Vous êtes sur la page 1sur 4

t e r S o l u

LEED Credits:
LEEDSustainable Sites
Credits: Sustainable Sites
t o r m w a
Maintenance
LEED Credits:and Repair Sites
Sustainable
i n a b l e S
• CREDIT 6.1
The
The
Stormwater
any•
• CREDIT
PaveDrain
PaveDrain
CREDIT
Design,
CREDIT
Stormwater
vacuuming
little, if any
Stormwater
6.1
Rate
6.1
maintenance
Systemrecommends
6.1System
&
isisdesigned
Quality
easy to maintain
Control:
Design,ifRate
equipment,
maintenance
Design,
over Rate
multiple
asan
1
anopen
Point
&& Quality
needed.
over Quality
years. IF
•sing
jointindustrial
CREDIT
using
open joint
Site
Control: 11amount
If a significant
multiple years. If
Control:
the the
joints
5.1 between
concept
concept
Development: •
•between
Point Site
joints
Point
become
CREDITunits.
CREDIT
1
CREDIT
become
filled or Point
fi
the
5.1 blocks.
5.1
5.1
Site Development:
ExistingExisting
Development: 11 Point
lled or
obstructed, Point
obstructed,
installations
installations
maintenance
maintenance is is
have required
have required little, if
accomplished
accomplished by using
S u s t a
Limit distribution
ofby Limitofadistribution
Stormwater
Limit
using
a sediment
conventional natural
distribution
vacuum water
Design,
truck
accumulates
combination flows
Rate
ofor
of natural
natural &by
the Quality
sewer water
water
ina combination
aggregate flows
flows
vacuum Protect
Control:
sewerby 1and
bedding
truck or the
Point
byvacuum restore
Site
Protect
truck habitat
Development:
Protect
and
PaveDrain orVac
or
the restore
restore
PaveDrain
Head. 1 IfPoint
habitat
habitat
Vac Head. If a signifi
a significant amount cantofamount of
sediment ® ®
managing sediment
stormwater
Limit
managing
managing
accumulates
stone,
runo
distribution
accumulates
PaveDrain
.
stormwater
stormwater of natural
theinonly
in theisaggregate runo
runo
thesystem water
..
aggregate flows
bedding stone,bedding by
•PaveDrain
CREDIT
be stone, 7.1 Protect
• CREDIT
partbe
can or or restore
all of the
CREDIT
removed 7.1
7.1
habitat
PaveDrain
allowing thesystem
subgradecantobeberemoved
cleaned andallowing
then ®
• CREDIT 6.2 managing stormwater runo . that can Heat can be
Island •
E ect,
CREDIT Non Roof:
7.1 1 Point
the•• CREDIT
CREDIT
subgrade
same
mechanically 6.2
6.2to
product be cleaned
liftedre-installed.
out allowing and then
Repair
for of the same
theindividual
subgrade product
PaveDrain Heat Island
Heat
re-installed.
to be blocks Island
can beEEaccomplished
Repair ect, Non
ect,
of Non Roof:
Roof:
individual 11 Point
Point
PaveDrain
without blocks can
removing the (mat) be

Stormwateraccomplished
Treatment:
CREDIT
Stormwater
Stormwater
cables. For 6.21 Point
Treatment:
Treatment:
without removing 1 Point
Point
1mats theon (mat) Reduce
cables. For heat
gomore islands
Heat Island
Reduceinformation
Reduce
detailed E ect,
heat islands
heat islandsNon
andon Roof:
these 1 Point
topics go&to
Implement cleaned
a andmore
stormwater
Stormwater
Implement then detailed
the same
management
Treatment:
a
information
stormwater 1 plan
Point
management
these
re-installed. topics
Repair
plan
to
ofwww.pavedrain.com
Reduce heat islands
select Installation MAINTENANCE
Implement a stormwater management plan
s
www.pavedrain.com
and then click on repair. and select Installation & MAINTENANCE and then click REPAIR.

o n n s
individual
that reduces impervious
Implement PaveDrain
cover, blocks
promotes
a impervious
stormwater can be accomplished
on-site
management MATERIALS
plan without &MATERIALS
RESOURCES:
i
that reduces
reduces impervious cover, promotes on-site MATERIALS && RESOURCES:
RESOURCES:
t i o
that cover, promotes on-site
filtration and eliminates
that
removing reduces
filtration contaminants.
and
theand
filtration impervious
(mat) eliminates
cables. For
eliminates cover, promotes
contaminants.
contaminants. • CREDIT
on-site 5.2
more detailed information•• CREDIT Regional
MATERIALS
CREDIT 5.2 Materials:
&
5.2 Regional 1 Point
RESOURCES:
Regional Materials: 11 Point
Materials: Point

t e r o l u l u t
Ste r SSoo l u t i o n s
a
filtration and eliminates contaminants. • CREDIT 5.2 Regional Materials: 1 Point
on these topics go to www.pavedrain.com and select

S t o r m
S two r m w
w a
a t e r
Maintenance andGuidelines
Repair
l e r m
Installation
Maintenance , and
andthen click onrepair.
