Vous êtes sur la page 1sur 20

PVC

single core/pvc /cu


C.S.A INSTALLATION
UNDER GROUND IN AIR
FLAT-Ground TREFOIL-Ground Duct SINGLE-Air FLAT-Air TREFOIL-Air
4 42 40 32 37 33 29
6 52 50 40 48 42 38
10 70 67 52 66 58 51
16 90 85 65 80 75 65
25 115 110 85 105 95 90
35 135 130 105 130 125 110
50 160 155 125 160 150 135
70 200 190 155 200 190 170
95 235 225 185 250 240 210
120 270 255 210 285 275 245
150 300 285 235 330 320 280
185 345 325 270 380 370 320
240 400 375 310 480 460 385
300 450 420 350 550 530 450
400 515 475 390 630 615 520
500 580 525 435 720 700 600
630 660 590 495 830 810 680
800 740 650 555 940 920 775
1000 820 710 605 1030 1010 860
1 2 3

MULTI core/pvc /cu


C.S.A Approx.
INSTALLATION Overall
Ground Duct Air Diameter
4 35 30 31 14.8 7.74
6 45 36 39 16 5.20
10 60 48 53 17.9 3.10
16 75 60 72 20.3 1.99
25 100 80 94 23.9 1.28
35 120 95 110 26.6 0.96
50 145 115 138 29.3 0.72
70 175 145 171 32.9 0.52
95 210 165 209 37.8 0.40
120 240 195 242 41.2 0.34
150 270 220 275 45.9 0.29
185 300 245 314 50.7 0.24
240 345 290 374 57 0.20
300 390 320 440 63.3 0.18
400 453 376 507 70.1 0.16
500 510 429 566 77.6
7

GROUND TEMPERATURE D.F.


25 30 35 40 45 50
PVC 1.13 1.07 1 0.93 0.85 0.76
XLPE 1.09 1.04 1 0.95 0.9 0.85

TABLE 4
BURIAL DEPTH D.F.
DEPTH
OF UP TO 70 mm2 90 UP TO 240 mm2
LAYING
0.5 1 1
0.6 0.99 0.98
0.8 0.97 0.96
1 0.95 0.93
1.25 0.94 0.92
1.5 0.93 0.9
1.75 0.92 0.89
2 0.91 0.88

TABLE 5
SOIL THERMAL DERATING FACTOR
SOIL
THERMA 80 90 100 120 150 200
L
FACTOR 1.17 1.12 1.07 1 0.91 0.8

TABLE 8
multi core laid direct in ground

number of touching 0.15 m 0.3 m 0.45 m 0.6 m


1 1 1 1 1 1
2 0.81 0.87 0.91 0.93 0.95
3 0.7 0.78 0.84 0.88 0.9
4 0.63 0.74 0.81 0.86 0.89
5 0.59 0.7 0.78 0.84 0.87
6 0.55 0.68 0.77 0.83 0.87
1 2 3

TABLE 9
air grouping factor
no of
no of cables
trays
1 2 3 4 6 9
1 1 0.88 0.82 0.79 0.76 0.73
2 1 0.87 0.8 0.77 0.73 0.68
3 1 0.86 0.79 0.76 0.71 0.66
1 2 3 4 6
1 1 1 0.98 0.95 0.91
2 1 0.99 0.96 0.92 0.87
3 1 0.98 0.95 0.91 0.85
1 2 3 4 6 9
1 1 0.88 0.82 0.78 0.73 0.72
2 1 0.88 0.81 0.76 0.71 0.7
1 2 3 4 6
1 1 0.91 0.89 0.88 0.87
2 1 0.91 0.88 0.87 0.85
1 2 3 4 6 9
1 1 0.87 0.82 0.8 0.79 0.78
2 1 0.86 0.8 0.78 0.76 0.73
3 1 0.85 0.79 0.76 0.73 0.7
1 2 3 4 6
1 1 1 1 1 1
2 1 0.99 0.98 0.97 0.96
3 1 0.98 0.97 0.96 0.93

