A=06 -27'-57"
R=400m
T=22.59m
CL=45.14m
D-29
D-28A
CURVE NO 6(RH)
300
A=06 -15'-01"
R=400m
T=21.84m
CL=43.636m
199 199
5500
5500
6959
750 1660 750 1660 750750 1750 750 1750 750 750 1750 750 1750 750750 1660 750 1660 750 GENERAL NOTES :-
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES
UNLESS OTHERWISE SPECIFIED.
2. LOADING ---------- 25T LOADING-2008.
3. DESIGN CRITERIA
i) IRS BRIDGE RULES.
ii) IRS CONCRETE BRIDGE CODE.
15. PILES ARE OF 1200 DIA BORED CAST IN SITU AND THEIR CONSTRUCTION SHALL CONFORM TO
4000 RELEVANT CLAUSE OF I.S. 2911 (PART-1/SEC-2) 1979 AND IRS BRIDGES SUB-STRUCTURE
750 1750 750 1750 750750 1660 750 1660 750
AND FOUNDATION CODE.
16. GROUND PROFILE SHOULD BE VERIFIED BEFORE EXECUTION, CHANGES IF ANY, SHOULD
5000
450
1000
1285
0
0
60
10
1050 1050
5500
450
6459
0
10
1650
300
3000 250
250
6850
540
1800
15918 950
1650
1650
250 250
450 450
1800
540
750 750 DETAILS OF
8700 TOE WALL ( A GOVT. OF INDIA ENTERPRISE )
950 3600 3600 950
SCALE 1:50
750 750
8700
RITES/KOL/DVC/MTPS/MEJIA - /2013
100,50 & 25
R.BANERJEE
FEBRUARY-/2013
RPO/KOL/
P. Pal Drawn By P.SINHA ROY
CBE DY.CE. (BR.) XEN (BR.) Sr. DEN (WEST) H.S. GHOSH T.K. BISWAS Checked By /2013
Sr. DEN (Co-Ord) GM (P)
S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./KGP. Sr. DGM (C) (D &S) Sr. DGM ( C) R.Banerjee (Design) (T.A)
S.E. RLY./KGP. RITES
RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA
/KOLKATA
TO RANIGANJ
N.H.-60
DN LINE
UP LINE
D-46
0
0
60
10
450
0
10
1650
300
250
250 ( A GOVT. OF INDIA ENTERPRISE )
540
950
DETAILS OF
TOE WALL
SCALE 1:50
RITES/KOL/DVC/MTPS/MEJIA - /2013
100,50 & 25
R.BANERJEE
FEBRUARY-/2013
RPO/KOL/
P. Pal Drawn By P.SINHA ROY
CBE DY.CE. (BR.) XEN (BR.) Sr. DEN (WEST) H.S. GHOSH T.K. BISWAS Checked By /2013
Sr. DEN (Co-Ord) GM (P)
S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./KGP. Sr. DGM (C) (D &S) Sr. DGM ( C) R.Banerjee (Design) (T.A)
S.E. RLY./KGP. RITES /KOLKATA
RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA
400 TH APPROACH SLAB x1.2m)
o27(1
RDSO DWG NO. RDSO/B-11678 BR.N
E
H.PIP
300
300
150 TH P.C.C
M-25
2220
2000 2000
500
GENERAL NOTES :-
4116 4116
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES
UNLESS OTHERWISE SPECIFIED.
2. LOADING ---------- 25T LOADING-2008.
3. DESIGN CRITERIA
750 150 TH P.C.C M25 150 TH P.C.C M25 750 150 TH P.C.C M25 i) IRS BRIDGE RULES.
3600 3600 3600 3600
8700 750 ii) IRS CONCRETE BRIDGE CODE.
750 8700 iii) IRS BRIDGE SUBSTRUCTURE AND FOUNDATION CODE.
4. CONCRETE GRADE:-
i) ABUTMENTS -------------M-35.(DESIGN MIX)
ii) PILES & PILE CAPS --------M-35.(DESIGN MIX)
iii) APPROACH SLAB ----------M-35 (DESIGN MIX).
iv) LEVELLING COURSE --------M-25.
5. HIGH YIELD STRENGTH DEFORMED BAR OF GRADE Fe-500 CONFORMING TO I.S. 1786-1986.
SHALL BE USED AS REINFORCEMENT.
6.
7. ALL DIMENSIONS AND LEVEL SHOULD BE VERIFIED & RECONCILED BEFORE EXECUTION.
8. BACK FILL SHOULD BE AS PER CLAUSE 7.5 OF IRS BRIDGE SUB STRUCTURE CODE.
9. WEEP HOLES SHALL BE OF 75/100 DIA PVC PIPES STAGGERED @ 1000 C/C BOTH HORIZONTALLY
AND VERTICALLY THROUGH RETURN WALL & ABUTMENT.
10. DRAINAGE OF DECK SHALL BE PROVIDED 1 IN 40 (CROSS SLOPE) VIDE CLAUSE 15.2.2.1 OF IRS
CONCRETE BRIDGE 1997.
11. EXPOSURE CONDITION-MODERATE.
12. PILE LOAD TEST INITIAL AND ROUTINE SHALL BE CARRIED OUT CONFERMING TO IS: 2911
PART-IV (1985)
(i) VERTICAL LOAD TEST
(a) INITIAL LOAD TEST SHALL BE CARRIED FOR TEST LOAD OF 2.5 TIMES THE WORKING
LOAD( AS PER Cl 6.1.5 OF IS:2911 PART IV-1985 )
(b) ROUTINE LOAD TEST SHALL BE CARRIED FOR TEST LOAD OF 1.5 TIMES THE WORKING
LOAD( AS PER Cl 6.1.5.1 OF IS:2911 1985 PART IV)
(ii) HORIZONTAL LOAD TEST
(a) LATRAL LOAD TEST SHALL BE CARRIED FOR TEST LOAD OF 2.5 TIMES THE WORKING
LOAD( AS PER Cl 7.4 OF IS:2911 PART IV-1985 )
13. LOAD CARRYING CAPACITY OF PILE AS BELOW
(a) ABUTMENT -- HORIZONTAL (i) NORMAL --12t (ii) SEISMIC --15t.
(b) ABUTMENT -- VERTICAL (i) NORMAL -- 105t (ii) SEISMIC -- 110t.
(c) PIER----- HORIZONTAL (i) NORMAL --12t (ii) SEISMIC -- 9.5t.
(d) PIER----- VERTICAL (i) NORMAL-- 210t (ii) SEISMIC -- 205t.
THESE VALUES SHALL BE VERIFIED AT SITE BEFORE EXECUTION.
14. FINAL LAYOUT OF PILES AND THE LENGTH OF PILES TO BE DECIDED ON THE BASIS OF PILE
LOAD TEST RESULTS.
3600 3600
15. PILES ARE OF 1200 DIA BORED CAST IN SITU AND THEIR CONSTRUCTION SHALL CONFORM TO
RELEVANT CLAUSE OF I.S. 2911 (PART-1/SEC-2) 1979 AND IRS BRIDGES SUB-STRUCTURE
AND FOUNDATION CODE.
16. GROUND PROFILE SHOULD BE VERIFIED BEFORE EXECUTION, CHANGES IF ANY, SHOULD
2000 BE INTIMATED TO THE CONSULTANT
2000
17. 12MM THICK TARRED FELT SQUEEZED TO 6MM WILL BE USED UNDER ALL THE BED PLATES
4116 UNDER BEARING.
4116
1285
0
0
60
10
1050 1050
450
0
10
1650
600 1800 600
1800
8612
300
1650
1650
250 250
450 250 250
1800
540
540
540
RITES/KOL/DVC/MTPS/MEJIA - /2013
100,50 & 25
R.BANERJEE
FEBRUARY-/2013
RPO/KOL/
P. Pal Drawn By P.SINHA ROY
CBE DY.CE. (BR.) XEN (BR.) Sr. DEN (WEST) H.S. GHOSH T.K. BISWAS Checked By /2013
Sr. DEN (Co-Ord) GM (P)
S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./ASN. Sr. DGM (C) (D &S) Sr. DGM ( C) R.Banerjee (Design) (T.A)
S.E. RLY./GRC. S.E. RLY./ASN. RITES
RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA
/KOLKATA
C.L OF BEARING 400 TH APPROACH SLAB
C.L OF BEARING CL OF BRIDGE RDSO DWG NO. RDSO/BA-10059
STIFFENING PLATE
300X25X480
600 TH FILTER MATERIAL 150 TH P.C.C
150 THK. P.C.C M-25 (TYP) GENERAL NOTES :-
M-25
1 1
1.5 1.5
L.B.L 191.580m.
