Project Kelani Right Bank WTP-Stage 2

ECL+ RDC JOINT VENTURE Scheme Treatment Plant


Component Pulsatube Clarifier Date 4/4/2018
Reference Calculations Output
5.4 Design of walls on grid 3/ (B-D) and 4/ (B-D)

Wind load Calculations

Wind load calculations were done according to CP3


CP3-CH5-P2 qs = 0.613*Vs2 ____1

F = q*Cf*Ae ____2

Vs = V*S1*S2*S3 _____3

S1 = 1

S2 = 1

S3 ====>
H = 10.53
Building category 1
(Open category with no obstruction)
Building class-3

S3 = 0.95
V = 38 m/s
Vs = 36.1 m/s

q = 798.9 N/m2

Table 10 l/w = 1.3


b/d = 0.8
h/b = 2.4