Vous êtes sur la page 1sur 5

CURRICULUM VITAE

Djahid ZAIDI
Current Position | Site QA/QC Manager
.
Company | SARPI Spa Spa

June, 19th St. Ksar Bellezma, Batna


Algeria
05047
Mobile: +213 (0) 672 487 812
E-mail: djahid.zaidi@gmail.com
LinkedIn: https://dz.linkedin.com/in/zaidi-djahid-b031325a
SKILL’s SUMMARY

• More than 08 years’ experience working in the Oil & Gas industry
• Competent at managing responsibilities in a high-volume atmosphere
• Hard worker, quick learner, and ability to assume responsibility
• Competent and reliable professional, committed to top quality work
• Versatile and multi-skilled person
• Resourceful in solving problems and maximizing resources
• Enthusiastic, dependable, self-motivated
• Skilled in handling the public with diplomacy and professionalism
• Excellent hand and eye coordination and a safe work record
• Demonstrated ability to adapt to new equipment & technology
• Basics knowledge on Welding Standards

Training & Siminars

• Training regarding internal auditing for the three (03) referential ISO 9001:2015, ISO14001:2015 and OHSAS
18001:2007
st th
Mai 21 to 25 2017
Quality Consulting Management (QCM) – Boumerdes Algeria
• Training regarding risk identification and assessment related to OHSAS18001
April 17th and 18th 2017
Quality Consulting Management (QCM) – Boumerdes Algeria
• Training regarding identification and assessment of risks, issues, threats and opportunities related to quality
March 15th and 16th 2017
Quality Consulting Management (QCM) – Boumerdes Algeria
• Training regarding ISO 9001:2015, ISO14001:2015 and OHSAS 18001:2007
March 01st to 07th 2017
Quality Consulting Management (QCM) – Boumerdes Algeria
• Siminar Regarding Quality Management System ISO9001:2015
January 16th to 23rd 2016
Certificate Ref: DEP/KK/LC/AA/N° 758
INPED – Boumerdes Algeria

Professional Career

Company | SARPI Spa


Combined Cycle Power Plant (1163.44 MW) Naama Algeria
Position |Field QA/QC Manager
From August 2016 to Present

For a good control, flexible use, exploitation and minimizing risks of mistakes of all information related to quality at the
project level, I developed a database with MS Access, including:
• Dashboard, Monthly progress/Target, Progress By System, Progress by Schedule, Spools Painting Sta-
tus, Welders’ Defect Rate by Period, Welders’ Overall Defect Rate, Productions’ Monthly Defect Rate,
Defect by Type, Repair of defected joints Progress, Inspections Status, Averages: Avg Welded Inch/Day,
Avg Welded Joints/Day, Avg Welded Inchs/Welder per Day, Generating reports related to welder qualifi-

Page |1
CURRICULUM VITAE
cation, welder ID cards, Generating registers related to welding log sheet, welders performance monitor-
ing,Aetc.
For this project my main duties are cited as below:
Assist and support the project manager in the implementation, monitoring and continuous improvement of pro-
cesses at the project level
Propose any modification, creation or deletion of a document of the QMS and to ensure the availability of the rel-
evant versions at the project level
Promoting communication, dissemination and understanding of the company's quality management policy within
our project
Ensure the awareness of the staff of our project to the requirements of the clients
Ensure that management objectives are communicated, understood, implemented and maintained at the project
level
Conduct problem-solving or improvement groups within our project
Assist the project manager in determining the context, identifying stakeholder expectations and analyzing risks
and opportunities related to the activities and environment of our project
Ensure compliance of requirements and the satisfaction of clients, both external and internal, and ensure that
employees are aware of their requirements
Participate and enrich the quarterly process reviews conducted by the process pilots
Ensure the establishment and monitoring of the quality improvement plan specific to our project
Participate in the preparation of annual executive reviews