cables laid in ducts in the ground


no. of cables touching 0.25m 0.5m 1m
1 1 1 1 1
2 0.85 0.9 0.95 0.95
3 0.75 0.85 0.9 0.95
4 0.7 0.8 0.85 0.9
5 0.65 0.8 0.85 0.9
6 0.6 0.8 0.8 0.9
PVC
single core/pvc /AL
C.S.A INSTALLATION
Approx. Approx.
Overall UNDER GROUND IN AIR Overall
Diameter FLAT-Ground
TREFOIL-GroundDuct SINGLE-Air FLAT-Air TREFOIL-AirDiameter
7 4
7.9 6
8.9 10
9.9 16 65 63 50 65 60 45 9.9
11.6 25 85 83 65 85 80 65 11.6
12.7 35 105 102 80 105 100 85 12.7
14.6 50 125 120 95 125 120 105 14.6
16.3 70 155 145 120 165 155 125 16.3
18.7 95 185 175 135 205 195 160 18.7
20.4 120 210 200 165 235 225 185 20.4
22.6 150 235 225 180 265 255 210 22.6
24.9 185 265 255 205 310 300 245 24.8
28.3 240 310 295 240 365 355 290 28.3
31.1 300 355 335 270 420 405 335 31.1
35.3 400 410 380 310 500 480 390 35.3
38.8 500 465 430 355 580 560 460 38.8
42.7 630 535 490 405 680 660 535 42.7
47.2 800 600 530 450 765 745 620 47.2
52 1000 665 585 495 840 820 690 52
4 5 6

MULTI core/pvc /AL


C.S.A Approx.
INSTALLATION Overall
Ground Duct Air Diameter
4
6
10 42 34 37 17.9
16 53 42 50 20.3 3.26
25 70 56 66 23.9 2.08
35 95 75 88 26.6 1.53
50 115 85 105 29.3 1.15
70 135 110 132 32.9 0.82
95 165 130 160 37.8 0.61
120 185 150 187 41.2 0.50
150 210 170 215 45.9 0.42
185 235 195 248 50.7 0.35
240 275 225 292 57 0.29
300 310 260 347 63.3 0.25
400 361 300 405 70.1 0.21
500 413 348 459 77.6
8

AIR TEMPERATURE D.F.


55 25 30 35 40 45 50 55
0.65 PVC 1.22 1.15 1.08 1 0.95 0.82 0.71
0.8 XLPE 1.14 1.1 1.05 1 0.9 0.89 0.84

300 & above

1
0.97
0.94
0.92
0.89
0.87
0.86
0.85

250 300

0.73 0.67

single core laid direct in ground


touching spacing=0.15 m spacing=0.3 m
number of ct.
trefoil flat trefoil flat trefoil flat
1 1 1 1 1 1 1
2 0.77 0.8 0.82 0.85 0.88 0.91
3 0.66 0.69 0.73 0.76 0.8 0.83
4 0.6 0.63 0.68 0.71 0.74 0.77
5 0.56 0.59 0.64 0.67 0.72 0.75
6 0.53 0.57 0.61 0.64 0.7 0.73
4 5 6

