Hyderabad Metro
Bringing in
Lifestyle Changes
Hyderabad Metro Rail, a PPP project involving the
Government of Telangana and L&T Metro Rail (Hyderabad)
Limited (LTMRHL) is poised to give Hyderabad, India’s IT
and pharmaceutical powerhouse, a people-friendly, green,
seamlessly connected intermodal mass transit system.
T
he project, one of the world’s The project won the best Global
largest PPP Metro project, aims Engineering Project of the Year 2013
to bring lifestyle changes in award given by the Global Infrastructure
Hyderabad and transform it into the Leadership Forum, from among the
nation’s preferred city. Hyderabad world’s top 100 infrastructure projects at
Metro Rail (HMR) will be integrated the Forum’s 6th Annual Conference held
with existing railway stations, the in New York.
present suburban railway network
It also won the RoSPA (Royal Society
(MMTS) and bus stations. The 72km
for Prevention of Accidents) Gold Award
long, elevated metro will run through
for Construction Safety and Occupational
three high density corridors of the city
Health for the year 2013 at Glasgow, UK,
and will have modern, high-class metro
Metro Rail Project of the Year 2013 from
stations every 1km of the route. But
Construction Week India, Mumbai as well
HMR is not a simple Metro, rather it is an
as the American Concrete Institute (ACI)
urban redesign and rejuvenation effort
Award for the year 2013 at Mumbai
designed to transform Hyderabad into a
people friendly green city. The ‘Transit+’ A metro rail project is usually thought
concept on which it is based provides last of as an engineer’s paradise, but at
mile connectivity with Non-Motorised HMR, the emphasis is on building
Transport (NMT), pedestrian facilities a People’s Project, in spite of some
& street furniture, eco-friendly stations remarkable engineering achievements
with natural ventilation, sky-walks, that the project boasts of, such as the
ramps, escalators, elevators and a host of unique cantilever design, the first metro
commuter-friendly facilities. to have this in India. Hyderabad, the
fifth most populous city of India with a
There will be a total of 66 stations
population of about eight million people,
along the three corridors. Parking facilities
has witnessed a enormous growth of
and circulation areas are being offered at
private vehicles due to which it has been
strategic locations along the corridors on
experiencing tremendous pressures on
land provided by the state government.
its transport services, especially with
Green Initiatives
the absence of sidewalks. Thus one and Paris to Bogota, Singapore, Hong clearance required for the road below is
of the principal aims of HMR project Kong and Bangkok to study their metro 5.5m. It is in the 3m space between the
is to make Hyderabad a happier city systems. At Bogota, the mayor Enrique two that the skywalks are being built.
for the citizens. This begins by making Peñalosa had created quality public
Engineering Features
it a city for citizens and not cars. The space, provided good connectivity and
project will make it a city for children, introduced bicycle stations at the bus The metro stations’ cantilever type
senior citizens, differently abled and stops, transforming one of the worst design, mentioned earlier, has each
women, providing gender equality in cities into one of the best. In London, station resting on just 10 central pillars,
its services. It will provide Better Air the team found that the commuter a spine & wings and no side-pillars
Quality due to the sharp reduction in did not have to walk more than five – the first such design in India. This
fossil fuel usage, quality public spaces. minutes to take the metro. HMR is also design avoids portal structures and
Improved accessibility and affordable implementing Singapore’s ‘one-hour tunnel effect over the road at Metro
transportation can enhance productivity. city’ concept where no journey within stations and gives a clear, open view of
the city will take longer than one hour. the road below.
Bus-bays and auto-bays will also be
A major inspiration for HMR’s skywalks
constructed beneath the metro rail The metro would have check rails,
came from the BTS Skytrain elevated
stations, besides green plantation and also called restraining rails, procured
mass transit system in Bangkok. In case
other concepts as part of a strategy of from Tata Steel, France, to minimise
of the Skytrain, after construction, it
landscaping the areas under the viaduct wear and tear of the main rails, and
was observed that the space between
of metro rail corridors. HMR plans to prevent trains from derailing while
the elevated tracks and road below
to have exclusive women metro rail negotiating sharp curves. Another
was unused. This space was then used
stations besides a few stations catering special feature is the Track Master, a
to construct skywalks that connected
to youth and farmers. unique instrument for checking the
the mass transit stations to retail,
parameters of tracks and to enhance
HMR has been inspired and draws entertainment or educational facilities.
the quality of track installation. This
from the best of mass transit systems
HMR uses a similar design and has been procured from M/s Trimble
the world over. NVS Reddy, Managing
concept. The tracks are situated at USA. This instrument is being used
Director, Hyderabad Metro Rail Limited,
a height of 8.5m height while the in India for the second time after
and his team visited cities from London
Chennai; L&T is the first to introduce efficiency, cost considerations & better
this technology in India, both in economics of the elevated system.