SECTION A - A
SLOPE 2 IN 1
SLOPE 1 IN 1.5
CL OF BRIDGE
BED PLATE C.L. OF BEARING
390X50X750
C.L. OF TRACK
APPROACH SLAB
BEARINGPLATE
210X50X420
C.L. OF BEARING
PEDESTAL
630X150X1050
SLOPE 1 IN 1.5
SLOPE 2 IN 1
0
0
60
10
THIS DRG. IS BASED ON R.D.S.O. STANDARD DRG. NO. RDSO/B-16014
450
0
10
1650
300
250 THIS DRAWING FOR CONSTRUCTION PURPOSE.
250
540
950
RITES/KOL/DVC/MTPS/MEJIA - /2013
100,50 & 25
R.BANERJEE
FEBRUARY-/2013
P.SINHA ROY
RPO/KOL/
P. Pal Checked By
CBE DY.CE. (BR.) XEN (BR.) Sr. DEN (WEST) H.S. GHOSH T.K. BISWAS Drawn By /2013
Sr. DEN (Co-Ord) GM (P) R.Banerjee
E. RLY./KOLKATA E. RLY./KOLKATA E. RLY./KOLKATA E. RLY./ASANSOL Sr. DGM (C) (D &S) Sr. DGM ( C) (T.A)
E. RLY./ASANSOL RITES /KOLKATA Manager (Design)
RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA
300
1500
To Plant
1620
250 250
300
540
To Raniganj
1771
SL
:1
O
950
1
PE
AN
N
TH
O
T
R
ST
DETAILS OF
PE
3500 4125
300
EE
EE
PE
ST
DROP WALL / CURTAIN WALL
T
O
TH
N
AN
PE
1
O
400
350
:1
SL
20 MM GAP
X Y
GENERAL NOTES :-
225
3000
2949
450
225
2. LEVELS ARE IN METRES.
575
350
3. ALL DIMENSIONS AND LEVELS SHOULD BE VERIFIED & RECONCILED BEFORE EXECUTION.
4. LOADING STANDARD I.R.S. 25 TONNE LOADING OF 2008.
400
350
5. FOR CONCRETE, SPECIFICATION REFER I.S. 456 -2000 & I.R.S. CONC. BRIDGE CODE.
3000
7. REINFORCEMENT SHALL BE HYSD BAR OF GRADE Fe 500 CONFORMING TO
IS: 1786-1985 AND ALL RCC SURFACE COMING IN CONTACT WITH SOIL SHOULD BE
PAINTED WITH BITUMEN OR COALTAR OF APPROVED QUALITY @ 1.464 KG/SQM.
8. CONCRETE GRADE :-
738
i) R.C.C. BOX ....................................................M-35 (DESIGN MIX.)
150
ii) ALL R.C.C. WORK ...................................M-35 (DISIGN MIX)
225
iii) ALL P.C.C. WORK ................................M-25 (NOMINAL MIX)
PLAN
1196
9. MAX. SIZE OF AGGREGATE TO BE USED IS 20 mm.
350
1500
350
10. EXPOSURE CONDITION IS MODERATE REF. C.L. NO. 5.4.1 OF I.R.S. CONCRETE BRIDGE CODE.
11. CLEAR COVER OF 50 mm.
1200
300
850
12. LAPPING OF BARS SHOULD BE MINIMISED & ALL STAGGERED WHEREVER NECESSARY
2850
MINIMUM LENGTH OF LAP SHALL BE AS GIVEN IN IRS CONCRETE CODE 50 FOR TOR
3000
STEEL, THE NUMBER & LOCATION OF LAP IS TO BE DECIDED AT SITE.
750
13. WEEP HOLES TO BE PROVIDED IN RETURN WALLS BY USING 100/75 mm. DIA PVC PIPE
225 450
@ 1000 C/C VERT. & 1000 mm.C/C HOR. IN A STAGGERED BOTHWAY.
900
1200
3500 4125 1771
1500
350
600
OF BAR.
TYP.DETAILS AT A & B 15. 600 mm. WELL HAND PACKED BOULDERS BACK FILLING TO BE PROVIDED BESIDE THE BOX
738
AND RETURN WALLS AS PER C.L 7.5 OF I.R.S BRIDGE SUBSTRUCTURE & FOUNDATION CODE.
300
450 350
3000 350
1036
1196
225
11683 17. ENGINEER-IN-CHARGE AT SITE SHOULD SATISFY HIMSELF WITH S.B.C. OF SOIL.
225
2546
350
400
18. BED SLOPE SHALL BE ADJUSTED AS PER SITE CONDITIONS BY COMPETENT AUTHORITY
BAR BENDING SCHEDULE OF BOX IT SHOULD BE KEPT MINIMUM 1 IN 100.
4396
1000
4396
19. DEPTH OF FOUNDATION SHOWN TENTATIVELY. HOWEVER, THIS MAY VARY TO SUIT SITE
SECTION ALONG THE TRACK
3190
3000
2850
400
16@200 C/C 1305 23. FOR ALIGNMENT PLAN REFER DRG. No. RITES/KOL./KBUNL. SHEET No.- OF
1200
16@200 C/C
100
300
c 1289
3600
1289
100
183
A A
183
f2 16@200 C/C
100
g1 10@200 along
240
1500
barell and
along span 100
600
1350
RITES/KOL/DVC/MTPS/MEJIA - /2012
100,50 & 25
R.BANERJEE
OCTOBER-/2012
RPO/KOL/
Drawn By P.SINHA ROY
CBE DY.CE. (BR.) XEN (BR.) Sr. DEN (WEST) P. Pal H.S. GHOSH P.K. Das Checked By /2012
Sr. DEN (Co-Ord) R.Banerjee (Design)
S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./KGP. GM (P) Sr. DGM (C) (D & S) DY. G.M ( C) (T.A)
S.E. RLY./KGP.
RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA
300
3500 6000 550 6100 550 To
Ra
nig
1620
450 an
j
225
225
738
738
261
550
550
250 250
1811
1000
540
950
4661
3850
5100
4000
20 MM GAP
2850
4550
300 DETAILS OF
750 DROP WALL / CURTAIN WALL
4000
SL
:1
550
20 MM GAP
1
PE
1200
AN
N
TH
O
T
R
ST
PE
EE
450
EE
225
PE
ST
225 450
T
GENERAL NOTES :-
TH
O
900 7002
225
N
AN
PE
1
775
:1
SL
550
2. LEVELS ARE IN METRES.
3. ALL DIMENSIONS AND LEVELS SHOULD BE VERIFIED & RECONCILED BEFORE EXECUTION.
550
4. LOADING STANDARD I.R.S. 25 TONNE LOADING OF 2008.
SECTIONAL ELEVATION AT X-Y 5. FOR CONCRETE, SPECIFICATION REFER I.S. 456 -2000 & I.R.S. CONC. BRIDGE CODE.
6. DESIGN CRITERIA :-
150
i) I.R.S. BRIDGE RULES.
ii) I.R.S. CONCRETE BRIDGE CODE.
4000
iii) I.R.S. BRIDGE SUB-STRUCTURE & FOUNDATION CODE.
