport scaffolding (4)

- -

140 20,809 5 GEG Building

90 17,102 - Installation perimeter scaffolding (10)

10 6,637

50 4,140 6 Shelter Building

260 18,640 - Repair excavation (5)

- 6,536 - Chipping foundation (2)

1,090 191,761 - Fabrication rebar for air compressor (4)

- Transfer material rebar (2)

- Fabrication beton dike (1)

339
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,420 256,175

STATIC EQUIPMENT

340
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 424 - 46-MBM-106 LP Condensate Flash Drum

10 434 Installation of Platform

10 434 - 35-EBN-201 Thermal Reactor Waste Heat Boiler

10 434 Install of Equipment

10 434 - 35-SRF-501 Thermal Reactor Chamber

10 434 Install of Equipment

10 434 - 32-HAL-201 AGR Lean Amin Cooler

10 424 Preparation of intallation

10 688 - 32-MAF-101 AGR Absorber

80 2,195 Grouting on foundation

10 424 - 36-HBG-203A Produced Water Heater

10 434 Joint Inspection Leveling + Grouting on foundation

- - ROTARY EQUIPMENT

341
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 1,172 - 44-PBM-333 A/B Utility Water Transfer Pumps

10 434 Cont. Pre-Alignment

10 424 - 44-PBM-334 A/B Potable Water Pumps

50 2,170 Cont. Pre-Alignment

- - - 36-PAX-332 A/B Condensate Stabilizer Pump

10 434 Install of Pump

300 11,827 - 36-PBA-333 A/B Produced water Recycle pump

Padding on Foundation

- 46-PBE-332 A/B Steam Condensate Pump

60 1,473 Finishing on foundation

140 4,924 - 46-PBE-333 A/B LP Boiler Feed Water Pump

170 2,109 Finishing on foundation

60 1,020 PACKAGE EQUIPMENT

342
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

340 7,943 - 33-ZZZ-502 (EG Regeneration Package Skid)

110 3,150 Padding + Dumper grout on Foundation

80 1,160 - 46-ZBE-501 A/B BOILER PACKAGE A/B

960 21,779 Finishing foundation FD Fan Boiler A/B

Complete Duct Boiler A/B to Economizer A/B

Complete Duct Economizer to Stack A/B

Asemmbly + Install Structure Boiler A/B

- 35-KZZ-701 (Incenerator Stack)

Cont. Chipping on foundation

- 35-TTO-501 (Incenerator Combustion)

Cont. Chipping on foundation

1,260 33,606

343
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 697 1 Condensate B Tank

10 1,844 - Inspection shell plate course 5

10 877

10 1,347 2 Condensate C Tank

20 1,624 - Fit up shell plate course 3

10 857

40 3,588 3 Utility Water Tank

10 797 - Welding Battom plate to Annular plate

10 1,197 - Fit up bracket to external plate

10 627

10 627 4 - Moving roof to area fire water tank

344
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,347

30 1,581 5 Fire Water Tank

10 1,217 -Inspection shell plate course 4

- -

10 527 6 Demin Water Tank

10 607 - Inspection shell plate course 6

10 1,307

10 757 7 - Cutting support catodic protation

20 2,854

20 2,004

20 1,304

20 1,824

40 3,528

345
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 677

370 33,616

30 2,378

10 2,225

40 2,668

160 17,658

20 1,414

110 12,442

170 13,309

30 2,762

570 54,856

346
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

940 88,472

NTING WORK UTILITY AREA - ISTI)

10 1,640 A Welding Progress

10 1,530 Underground (16475.4)

10 1,640 1 Pipe HDPE 43

10 1,650 2 Low Temp Carbon Steel (LTCS) 12

10 1,640 3 Carbon Steel (CS) 86

20 2,160 Total 141

10 1,550

347
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

70 6,720 Above ground (61350.4)

10 1,620 1 Low Temp Carbon Steel (LTCS) 0

40 3,020 2 Carbon Steel (CS) 0

10 1,010 3 Stainless Steel (SS) 0

20 1,790 4 Duplex Stainless Steel 0

10 1,710 5 ALLOY 825 0

10 1,300 Total 0

10 1,550

10 510 B Support Progress

20 2,650 1 CS 0

30 4,110 2 LTCS 0

40 5,720 3 Stainless Steel 0

10 1,550 4 DUPLEX SS 0

348
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,420 5 Cold Shoe Support 0

50 5,980 6 Spring Support 0

30 2,200 Total 0

10 990

20 1,150

10 620

20 2,020

520 59,450

C Other Progress

1 Borrow Sand 0

70 5,000 2 Coating 0

40 3,690 3 Post Heat Treatment 0

150 13,100 4 Finish Painting 0

349
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,000 5 Lettering/Marking 0

- 30 6 Pressure Test (STM) 0

60 5,680 Total 0

50 3,990

20 1,720

20 2,630

40 3,030

10 860

10 650

370 33,100

860 75,480

350
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,380 134,930

ND PAINTING WORK PROCESS AREA - SWG)

- 330 A Welding Progress

20 2,101 Under Ground (5929.60)

10 1,377 1 HDPE 0

30 2,486 2 LTCS INCL GALV 6

10 1,227 3 Carbon Steel INCL GALV 46

- 1,194 Total 52

10 1,445

20 2,137 Above ground (61182.00)

10 589 1 LTCS INCL GALV 0

351
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,043 2 Carbon Steel INCL GALV 0

20 1,284 3 Staniless Steel 24

10 100 4 Duplex Stainless Steel 0

20 1,980 Total 24

10 1,128

10 1,228 B Support Progress (121.17)

20 1,797 1 CS (Ton) 0

70 4,422 2 LTCS (Ton) 0

50 3,808 3 Stainless Steel (Ton) 0

40 3,322 4 DUPLEX SS (Ton) 0

20 2,080 5 Cold shoe support (qty) 0

30 2,125 6 Spring Support (qty) 0

10 902 Total 0

352
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 868

10 820 C Other Progress

20 1,589 1 Borrow Sand (M3) 0

10 840 2 Post Heat Treatment (ID) 0

80 4,422 3 Coating & Finish Paninting ( M2) 0

20 1,960 4 Lettering/Marking (pnt) 0

10 1,359 5 Steam Tracing 0

20 170 6 Pressure Test (STM) 0

620 51,133 Total 0

- 720

40 2,959

353
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

130 8,139

60 3,788

50 3,784

40 2,944

40 2,704

40 3,157

40 3,074

10 1,293

10 1,197

460 33,759

1,080 84,892

354
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Unit Today

10 1,808 1 Glandbox Fabrication

10 748 2 Install Support for PVC 2" ea 36

10 680 3 Install PVC 2" for grounding cable m 3

10 1,924 4 Grounding cable pulling m 87

10 642 5 Install Cathodic - Anode ea 12

10 748 6 Install Cathodic - Reference Electrode ea 1

30 2,564 7 Install Cathodic - Wiring m 30

10 572 8 Install Cathodic - Connection to piping pnt 4

10 1,286 9 Instal Cathodic - splicing/ connection pnt 6

10 542 10 Setting Panel 43-SWG-1203E

355
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,034 11 Loading Cable drum to SS area ea 5

10 1,184

10 856

10 818

10 788

20 1,136

10 482

200 17,812

10 758

10 650

20 548

356
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 2,070

130 1,768

90 3,184

10 836

10 836

40 2,168

10 690

10 758

400 14,266

600 32,078

357
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Unit Today

20 1,978 1 Fabrication tray ea

2 Setting panel at MCR

3 Install Panel at MCR pnl 8

20 1,978 4 Install Channel support for tray

5 Install Tray Support at SS

10 90

30 1,230

40 1,320

358
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 3,298

LDING - TTP)

10 1,065 1 JEC MCS Yard

10 1,065 - Modification Scaffolding at JEC MCS Yard

10 1,065 for Material Warehouse

10 1,045 (Supporting Manpower)

10 1,065

10 1,065

10 528

359
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,035

- 1,045

10 518

10 488

10 2,023

10 925

10 765

10 87

140 13,784

20 1,800

20 2,130

360
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

100 8,490

70 4,093

210 16,513

350 30,297

NG - TNDT)

- 60 1 Stand By

10 730

10 750

10 750

361
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 2,290

30 1,450

10 1,500

10 710

20 1,000

70 4,660

100 6,950

362
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Fuel Supply

10 2,051

10 1,866

20 3,917

10 2,022

20 3,875

30 5,893

60 11,789

363
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

80 15,706

GEULUMPANG - MEULIGO)
- 1,957

K - THI) - NO WORK
- 33,568

BPP) - NO WORK
- 21,007.0

364
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,652

NO WORK
- 1,288.5

- 2,378

OOM BOY/ROOM MAID - BBS)


Ready

10 1,640

- -

10 1,640

365
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- -

10 1,640

10 1,640

40 6,560

10 1,640

10 1,640

10 1,640

20 3,280

20 3,280

30 4,920

10 1,640

366
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

140 22,680

90 14,580

50 8,100

30 4,920

30 4,860

20 3,280

470 76,460

510 83,020

15,670 2,592,448

OTHER
367
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
WEATHE
Condition From To

CLEAR 7.00 18.00


CLOUDY
RAINY

HEAVY
RAIN

368
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

INSU, CERTIFICATION)

369
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish

HIGHLIG

370
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA

371
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
2
3
4
5
6

372
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8

373
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

374
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

375
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

376
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

377
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

378
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

379
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5

380
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- FWBS 2000 2

A Utility Area 3

381
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Neutralization Pit 4

- Concrete for Top Slab 5

B Offsite Area 7

1 Sulfur Waste Pit 8

- Preparation for Concrete Wall 9

10

- FWBS 1000 11

1 Krueng Meureudu Road 12

- Continue Installation Rip-Rap Stone for V-Ditch 13

14

2 Kuta Binjai Road 15

- Compacting Sub Base Course 16

382
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

16

3 Product Silo Road 17

- Compacting Sub Base Course 18

19

20

17.5 m³

383
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

384
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

385
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total Concrete = 0 m³

4 Area A-400 1

- Installation Rebar For valve pit 104 2

- Repair Concrete in Feed Acid Gas KO Drum 3

386
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Curing Concrete In Provulsion Vessel 4

- Backfill In A4ST04 F3 and F2 5

- Pouring Concrete In A4SN04 F4 6

- Installation Formwork Pedestal In A4SN02 7

- Lean Concrete In Proses Air Blower 8

- Installation Rebar In Proses Air Blower 9

- Installation Anchor Bolt In A4PR02 10


- Pouring Concrete In A4PR02 11

5 Area B-500

- Backfill in B5ST07 F1B

- Installation Rebar Pedestal in B5ST07 F1A

- Pouring Concrete in B5ST07 F2A

387
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

reatment Package F8 , F9 AB - Backfill in B5ST07 F1A

tment Package F8, F9 AB - Installation Formwork in B5ST07

6 Area B-600

- Curing Concrete in Water Treatment Package F8 , F9 AB

- Installation Rebar in Water Treatment Package F8 , F9 AB

7 Area B-700

- Repair Concrete in Pipe Sleeper

- Backfill in Pipe Sleeper

388
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total concrete = 0 m³

389
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Area Pipe Sleeper 040-SLP-001-068 1

- Pouring Cncrete for Footing and Pedestal ( 6 m3) 2

- 3

2 Area Equipment Structure A6ST07 4

- Formwork Install for Footing

3 Area Equipment Structure A6ST08

- Continuing Formwork Install for Pedestal

4 Area Neutralization Pit (48-ABH-402)

- Continuing Rebar Install

390
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Area Misc. Foundation A200

- Pouring Concrete for Footing ( 1 m3)

6 Area Piperack A7PR01

- Formwork Install for Pedestal at GL-5,6 /ABC

7 Area Workshop JEC

- Rebar Fabrication for Sleeper All Foundation

8 Area Sulfur Pit (35-ZMB-551)

- Continuing Formwork Removal and Repairing

391
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

9 Area Temporary New for Precast

- Contining Formwork Install for Precast Sleeper

392
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total concrete = 7 m³

PIPERACK 1

- B2PR01 2

Attch Clip Grating 3

Install Handrail 4

- B2PR02 5

393
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Joint Inspection for plumbness 6

- D3PR01 7

Grouting on foundation 8

EQUIPMENT SUPPORT 10

- A3ST01 11

Cont. Install Main member 12

Adjusting Plumbness 13

- A4ST01

Cont. Install Main member

394
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

395
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

396
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

397
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Main Substation Building 2

- Installation scaffolding (4) 3

- Installation pipe EMT (7) 4

- Installation lamp (2) 5

- Installation Panel (3) 6

- Aplication epoxy top coat (6) 7

- Installation skirting (5) 8

- Installation tray for Hvac (4) 9

10

2 Main Control Room 11

- Installation ceramic for toilet (2) 12

- Repair plafond (2) 13

- Finishing wall (8) 14

398
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Polling cable (4) 15

- Installation pipe PVC line lamp (2) 16

- Test meger (4) 17

- Installation raised floor (4) 18

- Polling cable for conduit 2) 19

- Fabrication suport longdrat (2) 20

- Fabrication UNP for suport outdoor HVAC (4) 21

- Installation pipe flordrain and pipe ven (5) 22

23

3 Chemical Storage

- Removal scaffolding (4)

4 Waste Storage

399
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Installation additional purlin (3)

- Installation suport tray (3)

5 GEG Building

- Installation perimeter scaffolding (6)

6 Shelter Building

- Repair excavation (5)

- Chipping foundation (2)

- Fabrication rebar for air compressor (4)

- Transfer material rebar (2)

- Fabrication beton dike (1)

400
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

STATIC EQUIPMENT

401
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- 46-MBM-106 LP Condensate Flash Drum

Cont. Installation of Platform

- 31-MBD-102

Preparation of Install Equipment

- 32-MAF-101 AGR Absorber

Finishing foundation

- 36-HBG-203A Produced Water Heater

Finishing foundation

- 36-MAF-101 Condensate Stabilizer

Install Platform

- 32-HAL-201 AGR Lean Amin Cooler

Preparation of intallation

ROTARY EQUIPMENT

402
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- 44-PBM-333 A/B Utility Water Transfer Pumps

Joint Inspection

- 44-PBM-334 A/B Potable Water Pumps

Joint Inspection

- 36-PAX-332 A/B

Centering of pump

- 36-PBA-333 A/B Produced water Recycle pump

Padding on Foundation

PACKAGE EQUIPMENT

- 33-ZZZ-502 (EG Regeneration Package Skid)

Joint Inspection Padding on Foundation

- 35-KZZ-701 (Incenerator Stack)

403
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Padding on foundation

- 35-TTO-501 (Incenerator Combustion)

Padding on foundation

- 44-ZBM-504 (Clarifier System Package)

Chipping and Padding on foundation

- 46-ZBE-501 A/B BOILER PACKAGE A/B

Finishing foundation FD Fan Boiler A/B

Complete Duct Boiler A/B to Economizer A/B

404
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Tangki Condensate A 1

- Fit up shell plate course 6 2

2 Condensate B Tank

- External welding horizoltal shell plate course 4 to course 5

3 Condensate C Tank 4

- Fit up shell plate course 3 5

4 Demin Water Tank 7

- Inspection shell plate course 6 8

405
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Potable Water Tank

- Instalation Accessories

6 Utility Water Tank

- Fit up top angel

7 Fire Water Tank

-Inspection shell plate course 4

8 EG Make-Up Tank

- Instalation Accessories

406
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

9 Diesel Fuel Tank

- Welding shell plate to top angel

407
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Underground (16475.4) 2

1 Pipe HDPE 62 3

2 Low Temp Carbon Steel (LTCS) 4 4

3 Carbon Steel (CS) 86 5

Total 152 6

408
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Above ground (61350.4) 8

1 Low Temp Carbon Steel (LTCS) 0 9

2 Carbon Steel (CS) 0 10

3 Stainless Steel (SS) 0 11

4 Duplex Stainless Steel 0 12

5 ALLOY 825 0 13

Total 0 14

15

B Support Progress

1 CS 0

2 LTCS 0

3 Stainless Steel 0

4 DUPLEX SS 0

409
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Cold Shoe Support 0

6 Spring Support 0

Total 0

C Other Progress

1 Borrow Sand 0

2 Coating 0

3 Post Heat Treatment 0

4 Finish Painting 0

410
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Lettering/Marking 0

6 Pressure Test (STM) 0

Total 0

411
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Under Ground (5929.60) 2

1 HDPE 0 3

2 LTCS INCL GALV 0 4

3 Carbon Steel INCL GALV 16 5

Total 16 6

Above ground (61182.00) 8

1 LTCS INCL GALV 0 9

412
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Carbon Steel INCL GALV 14 10

3 Stainless Steel 0 11

4 Duplex Stainless Steel 0 12

Total 14 13

14

B Support Progress (121.17) 15

1 CS (Ton) 0 16

2 LTCS (Ton) 0 17

3 Stainless Steel (Ton) 0 18

4 DUPLEX SS (Ton) 0 19

5 Cold shoe support (qty) 0 20

6 Spring Support (qty) 0 21

Total 0 22

413
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

23

C Other Progress 24

1 Borrow Sand (M3) 0 25

2 Coating ( M2) 0

3 Post Heat Treatment (ID) 0

4 Finish Painting (M2) 0

5 Lettering/Marking (pnt) 0

6 Pressure Test (STM) 0

Total 0

414
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

415
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Glandbox fabrication 1

2 Setting panel 2

3 Pulingg Grounding cable at SS 3

4 Install PVC conduit 2" for grounding at SS 4

5 Internal Cable pulling at SS 5

10

10

416
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

11

12

13

14

15

15

15

16

17

18

19

20

417
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

418
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Setting panel at MCR

2 Tray Support Fabrication at Pipe Rack

3 Install Tray at mian pipe rack

4 Install tray support at MCR

419
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 JEC MCS Yard

- Modification Scaffolding at JEC MCS Yard

for Material Warehouse

(Supporting Manpower)

420
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

421
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Swadaya Workshop Area 1

- Radiography Inspection 2

2 Isma Tiur Workshop Area 4

422
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Radiography Inspection 5

10

11

12

13

14

423
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Fuel Supply 1

424
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

425
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Ready

426
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

427
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

OTHERS
428
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
WEATHER
Remark

429
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

430
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

WORKING HOUR

HIGHLIGHT

431
432
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Genset 10 KVA unit 1
Genset 25 KVA unit 1
Excavator unit 1
Buldozer unit 1
Crane 25T unit 1

433
EQUIPMENT
Equipment & Tools Unit QTY

Crane 55T unit 1


Trailler unit 1

434
EQUIPMENT
Equipment & Tools Unit QTY

435
EQUIPMENT
Equipment & Tools Unit QTY

436
EQUIPMENT
Equipment & Tools Unit QTY

437
EQUIPMENT
Equipment & Tools Unit QTY

438
EQUIPMENT
Equipment & Tools Unit QTY

439
EQUIPMENT
Equipment & Tools Unit QTY

440
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Generator Set unit 2
Truck Mixer unit 3
Wheel Loader unit 1
Batching Plant unit 2

441
EQUIPMENT
Equipment & Tools Unit QTY

Theodolite Unit 3

Total Station Set 3

Waterpass Unit 3

442
EQUIPMENT
Equipment & Tools Unit QTY

Excavator Unit 5

Dumptruck Unit 6

Bar Cutter Unit 2

Bar Bending Unit 2

Bulldozer Unit 1

Mesin Vibrator Unit 2

Plate Stamper Unit 4

Stamper Rammer Unit 2

Scaffolding Set 200

Genset Unit 4

Grader Unit 1

Water Compressor Unit 2

Vibro Roller Unit 1

443
EQUIPMENT
Equipment & Tools Unit QTY

Vibro Roller Unit 1

Air Compressor Unit 1

Water Pump Unit 5

Crane Unit 1

Baby Roller Unit 1

444
EQUIPMENT
Equipment & Tools Unit QTY

445
EQUIPMENT
Equipment & Tools Unit QTY

446
EQUIPMENT
Equipment & Tools Unit QTY

Excavator PC-200 Unit 2

Dump Truck Unit 2

Mini Bus Unit 3

447
EQUIPMENT
Equipment & Tools Unit QTY

Genset 30 KVA Unit 1

Genset 6,5 KVA Unit 1

Bar Cutter Unit 2

Bar Bending Unit 2

Submersible Water Pump Unit 1

Concrete Vibrator Unit 4

Compactor (Hand) Unit 2

Pick up/ Light Truck Unit 2

448
EQUIPMENT
Equipment & Tools Unit QTY

449
EQUIPMENT
Equipment & Tools Unit QTY

450
EQUIPMENT
Equipment & Tools Unit QTY

Excavator unit 1

Water Jump unit 1

Fibrator unit 1

Mixer DT 03 unit 1

451
EQUIPMENT
Equipment & Tools Unit QTY

452
EQUIPMENT
Equipment & Tools Unit QTY

453
EQUIPMENT
Equipment & Tools Unit QTY

R. Crane 80 Ton Unit 1

R. Crane 50 Ton Unit 1

R. Crane 25 Ton Unit 1

Unic Crane 5 T Unit 1

Trailler Truck Unit 1

454
EQUIPMENT
Equipment & Tools Unit QTY

Genset 150 kVA Unit 2

Genset 125 kVA Unit 1

Genset 25 kVA Unit 1

Compressor PDS 175 Unit 1

Welding Engine Unit 2

Scaffolding M 17020

Forklift 10 Ton Unit 1

Skylift Unit 3

455
EQUIPMENT
Equipment & Tools Unit QTY

456
EQUIPMENT
Equipment & Tools Unit QTY

457
EQUIPMENT
Equipment & Tools Unit QTY

Auto Level Unit 1

458
EQUIPMENT
Equipment & Tools Unit QTY

Tripod Unit 2

Cutting Concrete Unit 1

Hammer 5 kg Unit 1

Excavator Unit 2

water pump Unit 1

Cutting well Unit 3

Genset unit 1

Bar Bender unit 1

Bar Cutter unit 1

Submersible pump unit 1

Hammer Drill unit 1

Welding Machine unit 1

Hammer Drill unit 1

459
EQUIPMENT
Equipment & Tools Unit QTY

Welding Machine unit 1

Concrete Vibrator unit 1

Dump truck unit 2

Vehicle unit 1

Lampu Halogen unit 15

Stamper unit 1

Bucket unit 1

Crane unit 1

Coring Mechine Unit 1

460
EQUIPMENT
Equipment & Tools Unit QTY

461
EQUIPMENT
Equipment & Tools Unit QTY

462
EQUIPMENT
Equipment & Tools Unit QTY

Crawler Crane 550 Ton unit 1

Crawler Crane 250 Ton unit 1

Rough Crane 50 Ton unit 1

Flat Bed Trailler unit 1

Low bed Trailler unit 1

463
EQUIPMENT
Equipment & Tools Unit QTY

464
EQUIPMENT
Equipment & Tools Unit QTY

465
EQUIPMENT
Equipment & Tools Unit QTY

Oven Unit 2

Grinda

a. 4" Unit 13

b. 6" Unit 8

c. 7" Unit 3

Drayer Unit 24

Trapo Unit 26

Crane 25 ton Unit 1

Vacuum Box Set 1

Miller Unit 2

Cutting Touch Unit 3

466
EQUIPMENT
Equipment & Tools Unit QTY

Generator

a. 18 KVA Unit 1

b. 150 KVA Unit 1

c. 175 KVA Unit 1

d. 200 KVA Unit 1

467
EQUIPMENT
Equipment & Tools Unit QTY

468
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Set 3

Carry Pick-up Unit 1

Generator 100Kva Unit 2

Welding Travo Unit 5

Handryer Unit 5

Chain Saw Unit 1

Grinder Machine 7" Unit 5

469
EQUIPMENT
Equipment & Tools Unit QTY

Grinder Machine 4" Unit 5

Welding Machine Unit 4

TMC 9Ton Unit 1

Double Cabin Unit 2

Vehicle Unit 2

Generator 10-40Kva Unit 2

Water Pump Unit 2

Crane 35 Ton Unit 1

470
EQUIPMENT
Equipment & Tools Unit QTY

471
EQUIPMENT
Equipment & Tools Unit QTY

472
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Unit 1

Pick-up Unit 4

Vehicle Unit 2

Generator 6 A Unit 0

Generator 150 KVA Unit 2

Generator 100 KVA Unit 1

Grinder Machine 7" Unit 2

Grinder Machine 5" Unit 6

Grinder Machine 4" Unit 10

473
EQUIPMENT
Equipment & Tools Unit QTY

Cutting Wheel 14" Unit 2

Cutting Torch & accessories Unit 1

Chain Saw Unit 0

Crane HTC 85 ton Unit 1

Crawler Crane 80 ton Unit 1

Crane HTC 50 ton Unit 1

Crane HTC 20 ton Unit 1

TMC 7 ton Unit 1

Trailer Unit 2

Forklif Unit 1

Inventer Welding Machine Unit 1

TRAVO 400 A Unit 11

Chain Block 3 Ton Unit 8

474
EQUIPMENT
Equipment & Tools Unit QTY

Chain Block 2 Ton Unit 6

Level Block 1,5 Ton Unit 8

Compressor 175 CFM Unit 1

475
EQUIPMENT
Equipment & Tools Unit QTY

476
EQUIPMENT
Equipment & Tools Unit QTY

Light Vehicle 4x4 (LV) set 1

TMC 11T set 1

Mini Loader set 1

Power Generator set 2

Gasoline Generator Set 1

Welding Machine set 2

Welding Transformer set 4

Cable Jack set 4

Cable Roll Set 30

Cable Roll Set 30

477
EQUIPMENT
Equipment & Tools Unit QTY

Electric Bench Drill set 4

Electric Drilling Press Machine set 3

Electric High Speed Cutter set 1

Electric Hand Grinder & Cutter set 15

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hot Marker Machine set 2

Stamp Marker Machine set 1

Chain Block 2T set 3

Radio HT Comm set 15

Hot Gun set 3

478
EQUIPMENT
Equipment & Tools Unit QTY

479
EQUIPMENT
Equipment & Tools Unit QTY

480
EQUIPMENT
Equipment & Tools Unit QTY

481
EQUIPMENT
Equipment & Tools Unit QTY

482
EQUIPMENT
Equipment & Tools Unit QTY

Sentinel 880 Ir-192 Unit 1

Vehicle Toyota Hillux Unit 1

Collimator Unit 1

Barricade Roll 1

483
EQUIPMENT
Equipment & Tools Unit QTY

Megaphone Unit 1

Sign Board Unit 4

Radiation Flag Pcs 30

Crank Cable Unit 1

Source Cable Unit 1

Survey Meter Unit 1

Warning Light Unit 1

MC Cleaner Can 1

MC Penetrant Can 1

MC Developer Can 1

484
EQUIPMENT
Equipment & Tools Unit QTY

Container Office Unit 1

Fuel Tank 50 Unit 1

Fuel Truck Unit 1

Suction Pump Unit 1

Dispenser Unit 1

Fire Extinguisher 9 kg Unit 4

485
EQUIPMENT
Equipment & Tools Unit QTY

486
EQUIPMENT
Equipment & Tools Unit QTY

487
EQUIPMENT
Equipment & Tools Unit QTY

488
EQUIPMENT
Equipment & Tools Unit QTY

489
EQUIPMENT
Equipment & Tools Unit QTY

490
EQUIPMENT
Equipment & Tools Unit QTY

491
EQUIPMENT
Equipment & Tools Unit QTY

492
Project Name : BLOCK A SITE DEVELOPMENT PROJECT
Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL

497
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO

Date : 21-Jul-2017 Friday


Daily Report No. : DR-JEC-MEP-0272

PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 918 1 919 M/H 9,128
Deputy Site Manager M/D 152 1 153 M/H 1,468
Construction Manager M/D 298 1 299 M/H 2,925
Deputy Construction Manager M/D 188 1 189 M/H 1,828

498
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 170 1 171 M/H 1,645
2 HSSE
HSSE M/D 9,695 11 9,706 M/H 21,297
HSSE Administration M/D 1,193 1 1,194 M/H 2,582
3 Quality Control
Field. QC Manager M/D 235 2 237 M/H 2,249
QC Coordinator-2 M/D 313 2 315 M/H 3,014
QC Engineer M/D 1,040 6 1,046 M/H 9,652
QC Admin M/D 145 2 147 M/H 1,355
Welding Tracking M/D 18 1 19 M/H 173
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 372 1 373 M/H 3,425
Electrical Superintendent M/D 350 1 351 M/H 3,271
ME Supervisor Temfac M/D 342 1 343 M/H 3,230
Civil Supervisor Temfac M/D 679 2 681 M/H 6,389
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 260 1 261 M/H 2,502

499
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 233 1 234 M/H 2,263
4.2 Civil
General Civil Superintendent M/D 268 1 269 M/H 2,598
Project Engineer M/D 206 4 210 M/H 1,993
Civil Engineer M/D 459 1 460 M/H 4,134
Civil Engineer M/D 392 1 393 M/H 3,582
Field Engineer M/D 192 1 193 M/H 1,862
Civil Construction M/D 299 1 300 M/H 2,870
Batching Plant Coordinator M/D 240 1 241 M/H 2,323
Surveyor M/D 492 1 493 M/H 4,490
Helper Surveyor M/D 463 1 464 M/H 4,162
Steel Structure Engineer M/D 171 1 172 M/H 1,655
4.3 Building
Building Superintendent M/D 452 1 453 M/H 4,091
Building Supervisor M/D 580 3 583 M/H 5,644
Surveyor M/D 376 4 380 M/H 2,130
Helper Surveyor M/D 345 2 347 M/H 3,348
4.4 Piping

500
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 227 1 228 M/H 2,206
Asst. Piping Superintendent M/D 209 1 210 M/H 2,035
Piping Engineer M/D 165 2 167 M/H 1,607
Technical Suport M/D 5 1 6 M/H 47
Supervisor M/D 265 3 268 M/H 2,509
CMS Operator M/D 70 1 71 M/H 660
Clerk M/D 168 1 169 M/H 1,640
4.5 Process
Process Superintendent M/D 235 1 236 M/H 2,277
Clerk M/D 5 1 6 M/H 47
4.6 Mechanical & Tank
Mechanical Superintendent M/D 77 1 78 M/H 718
4.6.1 Tank
Tank Field Engineer M/D 170 1 171 M/H 1,648
Tank Supervisor M/D 76 1 77 M/H 708
4.6.2 Static Mechanical
Static Field Engineer M/D 78 2 80 M/H 728
Preservation Technician M/D 138 - 138 M/H 1,310

501
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 73 1 74 M/H 681
4.6.4 Rotary
Field Engineer M/D 5 1 6 M/H 47
Supervisor M/D 5 1 6 M/H 47
4.6.5 Combation
Field Engineer M/D 5 1 6 M/H 47
4.7 General Contruction
General Superintendent M/D 242 1 243 M/H 2,368
Jr.Mechanical Engineer M/D 76 1 77 M/H 673
Mechanical Supervisor M/D 68 1 69 M/H 644
4.8 Electrical
Elecctrical Superintendent M/D 11 1 12 M/H 106
Field Engineer M/D 11 1 12 M/H 106
Lead Supervisor M/D 11 1 12 M/H 106
Engineer M/D 11 1 12 M/H 106
Supervisor M/D 33 3 36 M/H 318
Clerk M/D 11 1 12 M/H 106

502
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 11 1 12 M/H 106
Supervisor M/D 11 1 12 M/H 106
5 Preservation
Preservation Coordinator M/D 11 1 12 M/H 106
Preservation Eng M/D 11 1 12 M/H 106
Preservation Junior Eng M/D 44 4 48 M/H 424
6 Control
Project Control Manager M/D 199 1 200 M/H 1,939
Project Control M/D 237 1 238 M/H 2,162
Document Control M/D 265 1 266 M/H 2,567
Schedule Engineer M/D 206 4 210 M/H 1,999
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 407 5 412 M/H 3,907
Cost Control M/D 290 2 292 M/H 2,791
Subcontracting M/D 568 4 572 M/H 5,475
Material Control M/D 645 4 649 M/H 6,235
7 Administration

503
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 212 1 213 M/H 2,056
Administration M/D 2,246 18 2,264 M/H 21,466
Business Coordinator M/D 743 2 745 M/H 6,830
Project Support M/D 435 2 437 M/H 4,222
Finance M/D 235 1 236 M/H 2,277
Puchasing M/D 339 2 341 M/H 3,295
8 Public Relation
Public Affair M/D 1,113 3 1,116 M/H 10,276
Government Permit M/D 461 1 462 M/H 4,141
9 IT
IT Engineer M/D 872 4 876 M/H 8,334
10 Others
Security M/D 6,450 33 6,483 M/H 61,941
Rigging & Lifting / Operator M/D 2,783 12 2,795 M/H 27,103
Operator Genset M/D 490 2 492 M/H 4,754
Office Boy/Girl M/D 1,298 6 1,304 M/H 12,596
Paramedic M/D 2,684 12 2,696 M/H 26,022
Driver M/D 4,434 26 4,460 M/H 42,937

504
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 285 4 289 M/H 2,879
Rigger M/D 370 5 375 M/H 3,470
Skill M/D 1,129 8 1,137 M/H 10,550
Warehouse M/D 332 17 349 M/H 3,234
Total 54,208 281 54,489 437,053

2 PT. BANGUN NUSA PERSADA (TEMFAC SECTION A - BNP)


Total 9,955 - 9,955 88,084

3 PT. INDOTECH KARYA MANDIRI (TEMFAC SECTION B & C - IKM)


Total 103,539 - 103,539 153,750

4 PT. NAD JAYA (TEMFAC SECTION D - NAD)

505
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 20,435 - 20,435 185,652

5 PT. PELITA NUSA PERKASA (BATCHING PLANT - PNP)


INDIRECT MANPOWER
1 Site Manager M/D 121 1 122 M/H 1,035
2 HSE M/D 327 1 328 M/H 3,029
3 Safetyman M/D 164 1 165 M/H 1,618
4 Quality Control M/D 309 1 310 M/H 2,853
5 Supervisor M/D 1 - 1 M/H 8
6 Finance M/D 198 - 198 M/H 1,942
7 Public Affair M/D 263 1 264 M/H 2,493
8 Mechanic M/D 511 1 512 M/H 4,881
9 Logistic M/D 207 1 208 M/H 2,022
10 Security M/D 756 3 759 M/H 7,309
Sub Total 2,857 10 2,867 27,189

506
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 798 3 801 M/H 7,636
2 Lab M/D 460 1 461 M/H 4,471
3 Driver Truck Mixer M/D 952 5 957 M/H 9,270
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,636 3 1,639 M/H 14,083
Sub Total 3,966 12 3,978 36,387

Total 6,823 22 6,845 63,576

6 PT. PUALAM BANGUN CIPTA (FWBS 2000 : CONCRETE STRUCTURE


INDIRECT MANPOWER

1 Project Manager M/D 189 1 190 M/H 1,842

2 Project Control M/D 113 1 114 M/H 1,138

507
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Site Manager M/D 418 1 419 M/H 4,088

4 HSE M/D 1,611 8 1,619 M/H 15,924

5 Quality Control M/D 1,490 7 1,497 M/H 14,686

6 Assistant Lab Quality Control M/D 17 - 17 M/H 170

7 Engineering Manager M/D 209 1 210 M/H 2,031

8 Engineer M/D 232 1 233 M/H 2,330

9 Supervisor M/D 1,629 7 1,636 M/H 16,116

10 Assistant Supervisor M/D 135 1 136 M/H 1,350

11 Document Control M/D 435 1 436 M/H 4,269

12 Drafter M/D 573 3 576 M/H 5,624

13 Finance & GA M/D 233 1 234 M/H 2,276

14 Payroll / Accounting M/D 335 1 336 M/H 3,250

15 Admin M/D 209 1 210 M/H 2,103

508
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

16 Assitant GA M/D 55 1 56 M/H 550

17 Surveyor M/D 674 3 677 M/H 6,679

18 Assistant Surveyor M/D 879 4 883 M/H 8,740

19 Public Affair M/D 242 1 243 M/H 2,359

20 Logistic M/D 1,436 9 1,445 M/H 14,227

21 Security M/D 992 5 997 M/H 9,783

22 Driver M/D 1,197 4 1,201 M/H 11,701

Sub Total 13,303 62 13,365 131,233

DIRECT MANPOWER

1 Worker M/D 5,271 - 5,271 M/H 5,271

2 Foreman M/D 2,291 1 2,292 M/H 8,681

3 Carpenter M/D 18,545 2 18,547 M/H 66,758

509
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Rebar Man M/D 23,599 6 23,605 M/H 93,561

5 Masonry M/D 388 - 388 M/H 3,880

6 Scaffolder M/D 4,174 7 4,181 M/H 12,593

7 Helper M/D 19,153 9 19,162 M/H 60,252

8 Operator M/D 11,531 6 11,537 M/H 34,727

Sub Total 84,950 31 84,981 285,721

510
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

511
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 98,253 93 98,346 416,954

7 JEC-DIRECT HIRED (FWBS 2300 : FOUNDATION WORK)


INDIRECT MANPOWER

1 Project Manager M/D 61 - 61 M/H 610

2 Site Manager M/D 105 1 106 M/H 1,037

3 Project Control M/D 129 1 130 M/H 1,274

512
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Civil Engineer M/D 165 1 166 M/H 1,634