no of no of circuits
trays
1 2 3
touching 1 0.98 0.91 0.87
2 0.96 0.87 0.81 Htrays
Htrays 3 0.95 0.85 0.78
1 2 3
spaced 1 0.96 0.86 0.76
vtrays
2 0.95 0.84 0.73
1 2 3
1 1 0.97 0.96
touching 2 0.98 0.93 0.89 ladders
vtrays 3 0.97 0.9 0.86
1 2 3
spaced 1 1 0.98 0.96
2 0.97 0.93 0.89 Htrays
3 0.96 0.92 0.86
touching 1 2 3
1 1 0.91 0.89
vtrays
ladder 2 1 0.9 0.86
1 2 3
spaced 1 1 1 1
2 0.97 0.95 0.93 ladders
3 0.96 0.94 0.9
XLPE
single core /XLPE /cu
C.S.A INSTALLATION
Approx.
UNDER GROUND IN AIR Overall
FLAT-Ground
TREFOIL-GroundDuct SINGLE-Air FLAT-Air TREFOIL-AirDiameter
4 55 51 40 53 47 40 6.8
6 68 65 53 65 59 53 7.3
10 98 86 68 84 79 68 8.3
16 116 111 87 116 110 95 9.3
25 150 142 110 143 137 121 11
35 179 172 137 179 173 152 12.1
50 210 200 163 221 210 184 13.8
70 263 247 200 278 268 236 15.7
95 310 294 242 347 336 289 17.7
120 357 336 273 404 394 341 19.6
150 394 373 310 457 446 389 21.8
185 452 425 352 530 520 441 23.9
240 520 488 404 651 641 536 27.1
300 588 546 457 824 756 620 29.7
400 672 620 515 893 872 714 33.9
500 761 693 572 1008 987 814 37.4
630 872 777 651 1155 1134 956 41.9
800 957 861 735 1313 1292 1092 46.8
1000 1082 935 798 1449 1428 1208 51.5
9 10 11

MULTI core/pvc /cu


C.S.A Approx.
INSTALLATION Overall
Ground Duct Air Diameter
4 45 36 41 13.4 7.73
6 57 45 50 14.6 5.19
10 75 60 68 16.4 3.09
16 97 75 89 18.9 1.98
25 128 102 120 22.5 1.28
35 155 120 145 25.2 0.96
50 185 145 179 27.1 0.72
70 220 180 225 31.4 0.52
95 265 210 268 35.1 0.39
120 305 245 310 39.2 0.34
150 335 275 352 43.7 0.28
185 375 310 404 48.7 0.24
240 435 365 483 54.5 0.20
300 490 405 562 60.1 0.18
400 579 476 660 66.9 0.16
500 653 546 762 74.4
15
XLPE
pvc
single core/ XLPE /AL cu/pvc
C.S.A INSTALLATION mV/A/m
Approx.
UNDER GROUND IN AIR Overall FLAT
FLAT-Ground
TREFOIL-GroundDuct SINGLE-Air FLAT-Air TREFOIL-AirDiameter 7.83
4 5.287
6 3.184
10 2.068
16 89 87 66 89 84 63 9.3 1.357
25 113 110 84 116 110 95 11 1.034
35 137 131 105 142 137 121 12.1 0.793
50 163 155 121 173 168 147 13.8 0.595
70 200 189 152 221 215 179 15.7 0.469
95 236 226 179 284 273 215 17.7 0.41
120 278 263 215 326 315 242 19.6 0.354
150 310 294 236 373 362 299 21.8 0.312
185 352 336 267 436 420 336 23.9 0.272
240 410 389 315 515 499 399 27.1 0.247
300 467 436 357 578 567 462 29.7 0.224
400 541 504 410 693 677 541 33.9 0.208
500 609 567 467 809 788 630 37.4 0.194
630 698 646 536 945 924 746 41.9
800 788 704 599 1071 1050 851 46.8
1000 872 767 651 1176 1155 966 51.5
12 13 14

