Vous êtes sur la page 1sur 3

CURRICULUM VITAE

PERSONAL DATA

Full Name : ABDUL LATIF


Place and Date of Birth : Palembang, 23 July 1975
Sex : Male
Present Lived Status : Married
Religion : Moslem
Nationality : Indonesia
ID Number : 6474012307750002
Passport Number : B0110353
Current Address : Jl. RE.Martadinata RT.36 No. 22 Kel. Loktuan Kec. Bontang
Utara Kota Bontang Kalimantan Timur
Mobile Phone : 0852 1870 5106 / 0852 5020 1046
Email : abdullatif.aldy@gmail.com

EDUCATION BACKGROUND

 Senior High School

WORKING EXPERIENCE

1. Company : PT. Rekayasa Industri


Periode : March, 12th 2015 up to February, 28th 2017
Project Location : SAMUR Project Sabah, Malaysia
Position : Instrument Foreman
Description : Installation Perforate Cable Tray and Junction Box, Pulling
Cable and Termination at Field Instrument, Junction Box
and Panel Instrument and Electrical

2. Company : PT. Ray Anjerrah Resources


Periode : October, 21st up to November, 22nd 2014
Project Location : Turn Around PT. Kaltim Methanol Industri Bontang, East
Kalimantan, Indonesia
Position : Instrument Technician
Description : Repair and Installation for Field Instrument and Valve

3. Company : PT. KONTROL POWER UTAMA


Periode : March, 25th up to Sept, 25th 2014
Project Location : Kaltim – 5 Project Bontang, East Kalimantan, Indonesia
Position : Instrumen QC Technician
Description : Leak Test Air Supply and Take Picture for Field Instrument
After installation

4. Company : PT. Kaltim Nusa Etika


Periode : November, 02nd up to November, 26th 2013
Project Location : Turn Around PT. Kaltim Pasifik Amoniak
Position : Electrician
Description : Sporting Job for All Activity Using Electric
5. Company : PT. KOTAMINYAK INTERNUSA
Periode : Oct, 15th 2012 up to Feb, 28th 2013
Project Location : Module I & II Cooling Water Area Reabilitiy Improvement
PT. Badak NGL Bontang, East Kalimantan, Indonesia
Position : Foreman Electrical and Instrument
Description : Installation Cable Ladder, Perforated Tray and Junction Box,
Pulling Cable and Termination, Cut Over and Demolish

6. Company : PT. KONTROL POWER UTAMA


Periode : Augt, 30th up to Oct, 25th 2012
Project Location : Coal Boiler Plant Project, PT. Pupuk Kaltim Bontang
Kalimantan Timur
Position : Technician
Description : Repair and Install MOV

7. Company : PT. Firda Makmur Abadi


Periode : May, 10th 2012 up to Augt, 16th 2012
Project Location : Proyek Pembangunan Temporary Site Office Proyek
Kaltim – 5
Position : Technician Electrical
Description : Installation Temporary MDP, Pulling Cable and Termination

8. Company : PT. KONTROL POWER UTAMA


Periode : Oct, 11th 2011 up to May, 08th 2012
Project Location : Improvement of All Conduit Installation at cooling Water
Module #2 (Electric Portion) , PT. Badak Bontang
Kalimantan Timur
Position : Technician Electrical and Instrument
Description : Installation Cable Ladder, Perforated Tray and Junction Box,
Pulling Cable and Termination, Cut Over and Demolish

9. Company : PT. Promatcon Tepatguna


Periode : June, 1st up to August, 31st 2011
Project Location : Supply and Retrofit of Badak Compressor Control Panel
(CCP)
Position : QC Electrical and Instrument Technician
Description : Continuity and Magger Cable Test

10. Company : PT. KONTROL POWER UTAMA


Periode : Dec, 26th 2010 up to Apr, 25th 2011
Project Location : Pembangunan Sarana Transportasi Bahan Baku dan Utilitas
Pabrik & Tie – In PT.KPA to PT. KNI,
Bontang Kalimantan Timur
Position : Technician II E/I
Description : Installation Perforate Tray and Conduit, Pulling Cable and
Termination
11. Company : PT. KONTROL POWER UTAMA
Periode : Nov, 05th 2010 up to Dec, 25th 2010
Project Location : Pembangunan Compressor Legature 09
Semberah, Kutai Kartanegara Kalimantan Timur
Position : Technician II Elektrik/ Instrument
Description : Installation Perforate Tray and Conduit, Pulling Cable and
Termination

12. Company : PT. Hotel Bintang Sintuk


Periode : Aug, 02nd 2008 up to Aug, 02nd 2010
Project Location : Maintenance
Position : Mechanical and Electrical Technician
Description : Maintenance

13. Company : PT. WIJAYA ENGINDO NUSA


Periode : May, 30th 2007 up to Oct, 23th 2007
Project Location : Tangguh LNG Project Tanah Merah Kab. Teluk Bintuni
Papua Indonesia
Position : Instrument Technician
Description : Installation Perforate Tray, Conduit and Air Supply Pipe

Your Faithfully

ABDUL LATIF

Vous aimerez peut-être aussi