5 HSSE Coordinator M/D 136 1 137 M/H 1,350

6 HSSE Admin M/D 147 1 148 M/H 1,456

7 Material Control M/D 169 1 170 M/H 1,681

8 Quality Control M/D 219 2 221 M/H 2,181

9 Ass Quality Control M/D 150 1 151 M/H 1,488

10 HRD/ Personel M/D 96 1 97 M/H 957

11 Time Keeper M/D 198 1 199 M/H 1,959

12 Surveyor M/D 830 6 836 M/H 8,210

13 Drafter M/D 78 1 79 M/H 766

14 Procurement M/D 139 - 139 M/H 1,376

15 Site Environment Coordinator M/D 105 - 105 M/H 1,047

16 Tool Keeper M/D 405 2 407 M/H 4,036

513
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

17 Safetyman M/D 434 2 436 M/H 4,297

18 Mechanic M/D 64 - 64 M/H 634

19 Electrician M/D 222 1 223 M/H 2,195

20 Driver M/D 730 5 735 M/H 7,236

21 Security M/D 621 2 623 M/H 6,184

22 Office Boy M/D 124 - 124 M/H 1,235

Sub Total 5,327 30 5,357 52,843

DIRECT MANPOWER

1 Field Supervisor M/D 451 3 454 M/H 4,469

2 Foreman M/D 686 7 693 M/H 6,788

3 Carpenter M/D 962 11 973 M/H 9,565

4 Rebar Worker M/D 1,107 14 1,121 M/H 11,008

514
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

5 Concrete Worker M/D 571 9 580 M/H 5,621

6 Mason Worker M/D - - - M/H -

7 Scaffolder M/D 163 - 163 M/H 1,630

8 Welder SMAW M/D 1,305 10 1,315 M/H 12,889

9 Semi Skill M/D 1,961 11 1,972 M/H 19,466

10 Common Labor M/D 2,536 23 2,559 M/H 25,078

11 Operator Excavator M/D 282 2 284 M/H 2,788

12 Operator Boom Truck M/D 8 - 8 M/H 80

Sub Total 10,032 90 10,122 99,382

Total 15,359 120 15,479 152,225

515
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 JEC-DELTA (FWBS 2300 : FOUNDATION WORK)


INDIRECT MANPOWER

1 Coordinator M/D 30 - 30 M/H 300

2 Supervisor M/D 15 - 15 M/H 150

3 Jr. Civil Engineer M/D 129 - 129 M/H 1,288

4 Drafter M/D 148 1 149 M/H 1,478

- - - M/H -

Sub Total 322 1 323 3,216

DIRECT MANPOWER

1 Foreman M/D 140 1 141 M/H 1,400

2 Ass. Foreman M/D 401 2 403 M/H 4,010

3 Rebar Man M/D 1,517 12 1,529 M/H 15,170

516
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Mason M/D 1,487 22 1,509 M/H 14,870

5 Carpenter M/D 1,444 18 1,462 M/H 14,440

6 Finishing M/D 923 4 927 M/H 9,230

7 Semi Skill M/D 889 - 889 M/H 8,890

8 Skill Worker M/D 672 9 681 M/H 6,720

9 Helper M/D 5,601 55 5,656 M/H 56,010

Sub Total 13,074 123 13,197 130,740

517
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

518
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,396 124 13,520 133,956

9 PT. GUNA TEGUH ABADI (STEEL STRUCTURE ERECTION - GTA)


INDIRECT MANPOWER

1 Site Manager M/D 115 - 115 M/H 1,132

2 Construction Manager M/D 109 - 109 M/H 1,072

3 HSE Coordinator M/D 114 - 114 M/H 1,122

4 QC Coordinator M/D 116 - 116 M/H 1,142

5 Field Enginer Leader M/D 121 - 121 M/H 1,192

519
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Project Control M/D 114 - 114 M/H 1,122

7 ADM. Coordinator M/D 107 - 107 M/H 1,052

8 Superintendent M/D 147 - 147 M/H 1,440

9 Supervisor M/D 205 - 205 M/H 2,008

10 Safetyman M/D 333 2 335 M/H 3,276

11 Safety Officer M/D 194 4 198 M/H 1,916

12 QC M/D 152 - 152 M/H 1,484

13 Finance M/D 219 2 221 M/H 2,154

14 Procurement M/D 41 - 41 M/H 404

15 Adm. Staff M/D 203 - 203 M/H 1,994

16 Material Control M/D 318 - 318 M/H 3,123

17 Mechanical / Electrical M/D 387 4 391 M/H 3,810

18 Document Control M/D 94 - 94 M/H 934

520
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

19 Security M/D 205 - 205 M/H 2,008

20 Driver M/D 172 - 172 M/H 1,678

21 Opr. Leader M/D 39 - 39 M/H 390

22 Office Boy/Girl M/D 120 - 120 M/H 1,188

23 Engineer Staff M/D 83 1 84 M/H 809

Sub Total 3,708 13 3,721 36,450

DIRECT MANPOWER

1 Foreman M/D 538 4 542 M/H 5,290

2 Operator M/D 1,680 19 1,699 M/H 16,410

3 Rigger M/D 1,608 9 1,617 M/H 15,633

4 Millwright M/D 835 8 843 M/H 8,200

5 Scafolder M/D 1,625 11 1,636 M/H 15,914

521
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Welder M/D 317 9 326 M/H 3,107

7 Helper M/D 2,851 18 2,869 M/H 27,922

Sub Total 9,454 78 9,532 92,476

522
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,162 91 13,253 128,926

10 PT. BANGUN NUSA PERSADA (MAIN BUILDING - BNP)


INDIRECT MANPOWER

523
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Site Manager M/D 251 1 252 M/H 2,378

2 HSE M/D 693 3 696 M/H 6,792

3 Quality Control M/D 695 2 697 M/H 6,698

4 Site Engineering Manager M/D 75 - 75 M/H 686

5 Engineer M/D 499 1 500 M/H 4,876

6 Drafter M/D 603 5 608 M/H 6,020

7 Supervisor M/D 1,095 9 1,104 M/H 10,830

8 Surveyor M/D 1,040 3 1,043 M/H 9,982

9 Administration M/D 394 2 396 M/H 3,728

11 Logistic M/D 924 4 928 M/H 8,998

13 Driver M/D 266 2 268 M/H 2,548

14 Purchasing M/D 51 1 52 M/H 510

15 Delivery M/D 37 - 37 M/H 370

524
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 6,623 33 6,656 64,414

DIRECT MANPOWER

1 Finishing Worker M/D 2,404 27 2,431 M/H 23,486

2 Worker Site Temporary M/D 185 - 185 M/H 1,633

3 Operator Excavator M/D 183 - 183 M/H 1,778

4 Driver Dump Truck M/D 130 - 130 M/H 1,205

5 Operator Crane M/D 197 - 197 M/H 1,912

6 Rigger Crane M/D 389 - 389 M/H 3,797

7 Helper Crane M/D 197 - 197 M/H 1,918

8 Carpenter M/D 1,421 - 1,421 M/H 13,900

9 Rebar Man M/D 2,071 2 2,073 M/H 20,265

10 Digger M/D 423 1 424 M/H 4,178

525
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

11 Masonry & Concrete worker M/D 4,349 23 4,372 M/H 43,358

12 Mechanical M/D 47 - 47 M/H 470

13 Pipe M/D - - - M/H -

14 Scaffolder M/D 2,106 14 2,120 M/H 20,809

15 Steel worker M/D 1,724 9 1,733 M/H 17,102

16 Mechanic M/D 686 1 687 M/H 6,637

17 Teknisi Plumbing M/D 414 5 419 M/H 4,140

18 Teknisi Electrical M/D 1,864 26 1,890 M/H 18,640

19 General Worker M/D 693 - 693 M/H 6,536

Sub Total 19,483 108 19,591 191,761

526
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 26,106 141 26,247 256,175

11 PT. GUNA TEGUH ABADI (MECHANICAL WORK - GTA)


INDIRECT MANPOWER

527
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Site Manager M/D 44 1 45 M/H 424

2 Construction Manager M/D 45 1 46 M/H 434

3 HSE Coordinator M/D 45 1 46 M/H 434

4 QC Coordinator M/D 45 1 46 M/H 434

5 Inspector Welder M/D 45 1 46 M/H 434

6 Field Enginer Leader M/D 45 1 46 M/H 434

7 Project Control M/D 45 1 46 M/H 434

8 ADM. Coordinator M/D 44 1 45 M/H 424

9 Superintendent M/D 72 1 73 M/H 688

10 Supervisor M/D 225 8 233 M/H 2,195

11 Safety Officer M/D 44 1 45 M/H 424

12 Finance M/D 45 1 46 M/H 434

13 Procurement M/D - - - M/H -

528
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

14 Adm. Staff M/D 122 3 125 M/H 1,172

15 Mechanic / Electrical M/D 45 1 46 M/H 434

16 Document Control M/D 44 1 45 M/H 424

17 Security M/D 225 5 230 M/H 2,170

18 Opr. Leader M/D - - - M/H -

19 Office Boy/Girl M/D 45 1 46 M/H 434

Sub Total 1,225 30 1,255 11,827

DIRECT MANPOWER

1 Foreman M/D 151 6 157 M/H 1,473

2 Millwright M/D 504 14 518 M/H 4,924

3 Fitter M/D 213 17 230 M/H 2,109

4 Operator M/D 102 6 108 M/H 1,020

529
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

5 Helper M/D 808 34 842 M/H 7,943

6 Rigger M/D 322 11 333 M/H 3,150

7 Scaffolder M/D 116 8 124 1,160

Sub Total 2,216 96 2,312 21,779

Total 3,441 126 3,567 33,606

530
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

12 PT. BARATA INDONESIA (FIELD ERECTED TANK - BRT)


INDIRECT MANPOWER

1 Project Manager M/D 70 1 71 M/H 697

2 Construction Manager M/D 185 1 186 M/H 1,844

3 Project Control M/D 88 1 89 M/H 877

4 HSE Officer M/D 135 1 136 M/H 1,347

5 Safety Man M/D 164 2 166 M/H 1,624

6 Engineer M/D 86 1 87 M/H 857

7 Supervisor M/D 361 4 365 M/H 3,588

8 QC Manager M/D 80 1 81 M/H 797

9 QC Dimensional M/D 120 1 121 M/H 1,197

10 Material Control M/D 63 1 64 M/H 627

11 Drafter M/D 63 1 64 M/H 627

531
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

12 Surveyor M/D 135 1 136 M/H 1,347

13 NDE Coordinator M/D 159 3 162 M/H 1,581

14 Welding Inspector M/D 122 1 123 M/H 1,217

15 Scaffolding Inspector M/D - - - M/H -

16 Purchasing M/D 53 1 54 M/H 527

17 Logistic M/D 61 1 62 M/H 607

18 GA & Finance M/D 131 1 132 M/H 1,307

19 Admin 76 1 77 757

20 Public Affair M/D 288 2 290 M/H 2,854

21 Tools & Consumable Keeper M/D 201 2 203 M/H 2,004

22 House keeping M/D 133 2 135 M/H 1,304

23 Office Boy M/D 184 2 186 M/H 1,824

24 Security M/D 355 4 359 M/H 3,528

532
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

25 Driver M/D 70 1 71 M/H 677

Sub Total 3,383 37 3,420 33,616

DIRECT MANPOWER

1 Operator M/D 239 3 242 M/H 2,378

2 Rigger M/D 224 1 225 M/H 2,225

3 Foreman M/D 270 4 274 M/H 2,668

4 Fitter M/D 1,774 16 1,790 M/H 17,658

5 Scaffolder M/D 142 2 144 M/H 1,414

6 Welder M/D 1,253 11 1,264 M/H 12,442

7 Helper M/D 1,343 17 1,360 M/H 13,309

8 Technician M/D 277 3 280 M/H 2,762

Sub Total 5,522 57 5,579 54,856

533
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 8,905 94 8,999 88,472

13 PT. ISMA TIUR (PIPING FIELD INSTALLATION AND PAINTING WORK


INDIRECT MANPOWER

1 Site Manager M/D 164 1 165 M/H 1,640

2 Construction Manager M/D 153 1 154 M/H 1,530

3 Engineering Coordinator M/D 164 1 165 M/H 1,640

4 Project Control Coordinator M/D 165 1 166 M/H 1,650

5 HSE Coordinator M/D 164 1 165 M/H 1,640

6 Checker / Drafter Piping M/D 216 2 218 M/H 2,160

7 Material Control M/D 155 1 156 M/H 1,550

534
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 QC/Admin QC M/D 672 7 679 M/H 6,720

9 Store Keeper M/D 162 1 163 M/H 1,620

10 Surveyor M/D 302 4 306 M/H 3,020

11 Supervisor PTW M/D 101 1 102 M/H 1,010

12 Safety Officer/ HSE Man M/D 179 2 181 M/H 1,790

13 Safety Supervisor M/D 171 1 172 M/H 1,710

14 First Aids M/D 130 1 131 M/H 1,300

15 General Affair M/D 155 1 156 M/H 1,550

16 Superintendent M/D 51 1 52 M/H 510

17 Supervisor HDPE M/D 265 2 267 M/H 2,650

18 Supervisor CS, LTCS & Nace M/D 411 3 414 M/H 4,110

19 Humas M/D 572 4 576 M/H 5,720

20 Document Control M/D 155 1 156 M/H 1,550

535
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

21 HRD M/D 142 1 143 M/H 1,420

22 Admin M/D 598 5 603 M/H 5,980

23 Driver M/D 220 3 223 M/H 2,200

24 Supervisor Scaffolding M/D 99 1 100 M/H 990

25 Time Keeper M/D 115 2 117 M/H 1,150

26 Material Handling M/D 62 1 63 M/H 620

27 Security M/D 202 2 204 M/H 2,020

Sub Total 5,945 52 5,997 59,450

DIRECT MANPOWER

1 Operator M/D 500 7 507 M/H 5,000

2 Foreman Pipe Fitter M/D 369 4 373 M/H 3,690

3 Pipe Fitter I M/D 1,310 15 1,325 M/H 13,100

536
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Pipe Fitter II M/D 200 2 202 M/H 2,000

5 Foreman Welder M/D 3 - 3 M/H 30

6 Welder M/D 568 6 574 M/H 5,680

7 Rigger M/D 399 5 404 M/H 3,990

8 Painter M/D 172 2 174 M/H 1,720

9 Mechanic / Electrical M/D 263 2 265 M/H 2,630

10 Scaffolder 303 4 307 M/H 3,030

11 Hydrotest Skill M/D 86 1 87 M/H 860

12 Ware House 65 1 66 M/H 650

13 Helper M/D 3,310 37 3,347 M/H 33,100

Sub Total 7,548 86 7,634 75,480

537
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,493 138 13,631 134,930

14 PT. SWADAYA GRAHA (PIPING FIELD INSTALLATION AND PAINTING


INDIRECT MANPOWER

1 Project Manager M/D 33 - 33 M/H 330

2 Site Manager M/D 215 2 217 M/H 2,101

3 QC Manager M/D 140 1 141 M/H 1,377

4 QC Inspector M/D 255 3 258 M/H 2,486

5 HSE Manager M/D 125 1 126 M/H 1,227

6 Safety Officer M/D 121 - 121 M/H 1,194

7 Safety Man M/D 147 1 148 M/H 1,445

8 Material Control M/D 219 2 221 M/H 2,137

9 PPC Manager M/D 60 1 61 M/H 589

538
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

10 Daily Reporter M/D 209 2 211 M/H 2,043

11 Spool Control M/D 131 2 133 M/H 1,284

12 Engineering Manager M/D 10 1 11 M/H 100

13 Field Engineer M/D 202 2 204 M/H 1,980

14 Welding Tracker M/D 115 1 116 M/H 1,128

15 Document Control M/D 125 1 126 M/H 1,228

16 HRD M/D 183 2 185 M/H 1,797

17 Supervisor M/D 455 8 463 M/H 4,422

18 Driver M/D 393 5 398 M/H 3,808

19 Scurity M/D 343 4 347 M/H 3,322

20 Public Relations M/D 213 2 215 M/H 2,080

21 Logistik M/D 219 3 222 M/H 2,125

22 Surveyor M/D 92 1 93 M/H 902

539
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

23 Manager Operator M/D 89 1 90 M/H 868

24 Operator Forklif M/D 84 1 85 M/H 820

25 Operator Trailer M/D 163 2 165 M/H 1,589

26 Operator TMC M/D 86 1 87 M/H 840

27 Operator Crane M/D 459 8 467 M/H 4,422

28 General Support adm M/D 201 2 203 1,960

29 Painting Inspector M/D 138 1 139 1,359

30 Operator PWHT M/D 17 2 19 170

Sub Total 5,242 63 5,305 51,133

DIRECT MANPOWER

1 Operator HDPE M/D 72 - 72 M/H 720

2 Foreman Pipe M/D 306 4 310 M/H 2,959

540
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Pipe Fitter M/D 848 17 865 M/H 8,139

4 Welder M/D 395 6 401 M/H 3,788

5 Rigger M/D 392 6 398 M/H 3,784

6 Scaffolder M/D 305 4 309 M/H 2,944

7 Mechanic M/D 280 4 284 M/H 2,704

8 Werehouse M/D 325 4 329 M/H 3,157

9 Helper M/D 318 4 322 M/H 3,074

10 Office Boy M/D 132 1 133 M/H 1,293

11 Painting M/D 125 1 126 M/H 1,197

Sub Total 3,498 51 3,549 33,759

Total 8,740 114 8,854 84,892

541
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

15 PT. WIJAYA ENGINDO NUSA (ELECTRICAL - WEN)


INDIRECT MANPOWER

1 Site Manager M/D 183 1 184 M/H 1,808

2 E/I Construction Coord M/D 78 1 79 M/H 748

3 Finance/ Acctg M/D 70 1 71 M/H 680

4 Administration Coord M/D 194 1 195 M/H 1,924

5 Engineering Material M/D 66 1 67 M/H 642

6 QA/ QC Electrical M/D 78 1 79 M/H 748

7 Supervisor Electrical M/D 263 3 266 M/H 2,564

8 Superisor Material Control M/D 59 1 60 M/H 572

9 HSE Coord M/D 132 1 133 M/H 1,286

10 HSE/ Scaffolding Inspector M/D 56 1 57 M/H 542

542
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

11 Project Control M/D 106 1 107 M/H 1,034

12 Administration Staff M/D 121 1 122 M/H 1,184

13 Security M/D 88 1 89 M/H 856

14 Office Girl M/D 84 1 85 M/H 818

15 Housekeeping M/D 81 1 82 M/H 788

16 Cleaning Service M/D 117 2 119 M/H 1,136

17 Time Keeper/ Adm Staff M/D 50 1 51 M/H 482

Sub Total 1,826 20 1,846 17,812

DIRECT MANPOWER

1 QA/ QC Technician M/D 78 1 79 M/H 758

2 Scaffolder Foreman M/D 68 1 69 M/H 650

3 Scaffolder M/D 56 2 58 M/H 548

543
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Technician M/D 213 6 219 M/H 2,070

5 Helper M/D 182 13 195 M/H 1,768

6 Mechanic M/D 327 9 336 M/H 3,184

7 Warehouse M/D 86 1 87 M/H 836

8 Welder M/D 86 1 87 M/H 836

9 TMC Operator M/D 223 4 227 M/H 2,168

10 TMC Operator M/D 71 1 72 M/H 690

11 Rigger M/D 78 1 79 M/H 758

Sub Total 1,468 40 1,508 14,266

Total 3,294 60 3,354 32,078

544
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

16 PT. WIJAYA ENGINDO NUSA (INSTRUMENT - WEN)


INDIRECT MANPOWER

1 Supervisor Instrument M/D 199 2 201 M/H 1,978

Sub Total 199 2 201 1,978

DIRECT MANPOWER

1 Instrument Foreman M/D 9 1 10 M/H 90

2 Instrument Technician M/D 126 3 129 M/H 1,230

Sub Total 135 4 139 1,320

545
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 334 6 340 3,298

17 PT. TERAS TEKNIK PERDANA (INSULATION /SCAFFOLDING - TTP)


INDIRECT MANPOWER

1 Site Manager M/D 110 1 111 M/H 1,065

2 Construction Manager M/D 110 1 111 M/H 1,065

3 HSSE Coordinator M/D 110 1 111 M/H 1,065

4 Supv Scaffolding M/D 108 1 109 M/H 1,045

5 Inspector Scaffolding M/D 110 1 111 M/H 1,065

6 Material Control M/D 110 1 111 M/H 1,065

7 Ass Material Control M/D 56 1 57 M/H 528

546
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 Admin M/D 107 1 108 M/H 1,035

9 Public Relations M/D 108 - 108 M/H 1,045

10 HSSE Administration M/D 55 1 56 M/H 518

11 PPC M/D 52 1 53 M/H 488

12 Driver M/D 207 1 208 M/H 2,023

13 Timekeeper M/D 96 1 97 M/H 925

14 Office Boy M/D 79 1 80 M/H 765

15 Security Officer M/D 9 1 10 M/H 87

16 Cleaning Service M/D - 1 1 M/H -

Sub Total 1,427 15 1,442 13,784

DIRECT MANPOWER

1 Foreman M/D 185 2 187 M/H 1,800

547
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

2 Lead Worker M/D 218 2 220 M/H 2,130

3 Skilled Worker M/D 874 10 884 M/H 8,490

5 Helper M/D 425 7 432 M/H 4,093

Sub Total 1,702 21 1,723 16,513

Total 3,129 36 3,165 30,297

18 PT. THAI NDT INDONESIA (NON-DESTRUCTIVE TESTING - TNDT)


INDIRECT MANPOWER

1 Site Manager M/D 6 - 6 M/H 60

2 Supervisor M/D 73 1 74 M/H 730

3 Document Control M/D 75 1 76 M/H 750

548
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Interpreter Radiography M/D 75 1 76 M/H 750

Sub Total 229 3 232 2,290

DIRECT MANPOWER

1 Operator Radiography M/D 145 3 148 M/H 1,450

2 RPO M/D 150 1 151 M/H 1,500

3 Driver M/D 71 1 72 M/H 710

4 PT Technician M/D 100 2 102 M/H 1,000

M/H

Sub Total 466 7 473 4,660

549
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 695 10 705 6,950

19 PT. MI ENERGI (FUEL SUPPLY - MIE)


INDIRECT MANPOWER

1 Coordinator Manager M/D 207 1 208 M/H 2,051

2 Public Affair M/D 187 1 188 M/H 1,866

Sub Total 394 2 396 3,917

DIRECT MANPOWER

1 Driver M/D 203 1 204 M/H 2,022

2 Security M/D 387 2 389 M/H 3,875

3 Helper M/D 589 3 592 M/H 5,893

Sub Total 1,179 6 1,185 11,789

550
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 1,573 8 1,581 15,706

20 PT. MEULIGO (CONSTRUCTION OF JETTY AT KUALA GEULUMPANG


Total 197 - 197 1,957

21 PT. TAKA HYDROCORE INDONESIA (DEEP WELL WORK - THI) - NO W


Total 4,309 - 4,309 33,568

22 PT. BERDIKARI PONDASI PERKASA (PILING WORK - BPP) - NO WOR


Total 2,501 - 2,501 21,007.0

551
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

23 PT. SWING INDONESIA (WASTE WATER TREATMENT - SWI)


Total 298 - 298 2,652

24 PT. MITRA USAHA KREASINDO (PLN SCOPE - MUK) - NO WORK


Total 153 - 153 1,288.5

25 PT. EQUINE GLOBAL (NETWORK CABLE DATA - EGL)


Total 254 - 254 2,378

26 PT. BAASITHU BOGA SERVICES (RECEPTIONIST & ROOM BOY/ROO


INDIRECT MANPOWER

1 Site Manager M/D 164 1 165 M/H 1,640

2 F&B Supervisor M/D - - - M/H -

552
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Housekeeping SPV M/D 164 1 165 M/H 1,640

4 Storeman M/D - - - M/H -

5 Japanesse Cook M/D 164 1 165 M/H 1,640

6 Receptionist / ADM M/D 164 1 165 M/H 1,640

Sub Total 656 4 660 6,560

DIRECT MANPOWER

1 Camp Boss M/D 164 1 165 M/H 1,640

2 Housekeeping SPV M/D 164 1 165 M/H 1,640

3 Bakery M/D 164 1 165 M/H 1,640

4 Cook M/D 328 2 330 M/H 3,280

5 Cook Helper M/D 328 2 330 M/H 3,280

6 Kitchen Boy M/D 492 3 495 M/H 4,920

553
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

7 Receptionist M/D 164 1 165 M/H 1,640

8 Room Boy M/D 2,268 14 2,282 M/H 22,680

9 Room Maid Medco M/D 1,458 9 1,467 M/H 14,580

10 Office Boy / Girl M/D 810 5 815 M/H 8,100

11 Waitress M/D 492 3 495 M/H 4,920

12 Laundry M/D 486 3 489 M/H 4,860

13 Driver M/D 328 2 330 M/H 3,280

Sub Total 7,646 47 7,693 76,460

Total 8,302 51 8,353 83,020

TOTAL M/D 420,853 1,515 422,368 M/H 2,592,448

554
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

JEC PERSONNEL
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator

555
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Quality Control
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT

556
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 Zulfikar Said IT Engineer
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent

557
DAILY REPORT

P
JGC ENC

PORARY FACILITY SECTION A


PORARY FACILITY SECTION B & C
PORARY FACILITY SECTION D
CHING PLANT
BS 2000 (CONCRETE STRUCTURE) & FWBS 1000 (SEWER AND DRAINAGE)
2300 (FOUNDATION WORK)
2300 (FOUNDATION WORK)
EL STRUCTURE ERECTION
N BULDING
AHANICAL WORK
D ERECTED TANK
NG FIELD INSTALLATION AND PAINTING WORK UTILITY AREA
NG FIELD INSTALLATION AND PAINTING WORK PROCESS AREA
CTRICAL

558
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID

ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,845
8 9,136
8 1,476
8 2,933
8 1,836

559
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 1,653
-
88 21,385
8 2,590
-
16 2,265
16 3,030
48 9,700
16 1,371
8 181
-
-
8 3,433
8 3,279
8 3,238
16 6,405
- 158
8 2,510

560
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 2,271
-
8 2,606
32 2,025
8 4,142
8 3,590
8 1,870
8 2,878
8 2,331
8 4,498
8 4,170
8 1,663
-
8 4,099
24 5,668
32 2,162
16 3,364
-

561
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 2,214
8 2,043
16 1,623
8 55
24 2,533
8 668
8 1,648
-
8 2,285
8 55
-
8 726
-
8 1,656
8 716
-
16 744
- 1,310

562
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
8 689
-
8 55
8 55
-
8 55
-
8 2,376
8 681
8 652
-
8 114
8 114
8 114
8 114
24 342
8 114

563
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
8 114
8 114
-
8 114
8 114
32 456
-
8 1,947
8 2,170
8 2,575
32 2,031
- 980
40 3,947
16 2,807
32 5,507
32 6,267
-

564
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 2,064
144 21,610
16 6,846
16 4,238
8 2,285
16 3,311
-
24 10,300
8 4,149
-
32 8,366
-
264 62,205
96 27,199
16 4,770
48 12,644
96 26,118
208 43,145

565
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
32 2,911
40 3,510
64 10,614
136 3,370
2,248 439,301

- 88,084

& C - IKM)
- 153,750

566
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 185,652

10 1,045 1 Ready Mix Concrete Production


10 3,039 2 Ready Mix Concrete Production (Batching Plant II)
10 1,628
10 2,863
- 8
- 1,942
10 2,503
10 4,891
10 2,032
30 7,339
100 27,289

567
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 7,666
10 4,481
50 9,320
- 928
30 14,113
120 36,507

220 63,796

E STRUCTURE & FWBS 1000 : SEWER AND DRAINAGE - PBC)

10 1,852 - FWBS 2000

10 1,148 A Utility Area

568
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 4,098 1 Neutralization Pit

80 16,004 - Concrete for Top Slab

70 14,756

- 170 - FWBS 1000

10 2,041 No Activity

10 2,340

70 16,186 - Neutralization Pit 43 m³

10 1,360

10 4,279

30 5,654

10 2,286

10 3,260

10 2,113

569
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 560

30 6,709

40 8,780

10 2,369

90 14,317

50 9,833

40 11,741

620 131,853

- 5,271

10 8,691

20 66,778

570
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 93,621

- 3,880

70 12,663

90 60,342

60 34,787

310 286,031

571
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

572
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Total Concrete = 43 m³

930 417,884

- 610 1 Area A-400

10 1,047 - Pouring Concrete in A4ST04 : 2 m3

10 1,284 - Pouring Concretel In A4PR02 : 1,5 m3

573
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,644 - Setting Anchor Bolt In A4PR02

10 1,360 - Prepare to Lean Concrete In Proses Air Blower

10 1,466

10 1,691 2 Area B-500

20 2,201 - Backfill in B5ST07 F1B

10 1,498 - Installation Rebar Footing in B5ST07 F1 A

10 967 - Installation Formwork Footing in B5ST07 F1 A

10 1,969 - Curing Concrete Footing in B5ST07 F1A

60 8,270 - Installation Formwork Pedestal in B5ST07 F2A

10 776 - Backfill in B5ST07 F1A

- 1,376 - Installation Formwork Pedestal in B5ST07 F1A

- 1,047 - Excavation Oil Catcher B

20 4,056

574
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 4,317

- 634 3 Area B-600

10 2,205 - Install Rebar Pedestal in Water Treatment Package F8 , F9 AB

50 7,286 - Install Formwork Pedestal in Water Treatment Package F8 , F9

20 6,204 - Finishing Pipe Sleeper

- 1,235

300 53,143

30 4,499

70 6,858

110 9,675

140 11,148

575
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

90 5,711

- -

- 1,630

100 12,989

110 19,576 Total Concrete K125 : 0 m³

230 25,308 Total Concrete K300 : 3.5 m³

20 2,808

- 80

900 100,282

1,200 153,425

576
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 300 1 Area Neutralization Pit (48-ABH-402)

- 150 - Pouring Concrete for Top Slab

- 1,288

10 1,488 2 Area Equipment Structure A6ST07

- - - Formwork Install for Footing

10 3,226 -

3 Area Equipment Structure A6ST08

- Continuing Formwork Install for Pedestal

10 1,410

20 4,030 4 Area Misc. Proses Area A200

120 15,290 - Continuing Formwork Install for Pedestal

577
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

220 15,090

180 14,620 5 Area Sulfur Pit (35-ZMB-551)

40 9,270 - Formwork Removal and Repairing

- 8,890

90 6,810 6 Area Piperack A7PR01

550 56,560 - Formwork Install for Pedestal at GL-5,6 /ABC

1,230 131,970

7 Area Pipe Sleeper 040-SLP-001-068

- Formwork and Embedded Install for Pedestal

- Pouring Concrete for Footing F15 (6,5 m3)

8 Area Workshop JEC

- Rebar Fabrication for DOOU-OMH-09, 10

578
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

9 Area Temporary New for Precast

- Formwork Install for Precast Sleeper

10 Area Temporary Work Shop JEC for Precast

- Formwork Fabrication for DOOU-OMH-09,10

11 Area Dike for Condensate Tank (37-ABJ-402)

- Pouring Concrete for Wall

579
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Total concrete = 6.5 m³

1,240 135,196

ON - GTA)

- 1,132 PIPERACK

- 1,072 - B2PR01

- 1,122 Cont. Install member Piperack

- 1,142 Beam : 14 S. Column : 20

- 1,192 V. Brace : 3

580
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,122 Finishing Grating ( Attch claim Grating)

- 1,052 - B2PR02

- 1,440 Joint Inspection for Plumbness

- 2,008 - D3PR01

20 3,296 Grouting on foundation

40 1,956

- 1,484 EQUIPMENT SUPPORT

20 2,174 A3ST01

- 404 Joint Inspection Plumbness First Layer (partial)

- 1,994 Cont. Install Main member :

- 3,123 Girder :4 S. Column : 16

40 3,850 V. Brace : 12

- 934 A4ST01

581
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,008 Cont. Install member Piperack

- 1,678 V. Brace : 7 S. Column :2

- 390 Girder :7

- 1,188

10 819

130 36,580

40 5,330

190 16,600

90 15,723

80 8,280

110 16,024

582
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

90 3,197

180 28,102

780 93,256 PIPERACK Today ((Ton)

A1PR01A 0.0

A1PR01B 0.0

A1PR02A 0.0

A1PR02B 0.0

A1PR03A 0.0

A1PR03B 0.0

A2PR01 0.0

D1PR01 0.0

A6PR01 0.0

B2PR01 1.1

583
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

B2PR02 0.0

D3PR02 0.0

D3PR01 0.0

D3BG01 0.0

A6ST01 0.0

A4ST01 4.0

A3ST01 1.4

Total 6.5

910 129,836

584
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 2,388 1 Main Substation Building

30 6,822 - Installation pipe EMT (4)

20 6,718 - Installation lamp (2)

- 686 - Installation suport busduck and finishing pedestal (8)

10 4,886 - Finishing compone for wall (1)

50 6,070

90 10,920

30 10,012

20 3,748

40 9,038 2 Main Control Room

20 2,568 - Installation tray and conduti (6)

10 520 - Finishing defuser (3)

- 370 - Fabrication suport for hvac (4)

585
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

330 64,744 - Polling cable Lamp a and power lamp (5)

- Installation PVC for airlock and toilet (4)

- Polling cable fire alarm (2)

270 23,756 - Polling cable telephone (3)

- 1,633 - Installation pipe ven (3)

- 1,778 - Finishing wall and repair plafond (9 and (2)

- 1,205 - Installation cover for stell (2)

- 1,912 - Installation ceramic (4)

- 3,797

- 1,918 3 Chemical Storage

- 13,900 - Installation flashing (9)

20 20,285 - Installation pipe roofdrain (2)

10 4,188 4 Waste Storage

586
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

230 43,588 - Installation suport tray and fabrication (6)

- 470 - Installation suport scaffolding (4)

- -

140 20,949 5 GEG Building

90 17,192 - Installation perimeter scaffolding (10)

10 6,647

50 4,190 6 Shelter Building

260 18,900 - Repair excavation (5)

- 6,536 - Chipping foundation (2)

1,080 192,841 - Fabrication rebar for air compressor (4)

- Transfer material rebar (2)

- Fabrication beton dike (1)

587
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,410 257,585

STATIC EQUIPMENT

588
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 434 - 46-MBM-106 LP Condensate Flash Drum

10 444 Cont. Installation of Platform

10 444 - 35-EBN-201 Thermal Reactor Waste Heat Boiler

10 444 Check leveling of Equipment

10 444 - 35-SRF-501 Thermal Reactor Chamber

10 444 Check leveling of Equipment

10 444 - 32-HAL-201 AGR Lean Amin Cooler

10 434 Preparation of intallation

10 698 - 32-MAF-101 AGR Absorber

80 2,275 Identification material

10 434 - 39-MAJ-103 AGE Solvent Carbon Filter

10 444 Welding Washer

- -

589
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 1,202

10 444 ROTARY EQUIPMENT

10 434 - 44-PBM-333 B Utility Water Transfer Pumps

50 2,220 Joint inspection Prre-Alignment

- - - 44-PBM-334 B Potable Water Pumps

10 444 Joint inspection Prre-Alignment

300 12,127 - 36-PAX-332 A/B Condensate Stabilizer Pump

Centering of Pump

- 36-PBA-333 A/B Produced water Recycle pump

60 1,533 Padding on Foundation

140 5,064

170 2,279 PACKAGE EQUIPMENT

60 1,080 - 33-ZZZ-502 (EG Regeneratio

590
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

340 8,283 Joint Inspection padding

110 3,260 - 44-ZBM-504 (Clarifier System Package)

80 1,240 Cont. Chipping + Padding on foundation

960 22,739 - 46-ZBE-501 A/B BOILER PACKAGE

Modification Support Ducting

Install + Modification Platform

Install accessorie Structure boiler A/B (Grating)

1,260 34,866

591
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 707 1 Condensate A Tank

10 1,854 - Fit up shell plate course 6

10 887

10 1,357 2 Condensate B Tank

20 1,644 - External welding horizoltal shell plate course 4 to course 5

10 867

40 3,628 3 Condensate C Tank

10 807 - Fit up shell plate course 3

10 1,207

10 637 4 Utility Water Tank

10 637 - Welding Battom plate to Annular plate

592
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,357 - fit up bracket to external plate

30 1,611

10 1,227 5 Fire Water Tank

- - -Inspection shell plate course 4

10 537

10 617 6 Demin Water Tank

10 1,317 - inspection shell plate course 6

10 767

20 2,874 7 Diesel Fuel Tank

20 2,024 - welding shell plate to top angel

20 1,324

20 1,844 8 Potable Water Tank

40 3,568 - Internal welding shell plate to manhole

593
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 687

370 33,986

30 2,408

10 2,235

40 2,708

160 17,818

20 1,434

110 12,552

170 13,479

30 2,792

570 55,426

594
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

940 89,412

NTING WORK UTILITY AREA - ISTI)

10 1,650 A Welding Progress

10 1,540 Underground (16475.4)

10 1,650 1 Pipe HDPE 21

10 1,660 2 Low Temp Carbon Steel (LTCS) 12

10 1,650 3 Carbon Steel (CS) 108

20 2,180 Total 141

10 1,560

595
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

70 6,790 Above ground (61350.4)

10 1,630 1 Low Temp Carbon Steel (LTCS) 0

40 3,060 2 Carbon Steel (CS) 0

10 1,020 3 Stainless Steel (SS) 0

20 1,810 4 Duplex Stainless Steel 0

10 1,720 5 ALLOY 825 0

10 1,310 Total 0

10 1,560

10 520 B Support Progress

20 2,670 1 CS 0

30 4,140 2 LTCS 0

40 5,760 3 Stainless Steel 0

10 1,560 4 DUPLEX SS 0

596
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,430 5 Cold Shoe Support 0

50 6,030 6 Spring Support 0

30 2,230 Total 0

10 1,000

20 1,170

10 630

20 2,040

520 59,970

C Other Progress

1 Borrow Sand 0

70 5,070 2 Coating 0

40 3,730 3 Post Heat Treatment 0

150 13,250 4 Finish Painting 0

597
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,020 5 Lettering/Marking 0

- 30 6 Pressure Test (STM) 0

60 5,740 Total 0

50 4,040

20 1,740

20 2,650

40 3,070

10 870

10 660

370 33,470

860 76,340

598
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,380 136,310

ND PAINTING WORK PROCESS AREA - SWG)

- 330 A Welding Progress

20 2,121 Under Ground (5929.60)

10 1,387 1 HDPE 0

30 2,516 2 LTCS INCL GALV 0

10 1,237 3 Carbon Steel INCL GALV 34

- 1,194 Total 34

10 1,455

20 2,157 Above ground (61182.00)

10 599 1 LTCS INCL GALV 0

599
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,063 2 Carbon Steel INCL GALV 0