300 7. REINFORCEMENT SHALL BE HYSD BAR OF GRADE Fe 500 CONFORMING TO
IS: 1786-1985 AND ALL RCC SURFACE COMING IN CONTACT WITH SOIL SHOULD BE
1500
150
iii) ALL P.C.C. WORK ................................M-25 (NOMINAL MIX)
550
10. EXPOSURE CONDITION IS MODERATE REF. C.L. NO. 5.4.1 OF I.R.S. CONCRETE BRIDGE CODE.
1200
11. CLEAR COVER OF 50 mm.
650
12. LAPPING OF BARS SHOULD BE MINIMISED & ALL STAGGERED WHEREVER NECESSARY
300 3500 6000
MINIMUM LENGTH OF LAP SHALL BE AS GIVEN IN IRS CONCRETE CODE 50 FOR TOR
225 450 STEEL, THE NUMBER & LOCATION OF LAP IS TO BE DECIDED AT SITE.
225
738
13. WEEP HOLES TO BE PROVIDED IN RETURN WALLS BY USING 100/75 mm. DIA PVC PIPE
300 @ 1000 C/C VERT. & 1000 mm.C/C HOR. IN A STAGGERED BOTHWAY.
TYP.DETAILS AT A & B
550
400
OF BAR.
550
20 MM GAP 15. 600 mm. WELL HAND PACKED BOULDERS BACK FILLING TO BE PROVIDED BESIDE THE BOX
AND RETURN WALLS AS PER C.L 7.5 OF I.R.S BRIDGE SUBSTRUCTURE & FOUNDATION CODE.
3850
4000
TABLE SHOWING BRIDGE DETAILS
17. ENGINEER-IN-CHARGE AT SITE SHOULD SATISFY HIMSELF WITH S.B.C. OF SOIL.
X Y
750
18. BED SLOPE SHALL BE ADJUSTED AS PER SITE CONDITIONS BY COMPETENT AUTHORITY
6100
6500
900
550
1200
1500
19. DEPTH OF FOUNDATION SHOWN TENTATIVELY. HOWEVER, THIS MAY VARY TO SUIT SITE
600
CONDITION & TO BE DECIDED BY THE ENGINEER-IN-CHARGE.
20. DRAWING AND DESIGN BASED ON SOIL TEST REPORT.
300
550 6100 550 21. DESIGN MAX. BERING PRESSURE AT FOUNDATION LEVEL = t/m sq.
11683 22. SEPARATE WATERWAY CALCULATION ARE NOT PROVIDED AS IT IS
BALANCING CULVERT.
550
400
23. FOR ALIGNMENT PLAN REFER DRG. No. RITES/KOL./KBUNL. SHEET No.- OF
300 CE'S DRG. No.-
20 MM GAP
24. TOLERANCES FOR FINISHED CONCRETE BRIDGE STRUCTURE SHOULD NOT EXCEED THE
SECTION ALONG THE TRACK LIMIT AS GIVEN IN CLAUSE 6.5 OF CONCRETE BRIDGE CODE.
BAR BENDING SCHEDULE OF BOX
SCALE 1:100
2495
a1 25@200 C/C 5000
2495
THIS DRG. IS BASED ON R.D.S.O. STANDARD DRG. NO. RDSO/B-10151/3
PLAN a2 12@200 C/C 1849 7100 1849
1500
7100
b 20@100 C/C
300
c 16@200 C/C 1849
7100
1849
100
300
100
d 25@100 C/C 7100
243
100
A A f1 25@200 C/C 2021
100
350 243
B
B 243
f2 25@200 C/C 2021
750
900
243
1500
100
g1 10@200 along
440
600
1350
barell and
along span 100
300
C C
g2 10@200 along 100
400
RITES/KOL/DVC/MTPS/MEJIA - /2012
100,50 & 25
R.BANERJEE
OCTOBER-/2012
RPO/KOL/
Drawn By P.SINHA ROY
CBE DY.CE. (BR.) XEN (BR.) Sr. DEN (WEST) P. Pal H.S. GHOSH P.K. Das Checked By /2012
Sr. DEN (Co-Ord) R.Banerjee (Design)
S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./KGP. GM (P) Sr. DGM (C) (D & S) DY. G.M ( C) (T.A)
S.E. RLY./KGP.
RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA
To R
anig
an j
225
738
350
350 2000 350
1800
750
SL
350
:1
O
350
PE
AN
1500
1350
N
TH
O
T
R
ST
PE
EE
EE
400
PE
ST
R
T
SL 1800
O
TH
N
AN
PE
350 350
2000
H)
:1
O 5(R
T=41. .932m
CUR -58'-51"
R=100 3m
A=04 0m
VE N
49
4824
CL=86
350
GENERAL NOTES :-
C.L. OF EXT. TRACK C.L. OF PROP. TRACK
SECTION ALONG THE TRACK
6000
2. LEVELS ARE IN METRES.
SCALE 1:100
150
2980 3000 3500 450
RAIL LEVEL 83.172m. 3. ALL DIMENSIONS AND LEVELS SHOULD BE VERIFIED & RECONCILED BEFORE EXECUTION.
738
4. LOADING STANDARD I.R.S. 25 TONNE LOADING OF 2008.
688
P.C.C. SLEEPER
FORMATION LEVEL 82.434m.
120
5. FOR CONCRETE, SPECIFICATION REFER I.S. 456 -2000 & I.R.S. CONC. BRIDGE CODE.
350
418
850
500
6. DESIGN CRITERIA :-
H.F.L.= 81.584
2000
1738
1990
300 i) I.R.S. BRIDGE RULES.
1200
1800
INVERT LEVEL = 80.568m.
ii) I.R.S. CONCRETE BRIDGE CODE.
750
GROUND LEVEL 80.434m. iii) I.R.S. BRIDGE SUB-STRUCTURE & FOUNDATION CODE.
350
300
7. REINFORCEMENT SHALL BE HYSD BAR OF GRADE Fe 500 CONFORMING TO
1200
120
IS: 1786-1985 AND ALL RCC SURFACE COMING IN CONTACT WITH SOIL SHOULD BE
150 TH. P.C.C. BASE COURSE (M-20) PAINTED WITH BITUMEN OR COALTAR OF APPROVED QUALITY @ 1.464 KG/SQM.
450 TH. P.C.C. BASE COURSE (M-20)
1620
6950 8. CONCRETE GRADE :-
0.45m. SOIL TO BE EXCAVATED & FILLED BACK 225 i) R.C.C. BOX ....................................................M-35 (DESIGN MIX.)
WITH WEL COMPACTED SAND 450 ii) ALL R.C.C. WORK ...................................M-35 (DISIGN MIX)
900 iii) ALL P.C.C. WORK ................................M-25 (NOMINAL MIX)
225
250 250 9. MAX. SIZE OF AGGREGATE TO BE USED IS 20 mm.
350
10. EXPOSURE CONDITION IS MODERATE REF. C.L. NO. 5.4.1 OF I.R.S. CONCRETE BRIDGE CODE.
SECTIONAL ELEVATION AT X-Y
540
11. CLEAR COVER OF 50 mm.
950 12. LAPPING OF BARS SHOULD BE MINIMISED & ALL STAGGERED WHEREVER NECESSARY
MINIMUM LENGTH OF LAP SHALL BE AS GIVEN IN IRS CONCRETE CODE 50 FOR TOR
STEEL, THE NUMBER & LOCATION OF LAP IS TO BE DECIDED AT SITE.
1800
DETAILS OF 13. WEEP HOLES TO BE PROVIDED IN RETURN WALLS BY USING 100/75 mm. DIA PVC PIPE
@ 1000 C/C VERT. & 1000 mm.C/C HOR. IN A STAGGERED BOTHWAY.
DROP WALL / CURTAIN WALL
OF BAR.
350
15. 600 mm. WELL HAND PACKED BOULDERS BACK FILLING TO BE PROVIDED BESIDE THE BOX
AND RETURN WALLS AS PER C.L 7.5 OF I.R.S BRIDGE SUBSTRUCTURE & FOUNDATION CODE.
800
17. ENGINEER-IN-CHARGE AT SITE SHOULD SATISFY HIMSELF WITH S.B.C. OF SOIL.
18. BED SLOPE SHALL BE ADJUSTED AS PER SITE CONDITIONS BY COMPETENT AUTHORITY
IT SHOULD BE KEPT MINIMUM 1 IN 100.