Repair
Maintenance and Repair
The PaveDrainMaintenance and Repair
a i n a b i n a b l e
e S t o
S u s tSSuu ss tt aa i n a b l
The
The System
PaveDrainis easySystem
PaveDrain to maintain
System isis easy
easy using industrial
to maintain
to maintain using industrial
using industrial
The
vacuuming equipment, PaveDrain
vacuuming equipment,if System
needed. If
equipment, ifif needed.is
a easy to
significant maintain
amount
needed. IfIf aa significant using industrial
significant amount amount
vacuuming
•vacuuming
Initial installations showif aneeded. drastic reduction in the use of
of sediment accumulates
of sediment equipment,
in
sediment accumulates the aggregate
accumulates in bedding
in the
the aggregateIf a significant
aggregate bedding bedding amount
of deicing saltsaccumulates
over traditional asphalt and concrete surfaces.
stone, PaveDrain of sediment
stone, is the only system
PaveDrain thethat
is the incan
only the
systemaggregate
be can thatbecancanbedding
be can can be
be
stone,
• Installed PaveDrain is
with conventional only system
construction that be
equipment
mechanically stone,lifted PaveDrain
out
mechanically lifted
mechanically allowing is
lifted out the
for only
the
out allowing system
subgrade
allowing for that
for theto be can
the subgrade be
subgrade to can be
to be
be
•mechanically
Available in several lifted outcolor optionsfor the
allowing subgrade to be
cleaned and then cleaned the
cleaned and same
and then mats
then the re-installed.
the same same mats Repair
mats re-installed. of
re-installed. Repair Repair of of ELGIN Whirlwind® & Megawind® are registered
•cleaned
Fast, economical
and then installation
the same of intersection
mats re-installed. construction
Repair of or trademarks of Elgin Sweeper Co.
individual PaveDrain
individual blocks
individual PaveDrain can
PaveDrain blocks be accomplished
blocks can can be without
be accomplished
accomplished without without
retrofits of existing pavements
removing theindividual
(mat) cables.
removing
removing
PaveDrain
theFor
the (mat)
(mat) more blocks
cables.
cables. detailed canmore
For
For
be accomplished
information
more detailed information
detailed
without
information
•removing
No seamsthe to catch
(mat) on
cables. snow plows
Forand more detailed information
on these topics ongo
on to www.pavedrain.com
these
these topics
topics go to
go to www.pavedrain.com
www.pavedrain.com select and
and select
select
•on Available
these in
topics multiple
go to mat sizes
www.pavedrain.com for customized and applications
select
Installation Guidelines
Installation, and then
Installation GuidelinesGuidelinesclick on
,, and repair.
and then then clickclick onrepair.
on repair.
onrepair.
•Installation
Regional
PaveDrain manufacturing
Vac Head
Guidelines , and then supporting
click onlocal repair.economies
PaveDrain Vac Head
• Adaptable to small areas where retention ponds are
not
• Initial installations practical
show a drasticshow reduction in the use of in
•• Initial
Initial installations
installations show aa drastic
drastic reduction
reduction in the
the use
use ofof
deicing salts•over •Initial installations
traditional
Up to
deicing salts
deicing 5 LEED
salts over asphalt
Credits: show
Sustainable
over traditional a
and drastic
traditional asphalt concrete
Sites; reduction
Credit
asphalt and surfaces.
6.1, 6.2, in
5.1,
and concrete the
5.7 & use
concrete surfaces. of
surfaces.
Materials & Resources: Represented Locally and
Credit 5.1.equipment By; concrete
• Installed with••deicing
conventional salts
Installed with
Installed
over traditional
construction
with conventional
conventional construction asphalt
construction equipment equipment surfaces.
•••Installed
• Available in several
Initial installations
Availablecolor with options
in several
several
show a drasticconstruction
conventional color
reduction in the equipment
options
use of deicing salts
• Available in
over traditional asphaltcolor options
and concrete surfaces.
• Fast, economical••Availableinstallation
Fast,Installed in
economical several
of color
intersection
installation optionsofconstruction
intersection or
construction or
••Fast, economical by hand orinstallation
with conventional of intersection construction
construction equipment in all or
• Fast,
retrofits of existing economical
retrofitspavements
types ofofofweather
existing installation
for fast, of intersection
economical installations.
pavements construction or
retrofits existing pavements
• No seams to ••catch•retrofits
Available
No seams
No on
seams toof
snow existing
in multiple
plows
to catch
catch on pavements
mat
on snow sizes forplows
snow customized applications
plows

••No
• Available in multiple Available
seams mat in several
tosizes color
catchforoncustomized options
snowsizes plows applications
Available
••Available in
in multiple
multiple mat
mat sizes for
for customized applications
customized applications
•PaveDrain,No
Available seams in to
LLC catch
multiple on steel
mat snow plow
sizes for blades.
customized applications
• Regional manufacturing
•••Regional
Regional
Increased
supporting
manufacturing
manufacturing
skid
local
resistance oversupporting
economies
supporting local economies
local
traditional pavements. economies
• Adaptable to•Global Regional
small
•••Adaptable
Adaptable
Water
areas Center
manufacturing
where
to small
to
Solar Reflectance small retention
Index areas
areas
supporting
where
where
(SRI) range ponds
ofWI are
retention
retention
36
local economies
ponds
ponds
– 41 for lighter areunits.
are
colored
247 Freshwater Way Milwaukee, 53204
not practical•(414) Adaptable
•not
notUnlike to small
traditional
practical
practical
423-6531 O catch
areas where retention
ce basins, varmints cannot enter drainage system.
ponds are
•not practical
www.pavedrain.com supporting local economies.