20 1,304 3 Staniless Steel 3

10 110 4 Duplex Stainless Steel 0

20 2,000 Total 3

10 1,138

10 1,238 B Support Progress (121.17)

20 1,817 1 CS (Ton) 0

80 4,502 2 LTCS (Ton) 0

50 3,858 3 Stainless Steel (Ton) 0

40 3,362 4 DUPLEX SS (Ton) 0

20 2,100 5 Cold shoe support (qty) 0

30 2,155 6 Spring Support (qty) 0

10 912 Total 0

600
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 878

10 830 C Other Progress

20 1,609 1 Borrow Sand (M3) 0

10 850 2 Post Heat Treatment (ID) 0

80 4,502 3 Coating & Finish Paninting ( M2) 0

20 1,980 4 Lettering/Marking (pnt) 0

10 1,369 5 Steam Tracing 0

20 190 6 Pressure Test (STM) 0

630 51,763 Total 0

- 720

40 2,999

601
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

170 8,309

60 3,848

60 3,844

40 2,984

40 2,744

40 3,197

40 3,114

10 1,303

10 1,207

510 34,269

1,140 86,032

602
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Unit Today

10 1,818 1 Glandbox Fabrication

10 758 2 Internal Cable Pulling at SS

10 690 3 Setting Panel 43-SWG-1203E

10 1,934 4 Internal Pulling Cable at 43-UPS-1201

10 652 5 IR Test for Motor

10 758

30 2,594

10 582

10 1,296

10 552

603
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,044

10 1,194

10 866

10 828

10 798

20 1,156

10 492

200 18,012

10 768

10 660

20 568

604
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 2,130

130 1,898

90 3,274

10 846

10 846

40 2,208

10 700

10 768

400 14,666

600 32,678

605
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Unit Today

20 1,998 1 Fabrication tray

2 Setting panel at MCR

3 Loading Panel/ console Type pnl 10

20 1,998 4 Install Channel support for tray

5 Install Tray Support at SS

10 100

30 1,260

40 1,360

606
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 3,358

LDING - TTP)

10 1,075 1 JEC MCS Yard

10 1,075 - Modif Scaffoding for JEC Warehouse at JEC MCS Yard

10 1,075

10 1,055

10 1,075 2 Utility Area

10 1,075 - Preparation scaffolding material for B2PR01

10 538

607
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,045

- 1,045

10 528

10 498

10 2,033

10 935

10 775

10 97

10 10

150 13,934

20 1,820

608
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,150

100 8,590

70 4,163

210 16,723

360 30,657

NG - TNDT)

- 60 1 Stand By

10 740

10 760

609
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 760

30 2,320

30 1,480

10 1,510

10 720

20 1,020

70 4,730

610
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

100 7,050

Fuel Supply

10 2,061

10 1,876

20 3,937

10 2,032

20 3,895

30 5,923

60 11,849

611
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

80 15,786

GEULUMPANG - MEULIGO)
- 1,957

K - THI) - NO WORK
- 33,568

BPP) - NO WORK
- 21,007.0

612
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,652

NO WORK
- 1,288.5

- 2,378

OOM BOY/ROOM MAID - BBS)


Ready

10 1,650

- -

613
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,650

- -

10 1,650

10 1,650

40 6,600

10 1,650

10 1,650

10 1,650

20 3,300

20 3,300

30 4,950

614
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,650

140 22,820

90 14,670

50 8,150

30 4,950

30 4,890

20 3,300

470 76,930

510 83,530

14,588 2,607,036

615
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

OTHER
WEATHE
Condition From To

CLEAR 7.00 18.00


CLOUDY
RAINY

HEAVY
RAIN

616
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

INSU, CERTIFICATION)

617
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish

HIGHLIG

618
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA

619
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
2
3
4
5
6

620
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8

621
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

622
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

623
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

624
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

625
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

626
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

627
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5

628
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- FWBS 2000 2

A Utility Area 3

629
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Neutralization Pit 4

- Curing for Top Slab 5

B Offsite Area 7

1 Sulfur Waste Pit 8

- Concrete Wall 9

43 m³ 10

- FWBS 1000 11

No Activity 12

13

14

15

16

630
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

16

17

18

19

20

631
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

632
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

633
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total Concrete = 0 m³

1 Area A-400 1

- Installation Rebar For valve pit 104 2

- Repair Concrete in Feed Acid Gas KO Drum 3

634
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Curing Concrete In Provulsion Vessel 4

- Backfill In A4ST04 F3 and F2 5

- Curing Concrete In A4SN04 F4 6

- Installation Formwork Pedestal In A4SN02 7

- Lean Concrete In Proses Air Blower 8

- Installation Rebar In Proses Air Blower 9

- Curing Concrete In A4PR02 10


11

2 Area B-500

- Backfill in B5ST07 F1B

- Installation Rebar Pedestal in B5ST07 F1A

- pouring Concrete Pedestal in B5ST07 F2A

- Backfill in B5ST07 F1A

635
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Installation Formwork in B5ST07

- pouring Concrete in B5ST07 F1B

Treatment Package F8 , F9 AB

ater Treatment Package F8 , F9 3 Area B-600

- Install Anchor Bolt in Water Treatment Package F8 , F9 AB

- Pouring Concrete in Water Treatment Package F8 , F9 AB

4 Area B-700

- Repair Concrete in Pipe Sleeper

- Backfill in Pipe Sleeper

636
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total concrete = 0 m³

637
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Area Pipe Sleeper 040-SLP-001-068 1

- Formwork and Embedded Install for Pedestal F2, F15 2

2 Area Equipment Structure A6ST07 4

- Formwork Install for Footing

3 Area Equipment Structure A6ST08

- Continuing Formwork Install for Pedestal

4 Area Neutralization Pit (48-ABH-402)

- Support Periform removal

638
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Area Misc. Foundation A200

- Pouring Concrete for Pedestal ( 1 m3)

6 Area Piperack A7PR01

- Formwork Install for Pedestal at GL-5,6 /ABC

7 Area Workshop JEC

- Rebar Fabrication for Sleeper All Foundation

8 Area Sulfur Pit (35-ZMB-551)

- Continuing Formwork Removal and Repairing

639
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

9 Area Temporary New for Precast

- Contining Formwork Install for Precast Sleeper

640
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total concrete = 1 m³

PIPERACK 1

- B2PR01 2

Cont. Install member Piperack 3

Finishing Grating ( Attch claim Grating) 4

641
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- B2PR02 6

Install Accessories Member 7

- D3BG01 9

Joint Inspection for Plumbness 10

11

EQUIPMENT SUPPORT 12

- A3ST01 13

Install Accessorie member (First Layer)

Impact Bolt Accessories (First Layer)

- A4ST01

Cont. Install Main member

642
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

643
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

644
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

645
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Main Substation Building 2

- Installation scaffolding (4) 3

- Installation pipe EMT (7) 4

- Installation lamp (2) 5

- Installation Panel (3) 6

- Aplication epoxy top coat (6) 7

- Installation skirting (5) 8

- Installation tray for Hvac (4) 9

10

2 Main Control Room 11

- Installation ceramic for toilet (2) 12

- Repair plafond (2) 13

- Finishing wall (8) 14

646
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Polling cable (4) 15

- Installation pipe PVC line lamp (2) 16

- Test meger (4) 17

- Installation raised floor (4) 18

- Polling cable for conduit 2) 19

- Fabrication suport longdrat (2) 20

- Fabrication UNP for suport outdoor HVAC (4) 21

- Installation pipe flordrain and pipe ven (5) 22

23

3 Chemical Storage

- Removal scaffolding (4)

4 Waste Storage

647
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Installation additional purlin (3)

- Installation suport tray (3)

5 GEG Building

- Installation perimeter scaffolding (6)

6 Shelter Building

- Repair excavation (5)

- Chipping foundation (2)

- Fabrication rebar for air compressor (4)

- Transfer material rebar (2)

- Fabrication beton dike (1)

648
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

STATIC EQUIPMENT

649
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- 46-MBM-106 LP Condensate Flash Drum

Finishing of Platform

- 31-MBD-102 Slug Catcher

Preparation of Install Equipment

Install of Equipment

41-HBA-201 A/B Fuel Gas Heater

Install of Equipment

41-HBA-202 Secondary Fuel Gas Heater

Install of Equipment

31-MBD-101 Production Separator

Leveling of equipment

39-MAF-101 AGE Absorber

Welding Washer

650
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

ROTARY EQUIPMENT

- 44-PBM-333 A/B Utility Water Transfer Pumps

Full Grouting + Joint Inspection

- 44-PBM-334 A/B Potable Water Pumps

Full Grouting + Joint Inspection

- 36-PAX-332 A/B

Joint Inspection Centering of pump

- 36-PBA-333 A/B Produced water Recycle pump

Padding on Foundation

PACKAGE EQUIPMENT

- 44-ZBM-504 (Clarifier System Package)

651
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Cont. Chipping + Padding on foundation

- 46-ZBE-501 A/B BOILER PACKAGE A/B

Modification Support Ducting

Install + Modification Platform

Install accessorie Structure boiler A/B (Grating)

652
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Condensate A Tank 1

- Fit up shell plate course 6 2

2 Condensate B Tank

- Internal welding horizoltal shell plate course 4 to course 5

- Internal grinding horizoltal shell plate course 4 to course 5 3

3 Condensate C Tank 5

- Fit up shell plate course 3 6

4 Demin Water Tank 8

653
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Inspection shell plate course 6 9

5 Potable Water Tank

- Instalation Accessories

6 Utility Water Tank

- Fit up top angel

7 Fire Water Tank

-Inspection shell plate course 4

8 EG Make-Up Tank

- Instalation Accessories

654
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

9 Diesel Fuel Tank

- Welding shell plate to top angel

655
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Underground (16475.4) 2

1 Pipe HDPE 62 3

2 Low Temp Carbon Steel (LTCS) 4 4

3 Carbon Steel (CS) 86 5

Total 152 6

656
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Above ground (61350.4) 8

1 Low Temp Carbon Steel (LTCS) 0 9

2 Carbon Steel (CS) 0 10

3 Stainless Steel (SS) 0 11

4 Duplex Stainless Steel 0 12

5 ALLOY 825 0 13

Total 0 14

15

B Support Progress

1 CS 0

2 LTCS 0

3 Stainless Steel 0

4 DUPLEX SS 0

657
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Cold Shoe Support 0

6 Spring Support 0

Total 0

C Other Progress

1 Borrow Sand 0

2 Coating 0

3 Post Heat Treatment 0

4 Finish Painting 0

658
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

5 Lettering/Marking 0

6 Pressure Test (STM) 0

Total 0

659
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Under Ground (5929.60) 2

1 HDPE 0 3

2 LTCS INCL GALV 0 4

3 Carbon Steel INCL GALV 16 5

Total 16 6

Above ground (61182.00) 8

1 LTCS INCL GALV 0 9

660
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Carbon Steel INCL GALV 14 10

3 Stainless Steel 0 11

4 Duplex Stainless Steel 0 12

Total 14 13

14

B Support Progress (121.17) 15

1 CS (Ton) 0 16

2 LTCS (Ton) 0 17

3 Stainless Steel (Ton) 0 18

4 DUPLEX SS (Ton) 0 19

5 Cold shoe support (qty) 0 20

6 Spring Support (qty) 0 21

Total 0 22

661
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

23

C Other Progress 24

1 Borrow Sand (M3) 0 25

2 Coating ( M2) 0

3 Post Heat Treatment (ID) 0

4 Finish Painting (M2) 0

5 Lettering/Marking (pnt) 0

6 Pressure Test (STM) 0

Total 0

662
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

663
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Glandbox fabrication 1

2 Setting panel 2

3 Pulingg Grounding cable at SS 3

4 Install PVC conduit 2" for grounding at SS 4

5 Internal Cable pulling at SS 5

10

10

664
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

11

12

13

14

15

15

15

16

17

18

19

20

665
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

666
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Setting panel at MCR

2 Tray Support Fabrication at Pipe Rack

3 Install Tray at main pipe rack

4 Install tray support at MCR

667
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 JEC MCS Yard

- Modif Scaffoding for JEC Warehouse at JEC MCS Yard

2 Utility Area

- Installation scaffolding for working at height access

at B2PR01

668
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

669
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Swadaya Workshop Area 1

- Radiography Inspection 2

670
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Isma Tiur Workshop Area 4

- Radiography Inspection 5

10

11

12

13

14

671
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Fuel Supply 1

672
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

673
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Ready

674
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

675
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

676
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

OTHERS
WEATHER
Remark

677
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

678
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

WORKING HOUR

HIGHLIGHT

679
680
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Genset 10 KVA unit 1
Genset 25 KVA unit 1
Excavator unit 1
Buldozer unit 1
Crane 25T unit 1

681
EQUIPMENT
Equipment & Tools Unit QTY

Crane 55T unit 1


Trailler unit 1

682
EQUIPMENT
Equipment & Tools Unit QTY

683
EQUIPMENT
Equipment & Tools Unit QTY

684
EQUIPMENT
Equipment & Tools Unit QTY

685
EQUIPMENT
Equipment & Tools Unit QTY

686
EQUIPMENT
Equipment & Tools Unit QTY

687
EQUIPMENT
Equipment & Tools Unit QTY

688
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Generator Set unit 2
Truck Mixer unit 3
Wheel Loader unit 1
Batching Plant unit 2

689
EQUIPMENT
Equipment & Tools Unit QTY

Theodolite Unit 3

Total Station Set 3

Waterpass Unit 3

690
EQUIPMENT
Equipment & Tools Unit QTY

Excavator Unit 5

Dumptruck Unit 6

Bar Cutter Unit 2

Bar Bending Unit 2

Bulldozer Unit 1

Mesin Vibrator Unit 2

Plate Stamper Unit 4

Stamper Rammer Unit 2

Scaffolding Set 200

Genset Unit 4

Grader Unit 1

Water Compressor Unit 2

Vibro Roller Unit 1

691
EQUIPMENT
Equipment & Tools Unit QTY

Vibro Roller Unit 1

Air Compressor Unit 1

Water Pump Unit 5

Crane Unit 1

Baby Roller Unit 1

692
EQUIPMENT
Equipment & Tools Unit QTY

693
EQUIPMENT
Equipment & Tools Unit QTY

694
EQUIPMENT
Equipment & Tools Unit QTY

Excavator PC-200 Unit 2

Dump Truck Unit 2

Mini Bus Unit 3

695
EQUIPMENT
Equipment & Tools Unit QTY

Genset 30 KVA Unit 1

Genset 6,5 KVA Unit 1

Bar Cutter Unit 2

Bar Bending Unit 2

Submersible Water Pump Unit 1

Concrete Vibrator Unit 4

Compactor (Hand) Unit 2

Pick up/ Light Truck Unit 2

696
EQUIPMENT
Equipment & Tools Unit QTY

697
EQUIPMENT
Equipment & Tools Unit QTY

698
EQUIPMENT
Equipment & Tools Unit QTY

Excavator unit 1

Water Jump unit 1

Fibrator unit 1

Mixer DT 03 unit 1

699
EQUIPMENT
Equipment & Tools Unit QTY

700
EQUIPMENT
Equipment & Tools Unit QTY

701
EQUIPMENT
Equipment & Tools Unit QTY

R. Crane 80 Ton Unit 1

R. Crane 50 Ton Unit 1

R. Crane 25 Ton Unit 1

Unic Crane 5 T Unit 1

Trailler Truck Unit 1

702
EQUIPMENT
Equipment & Tools Unit QTY

Genset 150 kVA Unit 2

Genset 125 kVA Unit 1

Genset 25 kVA Unit 1

Compressor PDS 175 Unit 1

Welding Engine Unit 2

Scaffolding M 17020

Forklift 10 Ton Unit 1

Skylift Unit 3

703
EQUIPMENT
Equipment & Tools Unit QTY

704
EQUIPMENT
Equipment & Tools Unit QTY

705
EQUIPMENT
Equipment & Tools Unit QTY

Auto Level Unit 1

706
EQUIPMENT
Equipment & Tools Unit QTY

Tripod Unit 2

Cutting Concrete Unit 1

Hammer 5 kg Unit 1

Excavator Unit 2

water pump Unit 1

Cutting well Unit 3

Genset unit 1

Bar Bender unit 1

Bar Cutter unit 1

Submersible pump unit 1

Hammer Drill unit 1

Welding Machine unit 1

Hammer Drill unit 1

707
EQUIPMENT
Equipment & Tools Unit QTY

Welding Machine unit 1

Concrete Vibrator unit 1

Dump truck unit 2

Vehicle unit 1

Lampu Halogen unit 15

Stamper unit 1

Bucket unit 1

Crane unit 1

Coring Mechine Unit 1

708
EQUIPMENT
Equipment & Tools Unit QTY

709
EQUIPMENT
Equipment & Tools Unit QTY

710
EQUIPMENT
Equipment & Tools Unit QTY

Crawler Crane 550 Ton unit 1

Crawler Crane 250 Ton unit 1

Rough Crane 50 Ton unit 1

Flat Bed Trailler unit 1

Low bed Trailler unit 1

711
EQUIPMENT
Equipment & Tools Unit QTY

712
EQUIPMENT
Equipment & Tools Unit QTY

713
EQUIPMENT
Equipment & Tools Unit QTY

Oven Unit 2

Grinda

a. 4" Unit 13

b. 6" Unit 8

c. 7" Unit 3

Drayer Unit 24

Trapo Unit 26

Crane 25 ton Unit 1

Vacuum Box Set 1

Miller Unit 2

Cutting Touch Unit 3

714
EQUIPMENT
Equipment & Tools Unit QTY

Generator

a. 18 KVA Unit 1

b. 150 KVA Unit 1

c. 175 KVA Unit 1

d. 200 KVA Unit 1

715
EQUIPMENT
Equipment & Tools Unit QTY

716
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Set 3

Carry Pick-up Unit 1

Generator 100Kva Unit 2

Welding Travo Unit 5

Handryer Unit 5

Chain Saw Unit 1

Grinder Machine 7" Unit 5

717
EQUIPMENT
Equipment & Tools Unit QTY

Grinder Machine 4" Unit 5

Welding Machine Unit 4

TMC 9Ton Unit 1

Double Cabin Unit 2

Vehicle Unit 2

Generator 10-40Kva Unit 2

Water Pump Unit 2

Crane 35 Ton Unit 1

718
EQUIPMENT
Equipment & Tools Unit QTY

719
EQUIPMENT
Equipment & Tools Unit QTY

720
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Unit 1

Pick-up Unit 4

Vehicle Unit 2

Generator 6 A Unit 0

Generator 150 KVA Unit 2

Generator 100 KVA Unit 1

Grinder Machine 7" Unit 2

Grinder Machine 5" Unit 6

Grinder Machine 4" Unit 10

721
EQUIPMENT
Equipment & Tools Unit QTY

Cutting Wheel 14" Unit 2

Cutting Torch & accessories Unit 1

Chain Saw Unit 0

Crane HTC 85 ton Unit 1

Crawler Crane 80 ton Unit 1

Crane HTC 50 ton Unit 1

Crane HTC 20 ton Unit 1

TMC 7 ton Unit 1

Trailer Unit 2

Forklif Unit 1

Inventer Welding Machine Unit 1

TRAVO 400 A Unit 11

Chain Block 3 Ton Unit 8

722
EQUIPMENT
Equipment & Tools Unit QTY

Chain Block 2 Ton Unit 6

Level Block 1,5 Ton Unit 8

Compressor 175 CFM Unit 1

723
EQUIPMENT
Equipment & Tools Unit QTY

724
EQUIPMENT
Equipment & Tools Unit QTY

Light Vehicle 4x4 (LV) set 1

TMC 11T set 1

Mini Loader set 1

Power Generator set 2

Gasoline Generator Set 1

Welding Machine set 2

Welding Transformer set 4

Cable Jack set 4

Cable Roll Set 30

Cable Roll Set 30

725
EQUIPMENT
Equipment & Tools Unit QTY

Electric Bench Drill set 4

Electric Drilling Press Machine set 3

Electric High Speed Cutter set 1

Electric Hand Grinder & Cutter set 15

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hot Marker Machine set 2

Stamp Marker Machine set 1

Chain Block 2T set 3

Radio HT Comm set 15

Hot Gun set 3

726
EQUIPMENT
Equipment & Tools Unit QTY

727
EQUIPMENT
Equipment & Tools Unit QTY

728
EQUIPMENT
Equipment & Tools Unit QTY

729
EQUIPMENT
Equipment & Tools Unit QTY

730
EQUIPMENT
Equipment & Tools Unit QTY

Sentinel 880 Ir-192 Unit 1

Vehicle Toyota Hillux Unit 1

Collimator Unit 1

731
EQUIPMENT
Equipment & Tools Unit QTY

Barricade Roll 1

Megaphone Unit 1

Sign Board Unit 4

Radiation Flag Pcs 30

Crank Cable Unit 1

Source Cable Unit 1

Survey Meter Unit 1

Warning Light Unit 1

MC Cleaner Can 1

MC Penetrant Can 1

MC Developer Can 1

732
EQUIPMENT
Equipment & Tools Unit QTY

Container Office Unit 1

Fuel Tank 50 Unit 1

Fuel Truck Unit 1

Suction Pump Unit 1

Dispenser Unit 1

Fire Extinguisher 9 kg Unit 4

733
EQUIPMENT
Equipment & Tools Unit QTY

734
EQUIPMENT
Equipment & Tools Unit QTY

735
EQUIPMENT
Equipment & Tools Unit QTY

736
EQUIPMENT
Equipment & Tools Unit QTY

737
EQUIPMENT
Equipment & Tools Unit QTY

738
EQUIPMENT
Equipment & Tools Unit QTY

739
EQUIPMENT
Equipment & Tools Unit QTY

740
Project Name : BLOCK A SITE DEVELOPMENT PROJECT
Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL

745
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO

Date : 22-Jul-2017 Saturday


Daily Report No. : DR-JEC-MEP-0273

PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 919 1 920 M/H 9,136
Deputy Site Manager M/D 153 1 154 M/H 1,476
Construction Manager M/D 299 1 300 M/H 2,933
Deputy Construction Manager M/D 189 1 190 M/H 1,836

746
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 171 1 172 M/H 1,653
2 HSSE
HSSE M/D 9,706 11 9,717 M/H 21,385
HSSE Administration M/D 1,194 1 1,195 M/H 2,590
3 Quality Control
Field. QC Manager M/D 237 2 239 M/H 2,265
QC Coordinator-2 M/D 315 2 317 M/H 3,030
QC Engineer M/D 1,046 6 1,052 M/H 9,700
QC Admin M/D 147 2 149 M/H 1,371
Welding Tracking M/D 19 1 20 M/H 181
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 373 1 374 M/H 3,433
Electrical Superintendent M/D 351 1 352 M/H 3,279
ME Supervisor Temfac M/D 343 1 344 M/H 3,238
Civil Supervisor Temfac M/D 681 2 683 M/H 6,405
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 261 1 262 M/H 2,510

747
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 234 1 235 M/H 2,271
4.2 Civil
General Civil Superintendent M/D 269 1 270 M/H 2,606
Project Engineer M/D 210 4 214 M/H 2,025
Civil Engineer M/D 460 1 461 M/H 4,142
Civil Engineer M/D 393 1 394 M/H 3,590
Field Engineer M/D 193 1 194 M/H 1,870
Civil Construction M/D 300 1 301 M/H 2,878
Batching Plant Coordinator M/D 241 1 242 M/H 2,331
Surveyor M/D 493 1 494 M/H 4,498
Helper Surveyor M/D 464 1 465 M/H 4,170
Steel Structure Engineer M/D 172 1 173 M/H 1,663
4.3 Building
Building Superintendent M/D 453 1 454 M/H 4,099
Building Supervisor M/D 583 3 586 M/H 5,668
Surveyor M/D 380 4 384 M/H 2,162
Helper Surveyor M/D 347 2 349 M/H 3,364
4.4 Piping

748
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 228 1 229 M/H 2,214
Asst. Piping Superintendent M/D 210 1 211 M/H 2,043
Piping Engineer M/D 167 2 169 M/H 1,623
Technical Suport M/D 6 1 7 M/H 55
Supervisor M/D 268 3 271 M/H 2,533
CMS Operator M/D 71 1 72 M/H 668
Clerk M/D 169 1 170 M/H 1,648
4.5 Process
Process Superintendent M/D 236 1 237 M/H 2,285
Clerk M/D 6 1 7 M/H 55
4.6 Mechanical & Tank
Mechanical Superintendent M/D 78 1 79 M/H 726
4.6.1 Tank
Tank Field Engineer M/D 171 1 172 M/H 1,656
Tank Supervisor M/D 77 1 78 M/H 716
4.6.2 Static Mechanical
Static Field Engineer M/D 80 2 82 M/H 744
Preservation Technician M/D 138 - 138 M/H 1,310

749
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 74 1 75 M/H 689
4.6.4 Rotary
Field Engineer M/D 6 1 7 M/H 55
Supervisor M/D 6 1 7 M/H 55
4.6.5 Combation
Field Engineer M/D 6 1 7 M/H 55
4.7 General Contruction
General Superintendent M/D 243 1 244 M/H 2,376
Jr.Mechanical Engineer M/D 77 1 78 M/H 681
Mechanical Supervisor M/D 69 1 70 M/H 652
4.8 Electrical
Elecctrical Superintendent M/D 12 1 13 M/H 114
Field Engineer M/D 12 1 13 M/H 114
Lead Supervisor M/D 12 1 13 M/H 114
Engineer M/D 12 1 13 M/H 114
Supervisor M/D 36 3 39 M/H 342
Clerk M/D 12 1 13 M/H 114

750
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 12 1 13 M/H 114
Supervisor M/D 12 1 13 M/H 114
5 Preservation
Preservation Coordinator M/D 12 1 13 M/H 114
Preservation Eng M/D 12 1 13 M/H 114
Preservation Junior Eng M/D 48 4 52 M/H 456
6 Control
Project Control Manager M/D 200 1 201 M/H 1,947
Project Control M/D 238 1 239 M/H 2,170
Document Control M/D 266 1 267 M/H 2,575
Schedule Engineer M/D 210 4 214 M/H 2,031
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 412 5 417 M/H 3,947
Cost Control M/D 292 2 294 M/H 2,807
Subcontracting M/D 572 4 576 M/H 5,507
Material Control M/D 649 4 653 M/H 6,267
7 Administration

751
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 213 1 214 M/H 2,064
Administration M/D 2,264 18 2,282 M/H 21,610
Business Coordinator M/D 745 2 747 M/H 6,846
Project Support M/D 437 2 439 M/H 4,238
Finance M/D 236 1 237 M/H 2,285
Puchasing M/D 341 2 343 M/H 3,311
8 Public Relation
Public Affair M/D 1,116 3 1,119 M/H 10,300
Government Permit M/D 462 1 463 M/H 4,149
9 IT
IT Engineer M/D 876 4 880 M/H 8,366
10 Others
Security M/D 6,483 33 6,516 M/H 62,205
Rigging & Lifting / Operator M/D 2,795 12 2,807 M/H 27,199
Operator Genset M/D 492 2 494 M/H 4,770
Office Boy/Girl M/D 1,304 6 1,310 M/H 12,644
Paramedic M/D 2,696 12 2,708 M/H 26,118
Driver M/D 4,460 26 4,486 M/H 43,145

752
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 289 4 293 M/H 2,911
Rigger M/D 375 5 380 M/H 3,510
Skill M/D 1,137 8 1,145 M/H 10,614
Warehouse M/D 349 17 366 M/H 3,370
Total 54,489 281 54,770 439,301

2 PT. BANGUN NUSA PERSADA (TEMFAC SECTION A - BNP)


Total 9,955 - 9,955 88,084

3 PT. INDOTECH KARYA MANDIRI (TEMFAC SECTION B & C - IKM)


Total 103,539 - 103,539 153,750

4 PT. NAD JAYA (TEMFAC SECTION D - NAD)

753
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 20,435 - 20,435 185,652

5 PT. PELITA NUSA PERKASA (BATCHING PLANT - PNP)


INDIRECT MANPOWER
1 Site Manager M/D 122 1 123 M/H 1,045
2 HSE M/D 328 1 329 M/H 3,039
3 Safetyman M/D 165 1 166 M/H 1,628
4 Quality Control M/D 310 1 311 M/H 2,863
5 Supervisor M/D 1 - 1 M/H 8
6 Finance M/D 198 - 198 M/H 1,942
7 Public Affair M/D 264 1 265 M/H 2,503
8 Mechanic M/D 512 1 513 M/H 4,891
9 Logistic M/D 208 1 209 M/H 2,032
10 Security M/D 759 3 762 M/H 7,339
Sub Total 2,867 10 2,877 27,289

754
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 801 3 804 M/H 7,666
2 Lab M/D 461 1 462 M/H 4,481
3 Driver Truck Mixer M/D 957 5 962 M/H 9,320
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,639 3 1,642 M/H 14,113
Sub Total 3,978 12 3,990 36,507

Total 6,845 22 6,867 63,796

6 PT. PUALAM BANGUN CIPTA (FWBS 2000 : CONCRETE STRUCTURE


Total 98,346 - 98,346 417,884

7 JEC-DIRECT HIRED (FWBS 2300 : FOUNDATION WORK)

755
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

INDIRECT MANPOWER

1 Project Manager M/D 61 - 61 M/H 610

2 Site Manager M/D 106 1 107 M/H 1,047

3 Project Control M/D 130 1 131 M/H 1,284

4 Civil Engineer M/D 166 1 167 M/H 1,644

5 HSSE Coordinator M/D 137 1 138 M/H 1,360

6 HSSE Admin M/D 148 1 149 M/H 1,466

7 Material Control M/D 170 1 171 M/H 1,691

8 Quality Control M/D 221 2 223 M/H 2,201

9 Ass Quality Control M/D 151 1 152 M/H 1,498

10 HRD/ Personel M/D 97 1 98 M/H 967

11 Time Keeper M/D 199 1 200 M/H 1,969

12 Surveyor M/D 836 6 842 M/H 8,270

756
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

13 Drafter M/D 79 1 80 M/H 776

14 Procurement M/D 139 - 139 M/H 1,376

15 Site Environment Coordinator M/D 105 - 105 M/H 1,047

16 Tool Keeper M/D 407 2 409 M/H 4,056

17 Safetyman M/D 436 2 438 M/H 4,317

18 Mechanic M/D 64 - 64 M/H 634

19 Electrician M/D 223 1 224 M/H 2,205

20 Driver M/D 735 5 740 M/H 7,286

21 Security M/D 623 2 625 M/H 6,204

22 Office Boy M/D 124 - 124 M/H 1,235

Sub Total 5,357 30 5,387 53,143

DIRECT MANPOWER

757
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Field Supervisor M/D 454 3 457 M/H 4,499

2 Foreman M/D 693 7 700 M/H 6,858

3 Carpenter M/D 973 11 984 M/H 9,675

4 Rebar Worker M/D 1,121 10 1,131 M/H 11,148

5 Concrete Worker M/D 580 9 589 M/H 5,711

6 Mason Worker M/D - - - M/H -

7 Scaffolder M/D 163 - 163 M/H 1,630

8 Welder SMAW M/D 1,315 10 1,325 M/H 12,989

9 Semi Skill M/D 1,972 9 1,981 M/H 19,576

10 Common Labor M/D 2,559 20 2,579 M/H 25,308

11 Operator Excavator M/D 284 2 286 M/H 2,808

12 Operator Boom Truck M/D 8 - 8 M/H 80

Sub Total 10,122 81 10,203 100,282

758
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 15,479 111 15,590 153,425

8 JEC-DELTA (FWBS 2300 : FOUNDATION WORK)


INDIRECT MANPOWER

1 Coordinator M/D 30 - 30 M/H 300

2 Supervisor M/D 15 - 15 M/H 150

3 Jr. Civil Engineer M/D 129 - 129 M/H 1,288

4 Drafter M/D 149 1 150 M/H 1,488

- - - M/H -

Sub Total 323 1 324 3,226

759
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 Foreman M/D 141 1 142 M/H 1,410

2 Ass. Foreman M/D 403 2 405 M/H 4,030

3 Rebar Man M/D 1,529 16 1,545 M/H 15,290

4 Mason M/D 1,509 32 1,541 M/H 15,090

5 Carpenter M/D 1,462 21 1,483 M/H 14,620

6 Finishing M/D 927 4 931 M/H 9,270

7 Semi Skill M/D 889 1 890 M/H 8,890

8 Skill Worker M/D 681 9 690 M/H 6,810

9 Helper M/D 5,656 58 5,714 M/H 56,560

Sub Total 13,197 144 13,341 131,970

760
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

761
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,520 145 13,665 135,196

9 PT. GUNA TEGUH ABADI (STEEL STRUCTURE ERECTION - GTA)


INDIRECT MANPOWER

1 Site Manager M/D 115 - 115 M/H 1,132

762
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

2 Construction Manager M/D 109 - 109 M/H 1,072

3 HSE Coordinator M/D 114 - 114 M/H 1,122

4 QC Coordinator M/D 116 - 116 M/H 1,142

5 Field Enginer Leader M/D 121 - 121 M/H 1,192

6 Project Control M/D 114 - 114 M/H 1,122

7 ADM. Coordinator M/D 107 - 107 M/H 1,052

8 Superintendent M/D 147 - 147 M/H 1,440

9 Supervisor M/D 205 - 205 M/H 2,008

10 Safetyman M/D 335 2 337 M/H 3,296

11 Safety Officer M/D 198 4 202 M/H 1,956

12 QC M/D 152 - 152 M/H 1,484

13 Finance M/D 221 2 223 M/H 2,174

14 Procurement M/D 41 - 41 M/H 404

763
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

15 Adm. Staff M/D 203 - 203 M/H 1,994

16 Material Control M/D 318 - 318 M/H 3,123

17 Mechanical / Electrical M/D 391 4 395 M/H 3,850

18 Document Control M/D 94 - 94 M/H 934

19 Security M/D 205 - 205 M/H 2,008

20 Driver M/D 172 - 172 M/H 1,678

21 Opr. Leader M/D 39 - 39 M/H 390

22 Office Boy/Girl M/D 120 - 120 M/H 1,188

23 Engineer Staff M/D 84 1 85 M/H 819

Sub Total 3,721 13 3,734 36,580

DIRECT MANPOWER

1 Foreman M/D 542 4 546 M/H 5,330

764
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

2 Operator M/D 1,699 19 1,718 M/H 16,600

3 Rigger M/D 1,617 9 1,626 M/H 15,723

4 Millwright M/D 843 8 851 M/H 8,280

5 Scafolder M/D 1,636 11 1,647 M/H 16,024

6 Welder M/D 326 9 335 M/H 3,197

7 Helper M/D 2,869 18 2,887 M/H 28,102

Sub Total 9,532 78 9,610 93,256

765
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

766
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,253 91 13,344 129,836

10 PT. BANGUN NUSA PERSADA (MAIN BUILDING - BNP)


INDIRECT MANPOWER

1 Site Manager M/D 252 1 253 M/H 2,388

2 HSE M/D 696 3 699 M/H 6,822

3 Quality Control M/D 697 2 699 M/H 6,718

4 Site Engineering Manager M/D 75 - 75 M/H 686

5 Engineer M/D 500 1 501 M/H 4,886

6 Drafter M/D 608 5 613 M/H 6,070

7 Supervisor M/D 1,104 9 1,113 M/H 10,920

8 Surveyor M/D 1,043 3 1,046 M/H 10,012

9 Administration M/D 396 2 398 M/H 3,748

767
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

11 Logistic M/D 928 4 932 M/H 9,038

13 Driver M/D 268 2 270 M/H 2,568

14 Purchasing M/D 52 1 53 M/H 520

15 Delivery M/D 37 - 37 M/H 370

Sub Total 6,656 33 6,689 64,744

DIRECT MANPOWER

1 Finishing Worker M/D 2,431 22 2,453 M/H 23,756

2 Worker Site Temporary M/D 185 - 185 M/H 1,633

3 Operator Excavator M/D 183 - 183 M/H 1,778

4 Driver Dump Truck M/D 130 - 130 M/H 1,205

5 Operator Crane M/D 197 - 197 M/H 1,912

6 Rigger Crane M/D 389 - 389 M/H 3,797

768
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

7 Helper Crane M/D 197 - 197 M/H 1,918

8 Carpenter M/D 1,421 - 1,421 M/H 13,900

9 Rebar Man M/D 2,073 7 2,080 M/H 20,285

10 Digger M/D 424 7 431 M/H 4,188

11 Masonry & Concrete worker M/D 4,372 13 4,385 M/H 43,588

12 Mechanical M/D 47 - 47 M/H 470

13 Pipe M/D - - - M/H -

14 Scaffolder M/D 2,120 12 2,132 M/H 20,949

15 Steel worker M/D 1,733 9 1,742 M/H 17,192

16 Mechanic M/D 687 1 688 M/H 6,647

17 Teknisi Plumbing M/D 419 5 424 M/H 4,190

18 Teknisi Electrical M/D 1,890 27 1,917 M/H 18,900

19 General Worker M/D 693 - 693 M/H 6,536

769
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 19,591 103 19,694 192,841

770
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 26,247 136 26,383 257,585

11 PT. GUNA TEGUH ABADI (MECHANICAL WORK - GTA)


INDIRECT MANPOWER

1 Site Manager M/D 45 1 46 M/H 434

2 Construction Manager M/D 46 1 47 M/H 444

3 HSE Coordinator M/D 46 1 47 M/H 444

4 QC Coordinator M/D 46 1 47 M/H 444

5 Inspector Welder M/D 46 1 47 M/H 444

6 Field Enginer Leader M/D 46 1 47 M/H 444

7 Project Control M/D 46 1 47 M/H 444

8 ADM. Coordinator M/D 45 1 46 M/H 434

9 Superintendent M/D 73 1 74 M/H 698

771
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

10 Supervisor M/D 233 8 241 M/H 2,275

11 Safety Officer M/D 45 1 46 M/H 434

12 Finance M/D 46 1 47 M/H 444

13 Procurement M/D - - - M/H -

14 Adm. Staff M/D 125 3 128 M/H 1,202

15 Mechanic / Electrical M/D 46 1 47 M/H 444

16 Document Control M/D 45 1 46 M/H 434

17 Security M/D 230 5 235 M/H 2,220

18 Opr. Leader M/D - - - M/H -

19 Office Boy/Girl M/D 46 1 47 M/H 444

Sub Total 1,255 30 1,285 12,127

DIRECT MANPOWER

772
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Foreman M/D 157 6 163 M/H 1,533

