Vous êtes sur la page 1sur 1

A

**
**
A

FINALIZATION OF SECANT PILE LAYOUT AT STATION /


EXTENDED CONCOURSE / ENTRY LOCATION IS
SUBJECTED TO FINALIZATION OF ARCHITECTURAL
DRAWINGS.

THIS DRAWING IS INTENDED FOR INSTALLATION OF SECANT PILE ONLY


SOIL FACE

EXCAVATION FACE
HUTATMA CHOWK STATION

NO. OF LAYERS OF ANCHORS/STRUTS, HORIZONTAL AND VERTICAL SPACING OF


ANCHORS/STRUTS & SPECIFICATIONS OF ANCHORS/STRUTS WILL BE DECIDED PRIOR
TO EXCAVATION STAGE WHEN ACTUAL PILE TERMINATION LEVELS AT SITE WOULD BE
MADE AVAILABLE, AND TO ENSURE THAT DAMAGE ASSESSMENT OF HERITAGE
BUILDINGS MEET THE CONTRACTUAL REQUIREMENTS.

** LATERAL BRACING BETWEEN WALERS SHALL BE CONSIDERED TO TRANSFER


LONGITUDINAL FORCES FROM THE HEAD WALL IF FOUND NECESSARY DURING
STRUT AND WALER DESIGN.

MUMBAI METRO RAIL CORPORATION LTD.


G 16-12-2017 TGO REVISED AS MARKED MGO AAP NGU

F 12-12-2017 TGO REVISED AS MARKED MGO AAP NGU

E 12-10-2017 TGO REVISED AS MARKED MGO AAP NGU


HUTATMA CHOWK STATION
25-09-2017 MGO
TEMPORARY SECANT PILE WALL
D TGO REVISED AS MARKED AAP NGU
LAYOUT & CROSS SECTIONS
MUMBAI METRO LINE - 3
C 20-06-2017 TGO REVISED AS MARKED MGO AAP NGU
SHEET-5
B 18-05-2017 TGO REVISED AS PER GC COMMENTS MGO AAP NGU

A 07-04-2017 TGO FOR GC SUBMISSION MGO AAP NGU L&T – STEC JV MUMBAI UGC-01-CAC-SHC-4811-005 G C
17-03-2017 TGO FIRST ISSUE MGO AAP NGU MGO AAP NGU
A1

AS SHOWN TGO 17-03-2017 UGC-01-CAC-SHC-4811-005-G.DWG