MULTI core/pvc /AL


C.S.A Approx.
INSTALLATION Overall
Ground Duct Air Diameter
4
6
10 52 42 48 16.4
16 68 52 62 18.9 3.48
25 90 71 84 22.5 2.22
35 120 95 110 25.2 1.62
50 145 110 136 26.5 1.22
70 175 140 168 30.8 0.87
95 210 165 205 33.5 0.65
120 235 190 236 37.6 0.52
150 265 215 278 42.1 0.44
185 290 240 315 47.1 0.37
240 340 280 378 52.9 0.30
300 390 325 446 58.5 0.26
400 461 379 526 66.9 0.21
500 527 441 615 74.4
16
pvc xlpe
cu/pvc al/pvc cu/xlpe al/xlpe
mV/A/m mV/A/m mV/A/m mV/A/m mV/A/m mV/A/m mV/A/m
TREFOIL FLAT TREFOIL FLAT TREFOIL FLAT TREFOIL
7.77 8.34 8.28
5.226 5.63 5.57
3.124 3.40 3.34
2.008 3.343 3.283 2.20 2.14 3.56 3.50
1.297 2.161 2.1 1.44 1.38 2.30 2.24
0.971 1.602 1.542 1.09 1.02 1.70 1.64
0.732 1.222 1.162 0.84 0.78 1.29 1.23
0.534 0.89 0.83 0.62 0.56 0.94 0.88
0.408 0.686 0.623 0.49 0.43 0.72 0.66
0.349 0.569 0.509 0.42 0.36 0.59 0.53
0.294 0.49 0.43 0.37 0.31 0.51 0.45
0.252 0.42 0.36 0.32 0.26 0.44 0.38
0.211 0.353 0.293 0.28 0.22 0.37 0.31
0.187 0.312 0.252 0.25 0.19 0.32 0.26
0.164 0.274 0.214 0.22 0.16 0.28 0.22
0.148 0.245 0.185 0.21 0.15 0.26 0.20
0.134 0.222 0.162 0.19 0.13 0.22 0.16
Cable sizing calculation TOUCHING
According to IEC & BS 7671 0.15 m
project no. : 2017 0.3 m
REV: A 0.45 m
0.6 m
Feeder name : F-DB with multi-core Fed From: XXX

Circuit Breaker: V = 400 V

Ib = 43.3 x 1.25 = 54.13 A


In = 35 A
Derating factor
Installation: GROUND Ambient T : 25 1.13
no. of cables: 4 0.74
Insulation type : PVC type : 0.15 m 1.00
no. of trays: 2 1.00
Conductor type : CU burial depth 0.8 1 0.94
soil thermal 100 1.07
D.F = 0.841

cable size
1 // (4x 300 ) + (1x 16 )
ccc = 390 Iz = 328.0 A cccc1 328.00948
Iz >= In True 328.009484
I2 <= 1.45 Iz True
Voltage drop: LENGTH = 10 m
mv/A/L = 0.18
(mv/A/L) x Ib x L = 0.02%
VD=
1000 fed from : Panel

Accumulated V.D. = 0.02% KVA= 1000


Z% Imp.= 6%
Short circuit #REF! kA= 24.1
1.04

R.E.Symm.Fault (in kA) = #REF! #REF!

PANELBOARD SCHEDULE project no. : 2017


REV: A
Panel Name : DB with multi-core location : Type : Surface
Fed from :
ct ct WIRE EARTH Additional C.B TCL (VA) TDL (VA)
SIZE SIZE LOAD TYPE LOAD (VA)
no. ref. accessory (A) R Y B R Y B
(mm2) (mm2)
1 R1 3 3 LIGHTING 10000 10000 10000
2 Y1 3 3 LIGHTING 10000 10000 10000 1 phase
3 B1 3 3 LIGHTING 10000 10000 10000
4 R2 0 0
5 Y2 0 0 1 phase
6 B2 0 0
7 R3 0 0
8 Y3 0 0 1 phase
9 B3 0 0
10 R4 0 0
11 Y4 0 0 1 phase
12 B4 0 0
13 R5 0 0
14 Y5 0 0 1 phase
15 B5 0 0
16 R6 0 0
17 Y6 0 0 1 phase
18 B6 0 0
19 R7 0 0
20 Y7 0 0 1 phase
21 B7 0 0
22 R8 0 0
23 Y8 0 0 1 phase
24 B8 0 0
25 R9 0 0
26 Y9 0 0 1 phase
27 B9 0 0
28 R10 0 0
29 Y10 0 0 1 phase
30 B10 0 0
31 R11 0 0
32 Y11 0 0 1 phase
33 B11 0 0
34 R12 0 0
35 Y12 0 0 1 phase
36 B12 0 0
37 R13 0 0
38 Y13 0 0 1 phase
39 B13 0 0
40 R14 0 0
41 Y14 0 0 1 phase
42 B14 0 0
43 R15 0 0
44 Y15 0 0 1 phase
45 B15 0 0
46 R16 0 0
47 Y16 0 0 1 phase
48 B16 0 0
49 R17 0 0
50 Y17 0 0 1 phase
51 B17 0 0
52 R18 0 0
53 Y18 0 0 1 phase
54 B18 0 0
55 R19 0 0
56 Y19 0 0 1 phase
57 B19 0 0
58 R20 0 0
59 Y20 0 0 1 phase
60 B20 0 0
61 R21 0 0
62 Y21 0 0 1 phase
63 B21 0 0
64 R22 0 0
65 Y22 0 0 1 phase
66 B22 0 0
67 R23 0 0
68 Y23 0 0 1 phase
69 B23 0 0
70 R24 0 0
71 Y24 0 0 1 phase
72 B24 0 0