Regional manufacturing
• Represented
Adaptable to small areas (retrofits)
Locally
Represented By; where Locally retention
By; ponds are
©2011 PaveDrain, LLC AllRepresented Rights Reserved.Locally By;
outdated or not
PaveDrain System is a registered practical.
Represented trademark Locally By; LLC
of PaveDrain,
Represented Locally By:

PaveDrain, LLC PaveDrain, LLC


PaveDrain, LLC
Global Water Center
PaveDrain,
GlobalWater
Global LLC
WaterCenter
Center
247 Freshwater 247Way
Global
247 Milwaukee,
Water
Freshwater
Freshwater Center
Way
WayWIMilwaukee,
53204
Milwaukee, WI 53204
WI 53204
(414) 423-6531247 O
(414)
(888)
(414) ce
Freshwater
423-6531
575-5339
423-6531 OWay
O ceMilwaukee, WI 53204
Office
ce
www.pavedrain.com(414) 423-6531 O ce
www.pavedrain.com
www.pavedrain.com
www.pavedrain.com
©2011 PaveDrain, LLC AllPaveDrain,
©2011
©2011 Rights Reserved.
PaveDrain, LLC All
LLC All Rights
Rights Reserved.
Reserved. The PaveDrain System is protected by the following U.S. and Canadian
PaveDrain System©2011
is a registered trademark of PaveDrain, LLC of Patents; U.S. No. 8,251,607, No. D609,369, No. 8,366,343 & Canadian No.
PaveDrain System
PaveDrain,
PaveDrain System isis aaAll
LLC registered
Rights
registered trademark
Reserved.
trademark of PaveDrain,
PaveDrain, LLC
LLC
133082. Additional patents pending.
PaveDrain System is a registered trademark of PaveDrain, LLC
Structural and ASTM Standards & ADA
Structural and ASTM Standards & ADA
Compliance TheThePaveDrain®
The PaveDrain®
PaveDrain system
system
System® waswas
was tested
testedtested
andindocumented
accordance
in accordance withwith ASTM ASTMC1701/C1701M-09
C1701/
TheTThe PaveDrain®
PaveDrain® System
system combines
combines modern day
modern- Compliance
The
The PaveDrain
The PaveDrain
PaveDrain system
System
System meets
meets
meets the the
the requirements
requirements of
of ASTM
ASTM
by
by American
The PaveDrainExcelsior
C1701M-09
an independent
System®Company’s
by an independent
was testedErosionLab®
and documented
third party engineeringthird
to help
TTfunctionality
day functionality
he PaveDrain® and a structural
System with concept
a structural
combines modern usedday
for requirements
The
The PaveDrain
D6684-04
D6684-04 isof
andSystem
PaveDrain
and System
is ASTM
meets
meets
recognized
recognized D6684-04
the
by and
requirements
thethe
by therequirements
USEPA
USEPA as ais
as of
of ASTM
ASTM
a structural
structural better
by
firm.
party The understand
American
engineering was its
testExcelsior infiltration
Company’s
conducted
firm. The on capabilities.
tests were Itto
ErosionLab®
a PaveDrain washelp
centuries to
concept
functionality usedcreate
andfora the revolutionary
centuries
structural permeable
to create
concept for paving
used the recognized
D6684-04
D6684-04
Best and by the USEPA
and isis recognized
Best Management
Management recognized
Practice by as
by the
Practice (BMP)
(BMP) the a
forstructural
USEPA
USEPA
for as Best
as aa structural
stormwater
stormwater structural installed
better
project
conducted overhad
understand
that twodifferent
on plots
not thatPaveDrain
its infiltration
been contained
maintained anfor
capabilities.identical
It18
was
solution. PaveDrain
revolutionary
centuries to create incorporates
permeable
the revolutionary a patented
paving archpaving
solution.
permeable Management Practice (BMP) for stormwater months
six
months
installed and still
inch aggregate
installations and
over still
that
two infiltrated
bedding
infiltrated
hadthat
plots in excess
notlayer,
in
beenexcess
contained ofidentical
of
an 2,000
but different
4,000
Best
Best Management
Management
infiltration.
infiltration. The Practice
The Americans
Americans (BMP)
Practice with
with for
for stormwater
(BMP)Disabilities
stormwater
Disabilities Act
Act (ADA)
(ADA)
infiltration. The Americans with Disabilities inches/hour
inches/hour
maintained per
per
on one
an
one foot
average
foot diameter.
diameter.
of more than
design
This inPaveDrain
system
solution. the middle
incorporatesof an articulating
incorporates a patented concrete
a patented archblock
arch infiltration.
infiltration.