225 450
100
100 350 19. DEPTH OF FOUNDATION SHOWN TENTATIVELY. HOWEVER, THIS MAY VARY TO SUIT SITE
CONDITION & TO BE DECIDED BY THE ENGINEER-IN-CHARGE.
20. DRAWING AND DESIGN BASED ON SOIL TEST REPORT.
21. DESIGN MAX. BERING PRESSURE AT FOUNDATION LEVEL = t/m sq.
TYP.DETAILS AT A & B
750
22. SEPARATE WATERWAY CALCULATION ARE NOT PROVIDED AS IT IS
300 BALANCING CULVERT.
23. FOR ALIGNMENT PLAN REFER DRG. No. RITES/KOL./KBUNL. SHEET No.- OF
1500
1350
6000 LIMIT AS GIVEN IN CLAUSE 6.5 OF CONCRETE BRIDGE CODE.
1V
2H:
PE
LO
300 HS
RT
100
300 EA
400
100
300
2980 3000 3500
350
X Y
CL OF R.C.C. PIPE 450 SECTION OF RETURN WALL
2000
2260
1440
1200
SECTION AT C-C
410
SCALE 1:50
350
120
CL OF HUME PIPE
1750
688
350
120
300 150 980 980 150
TOP LEVEL = 81.888 m.
450
P.C.C M - 20
DETAILS OF R.C.C. WING WALL P.C.C M - 20
( A GOVT. OF INDIA ENTERPRISE )
450
120
SECTION C-C 150 THK. P.C.C (M-20)
SCALE 1:50
450
SAND FILLING
(COMPACTED)
2260
SECTION AT A-A
SCALE - 1:50
RITES/KOL/DVC/MTPS/MEJIA - /2013
100,50 & 25
R.BANERJEE
JANUARY-/2013
RPO/KOL/
Drawn By P.SINHA ROY
CBE DY.CE. (BR.) XEN (BR.) Sr. DEN (WEST) P. Pal H.S. GHOSH P.K. Das Checked By /2013
Sr. DEN (Co-Ord) R.Banerjee (Design)
S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./KGP. GM (P) Sr. DGM (C) (D & S) DY. G.M ( C) (T.A)
S.E. RLY./KGP.
RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA
300
3500 6000
450
1620
738
225
510
620
225
250 250
400
2020
To Raniganj
540
To MTPS
1000
3370
SL
:1
3300
O
2740
1
2500
PE
2350
AN
950
300
TH
O
T
R
ST
PE
750
EE
EE
PE
ST
DETAILS OF
T
400
O
TH
N
1200 20 MM GAP
AN
DROP WALL / CURTAIN WALL
PE
1
O
:1
SL
20 MM GAP
225
450
900 7720 GENERAL NOTES :-
225
450
225
2. LEVELS ARE IN METRES.
625
3. ALL DIMENSIONS AND LEVELS SHOULD BE VERIFIED & RECONCILED BEFORE EXECUTION.
400
4. LOADING STANDARD I.R.S. 25 TONNE LOADING OF 2008.
SECTIONAL ELEVATION AT X-Y 5. FOR CONCRETE, SPECIFICATION REFER I.S. 456 -2000 & I.R.S. CONC. BRIDGE CODE.
6. DESIGN CRITERIA :-
i) I.R.S. BRIDGE RULES.
2500
iii) I.R.S. BRIDGE SUB-STRUCTURE & FOUNDATION CODE.
7. REINFORCEMENT SHALL BE HYSD BAR OF GRADE Fe 500 CONFORMING TO
1500
IS: 1786-1985 AND ALL RCC SURFACE COMING IN CONTACT WITH SOIL SHOULD BE
PAINTED WITH BITUMEN OR COALTAR OF APPROVED QUALITY @ 1.464 KG/SQM.
150
8. CONCRETE GRADE :-
i) R.C.C. BOX ....................................................M-35 (DESIGN MIX.)
ii) ALL R.C.C. WORK ...................................M-35 (DISIGN MIX)
0
30
738
iii) ALL P.C.C. WORK ................................M-25 (NOMINAL MIX)
400
9. MAX. SIZE OF AGGREGATE TO BE USED IS 20 mm.
1200
10. EXPOSURE CONDITION IS MODERATE REF. C.L. NO. 5.4.1 OF I.R.S. CONCRETE BRIDGE CODE.
800
300 3750 6000 11. CLEAR COVER OF 50 mm.
3562
3337
12. LAPPING OF BARS SHOULD BE MINIMISED & ALL STAGGERED WHEREVER NECESSARY
225 450 MINIMUM LENGTH OF LAP SHALL BE AS GIVEN IN IRS CONCRETE CODE 50 FOR TOR
STEEL, THE NUMBER & LOCATION OF LAP IS TO BE DECIDED AT SITE.
225
300
13. WEEP HOLES TO BE PROVIDED IN RETURN WALLS BY USING 100/75 mm. DIA PVC PIPE
@ 1000 C/C VERT. & 1000 mm.C/C HOR. IN A STAGGERED BOTHWAY.
TYP.DETAILS AT A & B
400
400
400
OF BAR.
1200
20 MM GAP 15. 600 mm. WELL HAND PACKED BOULDERS BACK FILLING TO BE PROVIDED BESIDE THE BOX
2350
AND RETURN WALLS AS PER C.L 7.5 OF I.R.S BRIDGE SUBSTRUCTURE & FOUNDATION CODE.
2500
400
X Y
750
4000
1200
400
900
1200
1500
18. BED SLOPE SHALL BE ADJUSTED AS PER SITE CONDITIONS BY COMPETENT AUTHORITY
400
600
19. DEPTH OF FOUNDATION SHOWN TENTATIVELY. HOWEVER, THIS MAY VARY TO SUIT SITE
1200
300
400 400 20. DRAWING AND DESIGN BASED ON SOIL TEST REPORT.
400
4000
DIA & SPACING 21. DESIGN MAX. BERING PRESSURE AT FOUNDATION LEVEL = t/m sq.
MARK OF BARS(m.m.) BENDING OF BAR REMARKS
11683
300 22. SEPARATE WATERWAY CALCULATION ARE NOT PROVIDED AS IT IS
20 MM GAP 1670 BALANCING CULVERT.
a1 20@200 C/C 3200
1670 23. FOR ALIGNMENT PLAN REFER DRG. No. RITES/KOL./KBUNL. SHEET No.- OF
CE'S DRG. No.-
SECTION ALONG THE TRACK 24. TOLERANCES FOR FINISHED CONCRETE BRIDGE STRUCTURE SHOULD NOT EXCEED THE
a2 16@200 C/C 1254 4700 1254 LIMIT AS GIVEN IN CLAUSE 6.5 OF CONCRETE BRIDGE CODE.
SCALE 1:100
4700
b 20@100 C/C
30
0
c 12@200 C/C 1208
4700
1208
300 3200
300 100 e 16@200 C/C
100
265
f1 20@200 C/C 1314
THIS DRAWING FOR CONSTRUCTION PURPOSE.
VARYING 2740 TO 750
265
3500
265
f2 20@200 C/C 1314
A
265
A
TABLE SHOWING BRIDGE DETAILS
100
100 350
100
g1 10@200 along
B barell and 290
B
along span 100
750
900
100
1500
g2 10@200 along
barell and 290
along span
600
1350
100
300
along span
1633 620 2647
567 350 783 h1 10@100 C/C 7620
4900
1700
h2 10@100 C/C 7620
SECTION OF RETURN WALL DETAILS OF R.C.C. WING WALL
BORE-LOG DETAILS h3 10@100 C/C 7620
SECTION AT C-C SECTION A-A
SCALE 1:50 SCALE 1:50
RITES/KOL/DVC/MTPS/MEJIA - /2012
100,50 & 25
R.BANERJEE
OCTOBER-/2012
RPO/KOL/
Drawn By P.SINHA ROY
CBE DY.CE. (BR.) XEN (BR.) Sr. DEN (WEST) P. Pal H.S. GHOSH P.K. Das Checked By /2012
Sr. DEN (Co-Ord) R.Banerjee (Design)
S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./KGP. GM (P) Sr. DGM (C) (D & S) DY. G.M ( C) (T.A)
S.E. RLY./KGP.
RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA
300
3500 6000
1620
450
225
738
738
To Raniganj
225
225
250 250
620
510
620
To MTPS
REPEAT SAME AS ON
OTHER SIDE OF BOX
400
400
2020
540
2970
1000
300
2340
1950
1950
950
2100
2100
750
750
DETAILS OF
400
400
900
DROP WALL / CURTAIN WALL
1500
1200
600
20 MM GAP
400
20 MM GAP
225
450
900 8270 400 400 400 400
2000 2000 2000 GENERAL NOTES :-
11683 225
450
2. LEVELS ARE IN METRES.
400 225
3. ALL DIMENSIONS AND LEVELS SHOULD BE VERIFIED & RECONCILED BEFORE EXECUTION.
625
SECTIONAL ELEVATION AT X-Y 4. LOADING STANDARD I.R.S. 25 TONNE LOADING OF 2008.
SECTION ALONG THE TRACK 5. FOR CONCRETE, SPECIFICATION REFER I.S. 456 -2000 & I.R.S. CONC. BRIDGE CODE.
6. DESIGN CRITERIA :-
SCALE 1:100 i) I.R.S. BRIDGE RULES.
ii) I.R.S. CONCRETE BRIDGE CODE.
300
2100
iii) I.R.S. BRIDGE SUB-STRUCTURE & FOUNDATION CODE.
7. REINFORCEMENT SHALL BE HYSD BAR OF GRADE Fe 500 CONFORMING TO
1500
IS: 1786-1985 AND ALL RCC SURFACE COMING IN CONTACT WITH SOIL SHOULD BE
150
PAINTED WITH BITUMEN OR COALTAR OF APPROVED QUALITY @ 1.464 KG/SQM.
8. CONCRETE GRADE :-
i) R.C.C. BOX ....................................................M-35 (DESIGN MIX.)
400
ii) ALL R.C.C. WORK ...................................M-35 (DISIGN MIX)
0
30
1200
9. MAX. SIZE OF AGGREGATE TO BE USED IS 20 mm.
800
10. EXPOSURE CONDITION IS MODERATE REF. C.L. NO. 5.4.1 OF I.R.S. CONCRETE BRIDGE CODE.
5824
225 450 12. LAPPING OF BARS SHOULD BE MINIMISED & ALL STAGGERED WHEREVER NECESSARY
MINIMUM LENGTH OF LAP SHALL BE AS GIVEN IN IRS CONCRETE CODE 50 FOR TOR
STEEL, THE NUMBER & LOCATION OF LAP IS TO BE DECIDED AT SITE.
300
13. WEEP HOLES TO BE PROVIDED IN RETURN WALLS BY USING 100/75 mm. DIA PVC PIPE
@ 1000 C/C VERT. & 1000 mm.C/C HOR. IN A STAGGERED BOTHWAY.
TYP.DETAILS AT A & B
700
400
OF BAR.
20 MM GAP 15. 600 mm. WELL HAND PACKED BOULDERS BACK FILLING TO BE PROVIDED BESIDE THE BOX
AND RETURN WALLS AS PER C.L 7.5 OF I.R.S BRIDGE SUBSTRUCTURE & FOUNDATION CODE.
1850
2000
700
18. BED SLOPE SHALL BE ADJUSTED AS PER SITE CONDITIONS BY COMPETENT AUTHORITY
X Y IT SHOULD BE KEPT MINIMUM 1 IN 100.
2000
7600
19. DEPTH OF FOUNDATION SHOWN TENTATIVELY. HOWEVER, THIS MAY VARY TO SUIT SITE
1850
700
1850
23. FOR ALIGNMENT PLAN REFER DRG. No. RITES/KOL./KBUNL. SHEET No.- OF
CE'S DRG. No.-
24. TOLERANCES FOR FINISHED CONCRETE BRIDGE STRUCTURE SHOULD NOT EXCEED THE
400
700
20 MM GAP 20 MM GAP
300
100
100 300 THIS DRG. IS BASED ON R.D.S.O. STANDARD DRG. NO. RDSO/B-10151/3
PLAN
A A
100
100 350
900
1500
B
B
750
600
300
1350
RITES/KOL/DVC/MTPS/MEJIA - /2012
100,50 & 25
R.BANERJEE
OCTOBER-/2012
RPO/KOL/
Drawn By P.SINHA ROY
CBE DY.CE. (BR.) XEN (BR.) Sr. DEN (WEST) P. Pal H.S. GHOSH P.K. Das Checked By /2012
Sr. DEN (Co-Ord) R.Banerjee (Design)
S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./KGP. GM (P) Sr. DGM (C) (D & S) DY. G.M ( C) (T.A)
S.E. RLY./KGP.
RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA
3750 6000
300
738
To MTPS
1620
738
250 250
2962
450
2089
540
225
225
4412
700
950
6262
450
6477
DETAILS OF
1000 DROP WALL / CURTAIN WALL
3240
3900
2850
3100
3000
300
750
225
450
GENERAL NOTES :-
700
450
1200
450 225
675
20 MM GAP 2. LEVELS ARE IN METRES.
225 20 MM GAP
3. ALL DIMENSIONS AND LEVELS SHOULD BE VERIFIED & RECONCILED BEFORE EXECUTION.
900 12854 4. LOADING STANDARD I.R.S. 25 TONNE LOADING OF 2008.
5. FOR CONCRETE, SPECIFICATION REFER I.S. 456 -2000 & I.R.S. CONC. BRIDGE CODE.
6. DESIGN CRITERIA :-
i) I.R.S. BRIDGE RULES.
3000
738
7. REINFORCEMENT SHALL BE HYSD BAR OF GRADE Fe 500 CONFORMING TO
IS: 1786-1985 AND ALL RCC SURFACE COMING IN CONTACT WITH SOIL SHOULD BE
PAINTED WITH BITUMEN OR COALTAR OF APPROVED QUALITY @ 1.464 KG/SQM.
300 8. CONCRETE GRADE :-
i) R.C.C. BOX ....................................................M-35 (DESIGN MIX.)
150
2962
1200
225
9. MAX. SIZE OF AGGREGATE TO BE USED IS 20 mm.
450
10. EXPOSURE CONDITION IS MODERATE REF. C.L. NO. 5.4.1 OF I.R.S. CONCRETE BRIDGE CODE.
450
REPEAT SAME AS ON
OTHER SIDE OF BOX
0
1200
30
750
12. LAPPING OF BARS SHOULD BE MINIMISED & ALL STAGGERED WHEREVER NECESSARY
MINIMUM LENGTH OF LAP SHALL BE AS GIVEN IN IRS CONCRETE CODE 50 FOR TOR
2850
3000
STEEL, THE NUMBER & LOCATION OF LAP IS TO BE DECIDED AT SITE.
300 3750 6000 225 450
13. WEEP HOLES TO BE PROVIDED IN RETURN WALLS BY USING 100/75 mm. DIA PVC PIPE
750
@ 1000 C/C VERT. & 1000 mm.C/C HOR. IN A STAGGERED BOTHWAY.
450
TYP.DETAILS AT A & B
900
1200
1500
300 OF BAR.
15. 600 mm. WELL HAND PACKED BOULDERS BACK FILLING TO BE PROVIDED BESIDE THE BOX
600
AND RETURN WALLS AS PER C.L 7.5 OF I.R.S BRIDGE SUBSTRUCTURE & FOUNDATION CODE.
700
450
300
450 400 450
20 MM GAP 3000 3000 17. ENGINEER-IN-CHARGE AT SITE SHOULD SATISFY HIMSELF WITH S.B.C. OF SOIL.
11683 18. BED SLOPE SHALL BE ADJUSTED AS PER SITE CONDITIONS BY COMPETENT AUTHORITY
IT SHOULD BE KEPT MINIMUM 1 IN 100.
2850
3000
19. DEPTH OF FOUNDATION SHOWN TENTATIVELY. HOWEVER, THIS MAY VARY TO SUIT SITE
CONDITION & TO BE DECIDED BY THE ENGINEER-IN-CHARGE.