DEMAND FACTORS : CABLE : TOTAL 10000 10000 10000 10000 10000 10000
LIGHTING 1 3 1 // (4x 300 ) + (1x 16 ) R Y B R Y B
POWER 0.4 4 30000 30000
MCCB Photocell
A.C 0.7 6 Main CB = 35 A Split
6
✘ INCOME
Indicatin and 100
ELCB,
HEATING 0.7 Short ct. = #REF! KA Bus
MOTORS 0.7 6 ✘ R
g Timer
mA required Shunt trip
ELCB,
MISCELLANEOUS 1 6 Contactor
Lamps required
30 mA Metering
and PB
required
Cable sizing calculation TOUCHING
According to IEC & BS 7671 0.25m
project no. : 2017 0.5m
REV: A 1m
XXX
Feeder name : F-SMDB Fed From: XXX

Circuit Breaker: V = 400 V

Ib = 43.3 x 1.25 = 54.13 A


In = 35 A
Derating factor
Installation: DUCT Ambient T : 35 1
no. of cables: 3 1
Insulation type : XLPE type : TOUCHING 0.75
no. of trays: 1 1.00
Conductor type : CU burial depth 0.8 1 0.94
soil thermal 120 1
D.F = 0.705

cable size
1 // (4x 300 ) + (1x 150 )
ccc = 405 Iz = 285.5 A cccc3 285.525
Iz >= In True 285.525
I2 <= 1.45 Iz True
Voltage drop: LENGTH = 10 m
mv/A/L = 0.177
(mv/A/L) x Ib x L = 0.02%
VD=
1000 fed from : TR