Chennai & Hyderabad. Another first The difficult terrain and crowded
is the simulation study based track spaces have been tackled with better
design used for the project – the first engineering solutions and fine tuning
time this has been used for a metro of the alignment. The construction
project in the country. In this process, method is PSC segmental method and
before the tracks were actually 70% of the construction is through
designed, the probable speed of train pre-casting.
in a particular stretch was determined
by carrying out a simulation study. A prominent feature of the
Based on this data the track was Hyderabad Metro is its emphasis on
accordingly designed only for that intermodal integration. The metro
particular speed in that particular will be integrated with existing rail
stretch. This avoided the need for terminals, the city’s suburban rail
designing the track for much higher MMTS stations & bus depots and will
speeds than required. also link to a new bus rapid transport
(BRT) system throughout the city.
Further, this process offers better
One of the principal aims ride comfort to the passengers, reduces
There will be “Merry go round” feeder
buses between metro stations &
of HMR project is to rail and wheel wear as well as loading catchment areas, with seamless travel
make Hyderabad a happier on the Viaduct and increases the being ensured between these different
productivity in track installation. modes and the Metro by the facility
city for the citizens. This
HMR is a completely elevated Metro of travel on the same ticket. Unlike
begins by making it a city Rail project. Underground construction most mass transit systems in the
for citizens and not cars has been avoided because of the world where intermodal connectivity
tough rocky terrain conditions of is retrofitted, HMR will have built in
Hyderabad and also for energy intermodal connectivity.
Bharat Nagar
Erragadda Jubilee Bus Station
ESI 2
Prakash Nagar Paradise Parade Grounds
Shilparamam 3 Hitec City Madhura
Yusufguda Nagar
S.R.Nagar
Durgam Rasoolpura
Cheruvu Begumpet Mettuguda
Madhapur PS Ameerpet Secunderabad R.S
Jubilee Hills Secunderabad
Peddamma Temple Road No.5 Panjagutta
Tarnaka
Gandhi Hospital
Jubilee Hills Irrum Manzil Habsiguda
Check Post Musheerabad
Khairatabad NGRI
Survey of India
Lakdi-ka-pul
RTC X Road
Assembly Chikkadpally Uppal
Nampally Narayanaguda
Shamsheergunj
1
L.B.Nagar
Jangammet
Falaknuma 2
The total potential for TOD • L&T Rambøll – Design & Traffic Consultant
development of HMR is 18.5 million • L&T Construction – Detailed Engineering
square feet, with 12.5 million at the
• Skyline Archon (Hyd) Private Limited – Traffic Management
terminals and 6 million at the metro
stations. L&T Metro Rail will develop • Louis Berger was appointed independent engineering consultant by L&T Metro,
facilities for a wide variety of sectors Hyderabad Metro Rail Limited and the then Government of Andhra Pradesh.
in the TOD areas – Office Spaces
for IT/ITES and other companies,
hotels, service apartments etc for the HMR Main Features feature Automatic Train Operation (ATO)
hospitality sector, educational facilities, and Automatic Train Protection. The
hospitals, polyclinics for the healthcare Rolling Stock
coaches have a number of other safety
industry, convenience retail stores The coaches for the Metro are being features such as alarms for passenger
at metro stations and a multitude supplied by Korean based Hyundai emergencies and coach doors & closing,
of others – warehouses, convention Rotem. Hyundai Rotem was chosen, slip/slide protection for the train wheels,
centres, theme parks, entertainment based on considerations of technology CCTV in all the cars, derailment guard
zones etc. These facilities can be either and price as well as cost of maintenance, on rails, provision for enabling platform
customized for specific clients or can be service and availability of spares. The screen doors, smoke & fire detectors
multi-client facilities. basic train set is a 3-set Driver Motor Car and fire extinguishers in driver’s cab and
For the first phase of TOD, L&T Metro – Trailer Car – Driver Motor Car (DMC- saloon cars. The passenger coaches have
Rail has already initiated developments TC-DMC) set which can be extended longitudinal seats with maximum space
along six million square feet of space to a 6-set Driver Motor Car – Trailer for standing passengers and a dedicated
at important locations along the Car – Motor Car – Motor Car – Trailer space to accommodate wheelchairs
metro corridors and is spending about Car - Driver Motor Car (DMC‐TC‐MC‐ for people with reduced mobility. The
`2,243cr. The depots will have options MC‐TC‐DMC) if needed. The trains air-conditioned coaches have humidity
for building large facilities & campus
style developments while there will be
convenience retail space at the metro
stations. The depots and stations will
become hubs of economic, social and
educational activity in their own right.
