Vous êtes sur la page 1sur 22

Alternative 1 04/04/18

COMMUNITY
P.S. ENTRY • renovate Fusco & Collomb
ENTRY
• “expand” Fusco
HUMANITIES
STEAM
P.E.
P.E. • compact floor plan
• 225 + 80 parking spaces
PARKING • distinct entrances
PERFORMING UNDER
ARTS • community spaces on same floor
• centrally located library
• green roof near science
PROGRAMS
ENTRY MAIN
ENTRY

<< Mass Ave

Bike Path
New Toilet Facility Access

Pre-school
Drop-off

Drop-off

mbta Mass A
ve

mbta
225 Parking Spaces + 80 under building
Alternative 1
LABBB VISUAL
ARTS

OLD
HALL

ARLINGTON HIGH SCHOOL


3rd
FLOOR PROGRAMS MAIN
ENTRANCE ENTRANCE

GYM
PRE-
SCHOOL

CAFE PERF.
ARTS
2nd
FLOOR

COMMUNITY ENTRANCE

DISTRICT LOCKERS
PRE- ADMIN
SCHOOL
PS
ENTRANCE

PARKING
1st
FLOOR
Alternative 1
STEAM

HISTORY
SCI

6th

ARLINGTON HIGH SCHOOL


FLOOR

GREEN
ROOF
STEAM

ELA
SCI

5th
FLOOR

STEAM

W.L.
SCI
LIBRARY
4th
FLOOR
Alternative 1A 04/04/18

COMMUNITY
ENTRY
HUMANITIES
• renovate Fusco & Collomb
P.E.
• “expand” Fusco
• build new first provides swing space
PERFORMING • 204 + 80 parking spaces
ARTS
• distinct entrances
• community spaces on same floor
STEAM
PROGRAMS
ENTRY
MAIN
ENTRY

<< Mass Ave

New Toilet Facility Bike Path


Access

Pre-school
Drop-off

Drop-off

mbta Mass A
ve

mbta
204 Parking Spaces + 80 under building
Alternative 1A
GYM
LABBB

OLD
HALL LIB
3rd

ARLINGTON HIGH SCHOOL


STEAM

LOCKERS
PRE-
SCHOOL

PIT CAFE
PERF.
ARTS
KIT
2nd

DISTRICT
PRE-
SCHOOL

PARKING

1st
Alternative 1A
HISTORY

6th

ARLINGTON HIGH SCHOOL


STEAM

ELA

5th
STEAM

W.L.

LIB

4th
STEAM
Alternative 2 04/04/18

• renovate Fusco & Collomb


P.E. W/ • central circulation “Main St.”
GREEN ROOF
• distinct entrances
• 168 parking spaces
P.S. • gym/aud together, cafe above
ENTRY
• centrally located library
AMPHITHEATER
• green roof and amphitheater

PROGRAMS
ENTRY MAIN
ENTRY

<< Mass Ave

New Toilet Facility


Bike Path
Access
Pre-school
Drop-off

Drop-off

mbta Mass A
ve
mbta
168 Parking Spaces
Alternative 2
W.L.

OLD
HALL AMPHITHEATER

ARLINGTON HIGH SCHOOL


3rd
FLOOR
PROGRAMS MAIN ENTRANCE
ENTRANCE

VISUAL PRE-
ARTS SCHOOL

PIT CAFE

2nd
FLOOR

COMMUNITY PS
ENTRANCE ENTRANCE

PRE-
DISTRICT GYM SCHOOL
ADMIN

PERF.
LOCKERS ARTS
1st
FLOOR
Alternative 2
MATH/
SCIENCE

6th

ARLINGTON HIGH SCHOOL


FLOOR

HISTORY/
SCIENCE

5th
FLOOR

GREEN ROOF

ELA/
SCIENCE

LABBB

4th LIBRARY
FLOOR
Alternative 4 04/04/18

COMMUNITY
PROGRAMS ENTRY • renovate Collomb
ENTRY ACADEMICS ACADEMICS • programs “radiate” off central cafe/lib
• cafe/aud & gym/upper aud together

P.S. • distinct entrances


ENTRY • 186 parking spaces
P.E.
ARTS • cafeteria with direct outdoor access
• centrally located library
• green roof/amphitheater outside lib