7300
X Y
SECTION ALONG THE TRACK 20. DRAWING AND DESIGN BASED ON SOIL TEST REPORT.
21. DESIGN MAX. BERING PRESSURE AT FOUNDATION LEVEL = t/m sq.
400
700
SCALE 1:100 BAR BENDING SCHEDULE OF BOX 22. SEPARATE WATERWAY CALCULATION ARE NOT PROVIDED AS IT IS
BALANCING CULVERT.
23. FOR ALIGNMENT PLAN REFER DRG. No. RITES/KOL./KBUNL. SHEET No.- OF
DIA & SPACING
3000
700
194 194
1455 1455
20 MM GAP h1 20@200C/C
20 MM GAP 2520
a2 20@200 C/C 194 194
300
194 194
100
300 2455
100 THIS DRG. IS BASED ON R.D.S.O. STANDARD DRG. NO. RDSO/B-10151/3
3800 h2 20@200C/C
a3 20@200 C/C 2455 1455 1455
194 194
194 194
7200
b 12@100 C/C 194 194
3500
350
100
j1 10@100 along
B d1 20@200 C/C 1415 1415
7200 barell and 340
B
along span
750
100
900
1500
340
along span
100
300
j3 10@100 along
barell and 340
1633 620 2647 100 100
567 350 783 along span
4900
1700
f 16@200 C/C 3800
j4 10@100 along
290
SECTION OF RETURN WALL BORE-LOG DETAILS DETAILS OF R.C.C. WING WALL
barell and
12754 along span 100 100
g
SECTION AT C-C SECTION A-A
10@100 C/C
RITES/KOL/DVC/MTPS/MEJIA - /2011
100,50 & 25
R.BANERJEE
OCTOBER-/2012
RPO/KOL/
Drawn By P.SINHA ROY
CBE DY.CE. (BR.) XEN (BR.) Sr. DEN (WEST) P. Pal H.S. GHOSH P.K. Das Checked By /2012
Sr. DEN (Co-Ord) R.Banerjee (Design)
S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./GRC. S.E. RLY./KGP. GM (P) Sr. DGM (C) (D & S) DY. G.M ( C) (T.A)
S.E. RLY./KGP.
RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA RITES /KOLKATA
X,
X
BO
.)
BO
.B
C
.O
C.
RC
(R
R.
BO 0
C /00
0m
X
0m
RC 3
3.
6.
m
1X
3x
6m , K
0,
3/ 2
7,
Km 42
1X G
21
27
, X IN
.
3/
52
/2
9A D
m
o. A
,K
3
N RO
1,
Km
10
.1
BR CA
o.
O
II
.N
N
C
TP
PU
BR
BR
CURVE No:5 RH
CURVE No:4 (LH)
3/779.465
3/862.412
84.056
84.056
R =356.0m
3/357.1
86.300
R =400.0m TL=154.037m
TL=158.598m
ALIGNMENT CL=301.986m
CL=290.756m
4.069
3.966
4.099
4.219
4.327
4.414
4.675
5.299
5.861
5.967
6.083
6.350
6.664
6.841
5.109
3.224
3.268
3.274
3.449
3.449
3.655
4.061
4.617
4.023
3.499
3.105
2.891
2.247
2.143
2.039
2.145
2.071
2.177
1.683
1.536
1.442
1.289
2.136
1.051
1.021
0.956
1.156
1.327
1.041
1.056
1.576
CUTTING / FILLING
84.977
85.051
85.126
85.200
85.274
85.348
85.422
85.496
85.570
85.644
85.718
85.792
85.866
85.940
86.014
86.089
86.163
86.237
86.300
86.281
86.147
86.014
86.014
85.905
85.811
85.717
85.623
85.529
85.435
85.341
85.247
85.153
85.059
84.965
84.871
84.777
84.683
84.586
84.452
84.319
84.186
84.056
84.056
84.056
84.056
84.027
84.056
84.056
84.596
FORMATION LEVEL
84.468
82.340
81.057
81.234
81.175
81.129
81.095
81.082
80.895
80.345
79.857
79.825
79.783
79.590
79.350
79.248
81.054
83.013
83.013
82.873
82.565
82.250
81.750
81.100
81.600
82.030
82.330
82.450
83.000
83.010
83.020
82.820
82.800
82.600
83.000
83.050
83.010
83.030
82.050
83.005
83.035
83.100
82.900
82.700
83.015
83.000
83.020
GROUND LEVEL
3/862.412
3/779.465
3/357.1
3/000
3/020
3/040
3/060
3/080
3/100
3/120
3/140
3/160
3/180
3/200
3/220
3/240
3/260
3/280
3/300
3/320
3/340
3/360
3/380
3/400
3/420
3/440
3/460
3/480
3/500
3/520
3/540
3/560
3/580
3/600
3/620
3/640
3/660
3/680
3/700
3/720
3/740
3/760
3/780
3/800
3/820
3/840
3/860
CHAINAGE
Km 3/779.465 F/BQT. 2. ALL LEVELS ARE RELATED TO THIS SURVEY ARE BASED ON THE RAIL TOP
65m LEVEL OF EXISTING POWER HOUSE LINE CLOSE TO THE POWER UNITS.
THE VALUE IS 111.000m ABOVE M.S.L. ( GTS )
FL : 84.056
Km 4/750
40m
3. TAKE OFF POINT OF PROPOSED LINE IS ASSUMED AS 0.000
65m 7. 60KG RAIL AND 60KG PSC SLEEPER SHALL BE PROVIDED IN PROPOSED LINE.
(0/769.22)
Km 4/750
N O T E S :-
THIS DRAWING IS PREPAIRED BASED ON CE's DRG No. D-000-98, DRM/ ASN/ Drg. No 124-98,
125-98 AND ACTUAL FIELD SURVEY.
EASTERN RAILWAY
3 OF 14
Sh.No
GRADIENT
DATUM (+)50m
CUT / FILL
FORMATION LEVEL
65m
40m
40m
15m
15m
To MTPS
40m
40m
65m
FL : 84.124
2. ALL LEVELS ARE RELATED TO THIS SURVEY ARE BASED ON THE RAIL TOP
FL : 84.124
Km 4/585
(0/769.22)
Km 4/750
LEVEL OF EXISTING POWER HOUSE LINE CLOSE TO THE POWER UNITS.
THE VALUE IS 111.000m ABOVE M.S.L. ( GTS )
FL : 84.056
FL : 83.823
(0/769.22)
Km 1/500
Km 4/750
4. HEIGHT MENTIONED IN DRAWING FOR OVERHEAD CROSSING ARE ABOVE
GROUND LEVEL.
8
.88 4
: 87 25 .46 7. 60KG RAIL AND 60KG PSC SLEEPER SHALL BE PROVIDED IN PROPOSED LINE.
FL 5/5 =88
P
Km TO
IL
RA 8. ALL POINTS AND CROSSING SHALL BE PROVIDED 1 IN 12 FAN SHAPE CURVE
SWITCH WITH 60 Kg RAIL AND SLEEPER. UNLESS OTHERWISE MENTIONED.
.22
/5 19
.5
Km
N O T E S :-
THIS DRAWING IS PREPAIRED BASED ON CE's DRG No. D-000-98, DRM/ ASN/ Drg. No 124-98,
125-98 AND ACTUAL FIELD SURVEY.
EASTERN RAILWAY
.62
Km 6 .165
/047
89
FL :
4 OF 14
Sh.No
GRADIENT
DATUM (+)50m
CUT / FILL
FORMATION LEVEL
To
Ran
iga
nj
15m
3
.82
: 83 00
FL
1/5
Km
20m
Km 2/863.6
FL : 85.000
Km 2/219.22
FL : 86.091
CU
FL : 85.621
Km 3/300
R
60 A=6 VE N
m R=3 9 -36 o 2 LH
'
T=2 44m -45"
3/250
15
m CL= 39.142
NO 417.94 m 1. All DIMENSIONS ARE IN METRES UNLESS OTHER WISE MENTIONED.
