Vous êtes sur la page 1sur 1

Fav 900 Chassis Number 23/3001 and up Testing

Fav 900 Engine / Injection Pump


Checking Start of Delivery VP 44 E
PM-Picturemodule
PMTAB_Picture
Important:
Bock injection pump. (Note sequence!)

- Loosen locking screw (Pos. A).

- Remove spacer washer (Pos. B).

- Tighten locking screw (Pos. A) .

PM-Picturemodule
PMTAB_Picture

Loosen TDP screw.

PM-Picturemodule
PMTAB_Picture

Turn cankshaft further until start of delivery , TDP


(+/- 0,5°) is reached.
Note:
If this position cannot be reached, the injection
pump drive pinion must be shifted by one
tooth.
Chapter 2700 Reg.G (Injection pump VP44 -
Replacement)

PM-Picturemodule
PMTAB_Picture

Tighten "TDP screw" at 25 Nm .

Date Version Page Capitel Index Docu-No.

01/2000 b 6/7 Checking Start of Delivery VP 44 2710 E 000003

Downloaded from www.Manualslib.com manuals search engine

Vous aimerez peut-être aussi