Vous êtes sur la page 1sur 6

Republic of the Philippines

Department of Public Works


Transportation and Communications
OFFICE OF THE BUILDING OFFICIAL
RECOMMENDING APPROVAL:

_____________________ _____________
IGNA
BUILDING OFFICIAL DATE
TIUS
AVEN
UE

APPROVED BY:

_____________________ _____________
BUILDING OFFICIAL DATE

L A N D U S E A N D ZO N I N G

XAVIER ESTATES
PHASE 1A

_____________________________

LINE AND GRADE

PARKING LOT
VICINITY MAP
_____________________________

XAVIER SPORTS
ARCHITECTURAL
AND COUNTRY
CLUB
RIDGEVIEW
CHALET

A BROWN
_____________________________
COMPANY INC.

STRUCTURAL/CIVIL

SITE DEVELOPMENT PLAN


_____________________________

S A N I T A R Y

_____________________________

P L U M B I N G

_____________________________

ELECTRICAL

21.19 m

_____________________________
TECHNICAL DESCRIPTION
m
17.44

M EC HA NIC AL
FLOOR
AREA
16.39 m

_____________________________

FIRE DEPARTMENT

LOT A
RE A

22.64 m _____________________________

PERSPECTIVE E L E C T R O N I C S

_____________________________
LOT PLAN
G E O D E T I C

_____________________________

CIVIL ENGINEERING DEPARTMENT S U B M I T T E D B Y : P R OJ EC T TIT LE : S U B M I T T E D T O :

PROPOSED TWO-STOREY
UNIVERSITY OF SCIENCE AND
N A P A Y , P E A R L Y N E J O Y D .
RESIDENTIAL BUILDING ENGR. MARICEL P. SAMONTEZA 1
TECHNOLOGY OF SOUTHERN PHILIPPINES
YEAR:
SECTION:
F O U R T H
B S C E
Y E A R
4 A - b 1
DATE SUBMITTED:
M A R C H 1 7 , 2 0 1 8 Xavier Estates, Cagayan de Oro City
I N S T R U C T O R
6
FRONT ELEVATION LEFT-SIDE ELEVATION
SCALE 1:100 mts.
SCALE 1:100 mts.

FLOOR PLAN (GF) FLOOR PLAN (2F)


SCALE 1:100 mts. SCALE 1:100 mts.

REAR ELEVATION
SCALE 1:100 mts. RIGHT-SIDE ELEVATION
SCALE 1:100 mts.

SCHEDULE OF DOORS AND WINDOWS


SCALE 1:100 mts.

SECTION (LONGITUDINAL) SECTION (TRANSVERSE)


SCALE 1:100 mts.
SCALE 1:100 mts.

CIVIL ENGINEERING DEPARTMENT


NAPAY, PEARLYNE JOY D. PROPOSED TWO-STOREY RESIDENTIAL
UNIVERSITY OF SCIENCE AND
S t u d e n t
B U I L D I N G ENGR. MARICEL P. SAMONTEZA 2
TECHNOLOGY OF SOUTHERN PHILIPPINES
YEAR: F O U R T H Y E A R D A T E
M A R C H
S U B M I T T E D :
1 7 , 2 0 1 8 Xavier Estates, Cagayan de Oro City
INSTRUCTOR 6
SECTION: B S C E 4 A - b 1
CONCRETE SLAB
CONCRETE SLAB

REFLECTED CEILING PLAN (GF)


SCALE 1:100 mts.

FOUNDATION PLAN
SCALE 1:100 mts. ROOF PLAN
SCALE 1:100 mts.

REFLECTED CEILING PLAN (2F)


SCALE 1:100 mts.

BEAM PLAN (2F) BEAM PLAN (ROOF)


SCALE 1:100 mts. SCALE 1:100 mts.

CIVIL ENGINEERING DEPARTMENT


NAPAY, PEARLYNE JOY D. PROPOSED TWO-STOREY RESIDENTIAL
UNIVERSITY OF SCIENCE AND
S t u d e n t
B U I L D I N G ENGR. MARICEL P. SAMONTEZA 3
TECHNOLOGY OF SOUTHERN PHILIPPINES
YEAR: F O U R T H Y E A R D A T E
M A R C H
S U B M I T T E D :
1 7 , 2 0 1 8 Xavier Estates, Cagayan de Oro City
INSTRUCTOR 6
SECTION: B S C E 4 A - b 1
equally bothways

BEAM DETAILS
SPACING O.C LENGTH (L) BEAM MARK
DIMENSION (m)
WIDTH HEIGHT
REBARS ( mm)
BARS @ 0.60m O.C. @
Every third Layers
L/3 L/3

WALL FOOTING L/4 L/4


SCALE 1:100 mts.
DETAILS

COLUMN DETAILS BEAM DETAILS


SCALE 1:100 mts.
SCALE 1:100 mts.

