Académique Documents
Professionnel Documents
Culture Documents
MO-S-113
Taurus 70 CED
24.05.2012
Ie H
Page 1 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
E
Thermocouple Port
2nd Stage Nozzle
2nd Stage Blades
2nd Stage Tip Shoe
Blade Retaining Pins
3rd Stage Nozzle
3rd Stage Tip Shoe
3rd Stage Blades
VGV
External Variable
Guide Vanes
IGV
00 Stage VGV
0 Stage VGV
1st Stage VGV
2nd Stage VGV
A
Air inlet
Air Inlet Duct
Air Inlet Screen
Compressor Inlet GV
00 Stage Blades
00 Stage GV
D
Fuel Injectors
Compressor Exit GV
Injectors
Combustor Interior
Combustor Pins
Torch Tube
Sliding Ring
1st Stage Nozzle
1st Stage Blades
B C
Borescope Port Borescope Port
4th Stage Blades 11th Stage Blades
RGB 4th Stage GV 11th Stage GV
5th Stage Blades 12th Stage Blades
Inspection Port
Pinion & Star Gear Star
Gear 2nd stage
Accessory Gear
Low Speed Brg
Page 2 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
b) Corrosive None
A Pitting
c) Cracks None
d) Excessive None
fouling
b) Cracks, None
A damaged mesh
Page 3 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
c) Corrosive None
pitting. Affected
area.
c) Corrosive
pitting. Affected None
area.
Page 4 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
B b) Excessive None
fouling
c) Corrosive None
pitting. Affected
area.
B b) Excessive None
fouling
c) Corrosive None
pitting. Affected
area.
B b) Excessive None
fouling
c) Corrosive None
pitting. Affected
area.
Page 5 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
C b) Excessive None
fouling
c) Corrosive None
pitting. Affected
area.
C b) Excessive Rust on
fouling both
sides
c) Corrosive
pitting. Affected None
area.
C b) Excessive None
fouling
c) Corrosive None
pitting. Affected
area.
Page 6 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
D b) Excessive None
fouling.
c) Corrosive Quite
pitting. Affected advance
area. d rust
c) Cracks.
Quantity and size. None
d) Liquid only:
broken main fuel None
spokes.
b) Thermal None
D Erosion.
d) Buckling or None
warpage.
Page 7 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
Page 8 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
Page 9 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
c) Thermal None
erosion. Depth
and affected area.
c) Thermal None
erosion. Depth
and affected area.
Page 10 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
Page 11 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
d) Corrosion None
External 00 Stage VGV a) Cracks None
VGV
b) Lever arms None
bent
VGV
c) Grommet out None
of position on
unison ring
d) Corrosion None
d) Corrosion None
Page 12 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
d) Corrosion None
d) Corrosion None
Page 13 of 14
Borescope Inspection Report
MO-S-113
Taurus 70 CED
24.05.2012
RGB
RGB
RGB
RGB
Page 14 of 14