The Agile Glossary of Terms

A WHITE PAPER PRovIdEd To AsPE by sTEvE dAvIs of dAvIsbAsE

www.aspe-sdlc.com toll-free: 877-800-5221


Agile Glossary
Words and terms common to agile methods

© 2010 Davisbase LLC. All Rights Reserved. Reproduction and distribution of this publication in any form without prior written
permission is forbidden. The information contained herein has been obtained from sources believed to be reliable. Davisbase dis-
claims all warranties as to the accuracy, completeness or adequacy of such information. Davisbase shall have no liability for er-
rors, omissions or inadequacies in the information contained herein or for interpretations thereof. The opinions expressed herein
1
are subject to change without notice.
Acceptance Criteria The specific criteria identified by the customer for each func-
tional requirement. The acceptance criteria, written in easily
to understand terms and from the customerʼs perspective,
provides additional detail into how a feature should work and
assesses the ability of the feature to perform its intended
function.

Actual Time A time-based method of estimating development work. The


Estimation intent of this method is to best approximate the amount of
time required to complete a given development task. Gener-
ally, these estimates are calculated using Ideal Engineering
Hours.

Examples:
This task will be complete in 10 days. Or...
This task will be complete by January 10th. Or...
This task will require 25 development hours for completion.

Agile Often used as the abbreviation for Agile Software Develop-


ment or Agile Methods. Agile is a generic term which refers
to a collection of light weight software development method-
ologies that value and support evolving requirements through
iterative development, direct Customer/Developer communi-
cation and collaboration, self organizing cross-functional
teams, and continuous improvement through frequent in-
spection and adaption.

The Agile Glossary of Terms -2 - Provided by Davisbase


Agile Manifesto A statement of the principles and values that support the ide-
als of Agile Software Development. The manifesto was
drafted in February 2001 at the Snowbird Ski Resort located
in the state of Utah. Users of agile can become signatories
of this manifesto at http://www.agilemanifesto.org.

The Agile Manifesto


We are uncovering better ways of developing software by doing it and
helping others do it. Through this work we have come to value:

• Individuals and interactions over processes and tools


• Working software over comprehensive documentation
• Customer collaboration over contract negotiation
• Responding to change over following a plan

That is, while there is value in the items on the right, we value the items
on the left more.

AgileUP Short for Agile Unified Process, it refers to a simplified ver-


sion of the IBM Rational Unified Process (RUP). Much like
RUP, AgileUP is an iterative process, that utilizes several ag-
ile techniques and ideas for the purpose of developing busi-
ness applications. The most noticeable difference between
the two processes is that AgileUP only defines 7 key disci-
plines to RUPʼs 9. Those disciplines are:

1. Model.  The goal of this discipline is to understand the business


of the organization, the problem domain being addressed by the
project, and to identify a viable solution to address the problem
domain.
2. Implementation.  The goal of this discipline is to transform your
model(s) into executable code and to perform a basic level of
testing, in particular unit testing.
3. Test.  The goal of this discipline is to perform an objective
evaluation to ensure quality. This includes finding defects, vali-
dating that the system works as designed, and verifying that the
requirements are met.
4. Deployment.  The goal of this discipline is to plan for the delivery
of the system and to execute the plan to make the system avail-
able to end users.
5. Configuration Management.  The goal of this discipline is to
manage access to your project artifacts. This includes not only
tracking artifact versions over time but also controlling and man-
aging changes to them.

The Agile Glossary of Terms -3 - Provided by Davisbase


AgileUP 6. Project Management.  The goal of this discipline is to direct the
(cont.) activities that takes place on the project. This includes managing
risks, directing people (assigning tasks, tracking progress, etc.),
and coordinating with people and systems outside the scope of
the project to be sure that it is delivered on time and within
budget
7. Environment. The goal of this discipline is to support the rest of
the effort by ensuring that the proper process, guidance (stan-
dards and guidelines), and tools (hardware, software, etc.) are
available for the team as needed.

Application Lifecycle Often abbreviated as ALM, it is generally used in reference to


Management tools that help facilitate the coordination of business man-
agement and software engineering practices by integrating
features related to requirements management, architecture
management, coding, testing, defect tracking and release
management into a single solution.

Burn Down Chart A burn down chart is a simple, easy to understand graphical
representation of “Work Remaining” versus “Time Remain-
ing”. Generally, “Work Remaining” will be represented on the
vertical axis while “Time Remaining” is displayed along the
horizontal axis. Burn down charts are effective tools for
communicating progress and predicting when work will be
completed. The burn down chart is also an effective means
for teams to make adjustments in order to meet product/
project delivery expectations.

Cadence Cadence, by definition is a noun that represents the flow or


rhythm of events and the pattern in which something is expe-
rienced. In verb form, it is used to describe the idea of mak-
ing something rhythmical. Cadence is something that agile
teams strive to achieve as it allows teams to operate effi-
ciently and sustainably within the iterative cycles that most
agile methods promote. In its simplest form, cadence allows
agile teams to focus on development and delivery of the
product rather than on process.

The Agile Glossary of Terms -4 - Provided by Davisbase


Capacity The measurement of how much work can be completed
within a given, fixed time frame by estimating the number of
available, productive work hours for an individual or team. To
accurately estimate capacity, it is important to factor in all
known variables such as meetings, holidays and vacations,
as well as the effects of multi-tasking and normal administra-
tive tasks.