Accumulated V.D. = 0.02% KVA= 1000


Z% Imp.= 6%
Short circuit 9.6 kA= 24.1
1.02

R.E.Symm.Fault (in kA) = 21.7 10.62

PANELBOARD SCHEDULE project no. : 2017


REV: A
Panel Name : SMDB location : Type : Surface
Fed from :
ct ct C.B LOAD TCL (VA) TDL (VA)
CABLE SIZE PANEL NAME
no. ref. (A) (VA) R Y B R Y B
1 R1 10000 5000
2 Y1 1 // (4x 300 ) + (1x 16) DB with multi-core 35 30000 10000 5000
3 B1 10000 5000
4 R2 10000 5000
5 Y2 1 // (4x 300 ) + (1x 16) DB with multi-core 35 30000 10000 5000
6 B2 10000 5000
7 R3
8 Y3
9 B3
10 R4
11 Y4
12 B4
13 R5
14 Y5
15 B5
16 R6
17 Y6
18 B6
19 R7
20 Y7
21 B7
22 R8
23 Y8
24 B8
25 R9
26 Y9
27 B9
28 R10
29 Y10
30 B10
31 R11
32 Y11
33 B11
34 R12
35 Y12
36 B12
37 R13
38 Y13
39 B13
40 R14
41 Y14
42 B14
43 R15
44 Y15
45 B15
46 R16
47 Y16
48 B16
49 R17
50 Y17
51 B17
52 R18
53 Y18
54 B18
55 R19
56 Y19
57 B19
58 R20
59 Y20
60 B20
61 R21
62 Y21
63 B21
64 R22
65 Y22
66 B22
67 R23
68 Y23
69 B23
70 R24
71 Y24
72 B24
DEMAND FACTORS : TOTAL 20000 20000 20000 10000 10000 10000
CABLE : 1 // (4x 300 ) + (1x 150 ) R Y B R Y B
COINCIDENCE FACTOR : 0.5 60000 30000
Main CB = A MCCB Photocell
✘ Split Bus
Short ct. = KA INCOMER ELCB, 100
and Timer
Indicating
✘ mA required
ELCB, 30 Shunt trip
Lamps
Contactor required
mA Metering
and PB
required
Cable sizing calculation TOUCHING
According to IEC & BS 7671 0.25m
project no. : 2017 0.5m
REV: A 1m
XXX
Feeder name : F-SMDB 1c Fed From: XXX

Circuit Breaker: V = 400 V

Ib = 43.3 x 1.25 = 54.13 A


In = 35 A
Derating factor Duct
Installation: DUCT Ambient T : 35 1
no. of cables: 3 1 dddf1
Insulation type : XLPE type : TOUCHING 0.75
no. of trays: 2 1.00
Conductor type : CU burial depth 0.8 1 0.94
soil thermal 120 1
installation : Trefoil D.F = 0.705

cable size
1 // (1x 630 ) + (1x 150 )
ccc = 651 Iz = 459.0 A cccs3 458.955
Iz >= In True 458.955
I2 <= 1.45 Iz True
Voltage drop: LENGTH = 10 m
mv/A/L = 0.131
(mv/A/L) x Ib x L = 0.01%
VD=
1000 fed from : TR

Accumulated V.D. = 0% KVA= 1000


Z% Imp.= 6%
Short circuit 9.6 kA= 24.1
0.76

R.E.Symm.Fault (in kA) = 22.3 10.36

PANELBOARD SCHEDULE project no. : 2017


REV: A
Panel Name : SMDB 1c location : Type : Surface
Fed from :
ct ct C.B LOAD TCL (VA) TDL (VA)
CABLE SIZE PANEL NAME
no. ref. (A) (VA) R Y B R Y B
1 R1 10000 5000
2 Y1 1 // (4x 300 ) + (1x 16) DB with multi-core 35 30000 10000 5000
3 B1 10000 5000
4 R2 10000 5000
5 Y2 1 // (4x 300 ) + (1x 16) DB with multi-core 35 30000 10000 5000
6 B2 10000 5000
7 R3
8 Y3
9 B3
10 R4
11 Y4
12 B4
13 R5
14 Y5
15 B5
16 R6
17 Y6
18 B6
19 R7
20 Y7
21 B7
22 R8
23 Y8
24 B8
25 R9
26 Y9
27 B9
28 R10
29 Y10
30 B10
31 R11
32 Y11
33 B11
34 R12
35 Y12
36 B12
37 R13
38 Y13
39 B13
40 R14
41 Y14
42 B14
43 R15
44 Y15
45 B15
46 R16
47 Y16
48 B16
49 R17
50 Y17
51 B17
52 R18
53 Y18
54 B18
55 R19
56 Y19
57 B19
58 R20
59 Y20
60 B20
61 R21
62 Y21
63 B21
64 R22
65 Y22
66 B22
67 R23
68 Y23
69 B23
70 R24
71 Y24
72 B24
DEMAND FACTORS : TOTAL 20000 20000 20000 10000 10000 10000
CABLE : 1 // (1x 630 ) + (1x 150 ) R Y B R Y B
COINCIDENCE FACTOR : 0.5 60000 30000
Main CB = A MCCB Photocell
✘ Split Bus
Short ct. = KA INCOMER ELCB, 100
and Timer
Indicating
✘ mA required
ELCB, 30 Shunt trip
Lamps
Contactor required
mA Metering
and PB
required
Cable sizing calculation H tray-flat
According to IEC & BS 7671 V tray-flat
project no. : 2017 Ladder-flat
REV: A H tray-trefoil
V tray-trefoil
Feeder name : F-single Fed From: Ladder-trefoil