22
21
20
19 L2
18
17
16
15
14
13
12

11 TYPICAL SLAB
10 SCALE 1:100 mts.

9
8
7
6
SCHEDULE OF SLABS
5
ALONG SHORT DIRECTION ALONG LONG DIRECTION
4 THICKNESS DIMENSIONS
SLAB MARK (m) SLAB
3 (mm) REBARS CONTINUOUS MID SPAN DISCONTINUOUS REBARS CONTINUOUS MID SPAN DISCONTINUOUS REMARKS
L B
2
1 S-1 1oo 6 4 10 10 2-WAY

S-2 100 4 3 10 10 2-WAY

STAIR RAILING DETAILS


SCALE 1:100 mts.
STAIR DETAILS
(GROUNDFLOOR TO 2ND FLOOR)
SCALE 1:100 mts.

CIVIL ENGINEERING DEPARTMENT


NAPAY, PEARLYNE JOY D. PROPOSED TWO-STOREY RESIDENTIAL
UNIVERSITY OF SCIENCE AND
S t u d e n t
B U I L D I N G ENGR. MARICEL P. SAMONTEZA 4
TECHNOLOGY OF SOUTHERN PHILIPPINES
YEAR: F O U R T H Y E A R D A T E
M A R C H
S U B M I T T E D :
1 7 , 2 0 1 8 Xavier Estates, Cagayan de Oro City
INSTRUCTOR 6
SECTION: B S C E 4 A - b 1
3
2

3
4

rp

sp

1
2 Ampere Rating
1

S1
S2

S3
LIGHTING CIRCUIT LAY-OUT (GF)
SCALE 1:100 mts. LIGHTING CIRCUIT LAY-OUT (2F)
SCALE 1:100 mts.

S2 S1

S1
S1

S1

S1 S3
S3
S2
S3 S2
S3 S3
SCHEDULE OF LOADS: DESIGN COMPUTATION FOR MAIN FEEDER:
S1 E E

SCHEDULE OF LOADS LIGHTING LOAD: 3600 WATTS


CONVENIENCE OUTLET LOAD: 5580 WATTS
SWITCHES 9180 WATTS
NO. OF VA (WATTS) AMPERES PROTECTION PER CONDUIT
CIRCUIT NO. DESCRIPTION
CIRCUIT S1 S2 S3 S3W WIRE SIZES
OUTLETS SIZES
FIRST 3000 WATTS @ 100% DF: 3000 WATTS
S3
REMAINDERS @ 35% DF: 2163 WATTS
1 LIGHTING OUTLET 7 700 3.27 15 2 20 mm
S3 S2 S2 5163 WATTS
2 LIGHTING OUTLET 8 800 3.64 15 2 20 mm
ACU 1.5HP @80% DEMAND FACTOR + 25%: 895 WATTS
3 LIGHTING OUTLET 10 1000 4.55 15 2 20 mm RANGE @ 80% DEMAND FACTOR: 2000 WATTS
REFRIGERATOR @ 80% DEMAND FACTOR: 144 WATTS
4 LIGHTING OUTLET 11 1100 5.00 15 2 20 mm
S3 3039 WATTS
5 CONVENIENCE OUTLET 9 1620 7.36 20 2 20 mm 5163 WATTS
8202 WATTS
6 CONVENIENCE OUTLET 5 900 4.09 20 2 20 mm
Itotal = 8202 WATTS
7 CONVENIENCE OUTLET 8 1440 6.55 20 2 20 mm
220
8 CONVENIENCE OUTLET 9 1620 7.36 20 2 20 mm Itotal = 37.28 AMPS
9 RANGE OUTLET 1 2500 11.36 30 2 20 mm

SWITCHING-OUTLET LAY-OUT (GF) 10 REFRIGERATOR OUTLET 1 180 0.82 30 2 20 mm EMT and a 60Amps main protection.
SCALE 1:100 mts. SWITCHING-OUTLET LAY-OUT (2F) 11 ACU - 1.5 HP 1 1119 5.09 30 2 20 mm
SCALE 1:100 mts. TOTAL 12,979 59.09

ELECTRICAL NOTES: ELECTRICAL SPECIFICATIONS:


