Fw: REPORT ON KULAI LAY BY BOTH BOUND WATER SHORTAGE DUE TO WATER PUMP
MALFUNCTION DUE TO INCOMMING POWER SUPPLY CABLE FAULT
To: Hishamuddin Buyong - UEM Edgenta <hishamuddin@uemedgenta.uemnet.com>; Mohd Rohani Min - UEM Edgenta <rohani.min@uemedgenta.uemnet.com>;
FYA
How much is the cost? I believe the cost will be higher. Technical report need to be ready asap as an evidence to prove it that this is not under
comprehensive maintenance. Any advice?
Wasalam,
https://webmail.uemedgenta.uemnet.com/owa/#viewmodel=ReadMessageItem&ItemID=AAMkADQ4Y2JiOTI3LWVkZWItNDkxNC04OTE5LTA0YjBiZDZmODExMgBGAAAAAABNKi9YEhxLSIP5nkcsL6H… 1/7
3/2/2018 Fw: REPORT ON KULAI LAY BY BOTH BOUND WA... - Hishamuddin Buyong - UEM Edgenta
As discussed with MEE HQ, the best op on is Op on Number 1. Based on the earlier email, the cost is under comprehensive maintenance. Sec on and EPB to
ensure the new cable is properly install and comply the specifica on and standard.
Thank you
Nizal Nasir
SRO
Assalam,
As requested during last Monday mee ng with BMR and we look forward for assistance and solu on. We have setup for temporary mi ga on plan but the
permanent solu on must be in placed soonest possible as to assure the water supply to both layby is not interrupted. Any necessary NOD and BQ please refer with
my Sr.EETE.
Regards,
HAIRUNIZAM SAAD
S4
15/02/2018
9:00 hrs - Send E-mail to SRO/HQ inform the current situation and Kulai Lay By
Bouth Bound.
11:00 hrs - MPD continue trouble shooting with specilase cable fault locator to find the
cable fault location.
12:00 hrs - Sr EETE had called TMC request panel crane to tow mobile generator set
from Senai Utara Toll Plaza to Kampung Rahmat for backup power supply at
pump house.
16:30 hrs - Portable mobile gen-set arrived at Kampung Rahmat and EPB/MPD setting
for cable arrangement.
17:00 hrs - MPD and Specialist cable locator still failed to find our the actual location of
cable fault.
20:00 hrs - Pump house fully backup power supply by portable genset and water pump
system back to normal operation to supply water at Kulai Lay By Both
Bound.
16/02/2018
11:00 hrs - Supply water from 3rd party water tanker and pump weter from SAJ at
kampung Rahmat to cater high user at Kli Lay By BB.
15:00 hrs - Supply water from 3rd party water tanker to Kampung Rahmat due to high
user at KLI LBY BB
20:00 hrs - Supply water from 3rd party water tanker to Kampung Rahmat due to high
user at KLI LBY BB
17/02/2018
12:00 hrs - Supply water from 3rd water tanker and Pump water from SAJ at Kampung
Rahmat to cater high user at KLI Lby BB.
15:00 hrs - Supply water from 3rd party water tanker to Kampung Rahmat due to high
https://webmail.uemedgenta.uemnet.com/owa/#viewmodel=ReadMessageItem&ItemID=AAMkADQ4Y2JiOTI3LWVkZWItNDkxNC04OTE5LTA0YjBiZDZmODExMgBGAAAAAABNKi9YEhxLSIP5nkcsL6H… 4/7
3/2/2018 Fw: REPORT ON KULAI LAY BY BOTH BOUND WA... - Hishamuddin Buyong - UEM Edgenta
11:00 hrs - Team EPB and MPD on site to rectify the air lock inside the piping system,
15:30 hrs - Water supply for KLI Lby NB and water pump system back to normal after
rectified the air lock inside the piping system.
3.0 TEMPERORY ACTION TAKEN
3.1 On 14 Feb 2018, upon receving failure event, MM Unit has coordinate to provide 3rd party
water tanker for backup water supply at KLI Lby BB from 15 Feb to 19 Feb 2018
under Chiness New Year preparation.
3.2 For temperory backup EPB has provide portable mobile generator set at Pump house at
Kampung rahmat.
3.3 To coordinet with PLUS/EPB team to monitor water level at elevated water tank at each
Lay By and update thru whatsapp every hour.
3.4 Propose to provide permanent water tanker static at Section S4 for back water supply
untill rectification cable fully rectify and for backup incase of water pump or portable
genset problem.
4.0 PROPOSE PERMANENT SOLUTION
4.1 Option 1
a. Edgenta Propel need to replace cable 4 core 120 mm/swa/pvc from MSB room to Pump house
incase of cable fault still not identify and the cost estimated is RM 250.000 inclusive under
comprehansive maintenance.
4.2 Option 2
b. To provide sub meter from nearest TNB pole to supply the permanant power supply complete with
permanant generator set (15 KVA) for backup during power failure. The cost estimated is
RM 160,000 and all the cost must cover under comprehensive maintenance.
5.0 Conclution
We look forwarded for better solution as the requirement to maintain water supply at Kulai Lay By Both Bond must priority.
https://webmail.uemedgenta.uemnet.com/owa/#viewmodel=ReadMessageItem&ItemID=AAMkADQ4Y2JiOTI3LWVkZWItNDkxNC04OTE5LTA0YjBiZDZmODExMgBGAAAAAABNKi9YEhxLSIP5nkcsL6H… 6/7
3/2/2018 Fw: REPORT ON KULAI LAY BY BOTH BOUND WA... - Hishamuddin Buyong - UEM Edgenta
Regards,
For
HAIRUNIZAM SA’AD
Section Manager S4