Chickens and Pigs From the popular Chickens and Pigs story by Ken Schwaber
(see below). A “Chicken” is used to describe someone who,
while involved in the process or project, is not committed and
accountable for any specific deliverables. Chickens are often
interested stake holders, managers and executives. As
these individuals are not directly involved or accountable, it is
encouraged that Chickens participation in the process is lim-
ited observation only. A “Pig”, however, is an individual who
is committed as they are directly accountable for specific pro-
ject and product deliverables. Pigs are encouraged to wholly
participate in the process as they will be accountable for the
expectations set by their involvement and estimates.

The Chicken and Pig Story

A pig and a chicken are walking down a road. The chicken looks at the
pig and says, “Hey, why donʼt we open a restaurant?” The pig looks back
at the chicken and says, “Good idea, what do you want to call it?” The
chicken thinks about it and says, “Why donʼt we call it ʻHam and Eggsʼ?”
“I donʼt think so,” says the pig, “Iʼd be committed, but youʼd only be in-
volved.”

Complexity Points Complexity points are units of measure, based on relative


sizing, used to estimate development work in terms of com-
plexity and/or size, versus traditional time based methods
which attempt to measure the duration of time required to
complete some unit of work. Complexity Points are similar to
ʻStory Pointsʼ (see Story Points) but the scale used for com-
plexity points may vary based on the differences in imple-
mentation of this sizing approach.

The Agile Glossary of Terms -5 - Provided by Davisbase


Continuous Integration The practice of continuously integrating new development
code into the existing codebase. Continuous integration al-
lows the development team to ensure that the code reposi-
tory always reflects the latest working build of the software.
As developers complete the coding of a feature, the feature
is applied to the latest software build where it is validated for
defects and integrated into the codebase previously deliv-
ered. Continuous integration practices generally include test-
ing and build automation, resulting in an end-to-end integra-
tion suite.

Crystal Crystal (sometimes referred to as Crystal Clear) is a light-


weight, agile software development framework developed
originally by Alistair Cockburn. Crystal, as a basic matter of
principle, is primarily focused on the collaboration and inter-
actions between teams of people rather than the processes
and artifacts of traditional methodologies. Crystal methods
value:

• Frequent delivery of working software


• Continuous, reflective improvement
• Osmotic communication via team colocation
• Technical excellence by utilizing automated testing, configuration
management and frequent integration

Customer Unit The Customer Unit refers to the people and roles that define
and/or represent the voice and expectations of the primary
consumers of the deliverables produced throughout the
course of the project. Product Managers, Sales, Marketing,
Executives and End-User Customers are all examples of
roles and titles that often comprise the Customer Unit. In ag-
ile projects, the Customer Unit is typically responsible for set-
ting the vision, project charter & roadmap, creating and main-
taining product backlog requirements and priorities, defining
user acceptance criteria and communicating with the Devel-
oper Unit.

The Agile Glossary of Terms -6 - Provided by Davisbase


Daily Scrum The Daily Scrum, also referred to as ʻthe daily stand-upʼ, is a
brief, daily communication and planning forum, in which
Agile/Scrum teams come together to evaluate the health and
progress of the iteration/sprint. It is also considered to be the
fifth and final level of the agile planning process. As a daily,
team planning meeting, an effective daily scrum should be a
tightly focused and time boxed meeting that occurs at the
same time and place, on a daily basis. The intent of the daily
scrum is to better understand the progress of the iteration, by
all contributing team members honestly answering the follow-
ing three questions:

1. What did I accomplish yesterday?


2. What will I commit to, or complete, today?
3. What impediments or obstacles are preventing me from meeting
my commitments?

Conversation in these meetings should remain focused on


answering these three questions only. For the sake of brev-
ity and greater team efficiency, additional discussion stem-
ming from these three questions should be handled inde-
pendently of the daily scrum, and should be limited to those
team members who are directly involved.

Demo At the end of each iteration, the development unit performs a


(Demonstration) demo of the functionality completed during the iteration. The
demo is a forum for the customer to provide feedback on the
productʼs development to influence the evolution of the prod-
uct.

Developer Unit The Developer Unit refers to the people that are responsible
for delivering working software that meets requirements by
collaborating with the customer throughout the development
lifecycle. Typically, the Development Unit is comprised of in-
dividuals fulfilling the technical roles of development (devel-
opers, QA, tech writer, project manager, DBA and others),
working together in one or more, cross-functional agile
teams. In agile projects, the developer unit is responsible for
estimating the backlog, working with the customer unit to
plan the iterations, iteration execution, demonstration, and
ultimate delivery of working software.

The Agile Glossary of Terms -7 - Provided by Davisbase


Dynamic Systems Often abbreviated as DSDM, it is another example of a light-
Development Method weight, agile software development methodology. DSDM is
an iterative and incremental approach that is largely based
on the Rapid Application Development (RAD) methodology.
The method provides a 4 staged/phased framework consist-
ing of:

1. Feasibility & Business Study


2. Functional Model / Prototype Iteration
3. Design and Build Iteration
4. Implementation

Within each of the different phases, DSDM relies on several


different activities and techniques that are all based on the
following key, underlying principles:

• Projects best evolve through direct and co-located collaboration


between the developers and the users.
• Self managed and empowered teams must have the authority to
make time sensitive and critical project level decisions.
• Design and Development is incremental and evolutionary in na-
ture and is largely driven by regular and iterative user feedback.
• Working software deliverables are defined as systems that ad-
dress the critical and current business needs versus systems that
address less critical and future needs.
• Frequent and incremental delivery of working software is valued
over infrequent delivery of perfectly working software.
• All changes introduced during development must be reversible.
• Continuous integration and QA Testing is conducted in-line,
throughout the project lifecycle.
• Visibility and transparency is encouraged through regular com-
munication and collaboration amongst all project stakeholders.