Design
Design The
The
GuidelinesAmericans
GuidelinesAmericans
require
require with
that
that Disabilities
withsurface
Disabilities
surface Act
Act
openings
openings (ADA)
(ADA)
shall
shall underlying
six inch aggregate soils consisting
beddingof claybut
layer, anddifferent
sand. The
Act (ADA) Design Guidelines require that View
2 years the andentire stillreport
infiltrated
by visiting
in excess
our website
of one
to create
design
design ininan
the internal
the middle
middle storage chamber
of anofarticulating
an that
articulating can be
concrete filled
block plots were exposed
underlying to increasing
soils consisting of clay simulated
and sand. The hour
surface
Design
Design
not
not exceed
exceedopenings
Guidelines
Guidelines
½”
½” and shall
andrequire
require
shall
shall be not
bethat
that
firm,
firm, exceed
surface
stable, ½”slip
stable,openings
surface openings
and
and andshall
slip shall www.pavedrain.com
at1,500 inches/hour per one andfoot go to How it
diameter.
towith
concrete stormwater
create anblock
internalrunoff
tostorage whilechamber
create simultaneously
an internal providing
storage
that can be filled shall be The
firm, stable, and slip resistant. The duration
plots wererainfall
exposed events (i.e. 4”, 6” and
to increasing 8”) until
simulated one runoff
hour
not
not exceed
exceed
resistant.
resistant. The½” and shall
½”PaveDrain
and shall be
PaveDrain be firm,
firm,
System
System stable,
stable,
easily
easily and
and slip
exceeds
exceedsslip all
all these
these Works and then Testing.
was measured.
duration rainfallView events the(i.e.
entire Test
4”, 6”ErosionLab
and#1 #1 Test
report #2
by
strength
chamber
with forthat
stormwater heavy can vehicular
runoff bewhileused loads.
as aThe PaveDrain
reservoir
simultaneously for
providing PaveDrain
resistant. The System easily exceeds all these Test
Test #18”) until
Test
Test #2runoff
#2
resistant.
requirementsThe PaveDrain
requirements PaveDrain
by System
Systemaaeasily
by incorporating
incorporating easily
3/8” exceeds
exceeds
3/8” gap
gap between
between all
all these
these Inside Dia. of Infiltration Ring (in) 12.19 12.19
System isfor
stormwater
strength designed
runoff,
heavy to be while
vehicular a critical component
simultaneously
loads. The PaveDrain of Low requirements by incorporating a 1/4” gap visiting
was
Inside
Elapsed Dia. our
Insidemeasured.
Dia.of
of website
Infiltration
Time View
Infiltration
of TestRing at
the
(in)
Ring(sec)
(in)www.pavedrain.com
entire ErosionLab
12.5 12.5
12.520.9 21.95
12.5and go
report byto
requirements
requirements
individual by
by incorporating
individual PaveDrain blocks. aa 3/8”
incorporating
PaveDrain blocks. 3/8” gap
gap between
between
Impact isDevelopment
providing
System strength
designed to (LID) allowing
fora heavy
be critical for the infiltration
vehicular
component of Low between individual PaveDrain blocks. Infiltration
visiting
How
ElapseditTime
Elapsed ourofofRate
Works.
Time Test
Test (in/hr)at(l=KM/(D2*tr))
website
(sec)
(sec) 7.3 1,630 1,560
www.pavedrain.com
7.3 7.8and go to
7.8
individual
individual PaveDrain
PaveDrain blocks.
blocks. Avg. Infiltration Rate (in/hr) 1,595
of stormwater
loads.
Impact The
Developmentrunoff…onsite.
PaveDrain (LID)System
allowingisfor designed
the infiltration Applications Infiltration
Infiltration
How Rate
Rate(in/hr)
it Works. (in/hr)(l=KM/(D2*t))
(l=KM/(D2*t)) 4,449
4,449 4,1634,163

to be a critical
of stormwater component of Low Impact
runoff…onsite. Applications
Parking LotsLots Low Speed Roadways PaveDrain System Properties
Avg.
Avg.Infiltration
InfiltrationRate
Rate(in/hr)
(in/hr)4,306
4,306
Parking
Development (LID) allowing for the Alley Ways Emergency Access Lanes PaveDrain
PaveDrain® System
Thickness 5.65” (+System
1/8”) Properties
Properties
The PaveDrain System is a Permeable Articulating Parking Lots
Alley Ways Thickness.......................................................................5.65”
Thickness.......................................................................5.65”
Unit Dimensions
Thickness 5.65” (+11.75” 1/8”) x 11.75” (+
(+ 1/8”)
1/8”)
infiltration of stormwater runoff. Intersections Residential Driveways
Concrete
The Block/Mat
PaveDrain System (P-ACB/M) that provides
is a Permeable Articulating Alley Ways Roadways
Low Speed Unit
UnitDimensions......................................................12.00”
Unit
Unit Dimensions......................................................12.00”
Weight 42-4511.75”
Dimensions lbs x 11.75” xx 12.00”
12.00”
environmental
Concrete Block/Matbenefits as a designated
(P-ACB/M) that provides solution Unit
Unit Weight..........................................................................45-49
Weight..........................................................................45-49
Units/SF 1 SF42-45 Nominal lbs
lbs
The PaveDrain system is an Low Speed Roadways
Intersections Unit Weight lbs
for compliancebenefits
environmental with local asregulatory
a designated stormwater
solution Unit..........................................................................1 Sq. Ft. Nominal
Unit..........................................................................1 Sq. Ft. Nominal
Percentage
Units/SF 1 SFOpen Nominal Space: 3% Surface, 20% Storage Area
aesthetically pleasing Permeable Intersections
Emergency Access Lanes Percentage
Percentage Open Open Space: Space: 7% 7% Surface,
Surface, 20% 20% Storage
Storage Area
Area Bladensburg,
Bladensburg, Marylanddemonstration
Maryland demonstrationtesttest
requirements.