2 Millwright M/D 518 14 532 M/H 5,064

3 Fitter M/D 230 17 247 M/H 2,279

4 Operator M/D 108 6 114 M/H 1,080

5 Helper M/D 842 34 876 M/H 8,283

6 Rigger M/D 333 11 344 M/H 3,260

7 Scaffolder M/D 124 8 132 1,240

Sub Total 2,312 96 2,408 22,739

773
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 3,567 126 3,693 34,866

12 PT. BARATA INDONESIA (FIELD ERECTED TANK - BRT)


INDIRECT MANPOWER

1 Project Manager M/D 71 1 72 M/H 707

2 Construction Manager M/D 186 1 187 M/H 1,854

3 Project Control M/D 89 1 90 M/H 887

4 HSE Officer M/D 136 1 137 M/H 1,357

5 Safety Man M/D 166 2 168 M/H 1,644

6 Engineer M/D 87 1 88 M/H 867

7 Supervisor M/D 365 4 369 M/H 3,628

774
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 QC Manager M/D 81 1 82 M/H 807

9 QC Dimensional M/D 121 1 122 M/H 1,207

10 Material Control M/D 64 1 65 M/H 637

11 Drafter M/D 64 1 65 M/H 637

12 Surveyor M/D 136 1 137 M/H 1,357

13 NDE Coordinator M/D 162 3 165 M/H 1,611

14 Welding Inspector M/D 123 1 124 M/H 1,227

15 Scaffolding Inspector M/D - - - M/H -

16 Purchasing M/D 54 1 55 M/H 537

17 Logistic M/D 62 1 63 M/H 617

18 GA & Finance M/D 132 1 133 M/H 1,317

19 Admin 77 1 78 767

20 Public Affair M/D 290 2 292 M/H 2,874

775
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

21 Tools & Consumable Keeper M/D 203 2 205 M/H 2,024

22 House keeping M/D 135 2 137 M/H 1,324

23 Office Boy M/D 186 2 188 M/H 1,844

24 Security M/D 359 4 363 M/H 3,568

25 Driver M/D 71 1 72 M/H 687

Sub Total 3,420 37 3,457 33,986

DIRECT MANPOWER

1 Operator M/D 242 3 245 M/H 2,408

2 Rigger M/D 225 1 226 M/H 2,235

3 Foreman M/D 274 4 278 M/H 2,708

4 Fitter M/D 1,790 16 1,806 M/H 17,818

5 Scaffolder M/D 144 2 146 M/H 1,434

776
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Welder M/D 1,264 11 1,275 M/H 12,552

7 Helper M/D 1,360 17 1,377 M/H 13,479

8 Technician M/D 280 3 283 M/H 2,792

Sub Total 5,579 57 5,636 55,426

Total 8,999 94 9,093 89,412

13 PT. ISMA TIUR (PIPING FIELD INSTALLATION AND PAINTING WORK


INDIRECT MANPOWER

1 Site Manager M/D 165 1 166 M/H 1,650

2 Construction Manager M/D 154 1 155 M/H 1,540

3 Engineering Coordinator M/D 165 1 166 M/H 1,650

777
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Project Control Coordinator M/D 166 1 167 M/H 1,660

5 HSE Coordinator M/D 165 1 166 M/H 1,650

6 Checker / Drafter Piping M/D 218 2 220 M/H 2,180

7 Material Control M/D 156 1 157 M/H 1,560

8 QC/Admin QC M/D 679 7 686 M/H 6,790

9 Store Keeper M/D 163 1 164 M/H 1,630

10 Surveyor M/D 306 4 310 M/H 3,060

11 Supervisor PTW M/D 102 1 103 M/H 1,020

12 Safety Officer/ HSE Man M/D 181 2 183 M/H 1,810

13 Safety Supervisor M/D 172 1 173 M/H 1,720

14 First Aids M/D 131 1 132 M/H 1,310

15 General Affair M/D 156 1 157 M/H 1,560

16 Superintendent M/D 52 1 53 M/H 520

778
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

17 Supervisor HDPE M/D 267 2 269 M/H 2,670

18 Supervisor CS, LTCS & Nace M/D 414 3 417 M/H 4,140

19 Humas M/D 576 4 580 M/H 5,760

20 Document Control M/D 156 1 157 M/H 1,560

21 HRD M/D 143 1 144 M/H 1,430

22 Admin M/D 603 5 608 M/H 6,030

23 Driver M/D 223 3 226 M/H 2,230

24 Supervisor Scaffolding M/D 100 1 101 M/H 1,000

25 Time Keeper M/D 117 2 119 M/H 1,170

26 Material Handling M/D 63 1 64 M/H 630

27 Security M/D 204 2 206 M/H 2,040

Sub Total 5,997 52 6,049 59,970

779
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 Operator M/D 507 7 514 M/H 5,070

2 Foreman Pipe Fitter M/D 373 4 377 M/H 3,730

3 Pipe Fitter I M/D 1,325 15 1,340 M/H 13,250

4 Pipe Fitter II M/D 202 2 204 M/H 2,020

5 Foreman Welder M/D 3 - 3 M/H 30

6 Welder M/D 574 6 580 M/H 5,740

7 Rigger M/D 404 5 409 M/H 4,040

8 Painter M/D 174 2 176 M/H 1,740

9 Mechanic / Electrical M/D 265 2 267 M/H 2,650

10 Scaffolder 307 4 311 M/H 3,070

11 Hydrotest Skill M/D 87 1 88 M/H 870

12 Ware House 66 1 67 M/H 660

780
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

13 Helper M/D 3,347 37 3,384 M/H 33,470

Sub Total 7,634 86 7,720 76,340

Total 13,631 138 13,769 136,310

14 PT. SWADAYA GRAHA (PIPING FIELD INSTALLATION AND PAINTING


INDIRECT MANPOWER

1 Project Manager M/D 33 - 33 M/H 330

2 Site Manager M/D 217 1 218 M/H 2,121

3 QC Manager M/D 141 1 142 M/H 1,387

4 QC Inspector M/D 258 3 261 M/H 2,516

5 HSE Manager M/D 126 1 127 M/H 1,237

781
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Safety Officer M/D 121 - 121 M/H 1,194

7 Safety Man M/D 148 1 149 M/H 1,455

8 Material Control M/D 221 2 223 M/H 2,157

9 PPC Manager M/D 61 1 62 M/H 599

10 Daily Reporter M/D 211 2 213 M/H 2,063

11 Spool Control M/D 133 2 135 M/H 1,304

12 Engineering Manager M/D 11 1 12 M/H 110

13 Field Engineer M/D 204 2 206 M/H 2,000

14 Welding Tracker M/D 116 1 117 M/H 1,138

15 Document Control M/D 126 1 127 M/H 1,238

16 HRD M/D 185 2 187 M/H 1,817

17 Supervisor M/D 463 7 470 M/H 4,502

18 Driver M/D 398 5 403 M/H 3,858

782
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

19 Scurity M/D 347 4 351 M/H 3,362

20 Public Relations M/D 215 2 217 M/H 2,100

21 Logistik M/D 222 3 225 M/H 2,155

22 Surveyor M/D 93 1 94 M/H 912

23 Manager Operator M/D 90 1 91 M/H 878

24 Operator Forklif M/D 85 1 86 M/H 830

25 Operator Trailer M/D 165 2 167 M/H 1,609

26 Operator TMC M/D 87 1 88 M/H 850

27 Operator Crane M/D 467 8 475 M/H 4,502

28 General Support adm M/D 203 2 205 1,980

29 Painting Inspector M/D 139 1 140 1,369

30 Operator PWHT M/D 19 2 21 190

Sub Total 5,305 61 5,366 51,763

783
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 Operator HDPE M/D 72 - 72 M/H 720

2 Foreman Pipe M/D 310 4 314 M/H 2,999

3 Pipe Fitter M/D 865 17 882 M/H 8,309

4 Welder M/D 401 6 407 M/H 3,848

5 Rigger M/D 398 6 404 M/H 3,844

6 Scaffolder M/D 309 4 313 M/H 2,984

7 Mechanic M/D 284 4 288 M/H 2,744

8 Werehouse M/D 329 4 333 M/H 3,197

9 Helper M/D 322 3 325 M/H 3,114

10 Office Boy M/D 133 1 134 M/H 1,303

11 Painting M/D 126 1 127 M/H 1,207

784
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 3,549 50 3,599 34,269

Total 8,854 111 8,965 86,032

15 PT. WIJAYA ENGINDO NUSA (ELECTRICAL - WEN)


INDIRECT MANPOWER

1 Site Manager M/D 184 1 185 M/H 1,818

2 E/I Construction Coord M/D 79 1 80 M/H 758

3 Finance/ Acctg M/D 71 1 72 M/H 690

4 Administration Coord M/D 195 1 196 M/H 1,934

5 Engineering Material M/D 67 1 68 M/H 652

6 QA/ QC Electrical M/D 79 1 80 M/H 758

785
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

7 Supervisor Electrical M/D 266 3 269 M/H 2,594

8 Superisor Material Control M/D 60 1 61 M/H 582

9 HSE Coord M/D 133 1 134 M/H 1,296

10 HSE/ Scaffolding Inspector M/D 57 1 58 M/H 552

11 Project Control M/D 107 1 108 M/H 1,044

12 Administration Staff M/D 122 1 123 M/H 1,194

13 Security M/D 89 1 90 M/H 866

14 Office Girl M/D 85 1 86 M/H 828

15 Housekeeping M/D 82 1 83 M/H 798

16 Cleaning Service M/D 119 2 121 M/H 1,156

17 Time Keeper/ Adm Staff M/D 51 1 52 M/H 492

Sub Total 1,846 20 1,866 18,012

786
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 QA/ QC Technician M/D 79 1 80 M/H 768

2 Scaffolder Foreman M/D 69 1 70 M/H 660

3 Scaffolder M/D 58 2 60 M/H 568

4 Technician M/D 219 6 225 M/H 2,130

5 Helper M/D 195 13 208 M/H 1,898

6 Mechanic M/D 336 9 345 M/H 3,274

7 Warehouse M/D 87 1 88 M/H 846

8 Welder M/D 87 1 88 M/H 846

9 TMC Operator M/D 227 4 231 M/H 2,208

10 TMC Operator M/D 72 1 73 M/H 700

11 Rigger M/D 79 1 80 M/H 768

Sub Total 1,508 40 1,548 14,666

787
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 3,354 60 3,414 32,678

16 PT. WIJAYA ENGINDO NUSA (INSTRUMENT - WEN)


INDIRECT MANPOWER

1 Supervisor Instrument M/D 201 2 203 M/H 1,998

Sub Total 201 2 203 1,998

DIRECT MANPOWER

1 Instrument Foreman M/D 10 1 11 M/H 100

2 Instrument Technician M/D 129 3 132 M/H 1,260

788
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 139 4 143 1,360

Total 340 6 346 3,358

17 PT. TERAS TEKNIK PERDANA (INSULATION /SCAFFOLDING - TTP)


INDIRECT MANPOWER

1 Site Manager M/D 111 1 112 M/H 1,075

2 Construction Manager M/D 111 1 112 M/H 1,075

3 HSSE Coordinator M/D 111 1 112 M/H 1,075

789
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Supv Scaffolding M/D 109 1 110 M/H 1,055

5 Inspector Scaffolding M/D 111 1 112 M/H 1,075

6 Material Control M/D 111 1 112 M/H 1,075

7 Ass Material Control M/D 57 1 58 M/H 538

8 Admin M/D 108 1 109 M/H 1,045

9 Public Relations M/D 108 - 108 M/H 1,045

10 HSSE Administration M/D 56 1 57 M/H 528

11 PPC M/D 53 1 54 M/H 498

12 Driver M/D 208 1 209 M/H 2,033

13 Timekeeper M/D 97 1 98 M/H 935

14 Office Boy M/D 80 1 81 M/H 775

15 Security Officer M/D 10 1 11 M/H 97

16 Cleaning Service M/D 1 1 2 M/H 10

790
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 1,442 15 1,457 13,934

DIRECT MANPOWER

1 Foreman M/D 187 2 189 M/H 1,820

2 Lead Worker M/D 220 2 222 M/H 2,150

3 Skilled Worker M/D 884 10 894 M/H 8,590

5 Helper M/D 432 7 439 M/H 4,163

Sub Total 1,723 21 1,744 16,723

Total 3,165 36 3,201 30,657

18 PT. THAI NDT INDONESIA (NON-DESTRUCTIVE TESTING - TNDT)

791
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

INDIRECT MANPOWER

1 Site Manager M/D 6 - 6 M/H 60

2 Supervisor M/D 74 1 75 M/H 740

3 Document Control M/D 76 1 77 M/H 760

4 Interpreter Radiography M/D 76 1 77 M/H 760

Sub Total 232 3 235 2,320

DIRECT MANPOWER

1 Operator Radiography M/D 148 3 151 M/H 1,480

2 RPO M/D 151 1 152 M/H 1,510

3 Driver M/D 72 1 73 M/H 720

4 PT Technician M/D 102 2 104 M/H 1,020

792
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

M/H

Sub Total 473 7 480 4,730

Total 705 10 715 7,050

19 PT. MI ENERGI (FUEL SUPPLY - MIE)


INDIRECT MANPOWER

1 Coordinator Manager M/D 208 1 209 M/H 2,061

2 Public Affair M/D 188 1 189 M/H 1,876

Sub Total 396 2 398 3,937

DIRECT MANPOWER

793
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Driver M/D 204 1 205 M/H 2,032

2 Security M/D 389 2 391 M/H 3,895

3 Helper M/D 592 3 595 M/H 5,923

Sub Total 1,185 6 1,191 11,849

Total 1,581 8 1,589 15,786

20 PT. MEULIGO (CONSTRUCTION OF JETTY AT KUALA GEULUMPANG


Total 197 - 197 1,957

21 PT. TAKA HYDROCORE INDONESIA (DEEP WELL WORK - THI) - NO W


Total 4,309 - 4,309 33,568

794
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

22 PT. BERDIKARI PONDASI PERKASA (PILING WORK - BPP) - NO WOR


Total 2,501 - 2,501 21,007.0

23 PT. SWING INDONESIA (WASTE WATER TREATMENT - SWI)


Total 298 - 298 2,652

24 PT. MITRA USAHA KREASINDO (PLN SCOPE - MUK) - NO WORK


Total 153 - 153 1,288.5

25 PT. EQUINE GLOBAL (NETWORK CABLE DATA - EGL)


Total 254 - 254 2,378

795
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

26 PT. BAASITHU BOGA SERVICES (RECEPTIONIST & ROOM BOY/ROO


INDIRECT MANPOWER

1 Site Manager M/D 165 1 166 M/H 1,650

2 F&B Supervisor M/D - - - M/H -

3 Housekeeping SPV M/D 165 1 166 M/H 1,650

4 Storeman M/D - - - M/H -

5 Japanesse Cook M/D 165 1 166 M/H 1,650

6 Receptionist / ADM M/D 165 1 166 M/H 1,650

Sub Total 660 4 664 6,600

DIRECT MANPOWER

1 Camp Boss M/D 165 1 166 M/H 1,650

2 Housekeeping SPV M/D 165 1 166 M/H 1,650

796
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Bakery M/D 165 1 166 M/H 1,650

4 Cook M/D 330 2 332 M/H 3,300

5 Cook Helper M/D 330 2 332 M/H 3,300

6 Kitchen Boy M/D 495 3 498 M/H 4,950

7 Receptionist M/D 165 1 166 M/H 1,650

8 Room Boy M/D 2,282 14 2,296 M/H 22,820

9 Room Maid Medco M/D 1,467 9 1,476 M/H 14,670

10 Office Boy / Girl M/D 815 5 820 M/H 8,150

11 Waitress M/D 495 3 498 M/H 4,950

12 Laundry M/D 489 3 492 M/H 4,890

13 Driver M/D 330 2 332 M/H 3,300

Sub Total 7,693 47 7,740 76,930

797
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 8,353 51 8,404 83,530

TOTAL M/D 422,368 1,426 423,794 M/H 2,607,036

JEC PERSONNEL
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager

798
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
Quality Control
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT

799
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
1 Zulfikar Said IT Engineer
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support

800
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent

801
DAILY REPORT

P
JGC ENC

PORARY FACILITY SECTION A


PORARY FACILITY SECTION B & C
PORARY FACILITY SECTION D
CHING PLANT
BS 2000 (CONCRETE STRUCTURE) & FWBS 1000 (SEWER AND DRAINAGE)
2300 (FOUNDATION WORK)
2300 (FOUNDATION WORK)
EL STRUCTURE ERECTION
N BULDING
AHANICAL WORK
D ERECTED TANK
NG FIELD INSTALLATION AND PAINTING WORK UTILITY AREA
NG FIELD INSTALLATION AND PAINTING WORK PROCESS AREA
CTRICAL

802
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID

ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,845
9 9,145
9 1,485
9 2,942
9 1,845

803
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
9 1,662
-
99 21,484
9 2,599
-
18 2,283
18 3,048
54 9,754
18 1,389
9 190
-
-
9 3,442
9 3,288
9 3,247
18 6,423
- 158
9 2,519

804
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
9 2,280
-
9 2,615
36 2,061
9 4,151
9 3,599
9 1,879
9 2,887
9 2,340
9 4,507
9 4,179
9 1,672
-
9 4,108
27 5,695
36 2,198
18 3,382
-

805
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
9 2,223
9 2,052
18 1,641
9 64
27 2,560
9 677
9 1,657
-
9 2,294
9 64
-
9 735
-
9 1,665
9 725
-
18 762
- 1,310

806
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
9 698
-
9 64
9 64
-
9 64
-
9 2,385
9 690
9 661
-
9 123
9 123
9 123
9 123
27 369
9 123

807
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
9 123
9 123
-
9 123
9 123
36 492
-
9 1,956
9 2,179
9 2,584
36 2,067
- 980
45 3,992
18 2,825
36 5,543
36 6,303
-

808
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
9 2,073
162 21,772
18 6,864
18 4,256
9 2,294
18 3,329
-
27 10,327
9 4,158
-
36 8,402
-
297 62,502
108 27,307
18 4,788
54 12,698
108 26,226
234 43,379

809
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
36 2,947
45 3,555
72 10,686
153 3,523
2,529 441,830

- 88,084

& C - IKM)
- 153,750

810
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 185,652

10 1,055 1 Ready Mix Concrete Production


10 3,049 2 Ready Mix Concrete Production (Batching Plant II)
10 1,638
10 2,873
- 8
- 1,942
10 2,513
10 4,901
10 2,042
30 7,369
100 27,389

811
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 7,696
10 4,491
50 9,370
- 928
30 14,143
120 36,627

220 64,016

E STRUCTURE & FWBS 1000 : SEWER AND DRAINAGE - PBC)


- 417,884

812
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 610 1 Workshop

10 1,057 - Installation Formwork lighting pole

10 1,294 - Pouring Concrete lighting pole : 13 m3

10 1,654 - Installation formwork in Manhole

10 1,370 - Installation Rebar in Manhole

10 1,476

10 1,701 2 Area A-400

20 2,221 - Remove Formwork Footing in A4ST04

10 1,508 - Installation Anchor Bolt In A4SN02

10 977 - Remove Formwork In A4PR02

10 1,979 - Lean Concrete In Proses Air Blower : 2 m3

60 8,330 - Lean Concrete in Analysis Shelter : 1.5 m3

813
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 786

- 1,376 3 Area B-500

- 1,047 - Backfill in B5ST07 F1B and A

20 4,076 - Installation Formwork in B5ST07 F1 B

20 4,337 - Installation Anchor Bolt in B5ST07 F1 B

- 634 - Installation Anchor Bolt in B5ST07 F2A

10 2,215 - Installation Formwork Pedestal in B5ST07 F1A

50 7,336 - Lean Concrete Oil Catcher B : 1,2 m3

20 6,224

- 1,235 4 Area B-600

300 53,443 - Install Fwk.Pedestal in Water Treatment Package F8 , F9 AB

- Lean Concrete in Water Treatment Package F1 8 and F14

- Finishing Pipe Sleeper

814
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 4,529

70 6,928

110 9,785

100 11,248

90 5,801

- -

- 1,630

100 13,089

90 19,666 Total Concrete K125 : 6 m³

200 25,508 Total Concrete K300 : 13 m³

20 2,828

- 80

810 101,092

815
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,110 154,535

- 300 1 Area Equipment Structure A6ST07 and A6ST08

- 150 - Formwork and Anchor Install for Footing

- 1,288

10 1,498 2 Area Equipment Structure A6ST02 & A6ST03

- - - Excavation for Foundation

10 3,236

3 Area Misc. Proses Area A200

816
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- Continuing Formwork Install for Pedestal

10 1,420

20 4,050 4 Area Sulfur Pit (35-ZMB-551)

160 15,450 - Formwork Removal and Repairing

320 15,410

210 14,830 5 Area Piperack A7PR01

40 9,310 - Formwork Install for Pedestal at GL-5,6 /ABC

10 8,900

90 6,900 6 Area Pipe Sleeper 040-SLP-001-068

580 57,140 - Formwork and Embedded Install for Pedestal

1,440 133,410 - Formwork Install for Footing at SLP 010 ( F12)

- Excavation for Foundation at SLP 19, 20 ( F11)

817
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

7 Area Workshop JEC

- Rebar Fabrication for Pipe Sleeper

- Rebar Fabrication for A6ST02

- Rebar Fabrication for A6ST03

8 Area Temporary New for Precast

- Pouring Concrete for Footing Precast Sleeper (6,50 M3)

9 Area Temporary Work Shop JEC for Precast

- Formwork Fabrication for DOOU-OMH-10

- Formwork Fabrication for AOOU-CMH-02, 04

10 Area Dike for Condensate Tank (37-ABJ-402)

818
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- Formwork Removal for Wall

Total concrete = 6.5 m³

1,450 136,646

ON - GTA)

- 1,132 PIPERACK

819
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,072 - B2PR01

- 1,122 Cont. Install member Piperack

- 1,142 Beam : 14 S. Column : 20

- 1,192 V. Brace : 3

- 1,122 Finishing Grating ( Attch claim Grating)

- 1,052 - B2PR02

- 1,440 Joint Inspection for Plumbness

- 2,008 - D3PR01

20 3,316 Grouting on foundation

40 1,996

- 1,484 EQUIPMENT SUPPORT

20 2,194 A3ST01

- 404 Joint Inspection Plumbness First Layer (partial)

820
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,994 Cont. Install Main member :

- 3,123 Girder :4 S. Column : 16

40 3,890 V. Brace : 12

- 934 A4ST01

- 2,008 Cont. Install member Piperack

- 1,678 V. Brace : 7 S. Column :2

- 390 Girder :7

- 1,188

10 829

130 36,710

40 5,370

821
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

190 16,790

90 15,813

80 8,360

110 16,134

90 3,287

180 28,282

780 94,036 PIPERACK Today ((Ton)

A1PR01A 0.0

A1PR01B 0.0

A1PR02A 0.0

A1PR02B 0.0

A1PR03A 0.0

A1PR03B 0.0

822
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

A2PR01 0.0

D1PR01 0.0

A6PR01 0.0

B2PR01 1.1

B2PR02 0.0

D3PR02 0.0

D3PR01 0.0

D3BG01 0.0

A6ST01 0.0

A4ST01 4.0

A3ST01 1.4

Total 6.5

823
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

910 130,746

10 2,398 1 Main Substation Building

30 6,852 - Installation pipe EMT (2)

20 6,738 - Wearing cable (6)

- 686 - Installation RGS (2)

10 4,896 - Installation busduck (3)

50 6,120 - Cleaning epoxy and dewatering (4)

90 11,010 - Finishing opening (3)

30 10,042

20 3,768

824
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

40 9,078 2 Main Control Room

20 2,588 - Fabrication tray and conduit (6)

10 530 - Polling cable for Hvac (3)

- 370 - Fabrication suport for hvac (4)

330 65,074 - Polling cable Lamp and power lamp (4)

- Installation PVC for airlock and toilet (4)

- Polling cable fire alarm (2)

220 23,976 - Polling cable telephone (2)

- 1,633 - Finishing wall (8)

- 1,778 - Installation ceramic (4)

- 1,205

- 1,912

- 3,797 3 Chemical Storage

825
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,918 - Installation flashing (9)

- 13,900 - Installation pipe roofdrain and suport (5)

70 20,355 - Repair suport scaffolding (6)

70 4,258 4 Waste Storage

130 43,718 - Installation tray and fabrication (5)

- 470 - Installation suport scaffolding (6)

- -

120 21,069 5 GEG Building

90 17,282 - Repair excavation (7)

10 6,657 - Fabrication rebar for air compressor (7)

50 4,240 - Concreting LC

270 19,170

- 6,536 6 SheltChipping foundation (2)

826
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,030 193,871 -

827
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,360 258,945

STATIC EQUIPMENT

10 444 - 46-MBM-106 LP Condensate Flash Drum

10 454 Finishing of Platform

10 454 - 31-MBD-102 Slug Catcher

10 454 Preparation of Install Equipment

10 454 Install of Equipment

10 454 - 39-MAF-101 AGE Absorber

10 454 Welding Washer

10 444 - 32-MAF-101 AGR Absorber

10 708 Identification material

828
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

80 2,355 - 35-EBN-201 Thermal Reactor Waste Heat Boiler

10 444 Joint Inspection Leveling

10 454 - 35-SRF-501 Thermal Reactor Chamber

- - Joint Inspection Leveling

30 1,232

10 454 ROTARY EQUIPMENT

10 444 - 44-PBM-333 B Utility Water Transfer Pumps

50 2,270 Full grout

- - - 44-PBM-334 B Potable Water Pumps

10 454 Full grout

300 12,427 - 36-PAX-332 A/B Condensate Stabilizer Pump

Pre-Alignment + Anchort Grout

829
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 1,593 PACKAGE EQUIPMENT

140 5,204 - 33-ZZZ-502 (EG Regeneration Package Skid)

170 2,449 Joint Inspection padding

60 1,140 - 44-ZBM-504 (Clarifier Syste

340 8,623 Cont. Chipping + Padding on foundation

110 3,370 - 46-ZBE-501 A/B BOILER PACKAGE

80 1,320 Cont. Modification Support Ducting

960 23,699 Anchort grout column structure

Cont. install Platform Structure Boiler A/B

830
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,260 36,126

10 717 1 Condensate A Tank

10 1,864 - Fit up shell plate course 6

10 897

10 1,367 2 Condensate B Tank

20 1,664 - Internal welding horizoltal shell plate course 4 to course 5

10 877 - Internal grinding horizoltal shell plate course 4 to course 5

40 3,668

831
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 817 3 Utility Water Tank

10 1,217 - Welding Battom plate to Annular plate

10 647 - Fit up bracket to external plate

10 647

10 1,367 4 Fire Water Tank

30 1,641 -Inspection shell plate course 4

10 1,237 - Welding center colloum

- -

10 547 5 Diesel Fuel Tank

10 627 - Welding shell plate to top angel

10 1,327

10 777 6 Potable Water Tank

20 2,894 - Welding accessories handrill to shell

832
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,044

20 1,344

20 1,864

40 3,608

10 697

370 34,356

30 2,438

10 2,245

40 2,748

160 17,978

20 1,454

833
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

110 12,662

170 13,649

30 2,822

570 55,996

940 90,352

NTING WORK UTILITY AREA - ISTI)

10 1,660 A Welding Progress

10 1,550 Underground (16475.4)

10 1,660 1 Pipe HDPE 35

834
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,670 2 Low Temp Carbon Steel (LTCS) 0

10 1,660 3 Carbon Steel (CS) 66

20 2,200 Total 101

10 1,570

70 6,860 Above ground (61350.4)

10 1,640 1 Low Temp Carbon Steel (LTCS) 0

40 3,100 2 Carbon Steel (CS) 0

10 1,030 3 Stainless Steel (SS) 0

20 1,830 4 Duplex Stainless Steel 0

10 1,730 5 ALLOY 825 0

10 1,320 Total 0

10 1,570

10 530 B Support Progress

835
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,690 1 CS 0

30 4,170 2 LTCS 0

40 5,800 3 Stainless Steel 0

10 1,570 4 DUPLEX SS 0

10 1,440 5 Cold Shoe Support 0

50 6,080 6 Spring Support 0

30 2,260 Total 0

10 1,010

20 1,190

10 640

20 2,060

520 60,490

C Other Progress

836
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1 Borrow Sand 0

70 5,140 2 Coating 0

40 3,770 3 Post Heat Treatment 0

150 13,400 4 Finish Painting 0

20 2,040 5 Lettering/Marking 0

- 30 6 Pressure Test (STM) 0

60 5,800 Total 0

50 4,090

20 1,760

20 2,670

40 3,110

10 880

10 670

837
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

370 33,840

860 77,200

1,380 137,690

ND PAINTING WORK PROCESS AREA - SWG)

- 330 A Welding Progress

10 2,131 Under Ground (5929.60)

10 1,397 1 HDPE 0

30 2,546 2 LTCS INCL GALV 0

10 1,247 3 Carbon Steel INCL GALV 50

838
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,194 Total 50

10 1,465

20 2,177 Above ground (61182.00)

10 609 1 LTCS INCL GALV 0

20 2,083 2 Carbon Steel INCL GALV 0

20 1,324 3 Staniless Steel 32

10 120 4 Duplex Stainless Steel 0

20 2,020 Total 32

10 1,148

10 1,248 B Support Progress (121.17)

20 1,837 1 CS (Ton) 0

70 4,572 2 LTCS (Ton) 0

50 3,908 3 Stainless Steel (Ton) 0

839
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

40 3,402 4 DUPLEX SS (Ton) 0

20 2,120 5 Cold shoe support (qty) 0

30 2,185 6 Spring Support (qty) 0

10 922 Total 0

10 888

10 840 C Other Progress

20 1,629 1 Borrow Sand (M3) 0

10 860 2 Post Heat Treatment (ID) 0

80 4,582 3 Coating & Finish Paninting ( M2) 0

20 2,000 4 Lettering/Marking (pnt) 0

10 1,379 5 Steam Tracing 0

20 210 6 Pressure Test (STM) 0

610 52,373 Total 0

840
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 720

40 3,039

170 8,479

60 3,908

60 3,904

40 3,024

40 2,784

40 3,237

30 3,144

10 1,313

10 1,217

841
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

500 34,769

1,110 87,142

Unit Today

10 1,828 1 Glandbox Fabrication Set

10 768 2 Cable Pulling at SS (Internal) (LV Cable) m ###

10 700 3 Asembly/Joint Panel 43-SWG-1202

10 1,944 4 Asembly/Joint Panel 43-SWG-1203

10 662 5 Install PVC conduit 2" for grounding at SS m 8

10 768 Install Cathodic - Connection Piping pnt 16

842
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 2,624

10 592

10 1,306

10 562

10 1,054

10 1,204

10 876

10 838

10 808

20 1,176

10 502

200 18,212

843
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 778

10 670

20 588

60 2,190

130 2,028

90 3,364

10 856

10 856

40 2,248

10 710

10 778

400 15,066

844
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

600 33,278

Unit Today

20 2,018 1 Fabrication Support for cable tray

2 Install Tray at Main Pipe Rack m 10

3 Install Support at Pipe Rack ea 10

20 2,018 4 Setting panel at MCR pnl 5

5 Install supprt at MCR ea 11

10 110 6 Install Tray Support at SS ea 22

30 1,290

845
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

40 1,400

60 3,418

LDING - TTP)

9 1,084 1 Utility Area

9 1,084 - Installation scaffolding for working at height access

9 1,084 at B2PR01

846
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

9 1,064

9 1,084

9 1,084

9 547

9 1,054

- 1,045

9 537

9 507

9 2,042

9 944

9 784

9 106

9 19

847
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

135 14,069

18 1,838

18 2,168

90 8,680

63 4,226

189 16,912

324 30,981

NG - TNDT)

848
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 60 1 Stand By

10 750

10 770

10 770

30 2,350

30 1,510

10 1,520

10 730

20 1,040

849
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

70 4,800

100 7,150

Fuel Supply

10 2,071

10 1,886

20 3,957

850
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 2,042

20 3,915

30 5,953

60 11,909

80 15,866

GEULUMPANG - MEULIGO)
- 1,957

K - THI) - NO WORK
- 33,568

851
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

BPP) - NO WORK
- 21,007.0

- 2,652

NO WORK
- 1,288.5

- 2,378

852
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

OOM BOY/ROOM MAID - BBS)


Ready

10 1,660

- -

10 1,660

- -

10 1,660

10 1,660

40 6,640

10 1,660

10 1,660

853
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,660

20 3,320

20 3,320

30 4,980

10 1,660

140 22,960

90 14,760

50 8,200

30 4,980

30 4,920

20 3,320

470 77,400

854
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

510 84,040

13,943 2,620,979

OTHER
WEATHE
Condition From To

CLEAR 7.00 18.00


CLOUDY
RAINY

HEAVY
RAIN

855
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

INSU, CERTIFICATION)

856
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish

857
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

HIGHLIG

858
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA

859
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
2
3
4
5
6

860
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8

861
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

862
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

863
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

864
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

865
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

866
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

867
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5

868
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

869
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Area A-400 1

- Installation Rebar For valve pit 104 2

: 13 m3 - Repair Concrete in Feed Acid Gas KO Drum 3

- Curing Concrete In Provulsion Vessel 4

- Curing Concrete In A4SN04 F4 5

- Pouring Concrete Pedestal In A4SN02 6

- Installation Rebar In Proses Air Blower 7

- Installation Formwork In Proses Air Blower 8

- Remove Formwork Pedestal In A4PR02 9

- Installation Rebar in Analysis Shelter 10


: 2 m3 11

: 1.5 m3 2 Area B-500

870
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Backfill in B5ST07 F1B, F1A

- Installation Rebar Pedestal in B5ST07 F1A

- pouring Concrete Pedestal in B5ST07 F2A

- Backfill in B5ST07 F1A

- Installation Formwork in B5ST07 F1A

- Pouring Concrete in B5ST07 F1A

: 1,2 m3 3 Area B-600

- Install Anchor Bolt in Water Treatment Package F8 , F9 AB

- Installation Rebar in Water Treatment Package F8 , F14

eatment Package F8 , F9 AB

ent Package F1 8 and F14 4 Area B-700

- Backfill in Pipe Sleeper

871
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total concrete = 0 m³

872
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Area Pipe Sleeper 040-SLP-001-068 1

- Fwk. and Embedded Install for Pedestal F2, F12 (SLP 8,9,10,11) 2

- Excavation for Foundation at SLP 19, 20 ( F11) 3

2 Area Equipment Structure A6ST02 & A6ST03

- Formwork and Pouring Concrete for LC (8 m3)

873
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

3 Area Equipment Structure A6ST07 and A6ST08

- Continuing Formwork and Anchor Install for Footing

4 Area Neutralization Pit (48-ABH-402)

- Support Periform removal

5 Area Misc. Foundation A200

- Pouring Concrete for Pedestal ( 1 m3)

6 Area Piperack A7PR01

- Formwork Install for Pedestal at GL-5,6 /ABC

7 Area Workshop JEC

874
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Rebar Fabrication for Sleeper All Foundation

8 Area Sulfur Pit (35-ZMB-551)

- Continuing Formwork Removal and Repairing

9 Area Temporary New for Precast

- Contining Formwork Install for Precast Sleeper

875
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total concrete = 9 m³

PIPERACK 1

876
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- B2PR01 2

Cont. Install member Piperack 3

Finishing Grating ( Attch claim Grating) 4

- B2PR02 6

Install Accessories Member 7

- D3BG01 9

Joint Inspection for Plumbness 10

11

EQUIPMENT SUPPORT 12

- A3ST01 13

Install Accessorie member (First Layer)

877
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Impact Bolt Accessories (First Layer)

- A4ST01

Cont. Install Main member

878
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

879
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

880
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Main Substation Building 2

- Installation scaffolding (4) 3

- Installation pipe EMT (7) 4

- Installation lamp (2) 5

- Installation Panel (3) 6

- Aplication epoxy top coat (6) 7

- Installation skirting (5) 8

- Installation tray for Hvac (4) 9

10

881
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Main Control Room 11

- Installation ceramic for toilet (2) 12

- Repair plafond (2) 13

- Finishing wall (8) 14

- Polling cable (4) 15

- Installation pipe PVC line lamp (2) 16

- Test meger (4) 17

- Installation raised floor (4) 18

- Polling cable for conduit 2) 19

- Fabrication suport longdrat (2) 20

- Fabrication UNP for suport outdoor HVAC (4) 21

- Installation pipe flordrain and pipe ven (5) 22

23

882
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

3 Chemical Storage

- Removal scaffolding (4)

4 Waste Storage

- Installation additional purlin (3)

- Installation suport tray (3)

5 GEG Building

- Installation perimeter scaffolding (6)

6 Shelter Building

- Repair excavation (5)

- Chipping foundation (2)

883
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Fabrication rebar for air compressor (4)

- Transfer material rebar (2)

- Fabrication beton dike (1)

884
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

STATIC EQUIPMENT

- 46-MBM-106 LP Condensate Flash Drum

Cont. Finishing of Platform

- 31-MBD-102 Slug Catcher

Leveling of equipment

- 41-HBA-201 A/B Fuel Gas Heater

Install of Equipment

- 41-HBA-202 Secondary Fuel Gas Heater

Install of Equipment

- 31-MBD-101 Production Separator

885
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Leveling of equipment

- 39-MAF-101 AGE Absorber

Welding Washer

ROTARY EQUIPMENT

- 36-PAX-332 A/B

Leveling of Pump

PACKAGE EQUIPMENT

- 44-ZBM-504 (Clarifier System Package)

Cont. Chipping + Padding on foundation

- 46-ZBE-501 A/B BOILER PACKAGE

Cont. Modification Support Ducting

886
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Joint Inspection plumbness for column structure