SRJ, Km 2/260.32 / Km
NT 70m
RA 9m
NSI
TIO 70m
20
m
A=
6
N 2. ALL LEVELS ARE RELATED TO THIS SURVEY ARE BASED ON THE RAIL TOP
R= 9
3
T= 50 6 - 3 LEVEL OF EXISTING POWER HOUSE LINE CLOSE TO THE POWER UNITS.
CL 243 m '-45" 60m
=4 .31 THE VALUE IS 111.000m ABOVE M.S.L. ( GTS )
25 m
.24 TO RANIGANJ
60 m 25m
m N.H.-60 3. TAKE OFF POINT OF PROPOSED LINE IS ASSUMED AS 0.000
25m
DN MAIN
UP MAIN 4. HEIGHT MENTIONED IN DRAWING FOR OVERHEAD CROSSING ARE ABOVE
GROUND LEVEL.
70m
70m
60m
CUR
V
7. 60KG RAIL AND 60KG PSC SLEEPER SHALL BE PROVIDED IN PROPOSED LINE.
A=69 E No 2A
R=35 -36'-45" LH
T=24 6m 8. ALL POINTS AND CROSSING SHALL BE PROVIDED 1 IN 12 FAN SHAPE CURVE
CL= 7.484m
Km 2/219.22
4
NON 32.528m
TRA
NSIT
ION
Km 2/655.62
FL : 84.934
N O T E S :-
THIS DRAWING IS PREPAIRED BASED ON CE's DRG No. D-320-98, DRM/ ASN/ Drg. No 123-98
AND ACTUAL FIELD SURVEY.
EASTERN RAILWAY
5 OF 14
Sh.No
GRADIENT
DATUM (+)50m
CUT / FILL
FORMATION LEVEL
Km 1/513.2
FL : 85.000
1. All DIMENSIONS ARE IN METRES UNLESS OTHER WISE MENTIONED.
2. ALL LEVELS ARE RELATED TO THIS SURVEY ARE BASED ON THE RAIL TOP
LEVEL OF EXISTING POWER HOUSE LINE CLOSE TO THE POWER UNITS.
80m 80m THE VALUE IS 111.000m ABOVE M.S.L. ( GTS )
70m 70m
3. TAKE OFF POINT OF PROPOSED LINE IS ASSUMED AS 0.000
DAMODAR RIVER
RA
80m NKU 4. HEIGHT MENTIONED IN DRAWING FOR OVERHEAD CROSSING ARE ABOVE
UR / BA
AVP GROUND LEVEL.
URL
D-43
TO D 15m 15m
42
D-
N.H.-60 N.H.-60 N.H.-60 N.H.-60
N.H.-60 N.H.-60 DN LINE 5. DIFFERENCE BETWEEN FORMATION LEVEL AND RAIL TOP LEVEL IS 0.638m
To Raniganj
D-44 UP / DN LINE UP LINE
ROAD CUM RAIL BRIDGE No 5R ( DAMODAR RIVER )
D-45
COMMON LOOP
25m 25m
80m
Km 1/575, Km 3/944.22
8. ALL POINTS AND CROSSING SHALL BE PROVIDED 1 IN 12 FAN SHAPE CURVE
70m
2X32.976m + 15X 48.5m STEEL GIRDER,
FL : 84.934
PROP. Km 4/006.02
Km 1/513.2,
N O T E S :-
THIS DRAWING IS PREPAIRED BASED ON CE's DRG No. D-319-98, DRM/ ASN/ Drg. No 122-98 AND
ACTUAL FIELD SURVEY.
EASTERN RAILWAY
6 OF 14
Sh.No
GRADIENT
DATUM (+)50m
CUT / FILL
FORMATION LEVEL
00
5
8.37
FL : 82.5
Km 2/52
17
0
Km 2/63
FL : 82.2
Km 0/00
1. All DIMENSIONS ARE IN METRES UNLESS OTHER WISE MENTIONED.
2. ALL LEVELS ARE RELATED TO THIS SURVEY ARE BASED ON THE RAIL TOP
LEVEL OF EXISTING POWER HOUSE LINE CLOSE TO THE POWER UNITS.
THE VALUE IS 111.000m ABOVE M.S.L. ( GTS )
7. 60KG RAIL AND 60KG PSC SLEEPER SHALL BE PROVIDED IN PROPOSED LINE.
15m
30m
8. ALL POINTS AND CROSSING SHALL BE PROVIDED 1 IN 12 FAN SHAPE CURVE
SWITCH WITH 60 Kg RAIL AND SLEEPER. UNLESS OTHERWISE MENTIONED.
D-40
45m
N O T E S :-
THIS DRAWING IS PREPAIRED BASED ON CE's DRG No. D-318-98& 317-98, DRM/ ASN/ Drg. No
121-98, 129-98 AND ACTUAL FIELD SURVEY.
EASTERN RAILWAY
7 OF 14
Sh.No
ER
LA D
E 65
RD
' C NE
AT 7/4
GI
52 'C N
0. AS MA
L Km
82 D N-
EE A ,
PL
6/ IVE U
ST . 2
G
5
Km OV TIN
m o
.2 . N
PR IS
12 Br
EX
5x op.
Pr
CURVE NO 6(RH) CURVE NO 7(LH)
A=06 -15'-01" A=06 -27'-57"
R=400m R=400m
CURVE NO 5(RH) T=21.84m T=22.59m
A=04 -58'-51" CL=43.636m CL=45.14m
ALIGNMENT
R=1000m
T=41.493m
CL=86.932m
GRADIENT
DATUM (+)50m
CUT / FILL
FORMATION LEVEL
FL : 83.000
Km 1/350
FL : 82.500
Km 0/700
BR. No. 6A (1x1.2m)
R.C. PIPE, Km 1/800
2. ALL LEVELS ARE RELATED TO THIS SURVEY ARE BASED ON THE RAIL TOP
55m
LEVEL OF EXISTING POWER HOUSE LINE CLOSE TO THE POWER UNITS.
E
55m
AG
1" TO CURVE NO 7(LH) THE VALUE IS 111.000m ABOVE M.S.L. ( GTS )
A=04 -58'-5
L
N.H
VIL
.-6 A=06 -27'-57"
R=1 00 0m 0 R=400m
T=41.493m E 3. TAKE OFF POINT OF PROPOSED LINE IS ASSUMED AS 0.000
VILLAG T=22.59m
CL=86.932m CL=45.14m
15m
15m 6m
D-29
4. HEIGHT MENTIONED IN DRAWING FOR OVERHEAD CROSSING ARE ABOVE
D-28A
D-30
33 D-32 GROUND LEVEL.
D- DN LINE
DN LINE 10m
UP LINE
UP LINE A=06 -15'-01" 5. DIFFERENCE BETWEEN FORMATION LEVEL AND RAIL TOP LEVEL IS 0.638m
NA 55m
L.T. LIN
IE D
D)
MODIF
5(RH) 7. 60KG RAIL AND 60KG PSC SLEEPER SHALL BE PROVIDED IN PROPOSED LINE.
CURVE NO
FIE
4 -58'-51"
ODI
A =0
R=1000m
(TO BE
Km 6/807.59
BE M
T=41.493m
CL=86.932m SWITCH WITH 60 Kg RAIL AND SLEEPER. UNLESS OTHERWISE MENTIONED.
(TO
N O T E S :-
THIS DRAWING IS PREPAIRED BASED ON CE's DRG No. D-000-98, DRM/ ASN/ Drg. No 120-98
AND ACTUAL FIELD SURVEY.
EASTERN RAILWAY
8 OF 14
Sh.No
R= 400.0m
T=119.659m
ALIGNMENT CURVE No 9(RH) CL=232.54m
A=06 -30'-08"
R=500m
CL=56.74m
GRADIENT
DATUM (+)50m
CUT / FILL
FORMATION LEVEL
CU
A= RVE N
R= 06 -29 O 8(L
G, Km TENDED)
5
T=2 00m '-13" H)
CL 8.33m
9/161,
=56
.60
9m
/M L TO BE EX
CU
A= RVE
N
R= 06 -30 O 9(
T= 500m '-08" RH)
N
9
Km 4.000
I
CL 8.40m
G
03.8
X
'C' CL 84, (L-XIN
=56
-
.74
0/6
8
m
FL :
ASS U
TO
30m 1. All DIMENSIONS ARE IN METRES UNLESS OTHER WISE MENTIONED.