for complianceThe withdurability and performance,
local regulatory stormwaterin terms Percentage Open Space: 3% Surface,
Each
Each individual
individual block20%
block is Storage Area
is Passes AASHTO
Passes HS-20 andHS-25 Truck
H-20 load Loading
testing
Articulating
of life-cycle costs,
requirements. Concrete
The make
durability Block/
it theandprudent alternative
performance, to
in terms Emergency Access Lanes
Residential Driveways Installation Diagram
interlocked
interlocked by
by six
six (6)
(6) units
units
Passes AASHTO Maryland
Bladensburg,
Bladensburg,
Passes
HS-20
Passes HS-20
HS-20 and
and
Maryland
and H-20
H-20 load testing
demonstration
demonstration
H-20 load
load testing
testing
test
test
Mat
of (P-ACB/M)
alllife-cycle
other paving
11
that
costs,surfaces. provides
make it PaveDrain
the prudent and its aggregate
alternative to Residential Driveways Installation Diagram
installation
bedding
all other paving ease and
stone issurfaces.
engineered flexibility
to create
PaveDrain anda its
natural, vertical
aggregate
Measurements
to meet current and future Measurements
infiltration
bedding
stormwater
path,is that
stone recharges
engineered
management
to local
creategroundwater
a natural, verticalall Why the PaveDrain System? .0500”””
.0
111212.7 12.00”
12.00”
while usingpath,
infiltration
regulations.
nature’s
The
thatinherent
rechargesability
PaveDrain
local to
system
filter first flush
groundwater
provides
all Why
As part the
of the PaveDrain System?
Clean Water Act, the
Why the PaveDrain System?
EPA 11.75”
pollutants.
while usingThis allows
nature’s for a reduction
inherent ability to or elimination
filter first flush developed theClean
National Pollution
infiltration, storage, detention, conveyance As
As
As part
part of
part of the
ofthe
the Clean
Clean Water
Water
Water Act,
Act, theDischarge
Act,the
the EPA
EPA
EPS 5.65”
in stormwater
pollutants. Thisinfrastructure while minimizing
allows for a reduction the
or elimination Eliminationthe System (NPDES)
National to improve
Pollution water
Discharge
and a paving surface all in one. When developed
developed the
the National
National Pollution
Pollution Discharge
Discharge
environmental
in impact. In addition
stormwater infrastructure to effectively
while minimizing the Elimination
Elimination System
System (NPDES)
(NPDES) to
to improve
improve
5.65”
quality by regulating
Elimination point sources
System (NPDES) and water
to improve non-point
combined,
managing stormwater
environmental these features
impact. runoff allow for
the PaveDrain
In addition a reduction
to effectively System is water
water quality
quality by by regulating
regulating point
point sources
sources and
and
sourcesbythat
quality discharge
regulating pollutants
point sourcesintoandwaters of
non-point 2.56”
or elimination
also being stormwater
managing in stormwater
developed using runoffrecycledinfrastructure
materials
the PaveDrain whichis
System non-point
non-point sources
sources that
that discharge
discharge pollutants
pollutants 0.38”
0.25”
0.25”
the U.S.
sources
into
into watersthatof
waters discharge
of the
the U.S. pollutants captures
U.S. PaveDrain
PaveDrain into waters
captures and
andof
costs
also while
will make minimizing
beingitdeveloped
one of theusing environmental
leading green materials
recycled impact.
technologies whichfor 0.38” 2.56”
Storage Chamber - R3.34”
treats
U.S.100%
treats
the 100% of of the
the surface
surface water
water and
and allows
allows you
you
The
will PaveDrain
stormwater
make it one system
management.
of the leadingworks.
PaveDrain works.
green technologies for to
to route
route stormwater
stormwater and
and control
control peak
peak flows.
flows. Storage Chamber - R3.34”
P-ACB/M
11
P-ACB/M isis aa registered
registered certification
certification mark
mark of
of ECS
ECS Solutions,
Solutions, LLC
LLC
stormwater management. PaveDrain works. 4”- 8” Minimum bedding stone compacted
6”
6” -- 8”
12”bedding
beddingstone
stone
PaveDrain® SystemBlocks
PaveDrain System Blocks to no movement. Stone to be ¾” – 1”dia.
(thickness determined
6” - 12”angular.
beddingNo stone by engineer)
engineer).Stone to be
clean, fines.
PaveDrain System
End View Cross Blocks
Section 3/4” - 1”
Stone to be
(thickness
(Thicker
clean or recycled
3/4” - 1” clean.
determined
cross sectionsby
stone or concrete.
No fines.
engineer)
with larger, Stone to be
End View Cross Section 3/4” - 1” clean
compacted or recycled
angular stonestone
TBD byor engineer).
concrete.

b a se!
v e the ase!
PaveDrain End
PaveDrain End Cap
Cap
e a b o e the b
ag v
Sto rage abo
Stor
Natural Soil
Recommended
PaveDrain System
PaveDrain® System Natural Soil Engineer approved
Approved geogrid
biaxial geogrid PaveDrain® System geogrid or
or geotextilegeotextile
PaveDrain
PaveDrain System
System Approved geogrid
or geotextile
Structural and ASTM Standards & ADA
Structural and ASTM Standards & ADA
Compliance TheThePaveDrain®
The PaveDrain®
PaveDrain system
system
System® waswas
was tested
testedtested
andindocumented
accordance
in accordance withwith ASTM ASTMC1701/C1701M-09
C1701/
TheTThe PaveDrain®
PaveDrain® System
system combines
combines modern day
modern- Compliance
The
The PaveDrain
The PaveDrain
PaveDrain system
System
System meets
meets
meets the the
the requirements
requirements of
of ASTM
ASTM
by
by American
The PaveDrainExcelsior
C1701M-09
an independent
System®Company’s
by an independent
was testedErosionLab®
and documented
third party engineeringthird
to help
TTfunctionality
day functionality
he PaveDrain® and a structural
System with concept
a structural
combines modern usedday
for requirements
The
The PaveDrain
D6684-04
D6684-04 isof
andSystem
PaveDrain
and System
is ASTM
meets
meets
recognized
recognized D6684-04
the
by and
requirements
thethe
by therequirements
USEPA
USEPA as ais
as of
of ASTM
ASTM
a structural
structural better
by
firm.