Epic Stories Epic stories are user stories whose scope is so large as to
make them difficult to complete in a single iteration or accu-
rately estimate the level of effort to deliver. Epic stories,
while common when first defining the product backlog (see
product backlog), should be decomposed into smaller user
stories where the requirements of the story are defined much
more narrowly in scope.

The Agile Glossary of Terms -8 - Provided by Davisbase


eXtreme Programing Often abbreviated as XP, it is a popular example of a light-
weight, agile software development method. XP seeks to
improve software quality by focusing on technical excellence,
while improving project agility and responsiveness to chang-
ing requirements by valuing small yet frequent, time-boxed
releases. XP provides a basic framework for managing pro-
jects based on the following key values:

• Communication: The most effective way to communicate re-


quirements is by direct communication between the user and the
developer
• Simplicity: Focus only on building the simplest solution that
meets the needs of today.
• Feedback: Inspect, adapt and evolve the system by responding
to feedback from system tests, user acceptance tests and team
input.
• Courage: By having the courage to refactor in the future, we can
focus on only building what we need today.
• Respect: Do no harm to others by striving for the highest degree
of quality in the solutions you build today.

Feature Based Feature based planning is an approach used in release plan-


Planning ning, where features and scope take priority over date. Re-
lease plans (see Release Planning) created utilizing this ap-
proach are created by estimating the amount of time that will
be required to complete a certain defined amount of scope.
Often this approach is utilized for new product launches
where a minimal or critical amount of feature/function must
be delivered in order for the completed product to be consid-
ered market worthy.

Feature Driven Feature driven development, or FDD, is an example of a


Development lightweight, agile approach to development. Like many other
agile methods, FDD seeks to deliver valuable, working soft-
ware frequently in an iterative manner. FDD utilizes an in-
cremental, model driven approach that is based on the fol-
lowing 5 key activities:

• Develop the overall model: Define the high level technical and
functional architecture and project vision.
• Build the Feature List: Define the individual features that are
required to meet the needs of the defined model.

The Agile Glossary of Terms -9 - Provided by Davisbase


Feature Driven • Plan by Feature: Create the actual working development plans
Development by grouping the defined requirements into feature groups or
(cont) themes.
• Design by Feature: Based on the feature based plans, design
packages are created that seek to group together small feature
sets that can be developed within 2 week, iterative periods.
• Develop by Feature: Development feature teams, execute
against the design packages and promote completed and tested
code to the main build branch within the 2 week, time-boxed it-
eration.

Feature Teams Feature teams are small, cross-functional teams of develop-


ment resources, focused on designing and building specific
feature groupings or areas of system functionality. The fea-
ture team concept is utilized by FDD and other agile meth-
ods.

Fibonacci Sequence Discovered in the 12th century by Leonardo Pisano, the Fi-
bonacci sequence is a mathematically recursive sequence, in
which the result of each subsequent term is determined by
the sum of the two previous terms. A classic example of this
concept is illustrated in the following string of numbers:

1, 1, 2, 3, 5, 8, 13, 21...

Using this example above, 1+1=2, 1+2=3, 2+3=5 and so on.


The Fibonacci sequence serves as the basis of popular agile
estimating technique known as Planning Poker.

Five Levels of Agile The five levels of Agile planning are Vision, Roadmap, Re-
Planning lease, Iteration (or Sprint), and Daily. The top level (Vision)
represents the “big picture” of the overall effort and thus the
planning at this level encompasses more strategic product
information and less details on the product specifics. Work-
ing through to the bottom level, more details are included in
the produced plans, so that in whole, the five levels of Agile
planning represents a holistic understanding of what we are
building, why we are undertaking the effort, and how we plan
to deliver.

The Agile Glossary of Terms - 10 - Provided by Davisbase


Ideal Hours Ideal hours is a concept often used when applying time
based estimates to development work items. Ideal time is
the time it would take to complete a given task assuming
zero interruptions or unplanned problems. Many time based
estimation methods utilize this time scale when planning and
estimating. Considering the grossly optimistic assumptions
this approach takes, the accuracy of ideal estimates are of-
ten inversely proportional to the duration of the estimate.

INVEST (acronym) Coined by Bill Wake in eXtreme Programing Explored, IN-


VEST is an acronym that defines a simple set of rules used
in creating well formed User Stories.

• Independent: Stories should not be dependent on other stories.


• Negotiable: Too much explicit detail regarding particulars and
solutions. Stories should capture the essence of the requirement
and should not represent a contract on how to solve it.
• Valuable: Stories should clearly illustrate value to the customer.
• Estimable: Stories should provide just enough information so
they can be estimated. It is not important to know the exact way
that a particular problem will be solved, it must be understood
enough to provide a high level estimate.
• Small: Stories should strive to be granular enough in scope that
they may be completed in as little time as possible, from a few
weeks to a few days.
• Testable: Stories need to be understood well enough so that a
test can be defined for it. An effective way to ensure testability is
to define user acceptance criteria for all user stories.