E E
1.) All works shall comply with all the provisions of the 8.) Wiriing devices shall have a minimum rating of 10 1.) All electrical works/installation shall be done in accordance with the
latest edition of Philippine Electrical Code. Amperes, 250 volts. provisions of the latest edition of the Philippines Electrical Code, with the
2.) All works herein shall be directly supervised by a duly 9.) Lighting fixtures shall conform with the schedule as rules and regulation of the national and local authorities concerned in the
Licensed Electrical Engineering Law or R.A. 7920. prepared by the architect. enforcement of the Electrical Law and Ordinance, the rules and regulations
3.) All materials to be used shalll be brand new and shall 10.) Panel boards shall conform to the load schedule as of the local power company concerned, and in accordance with the approved
bear te manufacturer's name including the "PSA" mark. shown on plans with respect to breaker phase arrangement, manufacturers recommendations
4.) Power supply to he building shall be single phase, 2 way, rating, capacity and short circuit consideration. 2.) Allthough not indicated in the plan a utility box shall be provided for the
230 volts. 11.) Fire alarm devices shall comply with the NFPA following equipments and field devices, main control panel, (MCP) PIR
5.) Raceway schedule shall be as follows: Provisions and shall bear the "UL" Standard Mark. motion indicator, smoke detectors, electric siren, strobe light, electric
5.1) Concrete pedestal to MDP-UPVC pipe schedule 40. 12.) All non-current carrying metallic parts, cabinets and firearm bell, duress/panic button and key pad unit. Plate cover shall be
5.2) MDP to distribution panel boards - IMC. equipment frames shall be properly grounded in provided for future expansion devices.
5.3) Branch circuits for power, llighting and auxilliary accorddance with the grounding requirements of the latest 3.) Wiring method shall be as follows:
6
UPVC schedule 40 minimum size of raceway shall edition of the Philippine Electrical Code. a. Electrical Metallic Tubing (EMT) @ for power and lighting layout.
be 15mm diameter. 13.) Mounting Heights shall be as follows: b. Polyvinyl Chloride Pipe (PVC) @ for auxiliary layout.
6.) Outlet boxes shall have a minimum thickness of gauge a. Wall switches 1400 mm AFP to center of device. c. Rigid Steel Conduit (RSC) @ for feeder layout.
number 16 with 1/2 KO and shall be painted with red lead b. Wall outlets 300 mm AFP to center of device.
paint prior to installation.
7.) Wires and cables shall be of the aproved type and good for 600 Volts.
5
bearing the "PSA" mark unless specified or indicated 5.) All electrical materials to be used shall be new and of approved type for
7 otherwise all power lighting conductors shall be insulated both purpose and location intended.
8
for 600 volts minimum.
7

CONVENIENCE OUTLET LAY-OUT (GF)


SCALE 1:100 mts. CONVENIENCE OUTLET LAY-OUT (2F)
SCALE 1:100 mts.

CIVIL ENGINEERING DEPARTMENT


NAPAY, PEARLYNE JOY D. PROPOSED TWO-STOREY RESIDENTIAL
UNIVERSITY OF SCIENCE AND
S t u d e n t
B U I L D I N G ENGR. MARICEL P. SAMONTEZA 5
TECHNOLOGY OF SOUTHERN PHILIPPINES
YEAR: F O U R T H Y E A R D A T E
M A R C H
S U B M I T T E D :
1 7 , 2 0 1 8 Xavier Estates, Cagayan de Oro City
INSTRUCTOR 6
SECTION: B S C E 4 A - b 1
PLUMBING NOTES: PLUMBING SPECIFICTIONS:
P P
1. ALL SOIL PIPES AND WASTE PIPE SHALL PVC SERIES 1000 WITH BELL AND SPIGOT LEGEND:
P
JOINTS FIRMLY CAULK WITH PVC EPROXY.
WATER CLOSET
2. ALL WATER SUPPLY PIPES SHALL BE GALVANIZED IRON PIPE SCHEDULE 40.
LAVATORY
3. PROVIDE TWO (2) PERCENT SLOPE SEWER LINE. co CLEAN OUT
FLOOR DRAIN
4. ALL PLUMBING MATERIALS SHALL BE FREE FROM DEFECTS. GATE VALVE
FD AND SINK PIPE
5. ALL PLUMBING WORKS SHALL BE DONE BY EXPERIENCED JOURNEYMEN PLUMBERS,
UNDER THE DIRECT SUPERVISIONS OF A DULY LICENSED MASTER PLUMBER. SOIL AND WASTE PIPE
WATER SYSTEM PIPE
6. OTHERS ASPECTS NOT FOUND IN THE PLAN AND SPECIFICATIONS, THE LATEST EDITION
OF OF THE NATIONAL PLUMBING CODE OF THE PHILIPPINES OR THE R.A. 1378 SHALL
PREVAIL.

CATCH BASIN DETAIL


SEPTIC VAULT DETAIL

STANDARD SOIL PIPE

WATER DISTRIBUTION PLAN (GF) WATER DISTRIBUTION PLAN (2F)


SCALE 1:100 mts.
SCALE 1:100 mts.
FLOOR DRAIN DETAIL

SEPTIC
VAULT

UNDERGROUND PUBLIC SEWER/CANAL

PLUMBING PLAN- SANITARY


WORKS (2F)
PLUMBING PLAN- SANITARY
WORKS (GF)

SCHEMATIC DIAGRAM

CIVIL ENGINEERING DEPARTMENT


NAPAY, PEARLYNE JOY D. PROPOSED TWO-STOREY RESIDENTIAL
UNIVERSITY OF SCIENCE AND
S t u d e n t
B U I L D I N G ENGR. MARICEL P. SAMONTEZA 6
TECHNOLOGY OF SOUTHERN PHILIPPINES
YEAR: F O U R T H Y E A R D A T E
M A R C H
S U B M I T T E D :
1 7 , 2 0 1 8 Xavier Estates, Cagayan de Oro City
INSTRUCTOR 6
SECTION: B S C E 4 A - b 1

Vous aimerez peut-être aussi