Circuit Breaker: V = 220 V

Ib = 6.818 x 1.25 = 8.523 A


In = 35 A
Derating factor Trefoil-AIR
Installation: AIR Ambient T : 35 1.05
no. of cables: 3 1 dddf4
Insulation type : XLPE type : H tray-flat 1.00
no. of trays: 2 0.81
Conductor type : CU burial depth 0.8 0.81 1
soil thermal 120 1
installation : Trefoil D.F = 0.8505

cable size
1 // (1x 300 ) + (1x 150 )
ccc = 620 Iz = 527.3 A cccs3 527.31
Iz >= In True 527.31
I2 <= 1.45 Iz True
Voltage drop: LENGTH = 10 m
mv/A/L = 0.192
VD= (mv/A/L) x Ib x L = 0.01%
1000 fed from : TR

Accumulated V.D. = 0% KVA= 1000


Z% Imp.= 6%
Short circuit 2.904 kA= 43.7
1.11
R.E.Symm.Fault (in kA) = 31.7 4.01

PANELBOARD SCHEDULE project no. : 2017

Panel Name : single location : Type : Surface REV: A


Fed from :
ct ct WIRE EARTH Additional C.B LOAD
SIZE SIZE LOAD TYPE CL (VA) DL (VA)
no. ref. (mm2) (mm2) accessory (A) (VA)
1 R1 3 3 LIGHTING 500 500
2 Y1 3 3 LIGHTING 500 500
3 B1 3 3 LIGHTING 500 500
4 R2 0
5 Y2 0
6 B2 0
7 R3 0
8 Y3 0
9 B3 0
10 R4 0
11 Y4 0
12 B4 0
13 R5 0
14 Y5 0
15 B5 0
16 R6 0
17 Y6 0
18 B6 0
19 R7 0
20 Y7 0
21 B7 0
22 R8 0
23 Y8 0
24 B8 0
25 R9 0
26 Y9 0
27 B9 0
28 R10 0
29 Y10 0
30 B10 0
31 R11 0
32 Y11 0
33 B11 0
34 R12 0
35 Y12 0
36 B12 0
37 R13 0
38 Y13 0
39 B13 0
40 R14 0
41 Y14 0
42 B14 0
43 R15 0
44 Y15 0
45 B15 0
46 R16 0
47 Y16 0
48 B16 0
49 R17 0
50 Y17 0
51 B17 0
52 R18 0
53 Y18 0
54 B18 0
55 R19 0
56 Y19 0
57 B19 0
58 R20 0
59 Y20 0
60 B20 0
61 R21 0
62 Y21 0
63 B21 0
64 R22 0
65 Y22 0
66 B22 0
67 R23 0
68 Y23 0
69 B23 0
70 R24 0
71 Y24 0
72 B24 0
DEMAND FACTORS : cable TOTAL 1500 1500
LIGHTING 1 3 1 // (1x 300 ) + 150 )
POWER 0.4 4
A.C 0.7 6 Main CB = A MCCB Photocell
✘ Split Bus
HEATING 0.7 6 Short ct. = KA INCOMER ELCB, 100
and Timer
Indicating
MOTORS 0.7 6 ✘ mA required Shunt trip
Lamps ELCB, 30
MISCELLANEOUS 1 6 Contactor required
mA Metering
and PB
required

Vous aimerez peut-être aussi