Vous êtes sur la page 1sur 2

UniversilY Of TechnologY

Building and construction Eng. Dept


Final Exam - Fi6l Attempt - 2010/2011
Branch :Hrohwavs& Bridqes Enoineering class:4
sLb,e"r: o;siqn oi rein. coac.ere bnqses Trme . 3 Hours
r-;,"d Assist Prol. Alaa Al.khateeb Oate: 02/ 05' 2011
Open books and noles exatn. Answer 4 qlestons onlv.
Starl each answerwith a and fo ow the Ouesuons seqte.ce

Qlrln the tabe beow match each b.ldqelvpe with lhe propersile requnerneni

l lnenrorcea
lnentorcea couete stao sr
sraoG; Loaqire Br
span with heavv Loadnc
l!19!4edja!e !!9!lryl!!i99!v
]!19!4qd9!e q
;i- I neinioea orcrele oercird+ q!Iv!!4!elviih had soilbglE . -.-
Pre{ast p-Eie"<co-! Fr.B '5n
pre si.essed colllgE-Br
t" _!uso.'.ore'-
pre..,s o.q span
15m Lo's
'pcn
si'ale B
si.alF Br
a R'p'l r/esirrla bda
. A, os ordoF Bri lh ad h' mo€ e"<
__ I-qryry,
o -c"O" ."rru"
-6",,, ri' - I STall rl9:!:!{i9!!9
ra,lemveaent B'
- <--- - c. ort, '16"- u'
i--*A'." & v' wo" " deep r'arev 9'-
v
'o
o a,.;bi. s1o r
'pa.
B idq'
ro I eoiq6ss eaion Br. Lons rei.rorced condete deck-slab

cJ2: Under the HS20 AASHTO Loadins design the required ma n

re,n.o.cen-ctof oreo r-eirL- o.grdeso rledec". q o-rb'ooe


shown below. use /"= 6000 bsiand /, =60000 psi clearsp!tr 3: i
Weiin-q sudrce $eight =:ioPsf.

l:

l--.

--1
Q3: Under the HS20 AASHTo loading, design (deck slab thickness. rnain
reinforcement and secondary relnforcempnt)a iwo way sab brjdge
having a clear span of 12ft. Use /: =:1000 psi and //= 50oi)0 psi.

Q4: Redesign the same bridge in queslion 3 but under the Standard vehicte
c ass 100. Draw your final desig n.

05 The pretensloned flanged g rder with a constant eccentrcity lendon as

shown n lhe Figure below has the folowing propedies:

L=28m, y,=221mm, yb=693mrn, 4"=4.43'10s, l=3 11'10r0mnri e=588rnm.

ws=3.6 kN/m, wD=1 kN/m, wL=2.4 kN/m, tendon force mmediatetv after

tmnsfer P=1100 kN, R=82%, f"istvpa, fc=42Mpa, catcuate:

T-Gider stresses at suppods and mtdspan for ihe lop and bottom tber

immediatey afier transfer and check with ACI-Code permissibte vatues.

z-Girder stresses at suppods and mtdspan for the iop and botiom fber ai

service load siage and check wiih ACI Code pemtssibte vatues.

i. ----
j
[""
-er +

Vous aimerez peut-être aussi