party The understand
American
engineering was its
testExcelsior infiltration
Company’s
conducted
firm. The on capabilities.
tests were Itto
ErosionLab®
a PaveDrain washelp
centuries to
concept
functionality usedcreate
andfora the revolutionary
centuries
structural permeable
to create
concept for paving
used the recognized
D6684-04
D6684-04
Best and by the USEPA
and isis recognized
Best Management
Management recognized
Practice by as
by the
Practice (BMP)
(BMP) the a
forstructural
USEPA
USEPA
for as Best
as aa structural
stormwater
stormwater structural installed
better
project
conducted overhad
understand
that twodifferent
on plots
not thatPaveDrain
its infiltration
been contained
maintained anfor
capabilities.identical
It18
was
solution. PaveDrain
revolutionary
centuries to create incorporates
permeable
the revolutionary a patented
paving archpaving
solution.
permeable Management Practice (BMP) for stormwater months
six
months
installed and still
inch aggregate
installations and
over still
that
two infiltrated
bedding
infiltrated
hadthat
plots in excess
notlayer,
in
beenexcess
contained ofidentical
of
an 2,000
but different
4,000
Best
Best Management
Management
infiltration.
infiltration. The Practice
The Americans
Americans (BMP)
Practice with
with for
for stormwater
(BMP)Disabilities
stormwater
Disabilities Act
Act (ADA)
(ADA)
infiltration. The Americans with Disabilities inches/hour
inches/hour
maintained per
per
on one
an
one foot
average
foot diameter.
diameter.
of more than
design
This inPaveDrain
system
solution. the middle
incorporatesof an articulating
incorporates a patented concrete
a patented archblock
arch infiltration.
infiltration.
Design
Design The
The
GuidelinesAmericans
GuidelinesAmericans
require
require with
that
that Disabilities
withsurface
Disabilities
surface Act
Act
openings
openings (ADA)
(ADA)
shall
shall underlying
six inch aggregate soils consisting
beddingof claybut
layer, anddifferent
sand. The
Act (ADA) Design Guidelines require that View
2 years the andentire stillreport
infiltrated
by visiting
in excess
our website
of one
to create
design
design ininan
the internal
the middle
middle storage chamber
of anofarticulating
an that
articulating can be
concrete filled
block plots were exposed
underlying to increasing
soils consisting of clay simulated
and sand. The hour
surface
Design
Design
not
not exceed
exceedopenings
Guidelines
Guidelines
½”
½” and shall
andrequire
require
shall
shall be not
bethat
that
firm,
firm, exceed
surface
stable, ½”slip
stable,openings
surface openings
and
and andshall
slip shall www.pavedrain.com
at1,500 inches/hour per one andfoot go to How it
diameter.
towith
concrete stormwater
create anblock
internalrunoff
tostorage whilechamber
create simultaneously
an internal providing
storage
that can be filled shall be The
firm, stable, and slip resistant. The duration
plots wererainfall
exposed events (i.e. 4”, 6” and
to increasing 8”) until
simulated one runoff
hour
not
not exceed
exceed
resistant.
resistant. The½” and shall
½”PaveDrain
and shall be
PaveDrain be firm,
firm,
System
System stable,
stable,
easily
easily and
and slip
exceeds
exceedsslip all
all these
these Works and then Testing.
was measured.
duration rainfallView events the(i.e.
entire Test
4”, 6”ErosionLab
and#1 #1 Test
report #2
by
strength
chamber
with forthat
stormwater heavy can vehicular
runoff bewhileused loads.
as aThe PaveDrain
reservoir
simultaneously for
providing PaveDrain
resistant. The System easily exceeds all these Test
Test #18”) until
Test
Test #2runoff
#2
resistant.
requirementsThe PaveDrain
requirements PaveDrain
by System
Systemaaeasily
by incorporating
incorporating easily
3/8” exceeds
exceeds
3/8” gap
gap between
between all
all these
these Inside Dia. of Infiltration Ring (in) 12.19 12.19
System isfor
stormwater
strength designed
runoff,
heavy to be while
vehicular a critical component
simultaneously
loads. The PaveDrain of Low requirements by incorporating a 1/4” gap visiting
was
Inside
Elapsed Dia. our
Insidemeasured.
Dia.of
of website
Infiltration
Time View
Infiltration
of TestRing at
the
(in)
Ring(sec)
(in)www.pavedrain.com
entire ErosionLab
12.5 12.5
12.520.9 21.95
12.5and go
report byto
requirements
requirements
individual by
by incorporating
individual PaveDrain blocks. aa 3/8”
incorporating
PaveDrain blocks. 3/8” gap
gap between
between
Impact isDevelopment
providing
System strength
designed to (LID) allowing
fora heavy
be critical for the infiltration
vehicular
component of Low between individual PaveDrain blocks. Infiltration
visiting
How
ElapseditTime
Elapsed ourofofRate
Works.