Company | SARPI Spa


Gathering System Construction & Train 3 Repair (SONATRACH, BP & STATOIL Joint Venture In Amenas)
Position | Field QA/QC Coordinator
From January 2015 to August 2016

My Main duties and responsibilities were


• Implementation of Client’s approved quality plan.
• Prepare and participate in required audits during SARPI Execution and Post SARPI Phase with Client
• Take a lead role in quality system implementation and follow-up for SARPI contractor side as per Client, SARPI
QA/QC procedures.
• Responsible for all the quality forms/certifications through-out the SARPI job execution.
• Follow up of quality plan for effective implementation.
• Decision maker in which jobs in the scope should have a technical quality check after execution.
• Develop standard or specific technical quality checklists for all jobs to be executed in the turnaround.
• Participate in the SARPIs’ General and specific task Risk Assessment(s).
• Follow up of quality plan and report daily status to Client
• Closely follow up of the critical activities in terms of quality.
• Control all technical checklists after the jobs have been completed.
• Participation in the weekly construction meetings with respective operations departments to highlight any quality
related issue.
• Give input to close-out report for quality related issues.
• Participate in close out review in this time phase.
• Logging of all quality standard and specific quality checklists for future
• Turnarounds and handing over to client

Company | Foraid Algerie For SPIE Oil and Gas Services


JGC Gassi Touil Gas Processing Facilities Project in Algeria
Position | Instrumentation Commissioning Supervisor
From September 2013 to February 2014
On this project, I covered the following scope:
• Provide the support during the Start-up activities with the final preparation to the introduction of the feedstock into the
CPF plant.
• Loop checking for each standalone instrument and control loop
• Calibration of alarms and providing preliminary set points
• Calibration and functionality checks for all trip settings,

Page |2
CURRICULUM VITAE
• Functionality checks for the fire and gas system,
• Functionality checks for all instruments in each control loop,
• Functionality checks for all interlocking systems,
• Functionality checks for emergency shutdown systems.
Company | SARPI Spa
Flare Gas Recovery Project (SONATRACH-HBK Project)
Position | Instrumentation Engineer
From September 2012 to April 2013

Main tasks in this project were as follow:


• Perform inspections and tests as required by the discipline all Electrical & Instrumentation installation activities at site
• Prepare inspection/test reports and maintain the QA/QC files related to assignment
• Assist with tracking and logging Non-Conformance Reports, Quality/Productivity Improvement Reports.
• Implementation of quality plan for this project, which include inspection, testing and proper documentation
• Ensure that all works complied with client/contractor issued (IFC) drawing, applicable standards and specifications.
• Installation, wiring and cable laying, termination, witnessing of insulation resistance test and hipot test.
• Ensure that all related inspection and testing activities with regards to Environment, Health & Safety procedures and
maintenance rules are respected.
• Monitor the work performance to ensure the respect of work standards and project specifications.
• Coordinate and assist construction to resolve any encountered problems related to inspection and testing activities
• Initiate remedial or corrective action based on standard, code, and specification and verify the closure of NCR.
• Inspect and witness the construction works as per their approved Inspection Test Plan.
• Ensure the effective coordination with the client related to inspection, testing activities and documentation.
• Maintain all Quality Control Report.
• Control and monitoring of material flow to site, Controlling of drawing as per contract and client requirement.

Company | SARPI Spa


Gathering System Construction (SONATRACH, BP & STATOIL Joint Venture In Amenas)
Position | Instrumentation Engineer
From Mai 2011 to September 2012