The generation of revenue by making
metro stations hubs of a range of
activities will make off-peak transit
profitable for HMR.
“I am building a symbiotic
relationship between the property
developers and the ridership,” says
Reddy. “The stations and surroundings
become destinations. Malls,
multiplexes, theatres, restaurants and
food courts, social spaces – everything
people want should be available near a Model coach interior
metro station.”
assets. Prominent among these facilities Uppal depot which will monitor trains
The emphasis of are covered & open stabling lines, an running on all the three corridors. The
automatic train wash plant, inspection current locations of all trains running on
HMR is to make and workshop bays, wheel profiling the three corridors will be displayed and
lathe, infrastructure maintenance
Hyderabad an facilities, electrical & mechanical
indicated at an overview display panel.
The OCC will also have a backup control
eco-friendly city workshops and electronic repair shops. centre to take over operations in the
The main depot cum workshop is being event of any unforeseen emergency at
and at the same time built at Uppal where the overhaul and the OCC. To further ensure fool-proof
make the project corrective maintenance facilities for
whole fleet will be done. The other
operations, should there be a highly
unlikely failure of the CBTC system, a
financially viable. two depots have basic facilities for secondary detection system in the form
scheduled preventive maintenance of an Axle Counter based Fall-Back
and minor corrective maintenance. system is also being implemented.
control and LCD TVs which display the
Every night when trains return
route positions dynamically, besides The normal mode of operation
from revenue services, they will be
being a source of entertainment and of trains will be in Automatic Train
thoroughly washed at the train wash
other relevant information. The spring Operation (ATO) mode. In this mode,
plant before being stabled on stabling
applied air‐release parking brake system the Automatic Train Protection (ATP)
lines. The maintenance includes a daily
allows energy regeneration during system continuously monitors safe
internal cleaning schedule to provide
electro dynamic braking, resulting in a train operation, and will stop the train
clean environment and ambience to
substantial saving of energy required in case of any emergency and initiates
passengers.
to run trains. Each coach also has an other action as needed. Besides this,
electro‐pneumatic friction emergency Before a train is inducted into service, Passenger Emergency Stop Plungers
brake system and a brake‐pipe controlled it is inspected and checked thoroughly. are provided on each platform and
back‐up security brake system. The process involves visual inspection in the Station Control Room (SCR) to
by team of engineers & technicians, stop a train immediately in case of
Train Depots
successful completion of on-board emergency. In necessary situations, the
There will be three maintenance test of vital safety systems and other trains can also run in degraded or lower
depots for stabling and maintenance comfort functions of trains and performance modes such as RM mode
of trains, engineering maintenance thorough analysis of data downloaded and Cut out mode.
vehicles and other associated rail from the train.
systems. The three depots will be All important signalling equipment
Train Control and Signalling
located at Miyapur for Corridor 1, on the stations, on the trains and the
Falaknuma for Corridor 2 and Uppal for HMR uses Communication Based wayside such as the Computer Based
Corridor 3. They will be manned round Train Control (CBTC) to control trains, Interlocking (CBI), wayside ATP have a
the clock and will be equipped with the first Metro in the country to do high degree of redundancy built into
all facilities needed for efficient and this. The heart of the system is the them to avoid unnecessary disruption
effective maintenance of rail system Operation Control Centre (OCC) at the of services.
Track alignment works on the viaduct Energy saving, low loss, high
efficiency fluorescent lamps with high
power factor will be used at all stations.
The lighting system will have three
illumination levels: Emergency level
(33%), Off-peak hour(66%) and Peak
hour (100%).
Passenger Elevators suitable for
physically challenged with Electric
Traction and gearless motor having
VVVF Control are being provided
in all stations from Street level to
concourse level and concourse level
Ticketing - Automatic Fare presence of fire and initiates Fire to platform level. Escalators suitable
Collection System Suppression through Gas Flooding
for semi-outdoor installation are also
Systems, fire hydrants and Automatic
An Automatic Fare Collection being provided in all stations. Each
Sprinkler System, protecting critical
System based on Contactless Fare station will have a steel escalator from
railway equipment from fire. In the
Media Technology will be used for street level to concourse Level and
event a fire cannot be suppressed
dispensing tickets to commuters. The glass escalator from concourse level to
AFC System will have Automatic Gates, early, portable fire extinguishers of
platform level.
