Vous êtes sur la page 1sur 1

Line Pipe Coating Recommendation Form

Pipe Description
Size Schedule Mechanical Interference
Weight Type of Connection

Inches Body
Grade Length Wall Connection Manufacturer

Type of Service
How will the line be laid? Reasons for Coating Other
Land - Buried Corrosion
Gas Oil / Condensate Water
Material Being Transported per Day Units mmscf Units bbl Units bbl

Temperature Pressure
Inlet Temperature / Pressure °F psi Number of Compressor Stations

Exiting Temperature / Pressure °F psi Temperature Exiting Compressor °F

[CO2] [H2S] [O2] [CI] – ppm pH


Corrosive Agents ppm ppm ppm

Manufacturer Type Applicator


Pigging
Frequency per day External Coating

Additional
Comments

This area is for Tuboscope Employee's use only


Coating Specified

2835 Holmes Road coating2@nov.com nov.com/tuboscope


Houston, Texas 77051, USA
Phone 713 799 5100 © 2016 National Oilwell Varco | All Rights Reserved | D392006298-MKT-001 Rev 01

Vous aimerez peut-être aussi