Iteration Often also referred to as a Sprint, an iteration is a pre-


defined, time-boxed and recurring period of time in which
working software is created. The most commonly used itera-
tion durations are 2, 4 and 6 week periods. The iteration
level is also considered to be the fourth level in the five level
agile planning process.

Note: The terms Sprint and Iteration are synonyms and are effectively
interchangeable. The term sprint is widely used by teams that identify
their agile approach as Scrum, whereas iteration is a more generic term
used in the same manner.

The Agile Glossary of Terms - 11 - Provided by Davisbase


Iteration Backlog Often also referred to as the Sprint Backlog, the iteration
backlog is a subset of user stories from the product backlog,
that contains the planned scope of a specific iteration. Gen-
erally, the iteration backlog reflects the priority and order of
the release plan and product roadmap.

Iteration Execution Often also referred to as Sprint Execution, the recurring


phase within the project lifecycle in which the agile team
executes against the iteration backlog. The goal of this phase
is to complete all iteration commitments by delivering working
software within the defined time constraints of the iteration.
Typically, the iteration execution phase begins with the itera-
tion kickoff and culminates with the iteration review.

Iteration Plan Often also referred to as the Sprint Plan, the iteration plan is
the detailed execution plan for a given (usually current) itera-
tion. It defines the iteration goals and commitments by speci-
fying the user stories, work tasks, priorities and team mem-
ber work assignments required to complete the iteration.
The iteration plan is normally produced by the entire devel-
opment unit during the iteration planning session.

Iteration Review Often also referred to as Sprint Review, the iteration review is
an important communication forum that occurs at the end of
an iteration. During the iteration review an agile team will
evaluate and agree on which stories have been completed
and which stories need to be deferred or split. The iteration
review is an event that generally signifies the closing of an
iteration.

The Agile Glossary of Terms - 12 - Provided by Davisbase


Kano Analysis Developed by Professor Noriako Kano, it is a method used
for classifying and categorizing requirements (user stories)
based on their impact to customer satisfaction. The Kano
Analysis model utilizes four categories into which each re-
quirement can be classified. Those categories are:

• Must Have/Must Be: Baseline features, functional barriers to


entry. Without these features customers wonʼt use the product.
• Satisfiers: These are the features that a customer will generally
expect and make the difference between a satisfying user expe-
rience versus one that is simply adequate. The more satisfiers
the better.
• Exciters and Delighters: These are the features that ʻdelightʼ
your customers, they love your product because of these fea-
tures. Generally these are product differentiators.
• Dissatisfiers: These are features that customers do not want
and should not be delivered. Dissatisfiers emerge as a backlog
ages and better ideas are identified and delivered.

Lean Software Lean Software Development, which is rooted in the Lean


Development Manufacturing techniques developed by Toyota, is another
popular example of a lightweight agile approach to product
development. Much like other agile methods, Lean attempts
to address the shortcomings of traditional software project
management methods by focusing on people and effective
communication. Lean is further defined by the following
seven key principles:

• Eliminate Waste: Understand your customers needs and seek


to deliver solutions that address only those needs as simply as
possible.
• Create Knowledge: Create a team based environment in which
all individual participate in the design and problem-solving proc-
ess. Create a culture that encourages constant improvement
through regular inspection and adaptation.
• Build Quality In: Embrace re-factoring and test automation and
test driven development. Understand your test requirements and
plans before you begin coding.
• Defer Commitment: Avoid dependencies by embracing loose
coupling. Maximize flexibility by narrowly defining requirements
and schedule irreversible decisions to the last possible moment.
• Optimize the Whole: Focus on the entire value stream. Under-
stand that a completed product is the sum of the all the various
contributors and the result of effective collaboration.

The Agile Glossary of Terms - 13 - Provided by Davisbase


Lean Software • Deliver Fast: Reduce risk and volatility by limiting scope.
Development Commit only to work for which you have the capacity to com-
plete. Decompose work to discrete actionable tasks and release
(cont.)
work often and iteratively.
• Respect People: Trust that your people know best how to do
their jobs and empower them to make the decisions needed to
complete their commitments.

Meta-Scrum The Meta-Scrum is a communication forum that is often used


in larger projects that scale across multiple agile teams, for
the purpose of coordinating resources and dependencies.
Generally, this planning forum will involve the product own-
ers, project managers, and scrum masters.

MoSCoW MoSCow is a feature classification/categorization method,


rooted in rapid application development, that is commonly
utilized in agile projects. The method is intended for short,
time-boxed development iterations where focus should re-
main on those items that are deemed most critical for deliv-
ery within the time-boxed period. MoSCoW itself is a modi-
fied acronym, that represents 4 different levels of priority
classification.

• Must Have - These are time critical project requirements that


must be delivered in order for the project not to be considered an
outright failure. These are generally baseline, or critical path fea-
tures.
• Should Have - These are also critical project level requirements,
however they are not as time critical as Must Have requirements.
• Could Have - These are considered to be the Nice to Have re-
quirements. Features that are not necessarily required for the
success of the iteration or project, but features that would in-
crease end-user/customer satisfaction in the completed product.
• Wonʼt Have - These are lowest priority requirements that will not
be scheduled or planned within the delivery time box.

