KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 17. Painting Works
Klang, Selangor. Date: Date:

17. Painting Works


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Mechanical (4) To control lorries speeding at site. (max.15km/h)


-Minor injury (5) Workers stay away from moving vehicle / lorry.
Struck by moving part of 2 3 6
-Damage to property - Traffic controlled by designated person.
Delivery of Material vehicle. (lorry) (6) To provide appropriate PPE.
Loading and
1 Project Manager
unloading material
(paint barrel) Physical ( Ergonomic ) (5) Manual handling / lifting should be carry out with Site Manager
Spine injury - Improper method -Negligible injury 2 3 6 correct method. Site Agent
of handling (6) To provide appropriate PPE.
Site Engineer
Site Supervisor
Physical (5) Supervised by designated person during stacking of
material. SHO / SSS
Slip / fall / collapse of material
-Minor injury 2 3 6 - To ensure material not obstruct any access / walkway. EO
due to poor material - Proper storage of material.
arrangement. (6) To provide appropriate PPE. Scaffolder
Stacking / Storing
2 Work Leader
Material at site / store
(5) Proper storage of flammable liquid / material. Machinery opr/
Chemical
-Serious injury - No person are allowed to smoke in the store room. Driver
Burn / Fire 2 4 8
-Damage to property - To provide fire extinguisher in the store room.
(by flammable liquid/material ) (6) To provide appropriate PPE. Signalman
Banksman
Rigger
Chemical -Serious injury
(5) Training for workers use PPE.
Skin contact with paint / (long term can impair 2 4 8 (6) To provide appropriate PPE.
Welder
thinner. worker skin dermatiti ) Workers
Dilute paint with
3
chemical (thinner) -Serious injury
Chemical (long term can effect (5) Training for workers use PPE.
2 4 8
Inhalation human respiration (6) To provide appropriate PPE.
systems)

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Painting Works (Cont’d)


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Project Manager
Chemical -Serious injury Site Manager
(5) Training for workers use PPE.
Skin contact with paint / (long term can impair 2 4 8 (6) To provide appropriate PPE. Site Agent
thinner. worker skin dermatiti )
Site Engineer
Site Supervisor
SHO / SSS
EO
-Serious injury
Chemical (long term can effect (5) Training for workers use PPE. Scaffolder
4 Painting 2 4 8
Inhalation human respiration (6) To provide appropriate PPE. Work Leader
systems)
Machinery opr/
Driver
Signalman
(5) Material handling should be carried out with correct Banksman
Physical (Ergonomic)
method. Rigger
Redundant repeated working -Negligible injury 2 3 6 - Take a 2-3 minutes rest after every 2 ( two ) hours.
behavior. (6) To provide appropriate PPE. Welder
Workers

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)