Time Test
Test (in/hr)at(l=KM/(D2*tr))
website
(sec)
(sec) 7.3 1,630 1,560
www.pavedrain.com
7.3 7.8and go to
7.8
individual
individual PaveDrain
PaveDrain blocks.
blocks. Avg. Infiltration Rate (in/hr) 1,595
of stormwater
loads.
Impact The
Developmentrunoff…onsite.
PaveDrain (LID)System
allowingisfor designed
the infiltration Applications Infiltration
Infiltration
How Rate
Rate(in/hr)
it Works. (in/hr)(l=KM/(D2*t))
(l=KM/(D2*t)) 4,449
4,449 4,1634,163

to be a critical
of stormwater component of Low Impact
runoff…onsite. Applications
Parking LotsLots Low Speed Roadways PaveDrain System Properties
Avg.
Avg.Infiltration
InfiltrationRate
Rate(in/hr)
(in/hr)4,306
4,306
Parking
Development (LID) allowing for the Alley Ways Emergency Access Lanes PaveDrain
PaveDrain® System
Thickness 5.65” (+System
1/8”) Properties
Properties
The PaveDrain System is a Permeable Articulating Parking Lots
Alley Ways Thickness.......................................................................5.65”
Thickness.......................................................................5.65”
Unit Dimensions
Thickness 5.65” (+11.75” 1/8”) x 11.75” (+
(+ 1/8”)
1/8”)
infiltration of stormwater runoff. Intersections Residential Driveways
Concrete
The Block/Mat
PaveDrain System (P-ACB/M) that provides
is a Permeable Articulating Alley Ways Roadways
Low Speed Unit
UnitDimensions......................................................12.00”
Unit
Unit Dimensions......................................................12.00”
Weight 42-4511.75”
Dimensions lbs x 11.75” xx 12.00”
12.00”
environmental
Concrete Block/Matbenefits as a designated
(P-ACB/M) that provides solution Unit
Unit Weight..........................................................................45-49
Weight..........................................................................45-49
Units/SF 1 SF42-45 Nominal lbs
lbs
The PaveDrain system is an Low Speed Roadways
Intersections Unit Weight lbs
for compliancebenefits
environmental with local asregulatory
a designated stormwater
solution Unit..........................................................................1 Sq. Ft. Nominal
Unit..........................................................................1 Sq. Ft. Nominal
Percentage
Units/SF 1 SFOpen Nominal Space: 3% Surface, 20% Storage Area
aesthetically pleasing Permeable Intersections
Emergency Access Lanes Percentage
Percentage Open Open Space: Space: 7% 7% Surface,
Surface, 20% 20% Storage
Storage Area
Area Bladensburg,
Bladensburg, Marylanddemonstration
Maryland demonstrationtesttest
requirements.
for complianceThe withdurability and performance,
local regulatory stormwaterin terms Percentage Open Space: 3% Surface,
Each
Each individual
individual block20%
block is Storage Area
is Passes AASHTO
Passes HS-20 andHS-25 Truck
H-20 load Loading
testing
Articulating
of life-cycle costs,
requirements. Concrete
The make
durability Block/
it theandprudent alternative
performance, to
in terms Emergency Access Lanes
Residential Driveways Installation Diagram
interlocked
interlocked by
by six
six (6)
(6) units
units
Passes AASHTO Maryland
Bladensburg,
Bladensburg,
Passes
HS-20
Passes HS-20
HS-20 and
and
Maryland
and H-20
H-20 load testing
demonstration
demonstration
H-20 load
load testing
testing
test
test
Mat
of (P-ACB/M)
alllife-cycle
other paving
11
that
costs,surfaces. provides
make it PaveDrain
the prudent and its aggregate
alternative to Residential Driveways Installation Diagram
installation
bedding
all other paving ease and
stone issurfaces.
engineered flexibility
to create
PaveDrain anda its
natural, vertical
aggregate
Measurements
to meet current and future Measurements
infiltration
bedding
stormwater
path,is that
stone recharges
engineered
management
to local
creategroundwater
a natural, verticalall Why the PaveDrain System? .0500”””
.0
111212.7 12.00”
12.00”
while usingpath,
infiltration
regulations.
nature’s
The
thatinherent
rechargesability
PaveDrain
local to
system
filter first flush
groundwater
provides
all Why
As part the
of the PaveDrain System?
Clean Water Act, the
Why the PaveDrain System?