887
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Condensate A Tank 1

- Fit up shell plate course 6 2

2 Condensate B Tank

- Internal welding horizoltal shell plate course 4 to course 5

- Internal grinding horizoltal shell plate course 4 to course 5 3

888
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

3 Condensate C Tank 5

- Fit up shell plate course 3 6

4 Demin Water Tank 8

- Inspection shell plate course 6 9

5 Potable Water Tank

- Instalation Accessories

6 Utility Water Tank

- Fit up top angel

7 Fire Water Tank

889
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

-Inspection shell plate course 4

8 EG Make-Up Tank

- Instalation Accessories

9 Diesel Fuel Tank

- Welding shell plate to top angel

890
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Underground (16475.4) 2

1 Pipe HDPE 62 3

891
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Low Temp Carbon Steel (LTCS) 4 4

3 Carbon Steel (CS) 86 5

Total 152 6

Above ground (61350.4) 8

1 Low Temp Carbon Steel (LTCS) 0 9

2 Carbon Steel (CS) 0 10

3 Stainless Steel (SS) 0 11

4 Duplex Stainless Steel 0 12

5 ALLOY 825 0 13

Total 0 14

15

B Support Progress

892
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 CS 0

2 LTCS 0

3 Stainless Steel 0

4 DUPLEX SS 0

5 Cold Shoe Support 0

6 Spring Support 0

Total 0

C Other Progress

893
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Borrow Sand 0

2 Coating 0

3 Post Heat Treatment 0

4 Finish Painting 0

5 Lettering/Marking 0

6 Pressure Test (STM) 0

Total 0

894
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Under Ground (5929.60) 2

1 HDPE 0 3

2 LTCS INCL GALV 0 4

3 Carbon Steel INCL GALV 16 5

895
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total 16 6

Above ground (61182.00) 8

1 LTCS INCL GALV 0 9

2 Carbon Steel INCL GALV 14 10

3 Stainless Steel 0 11

4 Duplex Stainless Steel 0 12

Total 14 13

14

B Support Progress (121.17) 15

1 CS (Ton) 0 16

2 LTCS (Ton) 0 17

3 Stainless Steel (Ton) 0 18

896
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

4 DUPLEX SS (Ton) 0 19

5 Cold shoe support (qty) 0 20

6 Spring Support (qty) 0 21

Total 0 22

23

C Other Progress 24

1 Borrow Sand (M3) 0 25

2 Coating ( M2) 0

3 Post Heat Treatment (ID) 0

4 Finish Painting (M2) 0

5 Lettering/Marking (pnt) 0

6 Pressure Test (STM) 0

Total 0

897
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

898
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Glandbox fabrication 1

2 Setting panel 2

3 Pulingg Grounding cable at SS 3

4 Install PVC conduit 2" for grounding at SS 4

5 Internal Cable pulling at SS 5

899
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

10

10

11

12

13

14

15

15

15

16

17

900
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

18

19

20

901
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Continue Setting panel at MCR

2 Continue Install support for cable tray at MCR

902
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Utility Area

- Installation scaffolding for working at height access

at B2PR01

903
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

904
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

905
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Swadaya Workshop Area 1

- Radiography Inspection 2

2 Isma Tiur Workshop Area 4

- Radiography Inspection 5

10

11

12

906
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

13

14

Fuel Supply 1

907
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

908
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

909
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Ready

910
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

911
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

OTHERS
WEATHER
Remark

912
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

913
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

WORKING HOUR

914
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

HIGHLIGHT

915
916
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Genset 10 KVA unit 1
Genset 25 KVA unit 1
Excavator unit 1
Buldozer unit 1
Crane 25T unit 1

917
EQUIPMENT
Equipment & Tools Unit QTY

Crane 55T unit 1


Trailler unit 1

918
EQUIPMENT
Equipment & Tools Unit QTY

919
EQUIPMENT
Equipment & Tools Unit QTY

920
EQUIPMENT
Equipment & Tools Unit QTY

921
EQUIPMENT
Equipment & Tools Unit QTY

922
EQUIPMENT
Equipment & Tools Unit QTY

923
EQUIPMENT
Equipment & Tools Unit QTY

924
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Generator Set unit 2
Truck Mixer unit 3
Wheel Loader unit 1
Batching Plant unit 2

925
EQUIPMENT
Equipment & Tools Unit QTY

926
EQUIPMENT
Equipment & Tools Unit QTY

Excavator PC-200 Unit 2

Dump Truck Unit 2

Mini Bus Unit 3

Genset 30 KVA Unit 1

Genset 6,5 KVA Unit 1

Bar Cutter Unit 2

Bar Bending Unit 2

Submersible Water Pump Unit 1

Concrete Vibrator Unit 4

Compactor (Hand) Unit 2

Pick up/ Light Truck Unit 2

927
EQUIPMENT
Equipment & Tools Unit QTY

928
EQUIPMENT
Equipment & Tools Unit QTY

929
EQUIPMENT
Equipment & Tools Unit QTY

Excavator unit 1

Water Jump unit 1

Fibrator unit 1

Mixer DT 03 unit 1

930
EQUIPMENT
Equipment & Tools Unit QTY

931
EQUIPMENT
Equipment & Tools Unit QTY

932
EQUIPMENT
Equipment & Tools Unit QTY

R. Crane 80 Ton Unit 1

933
EQUIPMENT
Equipment & Tools Unit QTY

R. Crane 50 Ton Unit 1

R. Crane 25 Ton Unit 1

Unic Crane 5 T Unit 1

Trailler Truck Unit 1

Genset 150 kVA Unit 2

Genset 125 kVA Unit 1

Genset 25 kVA Unit 1

Compressor PDS 175 Unit 1

Welding Engine Unit 2

Scaffolding M 17020

Forklift 10 Ton Unit 1

Skylift Unit 3

934
EQUIPMENT
Equipment & Tools Unit QTY

935
EQUIPMENT
Equipment & Tools Unit QTY

936
EQUIPMENT
Equipment & Tools Unit QTY

937
EQUIPMENT
Equipment & Tools Unit QTY

Auto Level Unit 1

Tripod Unit 2

Cutting Concrete Unit 1

Hammer 5 kg Unit 1

Excavator Unit 2

water pump Unit 1

Cutting well Unit 3

Genset unit 1

Bar Bender unit 1

Bar Cutter unit 1

938
EQUIPMENT
Equipment & Tools Unit QTY

Submersible pump unit 1

Hammer Drill unit 1

Welding Machine unit 1

Hammer Drill unit 1

Welding Machine unit 1

Concrete Vibrator unit 1

Dump truck unit 2

Vehicle unit 1

Lampu Halogen unit 15

Stamper unit 1

Bucket unit 1

Crane unit 1

Coring Mechine Unit 1

939
EQUIPMENT
Equipment & Tools Unit QTY

940
EQUIPMENT
Equipment & Tools Unit QTY

941
EQUIPMENT
Equipment & Tools Unit QTY

Crawler Crane 550 Ton unit 1

Crawler Crane 250 Ton unit 1

Rough Crane 50 Ton unit 1

Flat Bed Trailler unit 1

Low bed Trailler unit 1

942
EQUIPMENT
Equipment & Tools Unit QTY

943
EQUIPMENT
Equipment & Tools Unit QTY

944
EQUIPMENT
Equipment & Tools Unit QTY

Oven Unit 2

Grinda

a. 4" Unit 13

b. 6" Unit 8

c. 7" Unit 3

Drayer Unit 24

Trapo Unit 26

945
EQUIPMENT
Equipment & Tools Unit QTY

Crane 25 ton Unit 1

Vacuum Box Set 1

Miller Unit 2

Cutting Touch Unit 3

Generator

a. 18 KVA Unit 1

b. 150 KVA Unit 1

c. 175 KVA Unit 1

d. 200 KVA Unit 1

946
EQUIPMENT
Equipment & Tools Unit QTY

947
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Set 3

Carry Pick-up Unit 1

Generator 100Kva Unit 2

948
EQUIPMENT
Equipment & Tools Unit QTY

Welding Travo Unit 5

Handryer Unit 5

Chain Saw Unit 1

Grinder Machine 7" Unit 5

Grinder Machine 4" Unit 5

Welding Machine Unit 4

TMC 9Ton Unit 1

Double Cabin Unit 2

Vehicle Unit 2

Generator 10-40Kva Unit 2

Water Pump Unit 2

Crane 35 Ton Unit 1

949
EQUIPMENT
Equipment & Tools Unit QTY

950
EQUIPMENT
Equipment & Tools Unit QTY

951
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Unit 1

Pick-up Unit 4

Vehicle Unit 2

Generator 6 A Unit 0

Generator 150 KVA Unit 2

952
EQUIPMENT
Equipment & Tools Unit QTY

Generator 100 KVA Unit 1

Grinder Machine 7" Unit 2

Grinder Machine 5" Unit 6

Grinder Machine 4" Unit 10

Cutting Wheel 14" Unit 2

Cutting Torch & accessories Unit 1

Chain Saw Unit 0

Crane HTC 85 ton Unit 1

Crawler Crane 80 ton Unit 1

Crane HTC 50 ton Unit 1

Crane HTC 20 ton Unit 1

TMC 7 ton Unit 1

Trailer Unit 2

953
EQUIPMENT
Equipment & Tools Unit QTY

Forklif Unit 1

Inventer Welding Machine Unit 1

TRAVO 400 A Unit 11

Chain Block 3 Ton Unit 8

Chain Block 2 Ton Unit 6

Level Block 1,5 Ton Unit 8

Compressor 175 CFM Unit 1

954
EQUIPMENT
Equipment & Tools Unit QTY

955
EQUIPMENT
Equipment & Tools Unit QTY

Light Vehicle 4x4 (LV) set 1

TMC 11T set 1

Mini Loader set 1

Power Generator set 2

Gasoline Generator Set 1

Welding Machine set 2

956
EQUIPMENT
Equipment & Tools Unit QTY

Welding Transformer set 4

Cable Jack set 4

Cable Roll Set 30

Cable Roll Set 30

Electric Bench Drill set 4

Electric Drilling Press Machine set 3

Electric High Speed Cutter set 1

Electric Hand Grinder & Cutter set 15

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hot Marker Machine set 2

Stamp Marker Machine set 1

957
EQUIPMENT
Equipment & Tools Unit QTY

Chain Block 2T set 3

Radio HT Comm set 15

Hot Gun set 3

958
EQUIPMENT
Equipment & Tools Unit QTY

959
EQUIPMENT
Equipment & Tools Unit QTY

960
EQUIPMENT
Equipment & Tools Unit QTY

961
EQUIPMENT
Equipment & Tools Unit QTY

962
EQUIPMENT
Equipment & Tools Unit QTY

Sentinel 880 Ir-192 Unit 1

Vehicle Toyota Hillux Unit 1

Collimator Unit 1

Barricade Roll 1

Megaphone Unit 1

Sign Board Unit 4

Radiation Flag Pcs 30

Crank Cable Unit 1

Source Cable Unit 1

Survey Meter Unit 1

Warning Light Unit 1

MC Cleaner Can 1

963
EQUIPMENT
Equipment & Tools Unit QTY

MC Penetrant Can 1

MC Developer Can 1

Container Office Unit 1

Fuel Tank 50 Unit 1

Fuel Truck Unit 1

Suction Pump Unit 1

Dispenser Unit 1

Fire Extinguisher 9 kg Unit 4

964
EQUIPMENT
Equipment & Tools Unit QTY

965
EQUIPMENT
Equipment & Tools Unit QTY

966
EQUIPMENT
Equipment & Tools Unit QTY

967
EQUIPMENT
Equipment & Tools Unit QTY

968
EQUIPMENT
Equipment & Tools Unit QTY

969
EQUIPMENT
Equipment & Tools Unit QTY

970
EQUIPMENT
Equipment & Tools Unit QTY

971
EQUIPMENT
Equipment & Tools Unit QTY

972
Project Name : BLOCK A SITE DEVELOPMENT PROJECT
Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL

973
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO

Date : 23-Jul-2017 Sunday


Daily Report No. : DR-JEC-MEP-0274

PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 920 1 921 M/H 9,145
Deputy Site Manager M/D 154 - 154 M/H 1,485
Construction Manager M/D 300 - 300 M/H 2,942
Deputy Construction Manager M/D 190 1 191 M/H 1,845

974
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 172 1 173 M/H 1,662
2 HSSE
HSSE M/D 9,717 7 9,724 M/H 21,484
HSSE Administration M/D 1,195 1 1,196 M/H 2,599
3 Quality Control
Field. QC Manager M/D 239 2 241 M/H 2,283
QC Coordinator-2 M/D 317 2 319 M/H 3,048
QC Engineer M/D 1,052 9 1,061 M/H 9,754
QC Admin M/D 149 - 149 M/H 1,389
Welding Tracking M/D 20 1 21 M/H 190
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 374 1 375 M/H 3,442
Electrical Superintendent M/D 352 1 353 M/H 3,288
ME Supervisor Temfac M/D 344 1 345 M/H 3,247
Civil Supervisor Temfac M/D 683 1 684 M/H 6,423
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 262 1 263 M/H 2,519

975
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 235 1 236 M/H 2,280
4.2 Civil
General Civil Superintendent M/D 270 1 271 M/H 2,615
Project Engineer M/D 214 2 216 M/H 2,061
Civil Engineer M/D 461 1 462 M/H 4,151
Civil Engineer M/D 394 1 395 M/H 3,599
Field Engineer M/D 194 1 195 M/H 1,879
Civil Construction M/D 301 1 302 M/H 2,887
Batching Plant Coordinator M/D 242 1 243 M/H 2,340
Surveyor M/D 494 1 495 M/H 4,507
Helper Surveyor M/D 465 1 466 M/H 4,179
Steel Structure Engineer M/D 173 1 174 M/H 1,672
4.3 Building
Building Superintendent M/D 454 1 455 M/H 4,108
Building Supervisor M/D 586 3 589 M/H 5,695
Surveyor M/D 384 4 388 M/H 2,198
Helper Surveyor M/D 349 2 351 M/H 3,382
4.4 Piping

976
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 229 - 229 M/H 2,223
Asst. Piping Superintendent M/D 211 1 212 M/H 2,052
Piping Engineer M/D 169 2 171 M/H 1,641
Technical Suport M/D 7 1 8 M/H 64
Supervisor M/D 271 3 274 M/H 2,560
CMS Operator M/D 72 1 73 M/H 677
Clerk M/D 170 1 171 M/H 1,657
4.5 Process
Process Superintendent M/D 237 1 238 M/H 2,294
Clerk M/D 7 1 8 M/H 64
4.6 Mechanical & Tank
Mechanical Superintendent M/D 79 1 80 M/H 735
4.6.1 Tank
Tank Field Engineer M/D 172 1 173 M/H 1,665
Tank Supervisor M/D 78 1 79 M/H 725
4.6.2 Static Mechanical
Static Field Engineer M/D 82 2 84 M/H 762
Preservation Technician M/D 138 - 138 M/H 1,310

977
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 75 1 76 M/H 698
4.6.4 Rotary
Field Engineer M/D 7 1 8 M/H 64
Supervisor M/D 7 1 8 M/H 64
4.6.5 Combation
Field Engineer M/D 7 1 8 M/H 64
4.7 General Contruction
General Superintendent M/D 244 1 245 M/H 2,385
Jr.Mechanical Engineer M/D 78 1 79 M/H 690
Mechanical Supervisor M/D 70 1 71 M/H 661
4.8 Electrical
Elecctrical Superintendent M/D 13 1 14 M/H 123
Field Engineer M/D 13 1 14 M/H 123
Lead Supervisor M/D 13 1 14 M/H 123
Engineer M/D 13 1 14 M/H 123
Supervisor M/D 39 3 42 M/H 369
Clerk M/D 13 1 14 M/H 123

978
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 13 1 14 M/H 123
Supervisor M/D 13 1 14 M/H 123
5 Preservation
Preservation Coordinator M/D 13 1 14 M/H 123
Preservation Eng M/D 13 1 14 M/H 123
Preservation Junior Eng M/D 52 4 56 M/H 492
6 Control
Project Control Manager M/D 201 1 202 M/H 1,956
Project Control M/D 239 - 239 M/H 2,179
Document Control M/D 267 - 267 M/H 2,584
Schedule Engineer M/D 214 - 214 M/H 2,067
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 417 - 417 M/H 3,992
Cost Control M/D 294 - 294 M/H 2,825
Subcontracting M/D 576 1 577 M/H 5,543
Material Control M/D 653 4 657 M/H 6,303
7 Administration

979
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 214 1 215 M/H 2,073
Administration M/D 2,282 4 2,286 M/H 21,772
Business Coordinator M/D 747 1 748 M/H 6,864
Project Support M/D 439 2 441 M/H 4,256
Finance M/D 237 1 238 M/H 2,294
Puchasing M/D 343 2 345 M/H 3,329
8 Public Relation
Public Affair M/D 1,119 - 1,119 M/H 10,327
Government Permit M/D 463 - 463 M/H 4,158
9 IT
IT Engineer M/D 880 2 882 M/H 8,402
10 Others
Security M/D 6,516 33 6,549 M/H 62,502
Rigging & Lifting / Operator M/D 2,807 12 2,819 M/H 27,307
Operator Genset M/D 494 2 496 M/H 4,788
Office Boy/Girl M/D 1,310 6 1,316 M/H 12,698
Paramedic M/D 2,708 12 2,720 M/H 26,226
Driver M/D 4,486 26 4,512 M/H 43,379

980
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 293 4 297 M/H 2,947
Rigger M/D 380 5 385 M/H 3,555
Skill M/D 1,145 4 1,149 M/H 10,686
Warehouse M/D 366 10 376 M/H 3,523
Total 54,770 224 54,994 441,830

2 PT. BANGUN NUSA PERSADA (TEMFAC SECTION A - BNP)


Total 9,955 - 9,955 88,084

3 PT. INDOTECH KARYA MANDIRI (TEMFAC SECTION B & C - IKM)


Total 103,539 - 103,539 153,750

4 PT. NAD JAYA (TEMFAC SECTION D - NAD)

981
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 20,435 - 20,435 185,652

5 PT. PELITA NUSA PERKASA (BATCHING PLANT - PNP)


INDIRECT MANPOWER
1 Site Manager M/D 123 1 124 M/H 1,055
2 HSE M/D 329 1 330 M/H 3,049
3 Safetyman M/D 166 1 167 M/H 1,638
4 Quality Control M/D 311 1 312 M/H 2,873
5 Supervisor M/D 1 - 1 M/H 8
6 Finance M/D 198 - 198 M/H 1,942
7 Public Affair M/D 265 1 266 M/H 2,513
8 Mechanic M/D 513 1 514 M/H 4,901
9 Logistic M/D 209 1 210 M/H 2,042
10 Security M/D 762 3 765 M/H 7,369
Sub Total 2,877 10 2,887 27,389

982
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 804 3 807 M/H 7,696
2 Lab M/D 462 1 463 M/H 4,491
3 Driver Truck Mixer M/D 962 5 967 M/H 9,370
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,642 3 1,645 M/H 14,143
Sub Total 3,990 12 4,002 36,627

Total 6,867 22 6,889 64,016

6 PT. PUALAM BANGUN CIPTA (FWBS 2000 : CONCRETE STRUCTURE


Total 98,346 - 98,346 417,884

7 JEC-DIRECT HIRED (FWBS 2300 : FOUNDATION WORK)

983
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

INDIRECT MANPOWER

1 Project Manager M/D 61 - 61 M/H 610

2 Site Manager M/D 107 - 107 M/H 1,057

3 Project Control M/D 131 1 132 M/H 1,294

4 Civil Engineer M/D 167 1 168 M/H 1,654

5 HSSE Coordinator M/D 138 - 138 M/H 1,370

6 HSSE Admin M/D 149 1 150 M/H 1,476

7 Material Control M/D 171 1 172 M/H 1,701

8 Quality Control M/D 223 1 224 M/H 2,221

9 Ass Quality Control M/D 152 1 153 M/H 1,508

10 HRD/ Personel M/D 98 - 98 M/H 977

11 Time Keeper M/D 200 - 200 M/H 1,979

12 Surveyor M/D 842 6 848 M/H 8,330

984
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

13 Drafter M/D 80 1 81 M/H 786

14 Procurement M/D 139 1 140 M/H 1,376

15 Site Environment Coordinator M/D 105 - 105 M/H 1,047

16 Tool Keeper M/D 409 2 411 M/H 4,076

17 Safetyman M/D 438 1 439 M/H 4,337

18 Mechanic M/D 64 - 64 M/H 634

19 Electrician M/D 224 1 225 M/H 2,215

20 Driver M/D 740 4 744 M/H 7,336

21 Security M/D 625 1 626 M/H 6,224

22 Office Boy M/D 124 - 124 M/H 1,235

Sub Total 5,387 23 5,410 53,443

DIRECT MANPOWER

985
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Field Supervisor M/D 457 3 460 M/H 4,529

2 Foreman M/D 700 5 705 M/H 6,928

3 Carpenter M/D 984 11 995 M/H 9,785

4 Rebar Worker M/D 1,131 8 1,139 M/H 11,248

5 Concrete Worker M/D 589 9 598 M/H 5,801

6 Mason Worker M/D - - - M/H -

7 Scaffolder M/D 163 3 166 M/H 1,630

8 Welder SMAW M/D 1,325 9 1,334 M/H 13,089

9 Semi Skill M/D 1,981 9 1,990 M/H 19,666

10 Common Labor M/D 2,579 18 2,597 M/H 25,508

11 Operator Excavator M/D 286 1 287 M/H 2,828

12 Operator Boom Truck M/D 8 - 8 M/H 80

Sub Total 10,203 76 10,279 101,092

986
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 15,590 99 15,689 154,535

8 JEC-DELTA (FWBS 2300 : FOUNDATION WORK)


INDIRECT MANPOWER

1 Coordinator M/D 30 - 30 M/H 300

2 Supervisor M/D 15 - 15 M/H 150

3 Jr. Civil Engineer M/D 129 - 129 M/H 1,288

4 Drafter M/D 150 1 151 M/H 1,498

- - - M/H -

Sub Total 324 1 325 3,236

987
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 Foreman M/D 142 1 143 M/H 1,420

2 Ass. Foreman M/D 405 2 407 M/H 4,050

3 Rebar Man M/D 1,545 16 1,561 M/H 15,450

4 Mason M/D 1,541 32 1,573 M/H 15,410

5 Carpenter M/D 1,483 21 1,504 M/H 14,830

6 Finishing M/D 931 4 935 M/H 9,310

7 Semi Skill M/D 890 1 891 M/H 8,900

8 Skill Worker M/D 690 9 699 M/H 6,900

9 Helper M/D 5,714 58 5,772 M/H 57,140

Sub Total 13,341 144 13,485 133,410

988
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

989
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,665 145 13,810 136,646

9 PT. GUNA TEGUH ABADI (STEEL STRUCTURE ERECTION - GTA)


INDIRECT MANPOWER

1 Site Manager M/D 115 - 115 M/H 1,132

990
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

2 Construction Manager M/D 109 - 109 M/H 1,072

3 HSE Coordinator M/D 114 - 114 M/H 1,122

4 QC Coordinator M/D 116 - 116 M/H 1,142

5 Field Enginer Leader M/D 121 - 121 M/H 1,192

6 Project Control M/D 114 - 114 M/H 1,122

7 ADM. Coordinator M/D 107 - 107 M/H 1,052

8 Superintendent M/D 147 - 147 M/H 1,440

9 Supervisor M/D 205 - 205 M/H 2,008

10 Safetyman M/D 337 - 337 M/H 3,316

11 Safety Officer M/D 202 - 202 M/H 1,996

12 QC M/D 152 - 152 M/H 1,484

13 Finance M/D 223 - 223 M/H 2,194

14 Procurement M/D 41 - 41 M/H 404

991
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

15 Adm. Staff M/D 203 - 203 M/H 1,994

16 Material Control M/D 318 - 318 M/H 3,123

17 Mechanical / Electrical M/D 395 - 395 M/H 3,890

18 Document Control M/D 94 - 94 M/H 934

19 Security M/D 205 - 205 M/H 2,008

20 Driver M/D 172 - 172 M/H 1,678

21 Opr. Leader M/D 39 - 39 M/H 390

22 Office Boy/Girl M/D 120 - 120 M/H 1,188

23 Engineer Staff M/D 85 - 85 M/H 829

Sub Total 3,734 - 3,734 36,710

DIRECT MANPOWER

1 Foreman M/D 546 - 546 M/H 5,370

992
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

2 Operator M/D 1,718 - 1,718 M/H 16,790

3 Rigger M/D 1,626 - 1,626 M/H 15,813

4 Millwright M/D 851 - 851 M/H 8,360

5 Scafolder M/D 1,647 - 1,647 M/H 16,134

6 Welder M/D 335 - 335 M/H 3,287

7 Helper M/D 2,887 - 2,887 M/H 28,282

Sub Total 9,610 - 9,610 94,036

993
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

994
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,344 - 13,344 130,746

10 PT. BANGUN NUSA PERSADA (MAIN BUILDING - BNP)


INDIRECT MANPOWER

1 Site Manager M/D 253 1 254 M/H 2,398

2 HSE M/D 699 3 702 M/H 6,852

3 Quality Control M/D 699 2 701 M/H 6,738

4 Site Engineering Manager M/D 75 - 75 M/H 686

5 Engineer M/D 501 1 502 M/H 4,896

6 Drafter M/D 613 5 618 M/H 6,120

7 Supervisor M/D 1,113 9 1,122 M/H 11,010

8 Surveyor M/D 1,046 3 1,049 M/H 10,042

9 Administration M/D 398 2 400 M/H 3,768

995
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

11 Logistic M/D 932 4 936 M/H 9,078

13 Driver M/D 270 2 272 M/H 2,588

14 Purchasing M/D 53 1 54 M/H 530

15 Delivery M/D 37 - 37 M/H 370

Sub Total 6,689 33 6,722 65,074

DIRECT MANPOWER

1 Finishing Worker M/D 2,453 22 2,475 M/H 23,976

2 Worker Site Temporary M/D 185 - 185 M/H 1,633

3 Operator Excavator M/D 183 - 183 M/H 1,778

4 Driver Dump Truck M/D 130 - 130 M/H 1,205

5 Operator Crane M/D 197 - 197 M/H 1,912

6 Rigger Crane M/D 389 - 389 M/H 3,797

996
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

7 Helper Crane M/D 197 - 197 M/H 1,918

8 Carpenter M/D 1,421 - 1,421 M/H 13,900

9 Rebar Man M/D 2,080 7 2,087 M/H 20,355

10 Digger M/D 431 7 438 M/H 4,258

11 Masonry & Concrete worker M/D 4,385 13 4,398 M/H 43,718

12 Mechanical M/D 47 - 47 M/H 470

13 Pipe M/D - - - M/H -

14 Scaffolder M/D 2,132 12 2,144 M/H 21,069

15 Steel worker M/D 1,742 9 1,751 M/H 17,282

16 Mechanic M/D 688 1 689 M/H 6,657

17 Teknisi Plumbing M/D 424 5 429 M/H 4,240

18 Teknisi Electrical M/D 1,917 23 1,940 M/H 19,170

19 General Worker M/D 693 - 693 M/H 6,536

997
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 19,694 99 19,793 193,871

998
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 26,383 132 26,515 258,945

11 PT. GUNA TEGUH ABADI (MECHANICAL WORK - GTA)


INDIRECT MANPOWER

1 Site Manager M/D 46 - 46 M/H 444

2 Construction Manager M/D 47 - 47 M/H 454

3 HSE Coordinator M/D 47 - 47 M/H 454

4 QC Coordinator M/D 47 - 47 M/H 454

5 Inspector Welder M/D 47 - 47 M/H 454

6 Field Enginer Leader M/D 47 - 47 M/H 454

7 Project Control M/D 47 - 47 M/H 454

8 ADM. Coordinator M/D 46 - 46 M/H 444

9 Superintendent M/D 74 - 74 M/H 708

999
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

10 Supervisor M/D 241 - 241 M/H 2,355

11 Safety Officer M/D 46 - 46 M/H 444

12 Finance M/D 47 - 47 M/H 454

13 Procurement M/D - - - M/H -

14 Adm. Staff M/D 128 - 128 M/H 1,232

15 Mechanic / Electrical M/D 47 - 47 M/H 454

16 Document Control M/D 46 - 46 M/H 444

17 Security M/D 235 - 235 M/H 2,270

18 Opr. Leader M/D - - - M/H -

19 Office Boy/Girl M/D 47 - 47 M/H 454

Sub Total 1,285 - 1,285 12,427

DIRECT MANPOWER

1000
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Foreman M/D 163 - 163 M/H 1,593

2 Millwright M/D 532 - 532 M/H 5,204

3 Fitter M/D 247 - 247 M/H 2,449

4 Operator M/D 114 - 114 M/H 1,140

5 Helper M/D 876 - 876 M/H 8,623

6 Rigger M/D 344 - 344 M/H 3,370

7 Scaffolder M/D 132 - 132 1,320

Sub Total 2,408 - 2,408 23,699

1001
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 3,693 - 3,693 36,126

12 PT. BARATA INDONESIA (FIELD ERECTED TANK - BRT)


INDIRECT MANPOWER

1 Project Manager M/D 72 1 73 M/H 717

2 Construction Manager M/D 187 1 188 M/H 1,864

3 Project Control M/D 90 1 91 M/H 897

4 HSE Officer M/D 137 1 138 M/H 1,367

5 Safety Man M/D 168 2 170 M/H 1,664

6 Engineer M/D 88 1 89 M/H 877

7 Supervisor M/D 369 4 373 M/H 3,668

1002
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 QC Manager M/D 82 1 83 M/H 817

9 QC Dimensional M/D 122 1 123 M/H 1,217

10 Material Control M/D 65 1 66 M/H 647

11 Drafter M/D 65 1 66 M/H 647

12 Surveyor M/D 137 1 138 M/H 1,367

13 NDE Coordinator M/D 165 3 168 M/H 1,641

14 Welding Inspector M/D 124 1 125 M/H 1,237

15 Scaffolding Inspector M/D - - - M/H -

16 Purchasing M/D 55 1 56 M/H 547

17 Logistic M/D 63 1 64 M/H 627

18 GA & Finance M/D 133 1 134 M/H 1,327

19 Admin 78 1 79 777

20 Public Affair M/D 292 2 294 M/H 2,894

1003
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

21 Tools & Consumable Keeper M/D 205 2 207 M/H 2,044

22 House keeping M/D 137 2 139 M/H 1,344

23 Office Boy M/D 188 2 190 M/H 1,864

24 Security M/D 363 4 367 M/H 3,608

25 Driver M/D 72 1 73 M/H 697

Sub Total 3,457 37 3,494 34,356

DIRECT MANPOWER

1 Operator M/D 245 3 248 M/H 2,438

2 Rigger M/D 226 1 227 M/H 2,245

3 Foreman M/D 278 4 282 M/H 2,748

4 Fitter M/D 1,806 16 1,822 M/H 17,978

5 Scaffolder M/D 146 2 148 M/H 1,454

1004
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Welder M/D 1,275 15 1,290 M/H 12,662

7 Helper M/D 1,377 17 1,394 M/H 13,649

8 Technician M/D 283 3 286 M/H 2,822

Sub Total 5,636 61 5,697 55,996

Total 9,093 98 9,191 90,352

13 PT. ISMA TIUR (PIPING FIELD INSTALLATION AND PAINTING WORK


INDIRECT MANPOWER

1 Site Manager M/D 166 1 167 M/H 1,660

2 Construction Manager M/D 155 1 156 M/H 1,550

3 Engineering Coordinator M/D 166 1 167 M/H 1,660

1005
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Project Control Coordinator M/D 167 1 168 M/H 1,670

5 HSE Coordinator M/D 166 1 167 M/H 1,660

6 Checker / Drafter Piping M/D 220 2 222 M/H 2,200

7 Material Control M/D 157 1 158 M/H 1,570

8 QC/Admin QC M/D 686 7 693 M/H 6,860

9 Store Keeper M/D 164 1 165 M/H 1,640

10 Surveyor M/D 310 4 314 M/H 3,100

11 Supervisor PTW M/D 103 1 104 M/H 1,030

12 Safety Officer/ HSE Man M/D 183 2 185 M/H 1,830

13 Safety Supervisor M/D 173 1 174 M/H 1,730

14 First Aids M/D 132 1 133 M/H 1,320

15 General Affair M/D 157 1 158 M/H 1,570

16 Superintendent M/D 53 1 54 M/H 530

1006
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

17 Supervisor HDPE M/D 269 2 271 M/H 2,690

18 Supervisor CS, LTCS & Nace M/D 417 3 420 M/H 4,170

19 Humas M/D 580 4 584 M/H 5,800

20 Document Control M/D 157 1 158 M/H 1,570

21 HRD M/D 144 1 145 M/H 1,440

22 Admin M/D 608 5 613 M/H 6,080

23 Driver M/D 226 3 229 M/H 2,260

24 Supervisor Scaffolding M/D 101 1 102 M/H 1,010

25 Time Keeper M/D 119 2 121 M/H 1,190

26 Material Handling M/D 64 1 65 M/H 640

27 Security M/D 206 2 208 M/H 2,060

Sub Total 6,049 52 6,101 60,490

1007
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 Operator M/D 514 7 521 M/H 5,140

2 Foreman Pipe Fitter M/D 377 4 381 M/H 3,770

3 Pipe Fitter I M/D 1,340 15 1,355 M/H 13,400

4 Pipe Fitter II M/D 204 2 206 M/H 2,040

5 Foreman Welder M/D 3 - 3 M/H 30

6 Welder M/D 580 6 586 M/H 5,800

7 Rigger M/D 409 5 414 M/H 4,090

8 Painter M/D 176 2 178 M/H 1,760

9 Mechanic / Electrical M/D 267 2 269 M/H 2,670

10 Scaffolder 311 4 315 M/H 3,110

11 Hydrotest Skill M/D 88 1 89 M/H 880

12 Ware House 67 1 68 M/H 670

1008
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

13 Helper M/D 3,384 37 3,421 M/H 33,840

Sub Total 7,720 86 7,806 77,200

Total 13,769 138 13,907 137,690

14 PT. SWADAYA GRAHA (PIPING FIELD INSTALLATION AND PAINTING


INDIRECT MANPOWER

1 Project Manager M/D 33 - 33 M/H 330

2 Site Manager M/D 218 1 219 M/H 2,131

3 QC Manager M/D 142 1 143 M/H 1,397

4 QC Inspector M/D 261 3 264 M/H 2,546

5 HSE Manager M/D 127 1 128 M/H 1,247

1009
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Safety Officer M/D 121 - 121 M/H 1,194

7 Safety Man M/D 149 - 149 M/H 1,465

8 Material Control M/D 223 1 224 M/H 2,177

9 PPC Manager M/D 62 - 62 M/H 609

10 Daily Reporter M/D 213 2 215 M/H 2,083

11 Spool Control M/D 135 - 135 M/H 1,324

12 Engineering Manager M/D 12 - 12 M/H 120

13 Field Engineer M/D 206 - 206 M/H 2,020

14 Welding Tracker M/D 117 - 117 M/H 1,148

15 Document Control M/D 127 1 128 M/H 1,248

16 HRD M/D 187 - 187 M/H 1,837

17 Supervisor M/D 470 3 473 M/H 4,572

18 Driver M/D 403 3 406 M/H 3,908

1010
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

19 Scurity M/D 351 4 355 M/H 3,402

20 Public Relations M/D 217 - 217 M/H 2,120

21 Logistik M/D 225 1 226 M/H 2,185

22 Surveyor M/D 94 1 95 M/H 922

23 Manager Operator M/D 91 1 92 M/H 888

24 Operator Forklif M/D 86 1 87 M/H 840

25 Operator Trailer M/D 167 2 169 M/H 1,629

26 Operator TMC M/D 88 1 89 M/H 860

27 Operator Crane M/D 475 8 483 M/H 4,582

28 General Support adm M/D 205 2 207 2,000

29 Painting Inspector M/D 140 - 140 1,379

30 Operator PWHT M/D 21 2 23 210

Sub Total 5,366 39 5,405 52,373

1011
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 Operator HDPE M/D 72 - 72 M/H 720

2 Foreman Pipe M/D 314 4 318 M/H 3,039

3 Pipe Fitter M/D 882 16 898 M/H 8,479

4 Welder M/D 407 5 412 M/H 3,908

5 Rigger M/D 404 4 408 M/H 3,904

6 Scaffolder M/D 313 4 317 M/H 3,024

7 Mechanic M/D 288 4 292 M/H 2,784

8 Werehouse M/D 333 4 337 M/H 3,237

9 Helper M/D 325 - 325 M/H 3,144

10 Office Boy M/D 134 - 134 M/H 1,313

11 Painting M/D 127 - 127 M/H 1,217

1012
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 3,599 41 3,640 34,769

Total 8,965 80 9,045 87,142

15 PT. WIJAYA ENGINDO NUSA (ELECTRICAL - WEN)


INDIRECT MANPOWER

1 Site Manager M/D 185 1 186 M/H 1,828

2 E/I Construction Coord M/D 80 1 81 M/H 768

3 Finance/ Acctg M/D 72 1 73 M/H 700

4 Administration Coord M/D 196 1 197 M/H 1,944

5 Engineering Material M/D 68 1 69 M/H 662

6 QA/ QC Electrical M/D 80 1 81 M/H 768

1013
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

7 Supervisor Electrical M/D 269 3 272 M/H 2,624

8 Superisor Material Control M/D 61 1 62 M/H 592

9 HSE Coord M/D 134 1 135 M/H 1,306

10 HSE/ Scaffolding Inspector M/D 58 1 59 M/H 562

11 Project Control M/D 108 1 109 M/H 1,054

12 Administration Staff M/D 123 1 124 M/H 1,204

13 Security M/D 90 1 91 M/H 876

14 Office Girl M/D 86 1 87 M/H 838

15 Housekeeping M/D 83 1 84 M/H 808

16 Cleaning Service M/D 121 2 123 M/H 1,176

17 Time Keeper/ Adm Staff M/D 52 1 53 M/H 502

Sub Total 1,866 20 1,886 18,212

1014
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 QA/ QC Technician M/D 80 1 81 M/H 778