Paired Programming A programming technique where two developers work to-


gether at a single workstation on the development of a single
feature. Paired programming allows for better review of the
code as it is created and also allows one developer to con-
sider the strategic direction of the feature while the other
produces the code. Paired programming often yields higher
quality code and can allow for cross-training opportunities
among team members of differing skill levels.

The Agile Glossary of Terms - 14 - Provided by Davisbase


Persona A fictional character that is created to represent the attributes
of a group of the productʼs users. Personas are helpful tools
to use as a guide when deciding on a productʼs features,
functionality, or visual design. Personas allow a team to eas-
ily identify with a fictional version of the productʼs end users.

Planning Game A planning meeting with the goal of selecting user stories for
a release or iteration. The user stories selected for inclusion
in the iteration or release should be is based on which user
stories will deliver the highest value to the business given
current development estimates.

Planning Poker Planning poker is a team based exercise that is commonly


used for assigning relative estimate values to user stories/
requirements to express the effort required to deliver specific
features or functionality. The game utilizes playing cards,
printed with numbers based on a modified fibonacci se-
quence (0,1/2, 1, 2, 3, 5, 8, 13, 20, 40, 100). Equipped with
playing cards, all members of the development unit team and
the product owner meet together to discuss product backlog
requirements for the purpose of reaching a consensus based
estimate. The rules of the game are as follows:

1. The team and the product owner select from the backlog a re-
quirement that all agree is small enough in size and complexity to
be considered a 2. This becomes the the baseline requirement.
2. With the baseline requirements selected, the product owner se-
lects a requirement from the backlog and describes it greater
detail, allowing the team to ask any clarifying questions. Discus-
sion regarding the requirement should be limited in time to 5-8
minutes.
3. Once everyone on the team is satisfied with the details, each
player pulls a numbered card from their deck that they feel best
represents the current requirements size and complexity relative
to the baseline requirement or other known, estimated require-
ments. This card is placed face down.
4. Once all the players have made their selection, all cards are
turned face up and revealed to the group.
5. Those players with high and/or low estimates are asked to justify
their selection by discussing with the team.
6. After the outliers have justified their selections, the team repeats
the estimation process until group consensus achieved.
7. This process is repeated as much as needed in order to score all
requirements from the backlog.

The Agile Glossary of Terms - 15 - Provided by Davisbase


Product Backlog The product backlog is a prioritized and estimated list of all
outstanding product/project requirements, features, defects
and other work items. The product backlog is typically
owned and managed by the product owner who reviews it on
a regular cadence to ensure that the development unit is fo-
cusing on the completion of those items that represent the
highest impact on the overall product value.

Product Owner Often referred to as the “Voice of Customer” on agile projects


or the “Product Manager” on traditional projests, the product
owner is the person responsible for communicating the cus-
tomer requirements. While considered part of the customer
unit, the product owner role is critical to the success of an
agile product development effort. In addition to communicat-
ing requirements, the product owner is responsible for defin-
ing user acceptance criteria for requirements, prioritizing and
managing the product backlog, as well as collaborating with
the development unit throughout the iterative development
cycle.

Rapid Application Rapid application development, often abbreviated simply as


Development RAD, is a software development methodology that favors
rapid and iterative prototyping in lieu of detailed and compre-
hensive plans, and is often considered an example of agile
development methods. RAD promotes a highly collaborative,
team based approach to developing software, by evolving
requirements through frequent and iterative delivery of work-
ing prototypes.

Rational Unified Created by Rational Software (which was later acquired by


Process IBM), the Rational Unified Process (RUP) is an iterative de-
velopment process that seeks to increase development agil-
ity by providing a flexible, best practice based life cycle man-
agement framework. RUP prescribes the utilization of 9 key
disciplines extended across 4 main project phases. Those
phases are:

The Agile Glossary of Terms - 16 - Provided by Davisbase


Rational Unified 1. Inception Phase
Process 2. Elaboration Phase
(cont.) 3. Construction Phase
4. Transition Phase

The 9 key disciplines are as follows:

1. Model.  The goal of this discipline is to understand the business


of the organization, the problem domain being addressed by the
project, and to identify a viable solution to address the problem
domain.
2. Requirements. The goal of this discipline is to elicit stakeholder
feature/function requirements in order to define the scope of the
project.
3. Analysis and Design. The goal of this discipline is the define
the requirements into actionable and executable designs and
models.
4. Implementation.  The goal of this discipline is to transform your
model(s) into executable code and to perform a basic level of
testing, in particular unit testing.
5. Test.  The goal of this discipline is to perform an objective
evaluation to ensure quality. This includes finding defects, vali-
dating that the system works as designed, and verifying that the
requirements are met.
6. Deployment.  The goal of this discipline is to plan for the delivery
of the system and to execute the plan to make the system avail-
able to end users.
7. Configuration Management.  The goal of this discipline is to
manage access to your project artifacts. This includes not only
tracking artifact versions over time but also controlling and man-
aging changes to them.
8. Project Management.  The goal of this discipline is to direct the
activities that takes place on the project. This includes managing
risks, directing people (assigning tasks, tracking progress, etc.),
and coordinating with people and systems outside the scope of
the project to be sure that it is delivered on time and within
budget.
9. Environment. The goal of this discipline is to support the rest of
the effort by ensuring that the proper process, guidance (stan-
dards and guidelines), and tools (hardware, software, etc.) are
available for the team as needed.