Ticket Vending Machines, Add Value different types – Carbon dioxide, ABC
Machines, Ticket Office Machines, & DCP are used to extinguish fires in Telecommunication System
Ticket Readers and Portable Ticket the early stage to avoid major losses.
HMR has a state-of-the-art
Analysers. The system divides the To extinguish fires inside the critical
Telecommunication System which
stations into paid and unpaid areas, power supply panels located in the
ensures continuous communication
which will be separated by automatic sub-stations a carbon dioxide Fire Trace
between the OCC, Train Operators and
entry / exit gates and fencing. The System will be used.
Station Controllers. The modular nature
system accepts banknotes, coins, Photo luminescent safety signage of the system and high redundancy
credit/debit cards and smart cards has been installed to guide commuters built into it due to the distributed
for payment. Tickets are of two for safe escape in cases of fire and architecture ensures that in event of
types: Contactless Smart Card (CSC) power failure. This will also be useful in failure of the link between the OCC and
and Contactless Smart Token (CST). locating fire-fighting appliances in case a station, all station communication
Contactless Tokens are available for of emergencies even in darkness. equipment continue to operate
travel between fixed stations and could
Power and Lighting Systems independently in local mode. All train
be purchased for single or return trips,
related information will be displayed
more for non-frequent users. Electrification for overhead and broadcast in different languages
Contactless Smart Cards are stored pantographs of trains / locomotives is like Telugu, English and Hindi. There is
value cards and are available in the being done through 25 kV, Single phase, an Emergency Call Point / Help-point
form of either monetary (e-Purse) or 50 Hz AC power. The 132KV power phone system at stations to assist
non-monetary (Pass) or a combination received from the power stations by passenger in case of any help required.
of both; more suited for regular receiving stations will be stepped down
commuters. Some of the passes to 3-phase 33KV for lighting and other HMR, which began in 2012, is
planned are Tourist Pass, Trip Pass, Daily general purposes and to single phase expected to be fully operational in
Pass, Weekly Pass, Monthly Pass and 25KV for traction. The OCC at Uppal 2017, with the first stage of 8km
Holiday Pass. Depot will monitor and control the (Stage-I) scheduled to be inaugurated
entire power supply system and traction by March 2015.
Safety, Fire Detection and
system equipment through Supervisory
Suppression However, some challenges need to
Control and Data Acquisition System
be still overcome, such as the recent
As part of a strategy of fire (SCADA). To minimise interference
proposal to change some parts of the
prevention and early detection, HMR with communication lines, booster
alignment of the metro and to shift
has provided an Analogue Addressable transformers are being provided
some portions underground.
type Fire Detection & Alarm System throughout the corridors at specified
at all stations. This system detects locations. Rajmohan Kurup
T
he major challenge in this project last option that we had was concurrent the demand and supply of real estate. If
has been the availability of land in engineering which is very time-consuming we have to complete the metro project
the urban area. Hyderabad, which and causes delays. Unlike in road projects, in five years, development of commercial
is a 400 year old city is one of the oldest here you cannot change the alignment space will take 15 years. So, the balance
cities with heavy traffic congestion. Hence as you wish. The horizontal and vertical concession period available for us to
there were people who were skeptical alignments are technologically driven recover the rents is reduced.
about the project taking off. There were which cannot be changed.
In spite of all odds, we have managed
concerns regarding safety and traffic Financially, it was a very big challenge to achieve a lot within the 25 month
issues, which was a big challenge for us. because it is based on PPP model. timeframe. And we are quite sure no
We chose construction methods that were Cost automatically becomes extremely other project in India has managed to
quite unique in certain places; 70-80% of important for private enterprise, and going get completed so fast like the Hyderabad
the work was done in pre-cast yards. These back to last three years, the economical Metro. Of course, safety of the commuters
yards are at two locations near Hyderabad. parameters have not been very stable. and our staff/workers has been of utmost
Major technological challenges were Bank interest rates continued to go up; importance for us and so far our track
the congested roads as well as their there was double-digit inflation rate and record has been good. Construction
alignment (both vertical and horizontal). unprecedented devaluation of rupee. related accidents have been very few, in
Even the DPR (Detailed Project Plan) was Another complication was the difficulties fact we have received international awards
also not updated. Most of the projects in in getting the right of way and the as well. Technologically we have not left
India face this issue: there is a long gap demolition of buildings.
any stone unturned to get the latest and
between the DPR and the time taken for Moreover, we are investing `15,000- best technology in the world. We also aim
execution. Cities don’t stop growing, so 16,000cr and to make this project viable, for making an iconic project because even
even the city drawings were old. We had 18.5 million sqft of real estate has to be our brand value is attached to that. Today,
to revalidate our position going back and developed. Nowhere in the world has a the average traffic speed has gone down
forth because new buildings, flyovers etc standalone metro been viable; it needs to almost to 5-6km per hour which used
had come up. Many working assumptions to have additional resources because it is to be around 18-21km per hour before.