2 Scaffolder Foreman M/D 70 1 71 M/H 670

3 Scaffolder M/D 60 2 62 M/H 588

4 Technician M/D 225 6 231 M/H 2,190

5 Helper M/D 208 13 221 M/H 2,028

6 Mechanic M/D 345 9 354 M/H 3,364

7 Warehouse M/D 88 1 89 M/H 856

8 Welder M/D 88 1 89 M/H 856

9 TMC Operator M/D 231 4 235 M/H 2,248

10 TMC Operator M/D 73 1 74 M/H 710

11 Rigger M/D 80 1 81 M/H 778

Sub Total 1,548 40 1,588 15,066

1015
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 3,414 60 3,474 33,278

16 PT. WIJAYA ENGINDO NUSA (INSTRUMENT - WEN)


INDIRECT MANPOWER

1 Supervisor Instrument M/D 203 2 205 M/H 2,018

Sub Total 203 2 205 2,018

DIRECT MANPOWER

1 Instrument Foreman M/D 11 2 13 M/H 110

2 Instrument Technician M/D 132 4 136 M/H 1,290

1016
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 143 6 149 1,400

Total 346 8 354 3,418

17 PT. TERAS TEKNIK PERDANA (INSULATION /SCAFFOLDING - TTP)


INDIRECT MANPOWER

1 Site Manager M/D 112 1 113 M/H 1,084

2 Construction Manager M/D 112 1 113 M/H 1,084

3 HSSE Coordinator M/D 112 1 113 M/H 1,084

1017
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Supv Scaffolding M/D 110 1 111 M/H 1,064

5 Inspector Scaffolding M/D 112 1 113 M/H 1,084

6 Material Control M/D 112 1 113 M/H 1,084

7 Ass Material Control M/D 58 1 59 M/H 547

8 Admin M/D 109 1 110 M/H 1,054

9 Public Relations M/D 108 - 108 M/H 1,045

10 HSSE Administration M/D 57 1 58 M/H 537

11 PPC M/D 54 1 55 M/H 507

12 Driver M/D 209 1 210 M/H 2,042

13 Timekeeper M/D 98 1 99 M/H 944

14 Office Boy M/D 81 1 82 M/H 784

15 Security Officer M/D 11 1 12 M/H 106

16 Cleaning Service M/D 2 1 3 M/H 19

1018
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 1,457 15 1,472 14,069

DIRECT MANPOWER

1 Foreman M/D 189 2 191 M/H 1,838

2 Lead Worker M/D 222 2 224 M/H 2,168

3 Skilled Worker M/D 894 10 904 M/H 8,680

5 Helper M/D 439 7 446 M/H 4,226

Sub Total 1,744 21 1,765 16,912

Total 3,201 36 3,237 30,981

18 PT. THAI NDT INDONESIA (NON-DESTRUCTIVE TESTING - TNDT)

1019
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

INDIRECT MANPOWER

1 Site Manager M/D 6 - 6 M/H 60

2 Supervisor M/D 75 1 76 M/H 750

3 Document Control M/D 77 1 78 M/H 770

4 Interpreter Radiography M/D 77 1 78 M/H 770

Sub Total 235 3 238 2,350

DIRECT MANPOWER

1 Operator Radiography M/D 151 3 154 M/H 1,510

2 RPO M/D 152 1 153 M/H 1,520

3 Driver M/D 73 1 74 M/H 730

4 PT Technician M/D 104 2 106 M/H 1,040

1020
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

M/H

Sub Total 480 7 487 4,800

Total 715 10 725 7,150

19 PT. MI ENERGI (FUEL SUPPLY - MIE)


INDIRECT MANPOWER

1 Coordinator Manager M/D 209 1 210 M/H 2,071

2 Public Affair M/D 189 1 190 M/H 1,886

Sub Total 398 2 400 3,957

DIRECT MANPOWER

1021
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Driver M/D 205 1 206 M/H 2,042

2 Security M/D 391 2 393 M/H 3,915

3 Helper M/D 595 3 598 M/H 5,953

Sub Total 1,191 6 1,197 11,909

Total 1,589 8 1,597 15,866

20 PT. MEULIGO (CONSTRUCTION OF JETTY AT KUALA GEULUMPANG


Total 197 - 197 1,957

21 PT. TAKA HYDROCORE INDONESIA (DEEP WELL WORK - THI) - NO W


Total 4,309 - 4,309 33,568

1022
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

22 PT. BERDIKARI PONDASI PERKASA (PILING WORK - BPP) - NO WOR


Total 2,501 - 2,501 21,007.0

23 PT. SWING INDONESIA (WASTE WATER TREATMENT - SWI)


Total 298 - 298 2,652

24 PT. MITRA USAHA KREASINDO (PLN SCOPE - MUK) - NO WORK


Total 153 - 153 1,288.5

25 PT. EQUINE GLOBAL (NETWORK CABLE DATA - EGL)


Total 254 - 254 2,378

1023
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

26 PT. BAASITHU BOGA SERVICES (RECEPTIONIST & ROOM BOY/ROO


INDIRECT MANPOWER

1 Site Manager M/D 166 1 167 M/H 1,660

2 F&B Supervisor M/D - - - M/H -

3 Housekeeping SPV M/D 166 1 167 M/H 1,660

4 Storeman M/D - - - M/H -

5 Japanesse Cook M/D 166 1 167 M/H 1,660

6 Receptionist / ADM M/D 166 1 167 M/H 1,660

Sub Total 664 4 668 6,640

DIRECT MANPOWER

1 Camp Boss M/D 166 1 167 M/H 1,660

2 Housekeeping SPV M/D 166 1 167 M/H 1,660

1024
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Bakery M/D 166 1 167 M/H 1,660

4 Cook M/D 332 2 334 M/H 3,320

5 Cook Helper M/D 332 2 334 M/H 3,320

6 Kitchen Boy M/D 498 3 501 M/H 4,980

7 Receptionist M/D 166 1 167 M/H 1,660

8 Room Boy M/D 2,296 14 2,310 M/H 22,960

9 Room Maid Medco M/D 1,476 9 1,485 M/H 14,760

10 Office Boy / Girl M/D 820 5 825 M/H 8,200

11 Waitress M/D 498 3 501 M/H 4,980

12 Laundry M/D 492 3 495 M/H 4,920

13 Driver M/D 332 2 334 M/H 3,320

Sub Total 7,740 47 7,787 77,400

1025
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 8,404 51 8,455 84,040

TOTAL M/D 423,794 1,111 424,905 M/H 2,620,979

JEC PERSONNEL
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager

1026
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
Quality Control
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT

1027
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
1 Zulfikar Said IT Engineer
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support

1028
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent

1029
DAILY REPORT

P
JGC ENC

PORARY FACILITY SECTION A


PORARY FACILITY SECTION B & C
PORARY FACILITY SECTION D
CHING PLANT
BS 2000 (CONCRETE STRUCTURE) & FWBS 1000 (SEWER AND DRAINAGE)
2300 (FOUNDATION WORK)
2300 (FOUNDATION WORK)
EL STRUCTURE ERECTION
N BULDING
AHANICAL WORK
D ERECTED TANK
NG FIELD INSTALLATION AND PAINTING WORK UTILITY AREA
NG FIELD INSTALLATION AND PAINTING WORK PROCESS AREA
CTRICAL

1030
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID

ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,845
7 9,152
- 1,485
- 2,942
7 1,852

1031
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
7 1,669
-
49 21,533
7 2,606
-
14 2,297
14 3,062
63 9,817
- 1,389
7 197
-
-
7 3,449
7 3,295
7 3,254
7 6,430
- 158
7 2,526

1032
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
7 2,287
-
7 2,622
14 2,075
7 4,158
7 3,606
7 1,886
7 2,894
7 2,347
7 4,514
7 4,186
7 1,679
-
7 4,115
21 5,716
28 2,226
14 3,396
-

1033
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,223
7 2,059
14 1,655
7 71
21 2,581
7 684
7 1,664
-
7 2,301
7 71
-
7 742
-
7 1,672
7 732
-
14 776
- 1,310

1034
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
7 705
-
7 71
7 71
-
7 71
-
7 2,392
7 697
7 668
-
7 130
7 130
7 130
7 130
21 390
7 130

1035
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
7 130
7 130
-
7 130
7 130
28 520
-
7 1,963
- 2,179
- 2,584
- 2,067
- 980
- 3,992
- 2,825
7 5,550
28 6,331
-

1036
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
7 2,080
28 21,800
7 6,871
14 4,270
7 2,301
14 3,343
-
- 10,327
- 4,158
-
14 8,416
-
231 62,733
84 27,391
14 4,802
42 12,740
84 26,310
182 43,561

1037
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
28 2,975
35 3,590
28 10,714
70 3,593
1,568 443,398

- 88,084

& C - IKM)
- 153,750

1038
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 185,652

10 1,065 1 Ready Mix Concrete Production


10 3,059 2 Ready Mix Concrete Production (Batching Plant II)
10 1,648
10 2,883
- 8
- 1,942
10 2,523
10 4,911
10 2,052
30 7,399
100 27,489

1039
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 7,726
10 4,501
50 9,420
- 928
30 14,173
120 36,747

220 64,236

E STRUCTURE & FWBS 1000 : SEWER AND DRAINAGE - PBC)


- 417,884

1040
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 610 1 Area A-400

- 1,057 - Remove Formwork Pedestal in A4ST04

8 1,302 - Repair Concrete Pedestal in A4ST04

8 1,662 - Installation Anchor Bolt in A4ST04 F4

- 1,370 - Installation Anchor Bolt In A4SN02

8 1,484 - Installation Formwork In Proses Air Blower

8 1,709 - Remove formwork Pedestal in A4PR02

8 2,229

8 1,516 2 Area B-300

- 977 - Excavation In B3PR01

- 1,979 - Prepare to Lean Concrete In B3PR01

48 8,378

1041
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

8 794 3 Area B-500

8 1,384 - Backfill in B5ST07 F1B and A

- 1,047 - Joint Survey in B5ST07 F1 B and F2A

16 4,092 - Joint Inspaction in B5ST07 F1 B and F2A

8 4,345 - Pouring Conncrete in B5ST07 F1 B and F2A

- 634 - Installation Anchor Bolt in B5ST07 F2A

8 2,223 - Installation Formwork Pedestal in B5ST07 F1A

32 7,368 - Installation Rebar Oil Catcher B

8 6,232

- 1,235 4 Area B-600

184 53,627 - Install Fwk. Ped. in Water Treatment Package F8 , F9 AB

- Install Formwork in Water Treatment Package F1 8 and F14

- Finishing Pipe Sleeper

1042
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

24 4,553

40 6,968

88 9,873

64 11,312

72 5,873

- -

24 1,654

72 13,161

72 19,738 Total Concrete K125 : 0 m³

144 25,652 Total Concrete K300 : 4.5 m³

8 2,836

- 80

608 101,700

1043
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

792 155,327

- 300 1 Area Equipment Structure A6ST07 and A6ST08

- 150 - Formwork and Anchor Install for Pedestal

- 1,288

10 1,508 2 Area Equipment Structure A6ST02

- - - Pouring Concrete for LC ( 1 m3)

10 3,246

2 Area Equipment Structure A6ST09

1044
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- Pouring Concrete for LC ( 2.5 m3)

10 1,430

20 4,070 3 Area Misc. Proses Area A200

160 15,610 - Pouring Concrete for Pedestal ( 1 m3)

320 15,730

210 15,040 4 Area Sulfur Pit (35-ZMB-551)

40 9,350 - Formwork Removal and Repairing

10 8,910

90 6,990 5 Area Piperack A7PR01

580 57,720 - Formwork Install for Pedestal at GL-5,6 /ABC

1,440 134,850

6 Area Pipe Sleeper 040-SLP-001-068

- Formwork and Embedded Install for Pedestal

1045
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- Formwork Install for Footing at SLP 010 ( F12)

- Pouring Concrete for LC at SLP 19, 20 ( F11) (1 m3)

7 Area Workshop JEC

- Rebar Fabrication for Pipe Sleeper

8 Area Temporary New for Precast

- Pouring Concrete for Footing Precast Sleeper (6,50 M3)

9 Area Temporary Work Shop JEC for Precast

- Formwork Install for DOOU-OMH-10

- Formwork Install for AOOU-CMH-02, 04

1046
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 Area Dike for Condensate Tank (37-ABJ-402)

- Peri Formwork Install for Wall

Total concrete = 5.5 m³

1,450 138,096

ON - GTA)

- 1,132 No Activity

1047
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,072

- 1,122

- 1,142

- 1,192

- 1,122

- 1,052

- 1,440

- 2,008

- 3,316

- 1,996

- 1,484

- 2,194

- 404

1048
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,994

- 3,123

- 3,890

- 934

- 2,008

- 1,678

- 390

- 1,188

- 829

- 36,710

- 5,370

1049
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 16,790

- 15,813

- 8,360

- 16,134

- 3,287

- 28,282

- 94,036 PIPERACK Today ((Ton)

A1PR01A 0.0

A1PR01B 0.0

A1PR02A 0.0

A1PR02B 0.0

A1PR03A 0.0

A1PR03B 0.0

1050
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

A2PR01 0.0

D1PR01 0.0

A6PR01 0.0

B2PR01 0.0

B2PR02 0.0

D3PR02 0.0

D3PR01 0.0

D3BG01 0.0

A6ST01 0.0

A4ST01 0.0

A3ST01 0.0

Total 0.0

1051
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 130,746

10 2,408 1 Main Substation Building

30 6,882 - Installation pipe EMT (4)

20 6,758 - Wearing cable (6)

- 686 - Repair Beam (6)

10 4,906 - Dewatering (6)

50 6,170 - Removal scaffolding (3)

90 11,100 - Transfer material scaffolding (5)

30 10,072

20 3,788

1052
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

40 9,118 2 Main Control Room

20 2,608 - Transfer material pipe for HVAC (6)

10 540 - Polling cable for Hvac (3)

- 370 - Fabrication suport for hvac (4)

330 65,404 - Polling cable Lamp ind office room and laboratory (5)

- Connect cable speaker (3)

- Polling cable fire alarm (2)

220 24,196 - Installation pipe roof drain (2)

- 1,633 - Finishing wall (7)

- 1,778 - Installation ceramic (4)

- 1,205

- 1,912

- 3,797 3 Chemical Storage

1053
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,918 - Installation flashing (9)

- 13,900

70 20,425

70 4,328 4 Waste Storage

130 43,848 - Installation tray (3)

- 470 - Installation suport scaffolding (4)

- -

120 21,189 5 GEG Building

90 17,372 - Transfering material for geg(6)

10 6,667

50 4,290

230 19,400

- 6,536 6 Shelter Building

1054
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

990 194,861 - Insttallation rebar for footing (8)

1055
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,320 260,265

- 444 No Activity

- 454

- 454

- 454

- 454

- 454

- 454

- 444

- 708

1056
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,355

- 444

- 454

- -

- 1,232

- 454

- 444

- 2,270

- -

- 454

- 12,427

1057
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,593

- 5,204

- 2,449

- 1,140

- 8,623

- 3,370

- 1,320

- 23,699

1058
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 36,126

10 727 1 Condensate A Tank

10 1,874 - Inspection shell plate course 6

10 907

10 1,377 2 Condensate B Tank

20 1,684 - Internal welding horizoltal shell plate course 4 to course 5

10 887 - Inspection shell plate course 5

40 3,708

1059
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 827 3 Utility Water Tank

10 1,227 - Welding Battom plate to Annular plate

10 657

10 657 4 Fire Water Tank

10 1,377 -Inspection shell plate course 4

30 1,671

10 1,247 5 Diesel Fuel Tank

- - - welding shell plate to top angel

10 557 - Internal welding horizontal shell plate to bottom

10 637

10 1,337 6 Potable Water Tank

10 787 - Welding accessories handrill to shell

20 2,914

1060
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,064

20 1,364

20 1,884

40 3,648

10 707

370 34,726

30 2,468

10 2,255

40 2,788

160 18,138

20 1,474

1061
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

150 12,812

170 13,819

30 2,852

610 56,606

980 91,332

NTING WORK UTILITY AREA - ISTI)

10 1,670 A Welding Progress

10 1,560 Underground (16475.4)

10 1,670 1 Pipe HDPE 21

1062
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,680 2 Low Temp Carbon Steel (LTCS) 12

10 1,670 3 Carbon Steel (CS) 38

20 2,220 Total 71

10 1,580

70 6,930 Above ground (61350.4)

10 1,650 1 Low Temp Carbon Steel (LTCS) 0

40 3,140 2 Carbon Steel (CS) 0

10 1,040 3 Stainless Steel (SS) 0

20 1,850 4 Duplex Stainless Steel 0

10 1,740 5 ALLOY 825 0

10 1,330 Total 0

10 1,580

10 540 B Support Progress

1063
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,710 1 CS 0

30 4,200 2 LTCS 0

40 5,840 3 Stainless Steel 0

10 1,580 4 DUPLEX SS 0

10 1,450 5 Cold Shoe Support 0

50 6,130 6 Spring Support 0

30 2,290 Total 0

10 1,020

20 1,210

10 650

20 2,080

520 61,010

C Other Progress

1064
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1 Borrow Sand 0

70 5,210 2 Coating 0

40 3,810 3 Post Heat Treatment 0

150 13,550 4 Finish Painting 0

20 2,060 5 Lettering/Marking 0

- 30 6 Pressure Test (STM) 0

60 5,860 Total 0

50 4,140

20 1,780

20 2,690

40 3,150

10 890

10 680

1065
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

370 34,210

860 78,060

1,380 139,070

ND PAINTING WORK PROCESS AREA - SWG)

- 330 A Welding Progress

8 2,139 Under Ground (5929.60)

8 1,405 1 HDPE 0

24 2,570 2 LTCS INCL GALV 0

8 1,255 3 Carbon Steel INCL GALV 18

1066
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,194 Total 18

- 1,465

8 2,185 Above ground (61182.00)

- 609 1 LTCS INCL GALV 0

16 2,099 2 Carbon Steel INCL GALV 12

- 1,324 3 Staniless Steel 18

- 120 4 Duplex Stainless Steel 0

- 2,020 Total 30

- 1,148

8 1,256 B Support Progress (121.17)

- 1,837 1 CS (Ton) 0

24 4,596 2 LTCS (Ton) 0

24 3,932 3 Stainless Steel (Ton) 0

1067
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

32 3,434 4 DUPLEX SS (Ton) 0

- 2,120 5 Cold shoe support (qty) 0

8 2,193 6 Spring Support (qty) 0

8 930 Total 0

8 896

8 848 C Other Progress

16 1,645 1 Borrow Sand (M3) 0

8 868 2 Post Heat Treatment (ID) 0

64 4,646 3 Coating & Finish Paninting ( M2) 0

16 2,016 4 Lettering/Marking (pnt) 0

- 1,379 5 Steam Tracing 0

16 226 6 Pressure Test (STM) 0

312 52,685 Total 0

1068
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 720

32 3,071

128 8,607

40 3,948

32 3,936

32 3,056

32 2,816

32 3,269

- 3,144

- 1,313

- 1,217

1069
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

328 35,097

640 87,782

Unit Today

10 1,838 1 Glandbox Fabrication Set

10 778 2 Cable Pulling at SS (Internal) (LV Cable)

10 710 3 Asembly/Joint Panel 43-SWG-1202

10 1,954 4 Asembly/Joint Panel 43-SWG-1203

10 672 5 Install Cathodic - Connection Piping pnt 8

10 778 6 Install Cathodic - Anode ea 6

1070
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 2,654

10 602

10 1,316

10 572

10 1,064

10 1,214

10 886

10 848

10 818

20 1,196

10 512

200 18,412

1071
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 788

10 680

20 608

60 2,250

130 2,158

90 3,454

10 866

10 866

40 2,288

10 720

10 788

400 15,466

1072
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

600 33,878

Unit Today

20 2,038 1 Fab. Support for cable tray at Main Pipe Rack

2 Install Support for cable tray at Main Pipe Rack m 8

3 Install Support for cable tray at MCR

20 2,038 4 Install Tray Support at SS

20 130

40 1,330

1073
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 1,460

80 3,498

LDING - TTP)

7 1,091 1 Utility Area

7 1,091 - Installation scaffolding for working at height access

7 1,091 at B2PR01

1074
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

7 1,071

7 1,091 2 Sulfur Pit

7 1,091 - Installation Scaffolding for supporting civil works

7 554 (Site Instruction)

7 1,061

- 1,045

7 544

7 514

7 2,049

7 951

7 791

7 113

7 26

1075
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

105 14,174

14 1,852

14 2,182

70 8,750

49 4,275

147 17,059

252 31,233

NG - TNDT)

1076
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 60 1 A110 Piperack

10 760 - Radiography Inspection (5.00 pm - 8.00 pm)

10 780

10 780 2 Isma Tiur Workshop Area

- - Radiography Inspection (5.00 pm 8.00 pm)

30 2,380

30 1,540

10 1,530

10 740

20 1,060

1077
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

70 4,870

100 7,250

Fuel Supply

10 2,081

10 1,896

20 3,977

1078
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 2,052

20 3,935

30 5,983

60 11,969

80 15,946

GEULUMPANG - MEULIGO)
- 1,957

K - THI) - NO WORK
- 33,568

1079
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

BPP) - NO WORK
- 21,007.0

- 2,652

NO WORK
- 1,288.5

- 2,378

1080
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

OOM BOY/ROOM MAID - BBS)


Ready

10 1,670

- -

10 1,670

- -

10 1,670

10 1,670

40 6,680

10 1,670

10 1,670

1081
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,670

20 3,340

20 3,340

30 5,010

10 1,670

140 23,100

90 14,850

50 8,250

30 5,010

30 4,950

20 3,340

470 77,870

1082
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

510 84,550

9,972 2,630,951

OTHER
WEATHE
Condition From To

CLEAR 7.00 18.00


CLOUDY
RAINY

HEAVY
RAIN

1083
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

INSU, CERTIFICATION)

1084
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish

1085
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

HIGHLIG

1086
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA

1087
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
2
3
4
5
6

1088
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8

1089
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1090
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1091
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1092
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1093
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1094
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1095
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5

1096
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1097
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Area A-400 1

- Installation Rebar For valve pit 104 2

- Repair Concrete in Feed Acid Gas KO Drum 3

- Curing Concrete In Provulsion Vessel 4

- Curing Concrete In A4SN04 F4 5

- Pouring Concrete Pedestal In A4SN02 6

- Installation Rebar In Proses Air Blower 7

- Repair Concretel In A4PR02 8

- Installation Rebar in Analysis Shelter 9

10
2 Area B-300 11

- Lean Concrete In B3PR01

1098
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

3 Area B-500

- Backfill in B5ST07 F1B, F1A

- Curing Concrete Pedestal in B5ST07 F1 B

- Curing Concrete Pedestal in B5ST07 F2A

- Installation Formwork in B5ST07 F1A

- Installation Rebar Oil Catcher B

4 Area B-600

- Install Anchor Bolt in Water Treatment Package F8 , F9 AB

ment Package F8 , F9 AB - Installation Rebar in Water Treatment Package F8 , F14

ment Package F1 8 and F14

5 Area B-700

1099
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Backfill in Pipe Sleeper

Total concrete = 0 m³

1100
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Area Pipe Sleeper 040-SLP-001-068 1

- Pouring Concrete for Pedestal ( 2.5 m3) 2

- Formwork Install for Footing at SLP 19, 20 ( F11) 3

2 Area Equipment Structure A6ST02 & A6ST03

- Formwork and Pouring Concrete for LC (8 m3)

1101
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

3 Area Equipment Structure A6ST07 and A6ST08

- Continuing Formwork and Anchor Install for Footing

4 Area Neutralization Pit (48-ABH-402)

- Support Periform removal

5 Area Piperack A7PR01

- Formwork Install for Pedestal at GL-5,6 /ABC

6 Area Workshop JEC

- Rebar Fabrication for Sleeper All Foundation

7 Area Sulfur Pit (35-ZMB-551)

1102
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Continuing Formwork Removal and Repairing

8 Area Temporary New for Precast

- Contining Formwork Install for Precast Sleeper

1103
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total concrete = 10.5 m³

PIPERACK 1

1104
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- B2PR01 2

Cont. Install member Piperack 3

Finishing Grating ( Attch claim Grating) 4

- B2PR02 6

Install Accessories Member 7

- D3BG01 9

Joint Inspection for Plumbness 10

11

EQUIPMENT SUPPORT 12

- A3ST01 13

Install Accessorie member (First Layer)

1105
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Impact Bolt Accessories (First Layer)

- A4ST01

Cont. Install Main member

1106
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1107
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1108
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Main Substation Building 2

- Installation scaffolding 3

- Installation pipe EMT 4

- Installation lamp 5

- Installation Panel 6

- Aplication epoxy top coat 7

- Installation skirting 8

10

1109
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Main Control Room 11

- Transfer material pipe for HVAC (6) 12

- Polling cable for Hvac (3) 13

- Fabrication suport for hvac (4) 14

- Polling cable Lamp ind office room and laboratory (5) 15

- Connect cable speaker (3) 16

- Polling cable fire alarm (2) 17

- Installation pipe roof drain (2) 18

- Finishing wall (7) 19

- Installation ceramic (4) 20

21

22

3 Chemical Storage 23

1110
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Installation flashing (9)

4 Waste Storage

- Installation tray (3)

- Installation suport scaffolding (4)

5 GEG Building

- Transfering material for geg(6)

6 Shelter Building

1111
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Insttallation rebar for footing (8)

1112
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

STATIC EQUIPMENT

- 46-MBM-106 LP Condensate Flash Drum

Cont. Finishing of Platform

- 31-MBD-102 Slug Catcher

Leveling of equipment

- 41-HBA-201 A/B Fuel Gas Heater

Install of Equipment

- 41-HBA-202 Secondary Fuel Gas Heater

Install of Equipment

- 31-MBD-101 Production Separator

1113
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Leveling of equipment

- 39-MAF-101 AGE Absorber

Welding Washer

ROTARY EQUIPMENT

- 36-PAX-332 A/B

Leveling of Pump

PACKAGE EQUIPMENT

- 44-ZBM-504 (Clarifier System Package)

Cont. Chipping + Padding on foundation

- 46-ZBE-501 A/B BOILER PACKAGE

Cont. Modification Support Ducting

1114
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Joint Inspection plumbness for column structure

1115
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Condensate A Tank 1

- Fit up shell plate course 6 2

2 Condensate B Tank

- Internal welding horizoltal shell plate course 4 to course 5

- Internal grinding horizoltal shell plate course 4 to course 5 3

1116
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

3 Condensate C Tank 5

- Fit up shell plate course 3 6

4 Demin Water Tank 8

- Inspection shell plate course 6 9

5 Potable Water Tank

- Instalation Accessories

6 Utility Water Tank

- Fit up top angel

7 Fire Water Tank

1117
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

-Inspection shell plate course 4

8 EG Make-Up Tank

- Instalation Accessories

9 Diesel Fuel Tank

- Welding shell plate to top angel

1118
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Underground (16475.4) 2

1 Pipe HDPE 62 3

1119
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Low Temp Carbon Steel (LTCS) 4 4

3 Carbon Steel (CS) 86 5

Total 152 6

Above ground (61350.4) 8

1 Low Temp Carbon Steel (LTCS) 0 9

2 Carbon Steel (CS) 0 10

3 Stainless Steel (SS) 0 11

4 Duplex Stainless Steel 0 12

5 ALLOY 825 0 13

Total 0 14

15

B Support Progress

1120
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 CS 0

2 LTCS 0

3 Stainless Steel 0

4 DUPLEX SS 0

5 Cold Shoe Support 0

6 Spring Support 0

Total 0

C Other Progress

1121
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Borrow Sand 0

2 Coating 0

3 Post Heat Treatment 0

4 Finish Painting 0

5 Lettering/Marking 0

6 Pressure Test (STM) 0

Total 0

1122
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Under Ground (5929.60) 2

1 HDPE 0 3

2 LTCS INCL GALV 0 4

3 Carbon Steel INCL GALV 16 5

1123
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total 16 6

Above ground (61182.00) 8

1 LTCS INCL GALV 0 9

2 Carbon Steel INCL GALV 12 10

3 Stainless Steel 18 11

4 Duplex Stainless Steel 0 12

Total 30 13

14

B Support Progress (121.17) 15

1 CS (Ton) 0 16

2 LTCS (Ton) 0 17

3 Stainless Steel (Ton) 0 18

1124
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

4 DUPLEX SS (Ton) 0 19

5 Cold shoe support (qty) 0 20

6 Spring Support (qty) 0 21

Total 0 22

23

C Other Progress 24

1 Borrow Sand (M3) 0 25

2 Coating ( M2) 0

3 Post Heat Treatment (ID) 0

4 Finish Painting (M2) 0

5 Lettering/Marking (pnt) 0

6 Pressure Test (STM) 0

Total 0

1125
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1126
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Glandbox fabrication 1

2 Setting panel 2

3 Pulingg Grounding cable at SS 3

4 Internal Cable pulling at SS 4

1127
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

10

10

11

12

13

14

15

15

15

16

17

1128
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

18

19

20

1129
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Continue Fab. Support for cable tray at Piperack

2 Continue Install support for cable tray at MCR

1130
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Utility Area

- Installation scaffolding for working at height access

at B2PR01

1131
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Sulfur Pit

- Installation Scaffolding for supporting civil works

(Site Instruction)

1132
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1133
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Swadaya Workshop Area 1

- Radiography Inspection 2

2 Isma Tiur Workshop Area 4

- Radiography Inspection 5

10

11

12

1134
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

13

14

Fuel Supply 1

1135
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1136
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1137
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Ready

1138
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1139
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

OTHERS
WEATHER
Remark

1140
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1141
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

WORKING HOUR

1142
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

HIGHLIGHT

1143
1144
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Genset 10 KVA unit 1
Genset 25 KVA unit 1
Excavator unit 1
Buldozer unit 1
Crane 25T unit 1

1145
EQUIPMENT
Equipment & Tools Unit QTY

Crane 55T unit 1


Trailler unit 1

1146
EQUIPMENT
Equipment & Tools Unit QTY

1147
EQUIPMENT
Equipment & Tools Unit QTY

1148
EQUIPMENT
Equipment & Tools Unit QTY

1149
EQUIPMENT
Equipment & Tools Unit QTY

1150
EQUIPMENT
Equipment & Tools Unit QTY

1151
EQUIPMENT
Equipment & Tools Unit QTY

1152
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Generator Set unit 2
Truck Mixer unit 3
Wheel Loader unit 1
Batching Plant unit 2

1153
EQUIPMENT
Equipment & Tools Unit QTY

1154
EQUIPMENT
Equipment & Tools Unit QTY

Excavator PC-200 Unit 2

Dump Truck Unit 2

Mini Bus Unit 3

Genset 30 KVA Unit 1

Genset 6,5 KVA Unit 1

Bar Cutter Unit 2

Bar Bending Unit 2

Submersible Water Pump Unit 1

Concrete Vibrator Unit 4

Compactor (Hand) Unit 2

Pick up/ Light Truck Unit 2

1155
EQUIPMENT
Equipment & Tools Unit QTY

1156
EQUIPMENT
Equipment & Tools Unit QTY

1157
EQUIPMENT
Equipment & Tools Unit QTY

Excavator unit 1

Water Jump unit 1

Fibrator unit 1

Mixer DT 03 unit 1

1158
EQUIPMENT
Equipment & Tools Unit QTY

1159
EQUIPMENT
Equipment & Tools Unit QTY

1160
EQUIPMENT
Equipment & Tools Unit QTY

R. Crane 80 Ton Unit 1

1161
EQUIPMENT
Equipment & Tools Unit QTY

R. Crane 50 Ton Unit 1

R. Crane 25 Ton Unit 1

Unic Crane 5 T Unit 1

Trailler Truck Unit 1

Genset 150 kVA Unit 2

Genset 125 kVA Unit 1

Genset 25 kVA Unit 1

Compressor PDS 175 Unit 1

Welding Engine Unit 2

Scaffolding M 17020

Forklift 10 Ton Unit 1

Skylift Unit 3

1162
EQUIPMENT
Equipment & Tools Unit QTY

1163
EQUIPMENT
Equipment & Tools Unit QTY

1164
EQUIPMENT
Equipment & Tools Unit QTY

1165
EQUIPMENT
Equipment & Tools Unit QTY

Auto Level Unit 1

Tripod Unit 2

Cutting Concrete Unit 1

Hammer 5 kg Unit 1

Excavator Unit 2

water pump Unit 1

Cutting well Unit 3

Genset unit 1

Bar Bender unit 1

Bar Cutter unit 1

1166
EQUIPMENT
Equipment & Tools Unit QTY

Submersible pump unit 1

Hammer Drill unit 1

Welding Machine unit 1

Hammer Drill unit 1

Welding Machine unit 1

Concrete Vibrator unit 1

Dump truck unit 2

Vehicle unit 1

Lampu Halogen unit 15

Stamper unit 1

Bucket unit 1

Crane unit 1

Coring Mechine Unit 1

1167
EQUIPMENT
Equipment & Tools Unit QTY

1168
EQUIPMENT
Equipment & Tools Unit QTY

1169
EQUIPMENT
Equipment & Tools Unit QTY

Crawler Crane 550 Ton unit 1

Crawler Crane 250 Ton unit 1

Rough Crane 50 Ton unit 1

Flat Bed Trailler unit 1

Low bed Trailler unit 1

1170
EQUIPMENT
Equipment & Tools Unit QTY

1171
EQUIPMENT
Equipment & Tools Unit QTY

1172
EQUIPMENT
Equipment & Tools Unit QTY

Oven Unit 2

Grinda

a. 4" Unit 13

b. 6" Unit 8

c. 7" Unit 3

Drayer Unit 24

Trapo Unit 26

1173
EQUIPMENT
Equipment & Tools Unit QTY

Crane 25 ton Unit 1

Vacuum Box Set 1

Miller Unit 2

Cutting Touch Unit 3

Generator

a. 18 KVA Unit 1

b. 150 KVA Unit 1

c. 175 KVA Unit 1

d. 200 KVA Unit 1

1174
EQUIPMENT
Equipment & Tools Unit QTY

1175
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Set 3

Carry Pick-up Unit 1

Generator 100Kva Unit 2

1176
EQUIPMENT
Equipment & Tools Unit QTY

Welding Travo Unit 5

Handryer Unit 5

Chain Saw Unit 1

Grinder Machine 7" Unit 5

Grinder Machine 4" Unit 5

Welding Machine Unit 4

TMC 9Ton Unit 1

Double Cabin Unit 2

Vehicle Unit 2

Generator 10-40Kva Unit 2

Water Pump Unit 2

Crane 35 Ton Unit 1

1177
EQUIPMENT
Equipment & Tools Unit QTY

1178
EQUIPMENT
Equipment & Tools Unit QTY

1179
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Unit 1

Pick-up Unit 4

Vehicle Unit 2

Generator 6 A Unit 0

Generator 150 KVA Unit 2

1180
EQUIPMENT
Equipment & Tools Unit QTY

Generator 100 KVA Unit 1

Grinder Machine 7" Unit 2

Grinder Machine 5" Unit 6

Grinder Machine 4" Unit 10

Cutting Wheel 14" Unit 2

Cutting Torch & accessories Unit 1

Chain Saw Unit 0

Crane HTC 85 ton Unit 1

Crawler Crane 80 ton Unit 1

Crane HTC 50 ton Unit 1

Crane HTC 20 ton Unit 1

TMC 7 ton Unit 1

Trailer Unit 2

1181
EQUIPMENT
Equipment & Tools Unit QTY

Forklif Unit 1

Inventer Welding Machine Unit 1

TRAVO 400 A Unit 11

Chain Block 3 Ton Unit 8

Chain Block 2 Ton Unit 6

Level Block 1,5 Ton Unit 8

Compressor 175 CFM Unit 1

1182
EQUIPMENT
Equipment & Tools Unit QTY

1183
EQUIPMENT
Equipment & Tools Unit QTY

Light Vehicle 4x4 (LV) set 1

TMC 11T set 1

Mini Loader set 1

Power Generator set 2

Gasoline Generator Set 1

Welding Machine set 2

1184
EQUIPMENT
Equipment & Tools Unit QTY

Welding Transformer set 4

Cable Jack set 4

Cable Roll Set 30

Cable Roll Set 30

Electric Bench Drill set 4

Electric Drilling Press Machine set 3

Electric High Speed Cutter set 1

Electric Hand Grinder & Cutter set 15

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hot Marker Machine set 2

Stamp Marker Machine set 1

1185
EQUIPMENT
Equipment & Tools Unit QTY

Chain Block 2T set 3

Radio HT Comm set 15

Hot Gun set 3

1186
EQUIPMENT
Equipment & Tools Unit QTY

1187
EQUIPMENT
Equipment & Tools Unit QTY

1188
EQUIPMENT
Equipment & Tools Unit QTY

1189
EQUIPMENT
Equipment & Tools Unit QTY

1190
EQUIPMENT
Equipment & Tools Unit QTY

Sentinel 880 Ir-192 Unit 1

Vehicle Toyota Hillux Unit 1

Collimator Unit 1

Barricade Roll 1

Megaphone Unit 1

Sign Board Unit 4

Radiation Flag Pcs 30

Crank Cable Unit 1

Source Cable Unit 1

Survey Meter Unit 1

Warning Light Unit 1

MC Cleaner Can 1

1191
EQUIPMENT
Equipment & Tools Unit QTY

MC Penetrant Can 1

MC Developer Can 1

Container Office Unit 1

Fuel Tank 50 Unit 1

Fuel Truck Unit 1

Suction Pump Unit 1

Dispenser Unit 1

Fire Extinguisher 9 kg Unit 4

1192
EQUIPMENT
Equipment & Tools Unit QTY

1193
EQUIPMENT
Equipment & Tools Unit QTY

1194
EQUIPMENT
Equipment & Tools Unit QTY

1195
EQUIPMENT
Equipment & Tools Unit QTY

1196
EQUIPMENT
Equipment & Tools Unit QTY

1197
EQUIPMENT
Equipment & Tools Unit QTY

1198
EQUIPMENT
Equipment & Tools Unit QTY

1199
EQUIPMENT
Equipment & Tools Unit QTY

1200
Project Name : BLOCK A SITE DEVELOPMENT PROJECT
Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL

1201
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO

Date : 24-Jul-2017 Monday


Daily Report No. : DR-JEC-MEP-0275

PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 921 1 922 M/H 9,152
Deputy Site Manager M/D 154 1 155 M/H 1,485
Construction Manager M/D 300 1 301 M/H 2,942
Deputy Construction Manager M/D 191 1 192 M/H 1,852