The Agile Glossary of Terms - 17 - Provided by Davisbase


Refactoring Refactoring refers to the process of modifying and revising
development code in order to improve performance, effi-
ciency, readability, or simplicity without affecting functionality.
As agile methods advocate simplicity in design, solving only
the problems that exist today and technical excellence
through continuous improvement, code refactoring is some-
thing that should be embraced by teams and made part of
the normal development process. Refactoring is often seen
by management as an investment in the value of longevity
and adaptability of the product over time.

Regression Test A test completed to validate previously completed and tested


code. The regression test is performed in an effort to ensure
that subsequent deliveries of code segments have not cor-
rupted previously completed code. These tests are also of-
ten performed after defects are remediated to ensure that the
fixes have not corrupted any other portion of the software.

Relative Estimation Relative estimation is a software estimation technique that


attempts to size development requirements and work items
not in terms of time or duration, but rather in terms of size
and complexity relative to the size and complexity of other
known requirements and work items. Relative estimation is
commonly used in agile development methods, and forms
the basis of the planning poker estimation game.

Release Plan A release plan is a document that further distills the roadmap
by describing all of the anticipated activities, resources, and
responsibilities related to a particular release, including the
estimated duration of that release. Unlike in traditional wa-
terfall managed projects, agile methods seek to ensure the
highest degree of plan accuracy by encouraging regular and
iterative re-planning based on actual iteration results. Addi-
tionally, release planning is considered to be the third level in
the five level agile planning process.

The Agile Glossary of Terms - 18 - Provided by Davisbase


Retrospective By dictionary definition, retrospective refers to process of
looking back on, and/or contemplating the past. In agile
methods, a retrospective is a communication forum in which
agile teams come together to celebrate team successes and
to reflect on what can be improved. The goal of the meeting
is to develop a plan that the team will use to apply lessons
learned going forward. Unlike in traditionally managed pro-
jects where these meetings (often called “post mortems” or
“lessons learned” meetings) are typically held at the conclu-
sion of a project, agile methods advocate a more regular and
iterative approach, and encourage scheduling these meet-
ings at the conclusion of each and every iteration. Retro-
spectives are an immensely powerful tool and are extremely
useful in fostering an environment of continuous improve-
ment.

Roadmap The roadmap (or product roadmap) is a document that fur-


ther distills the product vision as defined in the product char-
ter into a high level plan. Commonly, the roadmap will at-
tempt to outline project work that spans one or more re-
leases, by grouping requirements into prioritized themes and
estimating the execution schedule against said themes. Ad-
ditionally, roadmap is considered to be the second level in
the five level agile planning process.

Schedule Based Schedule based planning is an approach used in release


Planning planning, where date and schedule take priority over features
and scope. Release plans created utilizing the approach are
are created by estimating the amount of scope that can be
completed within defined release time box.

The Agile Glossary of Terms - 19 - Provided by Davisbase


Scrum Scrum is a incremental and iterative software development
framework, and is arguably one of the most commonly used
agile methods. Unlike other agile methods, scrum is not an
acronym. The method was coined as such by Hirotaka
Takeuchi and Ikujiro Nonaka in a HBR article titled ʻThe New
Product Development Gameʼ written in 1986, in reference the
sport of rugby. The process involved was developed by Ken
Schwaber and Dr. Jeff Sutherland.

Scrum outlines a process framework in which Product Own-


ers, Scrum Masters and Team Members, all work together
collaboratively to define product and sprint backlogs that are
executed in short, time-boxed iterations that are called
sprints. At the end of each sprint, a working increment of the
software is delivered/demonstrated to the product owner and
the entire process repeats itself.

Scrum Master A key role in the Scrum product development framework, the
Scrum Master is the person who is primarily responsible for
facilitating all scrum meetings, removing team impediments,
protecting teams from external distractions, keeping the team
honest and on-track to ensure that the team is best able to
deliver against the sprint goals. As scrum teams are self-
organizing and self-managed, it is important to differentiate
between a Scrum Master and a traditional manager. Rather
than attempt to manage the scrum team, effective Scrum
Masters work for the team, and are often best described as
servant-leaders. Although many Scrum Masters were once
traditional project managers, Scrum Masters focus on
achieving the best performance from the product team and
holding the team accountable to their commitments.

The Agile Glossary of Terms - 20 - Provided by Davisbase


Scrum of Scrums Similar in intent to the Daily Scrum (or Daily Stand Up), the
Scrum of Scrums is a daily communication forum commonly
used in larger projects utilizing multiple scrum teams. As
more teams are introduced, the likelihood of intra-team im-
pediments due to overlapping work and dependencies in-
creases. The Scrum of Scrums is an effective way of man-
aging these impediments. Typically, this meeting occurs after
all of the individual team scrum meetings have been com-
pleted. An individual from each scrum team (usually the
scrum master) is tasked with representing the scrum team in
this meeting.

The agenda of this meeting is virtually identical to that of the


daily scrum, other than the three questions are modified
slightly to better reflect the focus on teams.

1. What did my team accomplish yesterday?


2. What will my team commit to, or complete, today?
3. What impediments or obstacles are preventing my
team from meeting itʼs commitments?