/8
N.
30m
8
H.
m
-6
55m
K
0
2. ALL LEVELS ARE RELATED TO THIS SURVEY ARE BASED ON THE RAIL TOP
55m
E( U/C) 10m
HT LIN LEVEL OF EXISTING POWER HOUSE LINE CLOSE TO THE POWER UNITS.
HT 11 KV THE VALUE IS 111.000m ABOVE M.S.L. ( GTS )
LIN
E( 35m
U/C
) 30m
6.350
FL : 8 50
30m
Km
Km 0/2 5
LIN
00
LT
7
FL : 85
GROUND LEVEL.
D-2
20m
INE
55m 3 DN L
D-2 NE 5. DIFFERENCE BETWEEN FORMATION LEVEL AND RAIL TOP LEVEL IS 0.638m
/C UP L
INE LT LI
INE U E
55m HT L VHT LIN
A=33 ' 32" 11 K
R=400m
35m
TO VILLAGE
T=119.659m
D
CL=232.54m RTE
IVE
10m BE D 7. 60KG RAIL AND 60KG PSC SLEEPER SHALL BE PROVIDED IN PROPOSED LINE.
D TO
ROA
Box
35m RS
ATE LIN
E
8. ALL POINTS AND CROSSING SHALL BE PROVIDED 1 IN 12 FAN SHAPE CURVE
. QU
R.C.C
5 No
6
LT
D-2
ERT
Km 8/ AS 1x1.5m
D DIV
30m ROA
E
UR
TO B
445
ID ASP
BR No XTENDED
20m
KAL
TO 30m
K
TRAC
TING ED
,
CURVE N
6
E
1
O 10(LH)
TO BE
ANTL
R= 400.0m VILLAGE
T=119.65
DISM
9m
S
CL=232.54
I
m
E X
57.59
Km 7/9 9
.80
FL : 85
N O T E S :-
THIS DRAWING IS PREPAIRED BASED ON CE's DRG No. D-316-98, DRM/ ASN/ Drg. No 118-98
AND ACTUAL FIELD SURVEY.
EASTERN RAILWAY
9 OF 14
Sh.No
R= 1000.0m
T=364.122m
CL=698.132m
GRADIENT
DATUM (+)50m
CUT / FILL
FORMATION LEVEL
HT LINE U/C 25m 1. All DIMENSIONS ARE IN METRES UNLESS OTHER WISE MENTIONED.
25m
/C 2. ALL LEVELS ARE RELATED TO THIS SURVEY ARE BASED ON THE RAIL TOP
INE U 11 KVHT LINE
HT L LEVEL OF EXISTING POWER HOUSE LINE CLOSE TO THE POWER UNITS.
10m THE VALUE IS 111.000m ABOVE M.S.L. ( GTS )
D-18
m
0.0
100 2m 30m
R= 364.12 132m D-19 3. TAKE OFF POINT OF PROPOSED LINE IS ASSUMED AS 0.000
FL : 91.784
Km 10/145
= 100 122m m 7. 60KG RAIL AND 60KG PSC SLEEPER SHALL BE PROVIDED IN PROPOSED LINE.
R 364. 132
T= =698.
CL 8. ALL POINTS AND CROSSING SHALL BE PROVIDED 1 IN 12 FAN SHAPE CURVE
SWITCH WITH 60 Kg RAIL AND SLEEPER. UNLESS OTHERWISE MENTIONED.
LT LINE
86
0.
C
83 21
U/
8/ 9/
NE
0
Km Km
LI
E, D)
T
1. 50
0
m H
N
85
: /7
LI OU
m 25
FL 8
30
HT GR
9
Km
KV ER
11 ND
(U
m
10
m
30
N O T E S :-
THIS DRAWING IS PREPAIRED BASED ON CE's DRG No. D-315-98, DRM/ ASN/ Drg. No 117-98
AND ACTUAL FIELD SURVEY.
EASTERN RAILWAY
1. 95
NE
4
78
: /2
U/
C LI
FL 9
HT
9
Km
NE V
LI 1 K
T 1
H
m
30
DAMODAR VALLEY CORPORATION
G 0m
EI 3
T
m
H LL
H
30
5m A
2. W
X NG
PROVISION OF DOUBLING
I
NG IN
LO TA
10 OF 14
Sh.No
R= 500.00m
T=26.46m
CL=52.876m
RISE 1 IN 200
GRADIENT
DATUM (+)50m
CUT / FILL
FORMATION LEVEL
m 11 ODIFIED
FL : 87.000
Km 6/800
Km 7/415
.3
/502
1. All DIMENSIONS ARE IN METRES UNLESS OTHER WISE MENTIONED.
G, K
O B E
T
2. ALL LEVELS ARE RELATED TO THIS SURVEY ARE BASED ON THE RAIL TOP
NALA
LINE
LEVEL OF EXISTING POWER HOUSE LINE CLOSE TO THE POWER UNITS.
XI N
( LT
THE VALUE IS 111.000m ABOVE M.S.L. ( GTS )
L.T.
I
PHAR
Km 7/224.40
45m 45m
DN LINE D-14
D-17A
15
UP LINE 5. DIFFERENCE BETWEEN FORMATION LEVEL AND RAIL TOP LEVEL IS 0.638m
30m
D-15
30m
6x12.2m STEEL PLATE GIRDER
PROP BR No. 11, Km 10/820.6
30m
7. 60KG RAIL AND 60KG PSC SLEEPER SHALL BE PROVIDED IN PROPOSED LINE.
N O T E S :-
THIS DRAWING IS PREPAIRED BASED ON CE's DRG No. D-314-98, DRM/ ASN/ Drg. No 116-98
AND ACTUAL FIELD SURVEY.
EASTERN RAILWAY
11 OF 14
Sh.No
x)
2. m . N
2x . K BR
op .
Pr IST
EX
CURVE NO 16(LH)
R= 500m
T=188.191m
CL=359.434m CURVE NO 17(RH)
ALIGNMENT
R= 500m
T=136.543m
CL=266.163m
RISE 1 IN 200(C)
GRADIENT
DATUM (+)50m
CUT / FILL
FORMATION LEVEL
HT
LINE
U/C
R= 500m
634
Box
4/1 300
T=136.543m
D
39.
PON
Km 100.
CL=266.163m
.C
VI
FL
RA LLA
0m
D-6
NI GE
PU
x3.
R
2. ALL LEVELS ARE RELATED TO THIS SURVEY ARE BASED ON THE RAIL TOP
DE /100
S1
EN
X,
VI
TO C. BO
RA LLA
NI GE
PU
R
3. TAKE OFF POINT OF PROPOSED LINE IS ASSUMED AS 0.000
BE
.C.
3/9 5m R
HT
LIN
45,
EU N
. K 1x3.
/C .H.
-60 /C GROUND LEVEL.
PO NE U
m1
T LI
,
PR o. 4
ND H
N
R= 50
BR
T= 18 0m
CL=3 8.191m
59.43
4m TO CURVE NO 17(RH)
VILL
INE AGE
UP L R= 500m
NE 7. 60KG RAIL AND 60KG PSC SLEEPER SHALL BE PROVIDED IN PROPOSED LINE.
DN LI T=136.543m
D-9
D-8
CL=266.163m
8. ALL POINTS AND CROSSING SHALL BE PROVIDED 1 IN 12 FAN SHAPE CURVE
SWITCH WITH 60 Kg RAIL AND SLEEPER. UNLESS OTHERWISE MENTIONED.
CUR
VE N
O 16(
LH)
R= 50
T=18 0m
8
CL=3 .191m
59.43
4m
6
.36
13/ 234
905
Km 100.
:
FL
N O T E S :-
THIS DRAWING IS PREPAIRED BASED ON CE's DRG No. D-312-98, DRM/ ASN/ Drg. No 114-98
AND ACTUAL FIELD SURVEY.
EASTERN RAILWAY
13 OF 14
Sh.No