1202
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 173 1 174 M/H 1,669
2 HSSE
HSSE M/D 9,724 11 9,735 M/H 21,533
HSSE Administration M/D 1,196 1 1,197 M/H 2,606
3 Quality Control
Field. QC Manager M/D 241 2 243 M/H 2,297
QC Coordinator-2 M/D 319 2 321 M/H 3,062
QC Engineer M/D 1,061 9 1,070 M/H 9,817
QC Admin M/D 149 2 151 M/H 1,389
Welding Tracking M/D 21 1 22 M/H 197
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 375 1 376 M/H 3,449
Electrical Superintendent M/D 353 1 354 M/H 3,295
ME Supervisor Temfac M/D 345 1 346 M/H 3,254
Civil Supervisor Temfac M/D 684 2 686 M/H 6,430
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 263 1 264 M/H 2,526

1203
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 236 1 237 M/H 2,287
4.2 Civil
General Civil Superintendent M/D 271 1 272 M/H 2,622
Project Engineer M/D 216 4 220 M/H 2,075
Civil Engineer M/D 462 1 463 M/H 4,158
Civil Engineer M/D 395 1 396 M/H 3,606
Field Engineer M/D 195 1 196 M/H 1,886
Civil Construction M/D 302 1 303 M/H 2,894
Batching Plant Coordinator M/D 243 1 244 M/H 2,347
Surveyor M/D 495 1 496 M/H 4,514
Helper Surveyor M/D 466 1 467 M/H 4,186
Steel Structure Engineer M/D 174 1 175 M/H 1,679
4.3 Building
Building Superintendent M/D 455 1 456 M/H 4,115
Building Supervisor M/D 589 3 592 M/H 5,716
Surveyor M/D 388 4 392 M/H 2,226
Helper Surveyor M/D 351 2 353 M/H 3,396
4.4 Piping

1204
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 229 1 230 M/H 2,223
Asst. Piping Superintendent M/D 212 1 213 M/H 2,059
Piping Engineer M/D 171 2 173 M/H 1,655
Technical Suport M/D 8 1 9 M/H 71
Supervisor M/D 274 3 277 M/H 2,581
CMS Operator M/D 73 1 74 M/H 684
Clerk M/D 171 1 172 M/H 1,664
4.5 Process
Process Superintendent M/D 238 1 239 M/H 2,301
Clerk M/D 8 1 9 M/H 71
4.6 Mechanical & Tank
Mechanical Superintendent M/D 80 1 81 M/H 742
4.6.1 Tank
Tank Field Engineer M/D 173 1 174 M/H 1,672
Tank Supervisor M/D 79 1 80 M/H 732
4.6.2 Static Mechanical
Static Field Engineer M/D 84 2 86 M/H 776
Preservation Technician M/D 138 - 138 M/H 1,310

1205
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 76 1 77 M/H 705
4.6.4 Rotary
Field Engineer M/D 8 1 9 M/H 71
Supervisor M/D 8 1 9 M/H 71
4.6.5 Combation
Field Engineer M/D 8 1 9 M/H 71
4.7 General Contruction
General Superintendent M/D 245 1 246 M/H 2,392
Jr.Mechanical Engineer M/D 79 1 80 M/H 697
Mechanical Supervisor M/D 71 1 72 M/H 668
4.8 Electrical
Elecctrical Superintendent M/D 14 1 15 M/H 130
Field Engineer M/D 14 1 15 M/H 130
Lead Supervisor M/D 14 1 15 M/H 130
Engineer M/D 14 1 15 M/H 130
Supervisor M/D 42 3 45 M/H 390
Clerk M/D 14 1 15 M/H 130

1206
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 14 1 15 M/H 130
Supervisor M/D 14 1 15 M/H 130
5 Preservation
Preservation Coordinator M/D 14 1 15 M/H 130
Preservation Eng M/D 14 1 15 M/H 130
Preservation Junior Eng M/D 56 4 60 M/H 520
6 Control
Project Control Manager M/D 202 1 203 M/H 1,963
Project Control M/D 239 1 240 M/H 2,179
Document Control M/D 267 1 268 M/H 2,584
Schedule Engineer M/D 214 4 218 M/H 2,067
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 417 5 422 M/H 3,992
Cost Control M/D 294 2 296 M/H 2,825
Subcontracting M/D 577 4 581 M/H 5,550
Material Control M/D 657 4 661 M/H 6,331
7 Administration

1207
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 215 1 216 M/H 2,080
Administration M/D 2,286 18 2,304 M/H 21,800
Business Coordinator M/D 748 2 750 M/H 6,871
Project Support M/D 441 2 443 M/H 4,270
Finance M/D 238 1 239 M/H 2,301
Puchasing M/D 345 2 347 M/H 3,343
8 Public Relation
Public Affair M/D 1,119 3 1,122 M/H 10,327
Government Permit M/D 463 1 464 M/H 4,158
9 IT
IT Engineer M/D 882 4 886 M/H 8,416
10 Others
Security M/D 6,549 33 6,582 M/H 62,733
Rigging & Lifting / Operator M/D 2,819 12 2,831 M/H 27,391
Operator Genset M/D 496 2 498 M/H 4,802
Office Boy/Girl M/D 1,316 6 1,322 M/H 12,740
Paramedic M/D 2,720 12 2,732 M/H 26,310
Driver M/D 4,512 26 4,538 M/H 43,561

1208
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 297 4 301 M/H 2,975
Rigger M/D 385 5 390 M/H 3,590
Skill M/D 1,149 8 1,157 M/H 10,714
Warehouse M/D 376 17 393 M/H 3,593
Total 54,994 284 55,278 443,398

2 PT. BANGUN NUSA PERSADA (TEMFAC SECTION A - BNP)


Total 9,955 - 9,955 88,084

3 PT. INDOTECH KARYA MANDIRI (TEMFAC SECTION B & C - IKM)


Total 103,539 - 103,539 153,750

4 PT. NAD JAYA (TEMFAC SECTION D - NAD)

1209
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 20,435 - 20,435 185,652

5 PT. PELITA NUSA PERKASA (BATCHING PLANT - PNP)


INDIRECT MANPOWER
1 Site Manager M/D 124 1 125 M/H 1,065
2 HSE M/D 330 1 331 M/H 3,059
3 Safetyman M/D 167 1 168 M/H 1,648
4 Quality Control M/D 312 1 313 M/H 2,883
5 Supervisor M/D 1 - 1 M/H 8
6 Finance M/D 198 1 199 M/H 1,942
7 Public Affair M/D 266 1 267 M/H 2,523
8 Mechanic M/D 514 1 515 M/H 4,911
9 Logistic M/D 210 1 211 M/H 2,052
10 Security M/D 765 3 768 M/H 7,399
Sub Total 2,887 11 2,898 27,489

1210
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 807 3 810 M/H 7,726
2 Lab M/D 463 1 464 M/H 4,501
3 Driver Truck Mixer M/D 967 5 972 M/H 9,420
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,645 2 1,647 M/H 14,173
Sub Total 4,002 11 4,013 36,747

Total 6,889 22 6,911 64,236

6 PT. PUALAM BANGUN CIPTA (FWBS 2000 : CONCRETE STRUCTURE


Total 98,346 - 98,346 417,884

7 JEC-DIRECT HIRED (FWBS 2300 : FOUNDATION WORK)

1211
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

INDIRECT MANPOWER

1 Project Manager M/D 61 - 61 M/H 610

2 Site Manager M/D 107 1 108 M/H 1,057

3 Project Control M/D 132 1 133 M/H 1,302

4 Civil Engineer M/D 168 1 169 M/H 1,662

5 HSSE Coordinator M/D 138 1 139 M/H 1,370

6 HSSE Admin M/D 150 1 151 M/H 1,484

7 Material Control M/D 172 1 173 M/H 1,709

8 Quality Control M/D 224 1 225 M/H 2,229

9 Ass Quality Control M/D 153 1 154 M/H 1,516

10 HRD/ Personel M/D 98 - 98 M/H 977

11 Time Keeper M/D 200 1 201 M/H 1,979

12 Surveyor M/D 848 6 854 M/H 8,378

1212
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

13 Drafter M/D 81 1 82 M/H 794

14 Procurement M/D 140 1 141 M/H 1,384

15 Site Environment Coordinator M/D 105 1 106 M/H 1,047

16 Tool Keeper M/D 411 2 413 M/H 4,092

17 Safetyman M/D 439 1 440 M/H 4,345

18 Mechanic M/D 64 - 64 M/H 634

19 Electrician M/D 225 3 228 M/H 2,223

20 Driver M/D 744 4 748 M/H 7,368

21 Security M/D 626 1 627 M/H 6,232

22 Office Boy M/D 124 - 124 M/H 1,235

Sub Total 5,410 29 5,439 53,627

DIRECT MANPOWER

1213
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Field Supervisor M/D 460 3 463 M/H 4,553

2 Foreman M/D 705 5 710 M/H 6,968

3 Carpenter M/D 995 11 1,006 M/H 9,873

4 Rebar Worker M/D 1,139 8 1,147 M/H 11,312

5 Concrete Worker M/D 598 9 607 M/H 5,873

6 Mason Worker M/D - - - M/H -

7 Scaffolder M/D 166 3 169 M/H 1,654

8 Welder SMAW M/D 1,334 15 1,349 M/H 13,161

9 Semi Skill M/D 1,990 12 2,002 M/H 19,738

10 Common Labor M/D 2,597 18 2,615 M/H 25,652

11 Operator Excavator M/D 287 1 288 M/H 2,836

12 Operator Boom Truck M/D 8 - 8 M/H 80

Sub Total 10,279 85 10,364 101,700

1214
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 15,689 114 15,803 155,327

8 JEC-DELTA (FWBS 2300 : FOUNDATION WORK)


INDIRECT MANPOWER

1 Coordinator M/D 30 - 30 M/H 300

2 Supervisor M/D 15 - 15 M/H 150

3 Jr. Civil Engineer M/D 129 - 129 M/H 1,288

4 Drafter M/D 151 1 152 M/H 1,508

- - - M/H -

Sub Total 325 1 326 3,246

1215
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 Foreman M/D 143 1 144 M/H 1,430

2 Ass. Foreman M/D 407 2 409 M/H 4,070

3 Rebar Man M/D 1,561 16 1,577 M/H 15,610

4 Mason M/D 1,573 32 1,605 M/H 15,730

5 Carpenter M/D 1,504 21 1,525 M/H 15,040

6 Finishing M/D 935 4 939 M/H 9,350

7 Semi Skill M/D 891 1 892 M/H 8,910

8 Skill Worker M/D 699 9 708 M/H 6,990

9 Helper M/D 5,772 58 5,830 M/H 57,720

Sub Total 13,485 144 13,629 134,850

1216
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1217
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,810 145 13,955 138,096

9 PT. GUNA TEGUH ABADI (STEEL STRUCTURE ERECTION - GTA)


INDIRECT MANPOWER

1 Site Manager M/D 115 - 115 M/H 1,132

1218
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

2 Construction Manager M/D 109 - 109 M/H 1,072

3 HSE Coordinator M/D 114 - 114 M/H 1,122

4 QC Coordinator M/D 116 - 116 M/H 1,142

5 Field Enginer Leader M/D 121 - 121 M/H 1,192

6 Project Control M/D 114 - 114 M/H 1,122

7 ADM. Coordinator M/D 107 - 107 M/H 1,052

8 Superintendent M/D 147 - 147 M/H 1,440

9 Supervisor M/D 205 - 205 M/H 2,008

10 Safetyman M/D 337 2 339 M/H 3,316

11 Safety Officer M/D 202 4 206 M/H 1,996

12 QC M/D 152 - 152 M/H 1,484

13 Finance M/D 223 2 225 M/H 2,194

14 Procurement M/D 41 - 41 M/H 404

1219
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

15 Adm. Staff M/D 203 - 203 M/H 1,994

16 Material Control M/D 318 - 318 M/H 3,123

17 Mechanical / Electrical M/D 395 4 399 M/H 3,890

18 Document Control M/D 94 - 94 M/H 934

19 Security M/D 205 - 205 M/H 2,008

20 Driver M/D 172 - 172 M/H 1,678

21 Opr. Leader M/D 39 - 39 M/H 390

22 Office Boy/Girl M/D 120 - 120 M/H 1,188

23 Engineer Staff M/D 85 1 86 M/H 829

Sub Total 3,734 13 3,747 36,710

DIRECT MANPOWER

1 Foreman M/D 546 4 550 M/H 5,370

1220
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

2 Operator M/D 1,718 19 1,737 M/H 16,790

3 Rigger M/D 1,626 9 1,635 M/H 15,813

4 Millwright M/D 851 8 859 M/H 8,360

5 Scafolder M/D 1,647 11 1,658 M/H 16,134

6 Welder M/D 335 9 344 M/H 3,287

7 Helper M/D 2,887 18 2,905 M/H 28,282

Sub Total 9,610 78 9,688 94,036

1221
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1222
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 13,344 91 13,435 130,746

10 PT. BANGUN NUSA PERSADA (MAIN BUILDING - BNP)


INDIRECT MANPOWER

1 Site Manager M/D 254 1 255 M/H 2,408

2 HSE M/D 702 3 705 M/H 6,882

3 Quality Control M/D 701 2 703 M/H 6,758

4 Site Engineering Manager M/D 75 - 75 M/H 686

5 Engineer M/D 502 1 503 M/H 4,906

6 Drafter M/D 618 5 623 M/H 6,170

7 Supervisor M/D 1,122 9 1,131 M/H 11,100

8 Surveyor M/D 1,049 3 1,052 M/H 10,072

9 Administration M/D 400 2 402 M/H 3,788

1223
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

11 Logistic M/D 936 4 940 M/H 9,118

13 Driver M/D 272 2 274 M/H 2,608

14 Purchasing M/D 54 1 55 M/H 540

15 Delivery M/D 37 - 37 M/H 370

Sub Total 6,722 33 6,755 65,404

DIRECT MANPOWER

1 Finishing Worker M/D 2,475 22 2,497 M/H 24,196

2 Worker Site Temporary M/D 185 - 185 M/H 1,633

3 Operator Excavator M/D 183 - 183 M/H 1,778

4 Driver Dump Truck M/D 130 - 130 M/H 1,205

5 Operator Crane M/D 197 - 197 M/H 1,912

6 Rigger Crane M/D 389 - 389 M/H 3,797

1224
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

7 Helper Crane M/D 197 - 197 M/H 1,918

8 Carpenter M/D 1,421 - 1,421 M/H 13,900

9 Rebar Man M/D 2,087 7 2,094 M/H 20,425

10 Digger M/D 438 7 445 M/H 4,328

11 Masonry & Concrete worker M/D 4,398 32 4,430 M/H 43,848

12 Mechanical M/D 47 - 47 M/H 470

13 Pipe M/D - - - M/H -

14 Scaffolder M/D 2,144 12 2,156 M/H 21,189

15 Steel worker M/D 1,751 9 1,760 M/H 17,372

16 Mechanic M/D 689 1 690 M/H 6,667

17 Teknisi Plumbing M/D 429 5 434 M/H 4,290

18 Teknisi Electrical M/D 1,940 23 1,963 M/H 19,400

19 General Worker M/D 693 - 693 M/H 6,536

1225
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 19,793 118 19,911 194,861

1226
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 26,515 151 26,666 260,265

11 PT. GUNA TEGUH ABADI (MECHANICAL WORK - GTA)


INDIRECT MANPOWER

1 Site Manager M/D 46 1 47 M/H 444

2 Construction Manager M/D 47 1 48 M/H 454

3 HSE Coordinator M/D 47 1 48 M/H 454

4 QC Coordinator M/D 47 1 48 M/H 454

5 Inspector Welder M/D 47 1 48 M/H 454

6 Field Enginer Leader M/D 47 1 48 M/H 454

7 Project Control M/D 47 1 48 M/H 454

8 ADM. Coordinator M/D 46 1 47 M/H 444

9 Superintendent M/D 74 1 75 M/H 708

1227
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

10 Supervisor M/D 241 8 249 M/H 2,355

11 Safety Officer M/D 46 1 47 M/H 444

12 Finance M/D 47 1 48 M/H 454

13 Procurement M/D - - - M/H -

14 Adm. Staff M/D 128 3 131 M/H 1,232

15 Mechanic / Electrical M/D 47 1 48 M/H 454

16 Document Control M/D 46 1 47 M/H 444

17 Security M/D 235 5 240 M/H 2,270

18 Opr. Leader M/D - - - M/H -

19 Office Boy/Girl M/D 47 1 48 M/H 454

Sub Total 1,285 30 1,315 12,427

DIRECT MANPOWER

1228
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Foreman M/D 163 6 169 M/H 1,593

2 Millwright M/D 532 14 546 M/H 5,204

3 Fitter M/D 247 17 264 M/H 2,449

4 Operator M/D 114 6 120 M/H 1,140

5 Helper M/D 876 34 910 M/H 8,623

6 Rigger M/D 344 11 355 M/H 3,370

7 Scaffolder M/D 132 8 140 1,320

Sub Total 2,408 96 2,504 23,699

1229
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 3,693 126 3,819 36,126

12 PT. BARATA INDONESIA (FIELD ERECTED TANK - BRT)


INDIRECT MANPOWER

1 Project Manager M/D 73 1 74 M/H 727

2 Construction Manager M/D 188 1 189 M/H 1,874

3 Project Control M/D 91 1 92 M/H 907

4 HSE Officer M/D 138 1 139 M/H 1,377

5 Safety Man M/D 170 2 172 M/H 1,684

6 Engineer M/D 89 1 90 M/H 887

7 Supervisor M/D 373 4 377 M/H 3,708

1230
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

8 QC Manager M/D 83 1 84 M/H 827

9 QC Dimensional M/D 123 1 124 M/H 1,227

10 Material Control M/D 66 1 67 M/H 657

11 Drafter M/D 66 1 67 M/H 657

12 Surveyor M/D 138 1 139 M/H 1,377

13 NDE Coordinator M/D 168 3 171 M/H 1,671

14 Welding Inspector M/D 125 1 126 M/H 1,247

15 Scaffolding Inspector M/D - - - M/H -

16 Purchasing M/D 56 1 57 M/H 557

17 Logistic M/D 64 1 65 M/H 637

18 GA & Finance M/D 134 1 135 M/H 1,337

19 Admin 79 1 80 787

20 Public Affair M/D 294 2 296 M/H 2,914

1231
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

21 Tools & Consumable Keeper M/D 207 2 209 M/H 2,064

22 House keeping M/D 139 2 141 M/H 1,364

23 Office Boy M/D 190 2 192 M/H 1,884

24 Security M/D 367 4 371 M/H 3,648

25 Driver M/D 73 1 74 M/H 707

Sub Total 3,494 37 3,531 34,726

DIRECT MANPOWER

1 Operator M/D 248 3 251 M/H 2,468

2 Rigger M/D 227 1 228 M/H 2,255

3 Foreman M/D 282 4 286 M/H 2,788

4 Fitter M/D 1,822 16 1,838 M/H 18,138

5 Scaffolder M/D 148 2 150 M/H 1,474

1232
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Welder M/D 1,290 17 1,307 M/H 12,812

7 Helper M/D 1,394 17 1,411 M/H 13,819

8 Technician M/D 286 3 289 M/H 2,852

Sub Total 5,697 63 5,760 56,606

Total 9,191 100 9,291 91,332

13 PT. ISMA TIUR (PIPING FIELD INSTALLATION AND PAINTING WORK


INDIRECT MANPOWER

1 Site Manager M/D 167 1 168 M/H 1,670

2 Construction Manager M/D 156 1 157 M/H 1,560

3 Engineering Coordinator M/D 167 1 168 M/H 1,670

1233
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Project Control Coordinator M/D 168 1 169 M/H 1,680

5 HSE Coordinator M/D 167 1 168 M/H 1,670

6 Checker / Drafter Piping M/D 222 2 224 M/H 2,220

7 Material Control M/D 158 1 159 M/H 1,580

8 QC/Admin QC M/D 693 7 700 M/H 6,930

9 Store Keeper M/D 165 1 166 M/H 1,650

10 Surveyor M/D 314 4 318 M/H 3,140

11 Supervisor PTW M/D 104 1 105 M/H 1,040

12 Safety Officer/ HSE Man M/D 185 2 187 M/H 1,850

13 Safety Supervisor M/D 174 1 175 M/H 1,740

14 First Aids M/D 133 1 134 M/H 1,330

15 General Affair M/D 158 1 159 M/H 1,580

16 Superintendent M/D 54 1 55 M/H 540

1234
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

17 Supervisor HDPE M/D 271 2 273 M/H 2,710

18 Supervisor CS, LTCS & Nace M/D 420 3 423 M/H 4,200

19 Humas M/D 584 4 588 M/H 5,840

20 Document Control M/D 158 1 159 M/H 1,580

21 HRD M/D 145 1 146 M/H 1,450

22 Admin M/D 613 5 618 M/H 6,130

23 Driver M/D 229 3 232 M/H 2,290

24 Supervisor Scaffolding M/D 102 1 103 M/H 1,020

25 Time Keeper M/D 121 2 123 M/H 1,210

26 Material Handling M/D 65 1 66 M/H 650

27 Security M/D 208 2 210 M/H 2,080

Sub Total 6,101 52 6,153 61,010

1235
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 Operator M/D 521 7 528 M/H 5,210

2 Foreman Pipe Fitter M/D 381 4 385 M/H 3,810

3 Pipe Fitter I M/D 1,355 15 1,370 M/H 13,550

4 Pipe Fitter II M/D 206 2 208 M/H 2,060

5 Foreman Welder M/D 3 - 3 M/H 30

6 Welder M/D 586 6 592 M/H 5,860

7 Rigger M/D 414 5 419 M/H 4,140

8 Painter M/D 178 2 180 M/H 1,780

9 Mechanic / Electrical M/D 269 2 271 M/H 2,690

10 Scaffolder 315 4 319 M/H 3,150

11 Hydrotest Skill M/D 89 1 90 M/H 890

12 Ware House 68 1 69 M/H 680

1236
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

13 Helper M/D 3,421 37 3,458 M/H 34,210

Sub Total 7,806 86 7,892 78,060

Total 13,907 138 14,045 139,070

14 PT. SWADAYA GRAHA (PIPING FIELD INSTALLATION AND PAINTING


INDIRECT MANPOWER

1 Project Manager M/D 33 - 33 M/H 330

2 Site Manager M/D 219 2 221 M/H 2,139

3 QC Manager M/D 143 1 144 M/H 1,405

4 QC Inspector M/D 264 3 267 M/H 2,570

5 HSE Manager M/D 128 1 129 M/H 1,255

1237
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

6 Safety Officer M/D 121 - 121 M/H 1,194

7 Safety Man M/D 149 1 150 M/H 1,465

8 Material Control M/D 224 2 226 M/H 2,185

9 PPC Manager M/D 62 1 63 M/H 609

10 Daily Reporter M/D 215 2 217 M/H 2,099

11 Spool Control M/D 135 2 137 M/H 1,324

12 Engineering Manager M/D 12 1 13 M/H 120

13 Field Engineer M/D 206 2 208 M/H 2,020

14 Welding Tracker M/D 117 1 118 M/H 1,148

15 Document Control M/D 128 1 129 M/H 1,256

16 HRD M/D 187 1 188 M/H 1,837

17 Supervisor M/D 473 8 481 M/H 4,596

18 Driver M/D 406 5 411 M/H 3,932

1238
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

19 Scurity M/D 355 4 359 M/H 3,434

20 Public Relations M/D 217 2 219 M/H 2,120

21 Logistik M/D 226 3 229 M/H 2,193

22 Surveyor M/D 95 1 96 M/H 930

23 Manager Operator M/D 92 1 93 M/H 896

24 Operator Forklif M/D 87 1 88 M/H 848

25 Operator Trailer M/D 169 2 171 M/H 1,645

26 Operator TMC M/D 89 1 90 M/H 868

27 Operator Crane M/D 483 8 491 M/H 4,646

28 General Support adm M/D 207 2 209 2,016

29 Painting Inspector M/D 140 1 141 1,379

30 Operator PWHT M/D 23 2 25 226

Sub Total 5,405 62 5,467 52,685

1239
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 Operator HDPE M/D 72 - 72 M/H 720

2 Foreman Pipe M/D 318 4 322 M/H 3,071

3 Pipe Fitter M/D 898 18 916 M/H 8,607

4 Welder M/D 412 6 418 M/H 3,948

5 Rigger M/D 408 6 414 M/H 3,936

6 Scaffolder M/D 317 3 320 M/H 3,056

7 Mechanic M/D 292 3 295 M/H 2,816

8 Werehouse M/D 337 4 341 M/H 3,269

9 Helper M/D 325 3 328 M/H 3,144

10 Office Boy M/D 134 1 135 M/H 1,313

11 Painting M/D 127 1 128 M/H 1,217

1240
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 3,640 49 3,689 35,097

Total 9,045 111 9,156 87,782

15 PT. WIJAYA ENGINDO NUSA (ELECTRICAL - WEN)


INDIRECT MANPOWER

1 Site Manager M/D 186 1 187 M/H 1,838

2 E/I Construction Coord M/D 81 1 82 M/H 778

3 Finance/ Acctg M/D 73 1 74 M/H 710

4 Administration Coord M/D 197 1 198 M/H 1,954

5 Engineering Material M/D 69 1 70 M/H 672

6 QA/ QC Electrical M/D 81 1 82 M/H 778

1241
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

7 Supervisor Electrical M/D 272 3 275 M/H 2,654

8 Superisor Material Control M/D 62 1 63 M/H 602

9 HSE Coord M/D 135 1 136 M/H 1,316

10 HSE/ Scaffolding Inspector M/D 59 1 60 M/H 572

11 Project Control M/D 109 1 110 M/H 1,064

12 Administration Staff M/D 124 1 125 M/H 1,214

13 Security M/D 91 1 92 M/H 886

14 Office Girl M/D 87 1 88 M/H 848

15 Housekeeping M/D 84 1 85 M/H 818

16 Cleaning Service M/D 123 2 125 M/H 1,196

17 Time Keeper/ Adm Staff M/D 53 1 54 M/H 512

Sub Total 1,886 20 1,906 18,412

1242
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

DIRECT MANPOWER

1 QA/ QC Technician M/D 81 1 82 M/H 788

2 Scaffolder Foreman M/D 71 1 72 M/H 680

3 Scaffolder M/D 62 3 65 M/H 608

4 Foreman M/D 231 6 237 M/H 2,250

5 Technician M/D 221 13 234 M/H 2,158

6 Helper M/D 354 9 363 M/H 3,454

7 Mechanic M/D 89 1 90 M/H 866

8 Warehouse M/D 89 1 90 M/H 866

9 Welder M/D 235 4 239 M/H 2,288

10 TMC Operator M/D 74 1 75 M/H 720

11 Rigger M/D 81 1 82 M/H 788

Sub Total 1,588 41 1,629 15,466

1243
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 3,474 61 3,535 33,878

16 PT. WIJAYA ENGINDO NUSA (INSTRUMENT - WEN)


INDIRECT MANPOWER

1 Supervisor Instrument M/D 205 2 207 M/H 2,038

Sub Total 205 2 207 2,038

DIRECT MANPOWER

1 Instrument Foreman M/D 13 2 15 M/H 130

2 Instrument Technician M/D 136 4 140 M/H 1,330

1244
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 149 6 155 1,460

Total 354 8 362 3,498

17 PT. TERAS TEKNIK PERDANA (INSULATION /SCAFFOLDING - TTP)


INDIRECT MANPOWER

1 Site Manager M/D 113 1 114 M/H 1,091

2 Construction Manager M/D 113 1 114 M/H 1,091

3 HSSE Coordinator M/D 113 1 114 M/H 1,091

1245
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

4 Supv Scaffolding M/D 111 1 112 M/H 1,071

5 Inspector Scaffolding M/D 113 1 114 M/H 1,091

6 Material Control M/D 113 1 114 M/H 1,091

7 Ass Material Control M/D 59 1 60 M/H 554

8 Admin M/D 110 1 111 M/H 1,061

9 Public Relations M/D 108 - 108 M/H 1,045

10 HSSE Administration M/D 58 1 59 M/H 544

11 PPC M/D 55 1 56 M/H 514

12 Driver M/D 210 1 211 M/H 2,049

13 Timekeeper M/D 99 1 100 M/H 951

14 Office Boy M/D 82 1 83 M/H 791

15 Security Officer M/D 12 1 13 M/H 113

16 Cleaning Service M/D 3 1 4 M/H 26

1246
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Sub Total 1,472 15 1,487 14,174

DIRECT MANPOWER

1 Foreman M/D 191 2 193 M/H 1,852

2 Lead Worker M/D 224 2 226 M/H 2,182

3 Skilled Worker M/D 904 10 914 M/H 8,750

5 Helper M/D 446 7 453 M/H 4,275

Sub Total 1,765 21 1,786 17,059

Total 3,237 36 3,273 31,233

18 PT. THAI NDT INDONESIA (NON-DESTRUCTIVE TESTING - TNDT)

1247
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

INDIRECT MANPOWER

1 Site Manager M/D 6 - 6 M/H 60

2 Supervisor M/D 76 1 77 M/H 760

3 Document Control M/D 78 1 79 M/H 780

4 Interpreter Radiography M/D 78 1 79 M/H 780

Sub Total 238 3 241 2,380

DIRECT MANPOWER

1 Operator Radiography M/D 154 3 157 M/H 1,540

2 RPO M/D 153 1 154 M/H 1,530

3 Driver M/D 74 1 75 M/H 740

4 PT Technician M/D 106 2 108 M/H 1,060

1248
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

M/H

Sub Total 487 7 494 4,870

Total 725 10 735 7,250

19 PT. MI ENERGI (FUEL SUPPLY - MIE)


INDIRECT MANPOWER

1 Coordinator Manager M/D 210 1 211 M/H 2,081

2 Public Affair M/D 190 1 191 M/H 1,896

Sub Total 400 2 402 3,977

DIRECT MANPOWER

1249
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

1 Driver M/D 206 1 207 M/H 2,052

2 Security M/D 393 2 395 M/H 3,935

3 Helper M/D 598 3 601 M/H 5,983

Sub Total 1,197 6 1,203 11,969

Total 1,597 8 1,605 15,946

20 PT. MEULIGO (CONSTRUCTION OF JETTY AT KUALA GEULUMPANG


Total 197 - 197 1,957

21 PT. TAKA HYDROCORE INDONESIA (DEEP WELL WORK - THI) - NO W


Total 4,309 - 4,309 33,568

1250
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

22 PT. BERDIKARI PONDASI PERKASA (PILING WORK - BPP) - NO WOR


Total 2,501 - 2,501 21,007.0

23 PT. SWING INDONESIA (WASTE WATER TREATMENT - SWI)


Total 298 - 298 2,652

24 PT. MITRA USAHA KREASINDO (PLN SCOPE - MUK) - NO WORK


Total 153 - 153 1,288.5

25 PT. EQUINE GLOBAL (NETWORK CABLE DATA - EGL)


Total 254 - 254 2,378

1251
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

26 PT. BAASITHU BOGA SERVICES (RECEPTIONIST & ROOM BOY/ROO


INDIRECT MANPOWER

1 Site Manager M/D 167 1 168 M/H 1,670

2 F&B Supervisor M/D - - - M/H -

3 Housekeeping SPV M/D 167 1 168 M/H 1,670

4 Storeman M/D - - - M/H -

5 Japanesse Cook M/D 167 1 168 M/H 1,670

6 Receptionist / ADM M/D 167 1 168 M/H 1,670

Sub Total 668 4 672 6,680

DIRECT MANPOWER

1 Camp Boss M/D 167 1 168 M/H 1,670

2 Housekeeping SPV M/D 167 1 168 M/H 1,670

1252
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

3 Bakery M/D 167 1 168 M/H 1,670

4 Cook M/D 334 2 336 M/H 3,340

5 Cook Helper M/D 334 2 336 M/H 3,340

6 Kitchen Boy M/D 501 3 504 M/H 5,010

7 Receptionist M/D 167 1 168 M/H 1,670

8 Room Boy M/D 2,310 14 2,324 M/H 23,100

9 Room Maid Medco M/D 1,485 9 1,494 M/H 14,850

10 Office Boy / Girl M/D 825 5 830 M/H 8,250

11 Waitress M/D 501 3 504 M/H 5,010

12 Laundry M/D 495 3 498 M/H 4,950

13 Driver M/D 334 2 336 M/H 3,340

Sub Total 7,787 47 7,834 77,870

1253
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.