Single Done Definition Single Done Definition is a concept that attempts to address
the phenomena where the number of different interpretations
of the word “doneʼ is equally proportional to the number of
individuals and roles found in an agile team. Understanding
that progress is measured in terms of delivered, working
software, and that team credit for iteration commitments is
only realized when said commitments are fully completed, it
becomes clear that a common team understanding of
“completed” is required. By explicitly defining and
documenting all of the various elements that must be
completed before a work item can be considered “done”, the
likelihood of delivering working software is improved as
teams ensure a consistent and common understanding of
“done” as it pertains to team iteration commitments.

The Agile Glossary of Terms - 21 - Provided by Davisbase


Sprint Often also referred to as an Iteration, a sprint is a pre-
defined, time-boxed and recurring period of time in which
working software is created. The most commonly used sprint
durations are 2, 4 and 6 week periods. The sprint level is
also considered to be the fourth level in the five level agile
planning process.

Note: The terms Sprint and Iteration are synonyms and are effectively
interchangeable. The term sprint is widely used by teams that identify
their agile approach as Scrum, whereas iteration is a more generic term
used in the same manner.

Sprint Backlog Often also referred to as the Iteration Backlog, the sprint
backlog is a subset of user stories from the product backlog,
that contains the planned scope of a specific iteration. Gen-
erally, the iteration backlog reflects the priority and order of
the release plan and product roadmap.

Sprint Plan Often also referred to as the Iteration Plan, the sprint plan is
the detailed execution plan for a given (usually current) itera-
tion. It defines the iteration goals and commitments by speci-
fying the user stories, work tasks, priorities and team mem-
ber work assignments required to complete the iteration.
The Sprint Plan is normally produced by the entire develop-
ment unit during the sprint planning session.

Sprint Review Often also referred to as Iteration Review, the sprint review is
an important communication forum that occurs at the end of
a sprint. During the sprint review an agile team will evaluate
and agree on which stories have been completed and which
stories need to be deferred or split. The sprint review is an
event that generally signifies the closing of a sprint. Often
times, teams will also use the sprint review as a forum to
demonstrate the work that was completed within the sprint.

The Agile Glossary of Terms - 22 - Provided by Davisbase


Story Points Story points are unit-less measures of relative size assigned
to requirements for functionality. Story points are assigned
by the entire team utilizing the planning poker exercise.
Story points allow the team to focus on the pure size and
complexity of delivering a specific piece of functionality rather
than trying to perfectly estimate a duration of time required
for the completion of the functionality.

Story Review The story review forum, is a brief meeting that occurs prior to
the start of new iteration and is attended by the product
owner and development team. The intent of this meeting is
to give teams a better understanding regarding upcoming
stories/requirements so that they may be better prepared for
the iteration planning meeting. Generally, story review
meetings are between an hour or two in length and are
scheduled about one week prior to the upcoming iteration
planning/kickoff meeting.

Sustainable Pace The concept that developers should not work an excessive
number of hours due to the possibility of “developer burnout.”
Reflects studies that have determined the team productivity
greatly decreases when teams work in excess of 40 hours
per week. Teams working at a sustainable pace are more
effective in accurately predicting their capacity over time
while also maintaing the quality of their deliverables.

Task Boards Task boards are visual communication and planning tools
that are extremely useful for teams working in co-located
environments. Typically, task boards take the form of a
simple matrix, utilizing different work states (examples: not
started, in progress, QA ready, completed) as column
headers, and User Story Cards as the row headers. Within
the matrix are the discrete tasks that describe the work
required to complete a story. As the iteration progresses,
tasks should move from one end of the task board to the
other, through all of the various states. Due to their intuitive
and simple nature, tasks boards provide a powerful means of
measuring and communicating iteration health and progress.

The Agile Glossary of Terms - 23 - Provided by Davisbase


Team Member Simply put, a team member is anyone on a scrum team who
is not a Product Owner or Scrum Master, who is responsible
for specific iteration deliverables and is accountable for
contributing to team iteration commitments and goals. A
team member may be a developer, a technical writer, an
architect, quality analyst or any other role essential to the
production and delivery of working software.

Test Automation The practice of using software to automate the testing proc-
ess. Testing automation requires up-front planning and con-
figuration of the testing software to ensure that the execution
of the test meets the expectations of the customer. Test
automation allows for more frequent regression testing with-
out increasing the resource requirements to execute the
tests.

Test Driven More a technique than an actual development methodology,


Development test driven development, often abbreviated as TDD, is a
practice that is commonly utilized in agile methods. TDD ad-
vocates the discipline of building working code, by first de-
signing and building tests that exercise how the completed
code should work, then creating the code so as to make all
the pre-defined tests pass. The idea being that if a devel-
oper first understands the tests required to validate how the
code should work and when it is complete, that developer will
be much more thoughtful and successful in designing and
developing working, quality software. While TDD promotes
the utilization of automated testing tools combined with ver-
sion and source code control tools, automation should not be
considered a strict requirement as there is still considerable
value in simply following the basic, quality driven principles of
TDD.

Unit Test A test performed by the developer to verify and validate the
code that the developer completed is fit for use. The Unit
Test is often the first level of testing that is completed as a
part of a comprehensive test approach for software devel-
opment.

The Agile Glossary of Terms - 24 - Provided by Davisbase


Use Case A use case is a document that attempts to describes system
behavior from an end-userʼs perspective, by outlining the
flow of data, system behavioral interchanges and corre-
sponding end-user interactions in a sequential, step-by-step
manner. While there is no single standard or format that they
must follow, and use cases should vary in detail based on the
needs of the requirements, uses cases often make use of the
following artifacts to describe how a system should work.

