Name of Work :

Proposed Outer Ring Road In Town planning scheme, Area of Urban Ring Development Corporation Ltd,Surat
TAPI RIVER BRIDGE
left approach start chainage 17700 m
bridge start chainage 17800 m
bridge end chainage 18850 m
right approach end chainage 19000 m
left approach length 100 m
right approach length 150 m
length of bridge 1050 m 50 m 21 spans
crash barrier 0.5 m
footpath 2.5 m
carriageway 11 m
median 1.2 m
total width of bridge 29.2 m
BLOCK COST ESTIMATE OF THE BRIDGE
NO ITEM L B AREA RATE AMOUNT(Rs)
1 Approaches 250 29.2 7300 15000 109500000
2 Bridge structure 1050 29.2 30660 45000 1379700000
TOTAL 1489200000
say 149 cr