Total 8,455 51 8,506 84,550

TOTAL M/D 424,905 1,456 426,361 M/H 2,630,951

JEC PERSONNEL
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager

1254
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
Quality Control
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT

1255
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
1 Zulfikar Said IT Engineer
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support

1256
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent

1257
DAILY REPORT

P
JGC ENC

PORARY FACILITY SECTION A


PORARY FACILITY SECTION B & C
PORARY FACILITY SECTION D
CHING PLANT
BS 2000 (CONCRETE STRUCTURE) & FWBS 1000 (SEWER AND DRAINAGE)
2300 (FOUNDATION WORK)
2300 (FOUNDATION WORK)
EL STRUCTURE ERECTION
N BULDING
AHANICAL WORK
D ERECTED TANK
NG FIELD INSTALLATION AND PAINTING WORK UTILITY AREA
NG FIELD INSTALLATION AND PAINTING WORK PROCESS AREA
CTRICAL

1258
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID

ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 2,845
10 9,162
10 1,495
10 2,952
10 1,862

1259
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,679
-
110 21,643
10 2,616
-
20 2,317
20 3,082
90 9,907
20 1,409
10 207
-
-
10 3,459
10 3,305
10 3,264
20 6,450
- 158
10 2,536

1260
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,297
-
10 2,632
40 2,115
10 4,168
10 3,616
10 1,896
10 2,904
10 2,357
10 4,524
10 4,196
10 1,689
-
10 4,125
30 5,746
40 2,266
20 3,416
-

1261
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,233
10 2,069
20 1,675
10 81
30 2,611
10 694
10 1,674
-
10 2,311
10 81
-
10 752
-
10 1,682
10 742
-
20 796
- 1,310

1262
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
10 715
-
10 81
10 81
-
10 81
-
10 2,402
10 707
10 678
-
10 140
10 140
10 140
10 140
30 420
10 140

1263
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
10 140
10 140
-
10 140
10 140
40 560
-
10 1,973
10 2,189
10 2,594
40 2,107
- 980
50 4,042
20 2,845
40 5,590
40 6,371
-

1264
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,090
180 21,980
20 6,891
20 4,290
10 2,311
20 3,363
-
30 10,357
10 4,168
-
40 8,456
-
330 63,063
120 27,511
20 4,822
60 12,800
120 26,430
260 43,821

1265
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
40 3,015
50 3,640
80 10,794
170 3,763
2,840 446,238

- 88,084

& C - IKM)
- 153,750

1266
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 185,652

10 1,075 1 Ready Mix Concrete Production


10 3,069 2 Ready Mix Concrete Production (Batching Plant II)
10 1,658
10 2,893
- 8
10 1,952
10 2,533
10 4,921
10 2,062
30 7,429
110 27,599

1267
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 7,756
10 4,511
50 9,470
- 928
20 14,193
110 36,857

220 64,456

E STRUCTURE & FWBS 1000 : SEWER AND DRAINAGE - PBC)


- 417,884

1268
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 610 1 Area A-400

10 1,067 - Installation Anchor Bolt in A4ST04 F4

10 1,312 - Installation Formwork In Proses Air Blower

10 1,672 - Repair Concrete Pedestal in A4PR02

10 1,380 - Installation Formwork in Analysis Shelter

10 1,494

10 1,719 2 Area B-300

10 2,239 - Joint Survey In B3PR01

10 1,526 - Joint Inspaction In B3PR01

- 977 - Lean Concrete In B3PR01 : 1,5 m3

10 1,989

60 8,438 3 Area B-500

1269
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 804 - Curing Conncrete in B5ST07 F1 B and F2A

10 1,394 - Installation Anchor Bolt in B5ST07 F2A

10 1,057 - Installation Formwork Pedestal in B5ST07 F1A

20 4,112 - Installation Rebar Oil Catcher B

10 4,355 - Installation Formwork Oil Catcher B

- 634

30 2,253 4 Area B-600

40 7,408 - Install Fwk. Pedestal in Water Treatment Package F9 AB

10 6,242 - Installation Anchor Bolt in Water Treatment Package F1 8

- 1,235 - Installation Rebar in Water Treatment Package F14

290 53,917 - Installation Formwork in Water Treatment Package F14

5Area B-700

1270
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 4,583 - Backfill in Pipe Sleeper

50 7,018 - Excavation in Pipe Sleeper

110 9,983

80 11,392

90 5,963

- -

30 1,684

150 13,311

120 19,858 Total Concrete K125 : 1.5 m³

180 25,832 Total Concrete K300 : 0 m³

10 2,846

- 80

850 102,550

1271
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,140 156,467

- 300 1 Area Equipment Structure A6ST08

- 150 - Pouring Concrete for Pedestal ( 1,5 m3)

- 1,288

10 1,518 2 Area Equipment Structure A6ST07

- - - Pouring Concrete for Footing ( 1 m3)

10 3,256

3 Area Equipment Structure A6ST02 and A6ST09

1272
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- Formwork Install for Footing

10 1,440

20 4,090 4 Area Amine Mike Up Filter

160 15,770 - Pouring Concrete for Footing (1 m3)

320 16,050

210 15,250 5 Area AGE INLET FILTER COALESCER (39-MAJ-101)

40 9,390 - Pouring Concrete for Pedestal (1 m3)

10 8,920

90 7,080 6 Area Misc. Proses Area A200

580 58,300 - Formwork Removal for Pedestal

1,440 136,290

7 Area Sulfur Waste Pit (48-ABH-403)

- Pouring Concrete for wall ( 14 m3)

1273
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

8 Area Piperack A7PR01

- Formwork Install for Pedestal at GL-5,6 /ABC

9 Area Pipe Sleeper 040-SLP-001-068

- Embedded Install for Pedestal

10 Area Workshop JEC

- Rebar Fabrication for Pipe Sleeper

11 Area Temporary Work Shop JEC for Precast

- Formwork Install for DOOU-OMH-10

12 Area Dike for Condensate Tank (37-ABJ-402)

- Peri Formwork Install for Wall

13 Area A200 CCW Valve Pit In Proses Area AOOU-CVP-01, 02

- Formwork Install for Wall

1274
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

Total concrete = 21.5 m³

1,450 139,546

ON - GTA)

- 1,132 PIPERACK

1275
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,072 - B2PR01

- 1,122 Cont. Install Accessories member Piperack

- 1,142 Handrail : 11

- 1,192 Finishing Grating ( Attch claim Grating)

- 1,122 Assemly Column line 7

- 1,052

- 1,440 - B2PR02

- 2,008 Cont. Impact Bolt

20 3,336

40 2,036 EQUIPMENT SUPPORT

- 1,484 A3ST01

20 2,214 Tranport material to erection point

- 404 Cont. Install Accssories member :

1276
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,994 Stair :6

- 3,123

40 3,930 A4ST01

- 934 Cont. Install member Piperack

- 2,008 V. Brace : 3 H. Brace :5

- 1,678 Girder :5 Beam :3

- 390

- 1,188

10 839

130 36,840

40 5,410

1277
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

190 16,980

90 15,903

80 8,440

110 16,244

90 3,377

180 28,462

780 94,816 PIPERACK Today ((Ton)

A1PR01A 0.0

A1PR01B 0.0

A1PR02A 0.0

A1PR02B 0.0

A1PR03A 0.0

A1PR03B 0.0

1278
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

A2PR01 0.0

D1PR01 0.0

A6PR01 0.0

B2PR01 0.2

B2PR02 0.0

D3PR02 0.0

D3PR01 0.0

D3BG01 0.0

A6ST01 0.0

A4ST01 0.0

A3ST01 1.4

Total 1.6

1279
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

910 131,656

10 2,418 1 Main Substation Building

30 6,912 - Installation pipe EMT (4)

20 6,778 - Wearing cable (6)

- 686 - Installation RGS (2)

10 4,916 - Dewatering (8)

50 6,220 - Installation scaffolding (5)

90 11,190

30 10,102

20 3,808 2 Main Control Room

1280
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

40 9,158 - Installation ducting (6)

20 2,628 - Polling cable for Hvac (3)

10 550 - Fabrication suport for hvac (4)

- 370 - Polling cable Lamp (6)

330 65,734 - Grounding lamp (2)

- Polling cable fire alarm (4)

- Cleaning epoxy (6)

220 24,416 - Finishing wall (6)

- 1,633 - Installation ceramic (4)

- 1,778 - Installation scaffolding (6)

- 1,205

- 1,912

- 3,797 3 Chemical Storage

1281
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,918 - Installation flashing (9)

- 13,900

70 20,495

70 4,398 4 Waste Storage

320 44,168 - Installation tray (3)

- 470 - Installation suport scaffolding (4)

- -

120 21,309 5 GEG Building

90 17,462 - Transfering material for geg(6)

10 6,677

50 4,340

230 19,630

- 6,536 6 Shelter Building

1282
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,180 196,041 - Insttallation rebar for footing (8)

1283
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,510 261,775

10 454 STATIC EQUIPMENT

10 464 - 41-HBA-201 A/B Fuel Gas Heater

10 464 Install of Equipment

10 464 - 46-MBM-106 LP Condensate Flash Drum

10 464 Cont. Finishing foundation

10 464 - 35-MBF-105 SRU Blow Down Drum

10 464 Install Accories (Ladder)

10 454 - 31-MBD-101A Production Separator

10 718 Preparation of install platform

1284
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

80 2,435 Leveling of Equipment

10 454 - 31-MBD-102 Slug Catcher

10 464 Leveling of Equipment

- -

30 1,262 ROTARY EQUIPMENT

10 464 - 44-PBM-333 B Utility Water Transfer Pumps

10 454 Finishing Foundation

50 2,320 - 44-PBM-334 B Potable Water Pumps

- - Finishing Foundation

10 464 - 36-PAX-332 A/B Condensate Stabilizer Pump

300 12,727 Check Alignment

PACKAGE EQUIPMENT

1285
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 1,653 - 44-ZBE-501 (Raw Water Filter Package)

140 5,344 Chipping on foundation

170 2,619 - 44-ZBM-504 (Clarifier System Package)

60 1,200 Cont.Padding + Dumper Grout

340 8,963 - 44-ZBE-502 (Clarifier System Package)

110 3,480 Check foundation

80 1,400 - 46-ZBE-501 A/B BOILER PACKAGE

960 24,659 Centering column support ducting

Install Box Ducting 1 , Box Ducting 2

Cont. Install Column Structure Boiler A/B

1286
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1,260 37,386

10 737 1 Condensate A Tank

10 1,884 - External welding vertical shell plate course 6

10 917 - Internal welding vertical shell plate course 7

10 1,387

20 1,704 2 Condensate B Tank

10 897 - Inspection shell plate course 5

40 3,748 - Erection shell plate course 6

1287
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 837 - Fit up shell plate course 6

10 1,237

10 667 3 Condensate C Tank

10 667 - Fit up shell plate course 3

10 1,387

30 1,701 4 Utility Water Tank

10 1,257 - Fit up top angel

- -

10 567 5 Fire Water Tank

10 647 - External welding vertical shell plate course 4

10 1,347

10 797 6 Diesel Fuel Tank

20 2,934 - Internal welding horizontal shell plate to bottom

1288
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,084 - Inspection welding shell plate to bottom

20 1,384

20 1,904 7 Potable Water Tank

40 3,688 - Welding accessories handrill to shell

10 717

370 35,096

30 2,498

10 2,265

40 2,828

160 18,298

20 1,494

1289
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

170 12,982

170 13,989

30 2,882

630 57,236

1,000 92,332

NTING WORK UTILITY AREA - ISTI)

10 1,680 A Welding Progress

10 1,570 Underground (16475.4)

10 1,680 1 Pipe HDPE 28

1290
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,690 2 Low Temp Carbon Steel (LTCS) 4

10 1,680 3 Carbon Steel (CS) 48.5

20 2,240 Total 80.5

10 1,590

70 7,000 Above ground (61350.4)

10 1,660 1 Low Temp Carbon Steel (LTCS) 0

40 3,180 2 Carbon Steel (CS) 0

10 1,050 3 Stainless Steel (SS) 0

20 1,870 4 Duplex Stainless Steel 0

10 1,750 5 ALLOY 825 0

10 1,340 Total 0

10 1,590

10 550 B Support Progress

1291
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

20 2,730 1 CS 0

30 4,230 2 LTCS 0

40 5,880 3 Stainless Steel 0

10 1,590 4 DUPLEX SS 0

10 1,460 5 Cold Shoe Support 0

50 6,180 6 Spring Support 0

30 2,320 Total 0

10 1,030

20 1,230

10 660

20 2,100

520 61,530

C Other Progress

1292
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

1 Borrow Sand 0

70 5,280 2 Coating 0

40 3,850 3 Post Heat Treatment 0

150 13,700 4 Finish Painting 0

20 2,080 5 Lettering/Marking 0

- 30 6 Pressure Test (STM) 0

60 5,920 Total 0

50 4,190

20 1,800

20 2,710

40 3,190

10 900

10 690

1293
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

370 34,580

860 78,920

1,380 140,450

ND PAINTING WORK PROCESS AREA - SWG)

- 330 A Welding Progress

20 2,159 Under Ground (5929.60)

10 1,415 1 HDPE 0

30 2,600 2 LTCS INCL GALV 1

10 1,265 3 Carbon Steel INCL GALV 30.8

1294
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 1,194 Total 31.8

10 1,475

20 2,205 Above ground (61182.00)

10 619 1 LTCS INCL GALV 0

20 2,119 2 Carbon Steel INCL GALV 0

20 1,344 3 Staniless Steel 14

10 130 4 Duplex Stainless Steel 0

20 2,040 Total 14

10 1,158

10 1,266 B Support Progress (121.17)

10 1,847 1 CS (Ton) 0

80 4,676 2 LTCS (Ton) 0

50 3,982 3 Stainless Steel (Ton) 0

1295
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

40 3,474 4 DUPLEX SS (Ton) 0

20 2,140 5 Cold shoe support (qty) 0

30 2,223 6 Spring Support (qty) 0

10 940 Total 0

10 906

10 858 C Other Progress

20 1,665 1 Borrow Sand (M3) 0

10 878 2 Post Heat Treatment (ID) 0

80 4,726 3 Coating & Finish Paninting ( M2) 0

20 2,036 4 Lettering/Marking (pnt) 0

10 1,389 5 Steam Tracing 0

20 246 6 Pressure Test (STM) 0

620 53,305 Total 0

1296
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 720

40 3,111

180 8,787

60 4,008

60 3,996

30 3,086

30 2,846

40 3,309

30 3,174

10 1,323

10 1,227

1297
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

490 35,587

1,110 88,892

Unit Today

10 1,848 1 Glandbox Fabrication Set 4

10 788 2 Cable Pulling at SS (Internal) (LV Cable) m 657

10 720 3 Asembly/Joint Panel 43-SWG-1201N pnl

10 1,964 4 Asembly/Joint Panel 43-SWG-1203E pnl

10 682 5 Install Cathodic - Connection Piping pnt 8

10 788 6 Loading panel pnl 4

1298
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

30 2,684

10 612

10 1,326

10 582

10 1,074

10 1,224

10 896

10 858

10 828

20 1,216

10 522

200 18,612

1299
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 798

10 690

30 638

60 2,310

130 2,288

90 3,544

10 876

10 876

40 2,328

10 730

10 798

410 15,876

1300
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

610 34,488

Unit Today

20 2,058 1 Fab. Support for cable tray at Main Pipe Rack

2 Install Support for cable tray at Main Pipe Rack m 11

3 Install Modification Support m 2

20 2,058 4 Install Support for cable tray at MCR m 8

20 150

40 1,370

1301
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

60 1,520

80 3,578

LDING - TTP)

10 1,101 1 Utility Area

10 1,101 - Installation scaffolding for working at height access

10 1,101 at B2PR01

1302
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,081

10 1,101 2 Sulfur Pit

10 1,101 - Installation Scaffolding for supporting civil works

10 564 (Site Instruction)

10 1,071

- 1,045

10 554

10 524

10 2,059

10 961

10 801

10 123

10 36

1303
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

150 14,324

20 1,872

20 2,202

100 8,850

70 4,345

210 17,269

360 31,593

NG - TNDT)

1304
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

- 60 Stand By

10 770

10 790

10 790

30 2,410

30 1,570

10 1,540

10 750

20 1,080

1305
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

70 4,940

100 7,350

Fuel Supply

10 2,091

10 1,906

20 3,997

1306
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 2,062

20 3,955

30 6,013

60 12,029

80 16,026

GEULUMPANG - MEULIGO)
- 1,957

K - THI) - NO WORK
- 33,568

1307
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

BPP) - NO WORK
- 21,007.0

- 2,652

NO WORK
- 1,288.5

- 2,378

1308
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

OOM BOY/ROOM MAID - BBS)


Ready

10 1,680

- -

10 1,680

- -

10 1,680

10 1,680

40 6,720

10 1,680

10 1,680

1309
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

10 1,680

20 3,360

20 3,360

30 5,040

10 1,680

140 23,240

90 14,940

50 8,300

30 5,040

30 4,980

20 3,360

470 78,340

1310
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

510 85,060

14,560 2,645,511

OTHER
WEATHE
Condition From To

CLEAR 7.00 18.00


CLOUDY
RAINY

HEAVY
RAIN

1311
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

INSU, CERTIFICATION)

1312
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish

1313
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description

HIGHLIG

1314
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA

1315
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
2
3
4
5
6

1316
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8

1317
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1318
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1319
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1320
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1321
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1322
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1323
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5

1324
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1325
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Area A-400 1

- Installation Rebar For valve pit 104 2

- Repair Concrete in Feed Acid Gas KO Drum 3

- Repair Concrete In Provulsion Vessel 4

- Pouring Concrete In A4SN04 F4 5

- Pouring Concrete Pedestal In A4SN02 6

- Installation Rebar In Proses Air Blower 7

- Finishing Concretel In A4PR02 8

- Installation Rebar in Analysis Shelter 9

10
2 Area B-300 11

- Installation Rebar In B3PR01

1326
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

3 Area B-500

- Backfill in B5ST07 F1B, F1A

- Curing Concrete Pedestal in B5ST07 F1 B

- Remove Fomwork Pedestal in B5ST07 F2A

- Installation Formwork in B5ST07 F1A

- Pouring Concrete Oil Catcher B

reatment Package F9 AB

4 Area B-600

- Installation Anchor Bolt in Water Treatment Package F8

- Installation Rebar in Water Treatment Package F8 , F14

5 Area B-700

1327
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Backfill in Pipe Sleeper

- Lean Concrete in Pipe Sleeper

Total concrete = 0 m³

1328
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Area Equipment Structure A6ST02 and A6ST09 1

- Formwork Install for Footing 2

2 Area Amine Mike Up Filter 4

- Formwork Install for Pedestal

3 Area Misc. Proses Area A200

1329
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Formwork Removal for Pedestal

4 Area Misc. Proses Area A200

- Formwork Removal for Pedestal

5 Area Piperack A7PR01

- Formwork Install for Pedestal at GL-5,6 /ABC

6 Area Pipe Sleeper 040-SLP-001-068

- Embedded Install for Pedestal

- Formwork Install for Footing at SLP 010 ( F12)

- Formwork Install for Footing at SLP 19, 20 ( F11)

1330
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

7 Area Workshop JEC

- Rebar Fabrication for Pipe Sleeper

8 Area Temporary Work Shop JEC for Precast

- Formwork Install for DOOU-OMH-10

9 Area Dike for Condensate Tank (37-ABJ-402)

- Peri Formwork Install for Wall

10 Area A200 CCW Valve Pit In Proses Area AOOU-CVP-01, 02

- Formwork Install for Wall

1331
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total concrete = 0 m³

PIPERACK 1

1332
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- B2PR01 2

Cont. Install member Piperack Line 7 3

Finishing Grating ( Attch claim Grating) 4

- B2PR02 6

Install Accessories Member 7

Cont. Impact Bolt 8

- D3BG01 10

Joint Inspection for Plumbness 11

12

EQUIPMENT SUPPORT 13

- A3ST01

1333
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Cont. Impact Bolt Accessories (First Layer)

- A4ST01

Cont. Install Main member

1334
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1335
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1336
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Main Substation Building 2

- Installation scaffolding 3

- Installation pipe EMT 4

- Installation lamp 5

- Installation Panel 6

- Aplication epoxy top coat 7

- Installation skirting 8

10

1337
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Main Control Room 11

- Transfer material pipe for HVAC (6) 12

- Polling cable for Hvac (3) 13

- Fabrication suport for hvac (4) 14

- Polling cable Lamp ind office room and laboratory (5) 15

- Connect cable speaker (3) 16

- Polling cable fire alarm (2) 17

- Installation pipe roof drain (2) 18

- Finishing wall (7) 19

- Installation ceramic (4) 20

21

22

3 Chemical Storage 23

1338
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Installation flashing (9)

4 Waste Storage

- Installation tray (3)

- Installation suport scaffolding (4)

5 GEG Building

- Transfering material for geg(6)

6 Shelter Building

1339
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- Insttallation rebar for footing (8)

1340
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

STATIC EQUIPMENT

- 41-MBD-101 HP Fuel Gas Separator

Install of Equipment

- 41-MBF-103 LP Fuel Gas Scrubber

Install of Equipment

- 41-HBA-202 Secondary Fuel Gas Heater

Install of Equipment

- 32-HAL-201 AGR Lean Amine Cooler

Cont. Assembly structure ACHE

1341
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- 32-MBD-101 AGR Flush Drum

Prepare install Platform

ROTARY EQUIPMENT

- 36-PAX-332 A/B

Leveling Nozle of Pump

- 39-PZZ-333 A/B

Check Foundation

- 39-PZZ-332 A/B

Check Foundation

PACKAGE EQUIPMENT

- 44-ZBM-504 (Clarifier System Package)

1342
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Joint Inspection Padding

- 44-ZBE-502 (Clarifier System Package)

Padding on foundation

- 46-ZBE-501 A/B BOILER PACKAGE

Modification Support Economizer

Install Box Ducting 1 , Box Ducting 2

Plumbness Structure Boiler A/B

1343
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Condensate A Tank 1

- External welding vertical shell plate course 6 2

2 Condensate B Tank

- Inspection shell plate course 5

- Erection shell plate course 6 3

1344
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

3 Condensate C Tank 5

- Fit up shell plate course 3 6

4 Demin Water Tank 8

- Inspection shell plate course 6 9

5 Potable Water Tank

- Instalation Accessories

6 Utility Water Tank

- Fit up top angel

7 Fire Water Tank

1345
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

- External welding vertical shell plate course 4

- Erection center colloum

8 EG Make-Up Tank

- Instalation Accessories

9 Diesel Fuel Tank

- Internal welding horizontal shell plate to bottom

- inspection welding shell plate to bottom

1346
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Underground (16475.4) 2

1 Pipe HDPE 62 3

1347
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Low Temp Carbon Steel (LTCS) 4 4

3 Carbon Steel (CS) 86 5

Total 152 6

Above ground (61350.4) 8

1 Low Temp Carbon Steel (LTCS) 0 9

2 Carbon Steel (CS) 0 10

3 Stainless Steel (SS) 0 11

4 Duplex Stainless Steel 0 12

5 ALLOY 825 0 13

Total 0 14

15

B Support Progress

1348
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 CS 0

2 LTCS 0

3 Stainless Steel 0

4 DUPLEX SS 0

5 Cold Shoe Support 0

6 Spring Support 0

Total 0

C Other Progress

1349
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Borrow Sand 0

2 Coating 0

3 Post Heat Treatment 0

4 Finish Painting 0

5 Lettering/Marking 0

6 Pressure Test (STM) 0

Total 0

1350
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

A Welding Progress 1

Under Ground (5929.60) 2

1 HDPE 0 3

2 LTCS INCL GALV 0 4

3 Carbon Steel INCL GALV 16 5

1351
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Total 16 6

Above ground (61182.00) 8

1 LTCS INCL GALV 0 9

2 Carbon Steel INCL GALV 12 10

3 Stainless Steel 18 11

4 Duplex Stainless Steel 0 12

Total 30 13

14

B Support Progress (121.17) 15

1 CS (Ton) 0 16

2 LTCS (Ton) 0 17

3 Stainless Steel (Ton) 0 18

1352
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

4 DUPLEX SS (Ton) 0 19

5 Cold shoe support (qty) 0 20

6 Spring Support (qty) 0 21

Total 0 22

23

C Other Progress 24

1 Borrow Sand (M3) 0 25

2 Coating ( M2) 0

3 Post Heat Treatment (ID) 0

4 Finish Painting (M2) 0

5 Lettering/Marking (pnt) 0

6 Pressure Test (STM) 0

Total 0

1353
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1354
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Glandbox fabrication 1

2 Continues Asembly/Joint Panel 2

3 Pulingg Grounding cable at SS 3

4 Internal Cable pulling at SS 4

1355
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

10

10

11

12

13

14

15

15

15

16

17

1356
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

18

19

20

1357
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Today Unit Quantity

1 Continue Fab. Support for cable tray at Pipe Rack

2 Continue Install support for cable tray at MCR

1358
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Utility Area

- Installation scaffolding for working at height access

at B2PR01

1359
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

2 Sulfur Pit

- Installation Scaffolding for supporting civil works

(Site Instruction)

1360
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1361
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1 Swadaya Workshop Area 1

- Radiography Inspection 2

2 Isma Tiur Workshop Area 4

- Radiography Inspection 5

10

11

12

1362
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

13

14

Fuel Supply 1

1363
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1364
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1365
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

Ready

1366
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1367
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

OTHERS
WEATHER
Remark

1368
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

1369
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

WORKING HOUR

1370
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description

HIGHLIGHT

1371
1372
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Genset 10 KVA unit 1
Genset 25 KVA unit 1
Excavator unit 1
Buldozer unit 1
Crane 25T unit 1

1373
EQUIPMENT
Equipment & Tools Unit QTY

Crane 55T unit 1


Trailler unit 1

1374
EQUIPMENT
Equipment & Tools Unit QTY

1375
EQUIPMENT
Equipment & Tools Unit QTY

1376
EQUIPMENT
Equipment & Tools Unit QTY

1377
EQUIPMENT
Equipment & Tools Unit QTY

1378
EQUIPMENT
Equipment & Tools Unit QTY

1379
EQUIPMENT
Equipment & Tools Unit QTY

1380
EQUIPMENT
Equipment & Tools Unit QTY

Total Station unit 1


Generator Set unit 2
Truck Mixer unit 3
Wheel Loader unit 1
Batching Plant unit 2

1381
EQUIPMENT
Equipment & Tools Unit QTY

1382
EQUIPMENT
Equipment & Tools Unit QTY

Excavator PC-200 Unit 2

Dump Truck Unit 2

Mini Bus Unit 3

Genset 30 KVA Unit 1

Genset 6,5 KVA Unit 1

Bar Cutter Unit 2

Bar Bending Unit 2

Submersible Water Pump Unit 1

Concrete Vibrator Unit 4

Compactor (Hand) Unit 2

Pick up/ Light Truck Unit 2

1383
EQUIPMENT
Equipment & Tools Unit QTY

1384
EQUIPMENT
Equipment & Tools Unit QTY

1385
EQUIPMENT
Equipment & Tools Unit QTY

Excavator unit 1

Water Jump unit 1

Fibrator unit 1

Mixer DT 03 unit 1

1386
EQUIPMENT
Equipment & Tools Unit QTY

1387
EQUIPMENT
Equipment & Tools Unit QTY

1388
EQUIPMENT
Equipment & Tools Unit QTY

R. Crane 80 Ton Unit 1

1389
EQUIPMENT
Equipment & Tools Unit QTY

R. Crane 50 Ton Unit 1

R. Crane 25 Ton Unit 1

Unic Crane 5 T Unit 1

Trailler Truck Unit 1

Genset 150 kVA Unit 2

Genset 125 kVA Unit 1

Genset 25 kVA Unit 1

Compressor PDS 175 Unit 1

Welding Engine Unit 2

Scaffolding M 17020

Forklift 10 Ton Unit 1

Skylift Unit 3

1390
EQUIPMENT
Equipment & Tools Unit QTY

1391
EQUIPMENT
Equipment & Tools Unit QTY

1392
EQUIPMENT
Equipment & Tools Unit QTY

1393
EQUIPMENT
Equipment & Tools Unit QTY

Auto Level Unit 1

Tripod Unit 2

Cutting Concrete Unit 1

Hammer 5 kg Unit 1

Excavator Unit 2

water pump Unit 1

Cutting well Unit 3

Genset unit 1

Bar Bender unit 1

Bar Cutter unit 1

1394
EQUIPMENT
Equipment & Tools Unit QTY

Submersible pump unit 1

Hammer Drill unit 1

Welding Machine unit 1

Hammer Drill unit 1

Welding Machine unit 1

Concrete Vibrator unit 1

Dump truck unit 2

Vehicle unit 1

Lampu Halogen unit 15

Stamper unit 1

Bucket unit 1

Crane unit 1

Coring Mechine Unit 1

1395
EQUIPMENT
Equipment & Tools Unit QTY

1396
EQUIPMENT
Equipment & Tools Unit QTY

1397
EQUIPMENT
Equipment & Tools Unit QTY

Crawler Crane 550 Ton unit 1

Crawler Crane 250 Ton unit 1

Rough Crane 50 Ton unit 1

Flat Bed Trailler unit 1

Low bed Trailler unit 1

1398
EQUIPMENT
Equipment & Tools Unit QTY

1399
EQUIPMENT
Equipment & Tools Unit QTY

1400
EQUIPMENT
Equipment & Tools Unit QTY

Oven Unit 2

Grinda

a. 4" Unit 13

b. 6" Unit 8

c. 7" Unit 3

Drayer Unit 24

Trapo Unit 26

1401
EQUIPMENT
Equipment & Tools Unit QTY

Crane 25 ton Unit 1

Vacuum Box Set 1

Miller Unit 2

Cutting Touch Unit 3

Generator

a. 18 KVA Unit 1

b. 150 KVA Unit 1

c. 175 KVA Unit 1

d. 200 KVA Unit 1

1402
EQUIPMENT
Equipment & Tools Unit QTY

1403
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Set 3

Carry Pick-up Unit 1

Generator 100Kva Unit 2

1404
EQUIPMENT
Equipment & Tools Unit QTY

Welding Travo Unit 5

Handryer Unit 5

Chain Saw Unit 1

Grinder Machine 7" Unit 5

Grinder Machine 4" Unit 5

Welding Machine Unit 4

TMC 9Ton Unit 1

Double Cabin Unit 2

Vehicle Unit 2

Generator 10-40Kva Unit 2

Water Pump Unit 2

Crane 35 Ton Unit 1

1405
EQUIPMENT
Equipment & Tools Unit QTY

1406
EQUIPMENT
Equipment & Tools Unit QTY

1407
EQUIPMENT
Equipment & Tools Unit QTY

HDPE Machine Unit 1

Pick-up Unit 4

Vehicle Unit 2

Generator 6 A Unit 0

Generator 150 KVA Unit 2

1408
EQUIPMENT
Equipment & Tools Unit QTY

Generator 100 KVA Unit 1

Grinder Machine 7" Unit 2

Grinder Machine 5" Unit 6

Grinder Machine 4" Unit 10

Cutting Wheel 14" Unit 2

Cutting Torch & accessories Unit 1

Chain Saw Unit 0

Crane HTC 85 ton Unit 1

Crawler Crane 80 ton Unit 1

Crane HTC 50 ton Unit 1

Crane HTC 20 ton Unit 1

TMC 7 ton Unit 1

Trailer Unit 2

1409
EQUIPMENT
Equipment & Tools Unit QTY

Forklif Unit 1

Inventer Welding Machine Unit 1

TRAVO 400 A Unit 11

Chain Block 3 Ton Unit 8

Chain Block 2 Ton Unit 6

Level Block 1,5 Ton Unit 8

Compressor 175 CFM Unit 1

1410
EQUIPMENT
Equipment & Tools Unit QTY

1411
EQUIPMENT
Equipment & Tools Unit QTY

Light Vehicle 4x4 (LV) set 1

TMC 11T set 1

Mini Loader set 1

Power Generator set 2

Gasoline Generator Set 1

Welding Machine set 2

1412
EQUIPMENT
Equipment & Tools Unit QTY

Welding Transformer set 4

Cable Jack set 4

Cable Roll Set 30

Cable Roll Set 30

Electric Bench Drill set 4

Electric Drilling Press Machine set 3

Electric High Speed Cutter set 1

Electric Hand Grinder & Cutter set 15

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hydraulic Hand Pallet set 2

Hot Marker Machine set 2

Stamp Marker Machine set 1

1413
EQUIPMENT
Equipment & Tools Unit QTY

Chain Block 2T set 3

Radio HT Comm set 15

Hot Gun set 3

1414
EQUIPMENT
Equipment & Tools Unit QTY

1415
EQUIPMENT
Equipment & Tools Unit QTY

1416
EQUIPMENT
Equipment & Tools Unit QTY

1417
EQUIPMENT
Equipment & Tools Unit QTY

1418
EQUIPMENT
Equipment & Tools Unit QTY

Sentinel 880 Ir-192 Unit 1

Vehicle Toyota Hillux Unit 1

Collimator Unit 1

Barricade Roll 1

Megaphone Unit 1

Sign Board Unit 4

Radiation Flag Pcs 30

Crank Cable Unit 1

Source Cable Unit 1

Survey Meter Unit 1

Warning Light Unit 1

MC Cleaner Can 1

1419
EQUIPMENT
Equipment & Tools Unit QTY

MC Penetrant Can 1

MC Developer Can 1

Container Office Unit 1

Fuel Tank 50 Unit 1

Fuel Truck Unit 1

Suction Pump Unit 1

Dispenser Unit 1

Fire Extinguisher 9 kg Unit 4

1420
EQUIPMENT
Equipment & Tools Unit QTY

1421
EQUIPMENT
Equipment & Tools Unit QTY

1422
EQUIPMENT
Equipment & Tools Unit QTY

1423
EQUIPMENT
Equipment & Tools Unit QTY

1424
EQUIPMENT
Equipment & Tools Unit QTY

1425
EQUIPMENT
Equipment & Tools Unit QTY

1426
EQUIPMENT
Equipment & Tools Unit QTY

1427
EQUIPMENT
Equipment & Tools Unit QTY

1428
No. Activities

1 Civil

2 Steel Structure

4 Building

5 Mechanical

6 TANK
7 PIPING

8 PIPING

9 Electrical

Total

10 Instrument
No Description

6
11 QC (NDT)

Total
12 Precomm & Comm

13 Interface

Highlight :
- Steel Structure on GEG - Need to provide Method and detail Sche
- Activities on MCR building target finish 6 of August
- Additional Heavy equipment from BNP to accelerate activities in G
- Start Piping A/g in area B600 (Sleeper)
Due date Target Today (10 August 2017)

JEC-DIRECT HIRED (FWBS 2300 : FOUNDATIO

PT. GUNA TEGUH ABADI (STEEL STRUCTURE

PT. BANGUN NUSA PERSADA (MAIN BUILDIN


- Installation suport scaffolding (8)

PT. GUNA TEGUH ABADI (MECHANICAL WOR

PT. BARATA INDONESIA (FIELD ERECTED TAN


PT. ISMA TIUR (PIPING FIELD INSTALLATION A

PT. SWADAYA GRAHA (PIPING FIELD INSTALL

PT. WIJAYA ENGINDO NUSA (ELECTRICAL - W

PT. WIJAYA ENGINDO NUSA (INSTRUMENT - W


PLAN WORK

Unit Quantity Remark


hod and detail Schedule
erate activities in GEG building
ACTIVITY
Remarks

OUNDATION WORK)

TRUCTURE ERECTION - GTA)

N BUILDING - BNP)

ICAL WORK - GTA)

ECTED TANK - BRT)


ALLATION AND PAINTING WORK UTILITY AREA - ISTI)

D INSTALLATION AND PAINTING WORK PROCESS AREA -

TRICAL - WEN)

UMENT - WEN)
ACTUAL WORK

k Unit Quantity Remark


Activity Next Day (11 August 2017)
REA - ISTI)

OCESS AREA - SWG)

Plann Activity Next Day


emark
)
No. Activities Due date Target Tod

1 Civil JEC-DIRECT HIRED (F

2 Steel Structure PT. GUNA TEGUH AB

4 Building PT. BANGUN NUSA P


- Installation suport scaffol

1450
No. Activities Due date Target Tod

5 Mechanical PT. GUNA TEGUH AB

6 TANK PT. BARATA INDONES

7 PIPING PT. ISMA TIUR (PIPING

8 PIPING PT. SWADAYA GRAHA

1451
No. Activities Due date Target Tod

9 Electrical PT. WIJAYA ENGINDO

Total

10 Instrument PT. WIJAYA ENGINDO


PL
No Description
Unit Quantity

1 Pulling Power Cable m 420

2 Install JB Support ( Relocate)

3 Install Tray Support ( Relocate)

4 Install JB Support ( Relocate)

5 Terminationn Cable at MCR-NET-001 & 002

6 Install JB Ea 3

1452
No. Activities Due date Target Tod

11 QC (NDT)

1453
No. Activities Due date Target Tod

Total

12 Precomm & Comm

1454
No. Activities Due date Target Tod

13 Interface

1455
ACTIVITY
Target Today ( August 2017) Remarks

JEC-DIRECT HIRED (FWBS 2300 : FOUNDATION WORK)

PT. GUNA TEGUH ABADI (STEEL STRUCTURE ERECTION - GTA)

PT. BANGUN NUSA PERSADA (MAIN BUILDING - BNP)


Installation suport scaffolding (8)

1456
ACTIVITY
Target Today ( August 2017) Remarks

PT. GUNA TEGUH ABADI (MECHANICAL WORK - GTA)

PT. BARATA INDONESIA (FIELD ERECTED TANK - BRT)

PT. ISMA TIUR (PIPING FIELD INSTALLATION AND PAINTING WORK UTILITY AREA

PT. SWADAYA GRAHA (PIPING FIELD INSTALLATION AND PAINTING WORK PROC

1457
ACTIVITY
Target Today ( August 2017) Remarks

PT. WIJAYA ENGINDO NUSA (ELECTRICAL - WEN)

PT. WIJAYA ENGINDO NUSA (INSTRUMENT - WEN)


PLAN WORK ACTUAL WORK

Quantity Remark Unit Quantity

1914

1458
ACTIVITY
Target Today ( August 2017) Remarks

1459
ACTIVITY
Target Today ( August 2017) Remarks

1460
ACTIVITY
Target Today ( August 2017) Remarks

1461
ACTIVITY
Remarks Activity Next Day ( August 2017)

1462
ACTIVITY
Remarks Activity Next Day ( August 2017)

WORK UTILITY AREA - ISTI)

NTING WORK PROCESS AREA - SWG)

1463
ACTIVITY
Remarks Activity Next Day ( August 2017)

ACTUAL WORK
Description
Remark

Continue Pulling cable at MCR B-300

Continue Termination at MCR B-300

1464
ACTIVITY
Remarks Activity Next Day ( August 2017)

1465
ACTIVITY
Remarks Activity Next Day ( August 2017)

1466
ACTIVITY
Remarks Activity Next Day ( August 2017)

1467
No. Activities

1 Civil

2 Steel Structure

4 Building

5 Mechanical

6 TANK
7 PIPING

8 PIPING

9 Electrical

Total

10 Instrument
No Description

1 Install support angle for cable

2 Preparation for termination at MCR-PDB

3 Pulling & Arrangement vendor cable / System Kabel at Cabinet Marshalling

11 QC (NDT)
Total

12 Precomm & Comm


13 Interface

Highlight :
- Steel Structure on GEG - Need to provide Method and detail Sc
- Activities on MCR building target finish 6 of August
- Additional Heavy equipment from BNP to accelerate activities i
- Start Piping A/g in area B600 (Sleeper)
Due date Target Today (12 August 2017)

JEC-DIRECT HIRED (FWBS 2300 : FOUNDAT

PT. GUNA TEGUH ABADI (STEEL STRUCTUR

PT. BANGUN NUSA PERSADA (MAIN BUILDI

PT. GUNA TEGUH ABADI (MECHANICAL WO

PT. BARATA INDONESIA (FIELD ERECTED T


PT. ISMA TIUR (PIPING FIELD INSTALLATION

PT. SWADAYA GRAHA (PIPING FIELD INSTAL

PT. WIJAYA ENGINDO NUSA (ELECTRICAL -

PT. WIJAYA ENGINDO NUSA (INSTRUMENT -


PLAN WORK

Unit Quantity Remark

Ea 24

Pnt 20 20

Cabinet Marshalling m 50 50
hod and detail Schedule
erate activities in GEG building
ACTIVITY
7) Remarks

0 : FOUNDATION WORK)

L STRUCTURE ERECTION - GTA)

MAIN BUILDING - BNP)

ANICAL WORK - GTA)

ERECTED TANK - BRT)


STALLATION AND PAINTING WORK UTILITY AREA - ISTI)

FIELD INSTALLATION AND PAINTING WORK PROCESS AR

ECTRICAL - WEN)

STRUMENT - WEN)
ACTUAL WORK

Remark Unit Quantity Remark

Ea 24

Pnt 20 20

m 50 50
Activity Next Day (13 August 2017)
REA - ISTI)

OCESS AREA - SWG)

Plann Activity Next Day


emark

Continue Pulling cable at MCR B-300

Continue Termination at MCR B-300


)
No. Activities

1 Civil

2 Steel Structure

4 Building

5 Mechanical

6 TANK
7 PIPING

8 PIPING

9 Electrical

Total

10 Instrument
No Description

1 Pulling Cable Sytem Cabinet to Marshalling Cabinet at MCR

2 Termination Cable System for Marshalling and System Cabine

6
11 QC (NDT)

Total
12 Precomm & Comm

13 Interface

Highlight :
- Steel Structure on GEG - Need to provide Method and detail Sche
- Activities on MCR building target finish 6 of August
- Additional Heavy equipment from BNP to accelerate activities in G
- Start Piping A/g in area B600 (Sleeper)
Due date Target Today (13 August 2017)

JEC-DIRECT HIRED (FWBS 2300 : FOUNDATIO

PT. GUNA TEGUH ABADI (STEEL STRUCTURE

PT. BANGUN NUSA PERSADA (MAIN BUILDIN


- Installation suport scaffolding (8)

PT. GUNA TEGUH ABADI (MECHANICAL WOR

PT. BARATA INDONESIA (FIELD ERECTED TAN


PT. ISMA TIUR (PIPING FIELD INSTALLATION A

PT. SWADAYA GRAHA (PIPING FIELD INSTALL

PT. WIJAYA ENGINDO NUSA (ELECTRICAL - W

PT. WIJAYA ENGINDO NUSA (INSTRUMENT - W


PLAN WORK

Unit Quantity Remark

MCR m

Cabine
hod and detail Schedule
erate activities in GEG building
ACTIVITY
Remarks

OUNDATION WORK)

TRUCTURE ERECTION - GTA)

N BUILDING - BNP)

ICAL WORK - GTA)

ECTED TANK - BRT)


ALLATION AND PAINTING WORK UTILITY AREA - ISTI)

D INSTALLATION AND PAINTING WORK PROCESS AREA -

TRICAL - WEN)

UMENT - WEN)
ACTUAL WORK

k Unit Quantity Remark


Activity Next Day (14 August 2017)
REA - ISTI)

OCESS AREA - SWG)

Plann Activity Next Day


emark
)