• Goal - What is end goal and desired effect of the functionality


that the use case is attempting to describe.
• Summary - A brief, high-level and easily understood description
of the use case.
• Actors - The consumers of the system that will be interacting
with the system within the scope of the use cases. Actors can be
people or other systems or services.
• Preconditions - System conditions and assumptions that must
be true for the use case to be valid.
• Triggers - The specific events required to initiate the use case.
• Body Text - The description of each of the steps involved/
required to complete the use case. Generally, body text will fo-
cus only the main (happy) path.
• Alternative Path - Steps that deviate from the main path due to
exceptions, alternative logic or other conditional events.
• Post Conditions - The changes in the system and data as a re-
sult of executing steps outlined in the use case.

User Acceptance Tests User acceptance tests describe the tests that must be suc-
cessfully executed in order to validate that specific piece of
functionality meets the needs of the user as outlined in the
customer requirements. As many agile methods advocate
the use of narrowly defined requirements that speak from a
specific userʼs perspective (i.e. user stories), it is recom-
mended that user acceptance criteria follow similar form and
define validation steps from the same user perspective. User
acceptance tests are an essential component of user re-
quirements, as without well defined acceptance criteria, it
becomes difficult to clearly define the scope of any given re-
quirement.

The Agile Glossary of Terms - 25 - Provided by Davisbase


User Roles A key ingredient in defining agile requirements, user roles are
used to describe the unique perspectives of the different
consumers that will interact with the working software. Much
like actors in a use case, user roles should not just be limited
to the human consumers of the software and should also in-
clude any other relevant external software or service.

User Stories User stories are simple, brief and concise statements, used
to describe customer software requirements, from a particu-
lar userʼs perspective. User stories are often used in agile
methods for capturing and communicating customer re-
quirements, as their short format allow for quick and easy re-
quirements gathering, and their high-level structure encour-
ages design evolution through team collaboration.

Commonly captured on 3x5 index cards so as to force brev-


ity, user stories should seek to describe requirements as
granularly as possible while still retaining customer value.
User stories are not intended to describe complex system
requirements on their own, but rather only narrow portions of
requirements singularly, and through the whole, the full sys-
tem requirements emerge.

A recommended format for users stories is as follows:

As a (user role), I would like (statement of need), so that I can (desired


benefit).
Or

As an agile student, I would like an agile glossary, so that I can under-


stand the meanings of words that I hear in training.

The Agile Glossary of Terms - 26 - Provided by Davisbase


Velocity Used in combination with relative (story point) estimation,
static teams, and fixed time-boxed iterations, velocity is a
predictive metric that is useful for long/mid term planning and
estimation. Simply put, velocity attempts to measure the
number of story points a single team can complete within a
single, time-boxed iteration. Assuming that all of the re-
quirements in a product backlog have all been estimated us-
ing a similar relative estimation point scale, it becomes pos-
sible to estimate the number of time-boxed iterations re-
quired to complete said backlog by simply dividing the team
velocity value by the sum of the backlogʼs complexity point
total.

Vision Vision is the first and highest level in the agile planning proc-
ess. Activities that are often associated with this level of
planning are the creation of project charters, feasibility stud-
ies, funding decisions, definition of project success factors/
metrics, and the formation of individual teams. Typically, vi-
sion planning is very strategic in nature and only occurs on
an annual basis.

Working Software The term used to describe the level of completeness that fea-
tures developed during an iteration should achieve by the
conclusion of the iteration. Working software implies that the
features demonstrated to the customer at the end of an itera-
tion should be functionally complete and will not require re-
development in order to prepare the functionality for a pro-
duction environment.

Used in one of the 12 Agile Principles


Deliver working software frequently, from a couple of weeks to a couple
of months, with a preference to the shorter timescale.

The Agile Glossary of Terms - 27 - Provided by Davisbase


About Davisbase
At Davisbase Consulting, our mission is simple. Helping companies develop people who develop software. Over time,
specific methods, processes and practices continue to change and evolve. Theory and academics may make for good
conversation, but when the goal is delivering real value and the prize is an improved bottom line, the importance of real
world, applied experience is paramount. At Davisbase, real world experience is what sets us apart. Our consultants
have been in the trenches for decades. We’ve lead multi-million dollar, mission critical implementations and
deployments. We’ve helped introduce multitudes of new, commercially viable products to market. We’ve held roles in
development, quality assurance and professional services, with virtually every position from developer, BA, architect and
project management, including such senior titles as Director and Vice President. We’ve worked with countless clients
both domestically and abroad, ranging in size from the smallest of startups to global Fortune 50 organizations. With
such rich and diverse backgrounds, the consultants at Davisbase Consulting have the type of practical industry
knowledge that can only be earned through years of real world practice. When the stakes are high and the margin of
error razor thin, experience is the differentiator between success and failure. Davisbase Consulting has that experience.

Davisbase consulting is a private company that has worked with all types and sizes of companies from start-ups to
Fortune 50 organizations in an effort to help them best utilize their most powerful and important resource, their people.

Davisbase Consulting
224 South Main Street
Suite 558
Springville, UT 84663
1-877-DAVIS-10
info@davisbase.org
www.davisbase.org