The alignment has been done very well; it has also got huge
possibilities of extension on the same lines. Hyderabad is a radial
L TMRHL’s flagship campaign, the HMR Brand
Ambassador Campaign aim to make celebrities
out of the common man who would be the Brand
city. For example Miyapur can go up to Ramakrishnapuram, one Ambassador(s) of the project. This unique campaign will
can go from Shilparamam all the way to Gachibowli or financial culminate by the selection of the Brand Ambassador(s)
district. That way, it has got good expansion plan on the existing from Hyderabad (Greater Hyderabad) – a metamorphosis
system to serve the population. Transit-oriented development is a of the ordinary to the extraordinary. The campaign ‘My
new international concept where you densify the corridors rather City, My Metro, My Pride’ is aimed at creating awareness
than spreading the people and going away. Now people will be among the public that this Hyderabad Metro Rail is theirs
closer to the transit area. and they own it. This campaign serves several purposes.
It encourages the public to give their views about HMR,
Even the concept of parking is changing the world over. If you brings about awareness of the project, how the project
have an efficient transport system, it should discourage people will change their lives, lends an ear to commuting
from getting their car to city center. There is no point in creating problems and helps in better transport planning.
metro if people start getting their cars to the station. Then you
Another good initiative has been a panel discussion “Metro
are not serving the purpose. Now in many places, people do not
Rail – The Game Changer for Employee Transportation”,
want the car to ply in the city or business centre. People travel by
involving top industry leaders. LTMRHL organized an
public transport and park their car outside the city. But people
Exhibition of Rolling Stock in October 2013. The rolling stock
still have a mindset as to whether we are going to provide them
was branded to look like the original train once the project is
with parking facilities in the stations. This cannot be achieved
commissioned. The exhibition aimed to create and develop
unless there is a good last mile connectivity. The public transport
a sense of ownership among the citizens of Hyderabad
system in a radius of three-four kilometers should pick-up and
regarding the Hyderabad Metro Rail Project.
drop off people at regular intervals. Take for example Mumbai
city. The Mumbai suburban train service has been running for An Impact Assessment & Awareness Study is
several years. One of the success factors has been that when you also being conducted which will review and analyse
get down in any station, you opt for a public transport which secondary information regarding pre and post impact
is affordable, clean and reliable. Having said that, we have also assessment studies related to LTMRHL construction
witnessed failures in this model. Take for example the MMTS of and performance. The study will also document specific
Chennai (local suburban trains). There are many stations where shortcomings or disadvantages perceived by the affected
you cannot go because there are no transport facilities available. population. Also, insights into the perceptions of the
people about the relocation and rehabilitation works,
Even today, people are not familiar with modern facilities. impact of the construction processes in particular and
There are people who are still afraid of travelling by escalators; the metro rail in general will also be documented.
they are hesitant which can lead to accidents. People still stand
LTMRHL is encouraging the citizens of Hyderabad to
on the door and hang outside trains. But the metro system is
capture snapshots of the ongoing project work and send it
designed for that. You cannot run the metro unless the doors
to them. A Photo Exhibition and Gallery, is being planned
are totally closed. We are also planning to run campaigns
which will showcase these pictures in an art gallery once
on ‘Dos’ and ‘Don’ts’, otherwise the whole timetable will go
in three months for the next four years and more. These
haywire.
pictures will later form part of the Hyderabad Metro Rail
India is still status-conscious, not waiting to make the change Museum.
from private transport to public. But Delhi has proved that An important social initiative was the Hyderabad
wrong. And we believe if you provide a reliable, safe and clean Metro Connects the objective of which was to create
atmosphere, people will change. awareness about HMR project and its symbiotic
The timelines are very sharp and we have to finish the project relationship with cycling and help fund create awareness
within 60 months. In spite of delays during the initial 18 months towards the education of the underprivileged kids in the
and the many challenges, being faced continuously we are quite schools adopted by the Atlanta Foundation.
confident to complete the project within the set deadline.