Responsible to manage field Electrical and Instrument installations, labor relations, productivity, manpower planning, ma-
terial and construction equipment planning, and adherence to work plan and schedule.
Member of multifunctional execution project team, responsible for planning, coordination, field supervision and
engineering input relating to all instrument equipment for CPF plant, Wells and manifolds.
Serve as day-to-day interface with the Area Construction Engineers, providing a focus on safety, quality, and engineering
queries.
Follow up all E&I tasks for Gathering System Construction at In Amenas Wells, Manifolds and CPF with main tasks which
mentioned below:
• Electrical and Instrument Cables pulling
• Instrument Installation and terminations including tubing
• Junction boxes Installation and terminations
• Cathodic protection
• Fiber Optic
As a member of technical office in Gathering System Construction project with In Amenas gas (Sonatrach-Britich Petro-
lum-Statoil Joint Venture) as client. The main tasks were:
• Conducting technical supervision over general construction works and accepting general modifications from field su-
pervisors.
• Controlling construction plans, drawings and schedules, scopes of work, terms and quality.
• Ensuring quality of applied materials, their compatibility with operational design drawings, construction norms and
regulations, technical specifications, HSE standards.
• Participating in reviewing and changing design concepts and raised it to client.

Page |3
CURRICULUM VITAE

• Performing changes of construction materials and equipment when necessary by raising a technical query to client.
Company | SARPI Spa
Hassi R’mel Boosting Phase II Project
Position | Instrumentation Engineer
From December 2008 to April 2011

As a member of the commissioning team I actively participated to the functional tests, performance tests and start up of
six compression stations of the BOOSTING Project (Phase-2) at Hassi R’Mel / Algeria.
Each station consists mainly of a turbo compressor unit and its related process auxiliaries:
Gas Turbine: Model Series MS-5002C from GE Oil & Gas;
Centrifugal Compressor: Type BCL-606A from Nuovo Pignone.
Control system: MARK-6 SPEEDTRONIC
The main tasks that I achieved are as follows:
• Loop check and commissioning of:
- Turbo compressor unit instrumentation
- Electric panels and switch gears from ABB / Nuovo Pignone vendors
- Fire & Gas Protection System from General Monitors
• Installation and configuration of Bentley Nevada 3500 RACK
• Configuration and acquisition of the process parameters on SYSTEM-1 of Bentley Nevada for the unit’s operation da-
ta bank analysis.
• Installation and configuration of the CIMPLICITY and TOOLBOX software parameters.
• Configuration of the 5.5KV SHNEIDER electric panels using the SEPAM SFT2841 software
• Follow up and assistance in programming the DCS logic of Foxboro’s control blocks
• Configuration of the circuit breakers from ABB
• Configuration of blocs and functions using CS3000 of YOKOGAWA
• Installation and calibration of various instruments such as Transmitters, Flow meters, DetectorsA
• Follow up and verification of instrumentation works
• Preparation of Mechanical Completion files
• Preparation of the Reception Records with the owner Sonatrach.

Professional Qualification
Master’s Degree in Microelectronic
I have got my BACCALAURIAT in June 2000, I joined Batna university as student in Technology branch for 02
years.
I pursued my studies, to have an ELECTRONIC ENGINEER diploma, for anothor three years when my last 02
years were in electronic industrial control branch.
in October 2007, I have exceeded Master degree contribution at Batna University and pursued those studies for
one year (succed in the First year) before getting a job in December 2008.
I came back to the university of Batna in 2014 to continue my studies to get MASTER’S DEGREE IN
MICROELECTRONIC.
I have got this diploma in June 2014.

Other Skills

Computer Skills
• Office automation: MS Access, Word, Excel, Power Point, MS Project.
• Programming languages: Assembler, Compiler C, VHDL.
• Software’s: MATLAB, Orcad, XILINX ISE, Eagle4.11, and AutoCAD, MARK VI and Control System Toolbox of
GE, CS3000 of YOKOGAWA, 3500 RACK of BENTLY NEVADA .
Languages
• FRENCH : Upper level (Speaking, writing and reading)
• ENGLISH: Good and under improvement

Page |4
CURRICULUM VITAE
• ARABIC: Mother tongue
Other Information
• Valid drive license Cat. B.
• Valid passport.
AVAILABILITY: 21 Days’ Notice
REFERENCES: On request

Page |5

Vous aimerez peut-être aussi