MAIN
ENTRY

<< Mass Ave

New Toilet Facility

Bike Path
Access

Drop-off

Drop-off

mbta Mass A
ve

mbta
186 Parking Spaces
Alternative 4
ELA
SCI

ARLINGTON HIGH SCHOOL


ARTS

3rd MAIN ENTRANCE

PRE-
SCHOOL

GYM

2nd
COMMUNITY
ENTRANCE PS
ENTRANCE
DISTRICT PRE-
ADMIN SCHOOL

LABBB CAFE
PERF.
ARTS

LOCKERS

1st
Alternative 4
MATH
W.L.
SCI

ARLINGTON HIGH SCHOOL


6th

MATH

W.L. SCI

5th

HISTORY

SCI

GREEN
ROOF
AMPHITHEATER

LIBRARY

4th
Alternative 5 04/04/18

COMMUNITY
ENTRY • maintain historic elements of Collomb
• frame the front green
P.E.
• build in front/more open space at rear
STEM ARTS
• build new first provides swing space
5
4
AMPHITHEATER
3
PARKING • 218 + 65 parking spaces
UNDER • distinct entrances
HUMANITIES
P.S. HUMANITIES • community spaces on same floor
ENTRY
• centrally located library
MAIN • green roof/amphitheater
ENTRY

<< Mass Ave

Bike Path
Access

New Toilet Facility

Drop-off

mbta
Mass A
mbta
ve

218 Parking Spaces + 65 under building


Alternative 5
ARTS

LIBRARY

PROGRAMS AMPHITHEATER

ENTRANCE

ARLINGTON HIGH SCHOOL


PRE MAIN
SCHOOL ENTRANCE
ELA
PS
3rd ENTRANCE
FLOOR

PERF.
GYM ARTS
CAFE
2nd
FLOOR

COMMUNITY ENTRANCE
DISTRICT
ADMIN.

LOCKERS
PARKING

1st
FLOOR
Alternative 5
W.L. HISTORY

6th

ARLINGTON HIGH SCHOOL


FLOOR

SCIENCE
GREEN ROOF

MATH
W.L. HISTORY

5th
FLOOR

SCIENCE

LIBRARY

MATH
LABBB
ELA

PRE
4th SCHOOL
FLOOR
Alternative 6 04/04/18

• all new construction


COMMUNITY • provide new “21st century” front
ENTRY
• build in front/ more open space at rear
P.S. ENTRY • build new first provides swing space
P.E.
PERFORMING • 176 parking spaces
ARTS
• programs “spiral” around central core
• cafe/aud & gym/upper aud together
STEAM • cafeteria with direct outdoor access
HUMANITIES
• centrally located library

MAIN
• Amphitheater
ENTRY

<< Mass Ave

New Toilet Facility

Bike Path
Access

Drop-off
Pre-school
Drop-off

mbta
Mass A
ve
mbta
172 Parking Spaces
Alternative 6
AMPHITHEATER

ARLINGTON HIGH SCHOOL


STEAM
MAIN
3rd ENTRANCE

PRE-
SCHOOL

GYM

2nd

COMMUNITY
ENTRANCE PRE-
SCHOOL PS
LABBB ENTRANCE

CAFE PERF
LOCKERS ARTS

1st
Alternative 6
HUMANITIES

ARLINGTON HIGH SCHOOL


STEAM

6th

HUMANITIES

STEAM

5th DISTRICT
ADMIN

HUMANITIES
LIBRARY

STEAM

4th
Alternative 6A 04/04/18

• all new construction


COMMUNITY
ENTRY • provide new “21st century” front
• build new first provides swing space
P.E. P.S. ENTRY • build in front/ move wing to side =
more open space at rear

• 238 parking spaces


STEAM
HUMANITIES

MAIN
ENTRY

<< Mass Ave

New Toilet Facility


Bike Path
Access

Drop-off
Pre-school
Drop-off

mbta
Mass A
ve
mbta
238 Parking Spaces
Alternative 6A
AMPHITHEATER
LIB

ARLINGTON HIGH SCHOOL


STEAM
MAIN
3rd ENTRANCE

PRE-
SCHOOL
GYM

2nd
COMMUNITY PS
ENTRANCE ENTRANCE

LABBB
PERF PRE-
CAFE ARTS SCHOOL
LOCKERS

1st
Alternative 6A
HUMANITIES

ARLINGTON HIGH SCHOOL


STEAM

ARTS
6th

HUMANITIES

STEAM

5th

DISTRICT
ADMIN

HUMANITIES
LIBRARY

STEAM

4th
Alternative 7 04/04/18

• all new construction


• build all in single construction phase
• build in front/more open space at rear
• increase parking and additional fields
P.E./STEAM
PERF. ARTS/
HUMANITIES
LIBRARY

PRE-SCHOOL
ENTRY MAIN ENTRY
DISTRICT
ENTRY

Mass Ave

Alternative 7 - Site Plan and Floor Plans, not available 04/04/18

Vous aimerez peut-être aussi