FRIT 7237: Evaluation of Educational Needs and Programs

Evaluation Plan: Braxton County, Georgia

Alison Geigerman
Kayla Metheny
Kelsey Prentice
Anna Maudie Saxon
Implementation Evaluation

The goal of this project is to prepare teachers to effectively teach New State Standards

for Mathematics and integrate technology. Therefore, to effectively evaluate this project, the

team will need to use a mixed methods approach.

Implementation Questions Activities Duration

What is the quality of the 1. Questionnaires will be 1. Throughout the five-


initial experience and the given to teachers after day workshop and
follow up activities? each training session post workshop
2. Multiple observations meetings
will occur during all PD 2. Each workshop during
sessions the five day training

Did the program activities 1. Pre-survey for teachers 1. Beginning workshop


provide quality instruction to provide baseline data on June 25th
and model appropriate 2. Post-survey for teachers 2. Immediately after
classroom implementation? to determine workshop ends. No
instructional growth later than January.
3. Questionnaire after each 3. Throughout the
session on the quality of workshop. After each
the presenter and training session
content

What methods were used to 1. List of all participants 1. Provided by Ms.


ensure a variety of program enrolled for the Lawton no later than
participants? workshop June 20th
2. Brief questionnaire to 2. Questionnaires will be
determine basic given on the first day
demographic of the workshop, June
information 25th.

Did the program’s follow- 1. Interviews with teachers 1. Mid-implementation


up activities provide enough to provide insight into meeting
support to ensure correct strengths and 2. During the Fall
implementation? weaknesses Semester 2015
2. Two observations per
teacher to demonstrate
fidelity in
implementation
The quality of the initial experience will be evaluated using questionnaires and

observations. After the training sessions, teachers will be asked to take a brief questionnaire

about the quality of their workshop. Each session will also be observed by two people on the

project team. Each team member will submit their workshop notes at the end of the session.

Also, teachers will be given a pre- and post-survey to determine their knowledge growth about

New Mathematics Standards.

Participants for this workshop were selected by Ms. Lawton. She used email and paper

mailings to invite these teachers to participate in the summer workshop. Ms. Lawton has agreed

to provide a list of participants prior to June 20th. When the participants arrive, they will conduct

a brief interview with a project team member to gather some basic demographic information,

such as gender, race, age, years in this field of study, years in the profession.

During the mid-implementation workshop, teachers will participate in a brief interview

about the areas in which they are excelling and the areas that they feel they need more assistance.

After gathering this data, teachers will receive two unannounced observations by a project team

member. These observations will happen after the mid-implementation workshops.

Data Collection Schedule

Date Data Collected: Instruments used: Measures: Responsible


Party:

May 2014 Student Georgia Student achievement Project Team


Mathematics Milestones in mathematics member
Scores on a
standardized test

June 20, Participants Google Doc Variety of Ms. Lawton


2015 attending providing each participants
workshop participant's name
June 25, Pre-Survey for Use of Google Background Teachers and
2015 teachers Forms to complete knowledge of Project Team
survey participants on PBL Member
and NSSM

June 25, Demographics Google Doc from Variety of Teachers and


2015 Survey Ms. Lawton to be participants Project Team
completed by Member
teachers

June 25- Workshop Quality Use of Google Quality of sessions Teachers and
29, 2015 Survey Form to complete Project Team
survey member

June 29, Post-Survey for Use of Google Academic growth of Teachers and
2015 Teachers Forms to complete teachers about PBL Project Team
survey and NSSM Member

September Teacher Interview Interview Teacher knowledge Project Team


2015 Questionnaire on effective Member
implementation

October Teacher Observation Teacher knowledge Project Team


2015 Observation #1 Checklist on PBL, NSSM, Member
technology

December Teacher Observation Teacher knowledge Project Team


2015 Observation #2 Checklist on PBL, NSSM, Member
technology

May 2016 Student Georgia Student achievement Project Team


Mathematics Milestones in mathematics member
Scores on a
standardized test

Summative Evaluation

Questions Objective Addressed Assessment tools

Were teachers able to create Objective 1: create PBL modules  Teacher


PBL modules based on for mathematics based on examples lesson plans
examples from local businesses from local businesses and  Observation
and industries? industries. checklist
Were teachers able to integrate Objective 3: integrate available  Teacher
technology in PBL modules? instructional technology into PBL lesson plans
experiences.  Observation
checklist

Were teachers able to create, Objective 2: create PBL modules,  Teacher


implement, and evaluate PBL which address NSSM. lesson plans
modules addressing NSSM? Objective 4: implement and  Observation
evaluate the learning modules checklist
created.  Teacher
interview

The summative project questions above are linked to an objective listed in the proposal

for this professional development project. Each question will be answered with an assessment

tool. The project team will meet at the end of the project to evaluate the impact of this project on

teacher implementation and student achievement. The data collected throughout the workshop

will demonstrate a growth or lack of growth in both student achievement in mathematics and

teacher’s subject knowledge/implementation of NSSM. The project team will compile a report of

the data to determine if this project was successful in achieving the four objectives listed in the

proposal. This report will include strengths and weaknesses of the project and provide insight

into future professional development opportunities of this nature.