01 TRABAJOS PRELIMINARES
02 MOVIMIENTO DE TIERRAS
03 CONCRETO SIMPLE
04 CONCRETO ARMADO
06 MADERAMEN
06.03 ABRAZADERA DE VIGA LONG. CON TRANSV. Fe LISO DE 3/8" DE 14x33cm und 170.00
06.07 PERNO CINCADO DE 3/8x5 INCL. TUERCA Y ARANDELA A PRES. und 272.00
06.08 PERNO CINCADO DE 1/2x8 INCL. TUERCA Y ARANDELA A PRES. und 200.00
07 IMPACTO AMBIENTAL
08 VARIOS
GASTOS GENERALES 7%
TOTAL PRESUPUESTO
1,840.58
0.84 268.80
1.10 571.78
1,000.00 1,000.00
13,952.49
9.61 10,413.11
16.18 3,539.38
158,398.52
79,335.31
237.92 74,040.70
26.70 5,294.61
79,063.21
193.28 70,299.80
26.70 4,624.44
6.14 4,138.97
48,842.76
42,335.23
337.17 8,253.92
31.05 4,284.90
6.14 25,348.81
2,223.80 4,447.60
6,507.53
337.17 1,618.42
31.05 670.68
6.14 4,218.43
208,718.87
539.90 2,159.60
149.98 299.96
413.20 3,305.60
439.80 879.60
79.95 639.60
1,652.44 6,609.76
61.13 114,924.40
72.77 6,985.92
28.99 3,710.72
46.76 6,078.80
205.88 26,764.40
48.22 6,268.60
424.68 27,604.20
20.25 2,487.71
143,357.92
3.60 9,919.80
3.86 11,888.80
40.22 6,837.40
42.22 2,870.96
45.22 4,612.44
21.91 2,979.76
10.61 2,885.92
12.61 2,522.00
504.29 98,840.84
1,000.00
1,000.00 1,000.00
5,000.00
5,000.00 5,000.00
581,111.14
40,677.78
===========
621,788.92