EPA 11.75”
pollutants.
while usingThis allows
nature’s for a reduction
inherent ability to or elimination
filter first flush developed theClean
National Pollution
infiltration, storage, detention, conveyance As
As
As part
part of
part of the
ofthe
the Clean
Clean Water
Water
Water Act,
Act, theDischarge
Act,the
the EPA
EPA
EPS 5.65”
in stormwater
pollutants. Thisinfrastructure while minimizing
allows for a reduction the
or elimination Eliminationthe System (NPDES)
National to improve
Pollution water
Discharge
and a paving surface all in one. When developed
developed the
the National
National Pollution
Pollution Discharge
Discharge
environmental
in impact. In addition
stormwater infrastructure to effectively
while minimizing the Elimination
Elimination System
System (NPDES)
(NPDES) to
to improve
improve
5.65”
quality by regulating
Elimination point sources
System (NPDES) and water
to improve non-point
combined,
managing stormwater
environmental these features
impact. runoff allow for
the PaveDrain
In addition a reduction
to effectively System is water
water quality
quality by by regulating
regulating point
point sources
sources and
and
sourcesbythat
quality discharge
regulating pollutants
point sourcesintoandwaters of
non-point 2.56”
or elimination
also being stormwater
managing in stormwater
developed using runoffrecycledinfrastructure
materials
the PaveDrain whichis
System non-point
non-point sources
sources that
that discharge
discharge pollutants
pollutants 0.38”
0.25”
0.25”
the U.S.
sources
into
into watersthatof
waters discharge
of the
the U.S. pollutants captures
U.S. PaveDrain
PaveDrain into waters
captures and
andof
costs
also while
will make minimizing
beingitdeveloped
one of theusing environmental
leading green materials
recycled impact.
technologies whichfor 0.38” 2.56”
Storage Chamber - R3.34”
treats
U.S.100%
treats
the 100% of of the
the surface
surface water
water and
and allows
allows you
you
The
will PaveDrain
stormwater
make it one system
management.
of the leadingworks.
PaveDrain works.
green technologies for to
to route
route stormwater
stormwater and
and control
control peak
peak flows.
flows. Storage Chamber - R3.34”
P-ACB/M
11
P-ACB/M isis aa registered
registered certification
certification mark
mark of
of ECS
ECS Solutions,
Solutions, LLC
LLC
stormwater management. PaveDrain works. 4”- 8” Minimum bedding stone compacted
6”
6” -- 8”
12”bedding
beddingstone
stone
PaveDrain® SystemBlocks
PaveDrain System Blocks to no movement. Stone to be ¾” – 1”dia.
(thickness determined
6” - 12”angular.
beddingNo stone by engineer)
engineer).Stone to be
clean, fines.
PaveDrain System
End View Cross Blocks
Section 3/4” - 1”
Stone to be
(thickness
(Thicker
clean or recycled
3/4” - 1” clean.
determined
cross sectionsby
stone or concrete.
No fines.
engineer)
with larger, Stone to be
End View Cross Section 3/4” - 1” clean
compacted or recycled
angular stonestone
TBD byor engineer).
concrete.

b a se!
v e the ase!
PaveDrain End
PaveDrain End Cap
Cap
e a b o e the b
ag v
Sto rage abo
Stor
Natural Soil
Recommended
PaveDrain System
PaveDrain® System Natural Soil Engineer approved
Approved geogrid
biaxial geogrid PaveDrain® System geogrid or
or geotextilegeotextile
PaveDrain
PaveDrain System
System Approved geogrid
or geotextile
t e r S o l u
LEED Credits:
LEEDSustainable Sites
Credits: Sustainable Sites
t o r m w a
Maintenance
LEED Credits:and Repair Sites
Sustainable
i n a b l e S
• CREDIT 6.1
The
The
Stormwater
any•
• CREDIT
PaveDrain
PaveDrain
CREDIT
Design,
CREDIT
Stormwater
vacuuming
little, if any
Stormwater
6.1
Rate
6.1
maintenance
Systemrecommends
6.1System
&
isisdesigned
Quality
easy to maintain
Control:
Design,ifRate
equipment,
maintenance
Design,
over Rate
multiple
asan
1
anopen
Point
&& Quality
needed.
over Quality
years. IF
•sing
jointindustrial
CREDIT
using
open joint
Site
Control: 11amount
If a significant
multiple years. If
Control:
the the
joints
5.1 between
concept
concept
Development: •
•between
Point Site
joints
Point
become
CREDITunits.
CREDIT
1
CREDIT
become
filled or Point
fi
the
5.1 blocks.
5.1
5.1
Site Development:
ExistingExisting
Development: 11 Point
lled or
obstructed, Point
obstructed,
installations
installations
maintenance
maintenance is is
have required
have required little, if
accomplished
accomplished by using
S u s t a
Limit distribution
ofby Limitofadistribution
Stormwater
Limit
using
a sediment
conventional natural
distribution
vacuum water
Design,
truck
accumulates
combination flows
Rate
ofor
of natural
natural &by
the Quality
sewer water
water
ina combination
aggregate flows
flows
vacuum Protect
Control:
sewerby 1and
bedding
truck or the
Point
byvacuum restore
Site
Protect
truck habitat
Development:
Protect
and
PaveDrain orVac
or
the restore
restore
PaveDrain
Head. 1 IfPoint
habitat
habitat
Vac Head. If a signifi
a significant amount cantofamount of
sediment ® ®
managing sediment
stormwater
Limit
managing
managing
accumulates
stone,
runo
distribution
accumulates
PaveDrain
.
stormwater
stormwater of natural
theinonly
in theisaggregate runo
runo
thesystem water
..
aggregate flows
bedding stone,bedding by
•PaveDrain
CREDIT
be stone, 7.1 Protect
• CREDIT
partbe
can or or restore
all of the
CREDIT
removed 7.1
7.1
habitat
PaveDrain
allowing thesystem
subgradecantobeberemoved
cleaned andallowing
then ®
• CREDIT 6.2 managing stormwater runo . that can Heat can be
Island •
E ect,
CREDIT Non Roof:
7.1 1 Point
the•• CREDIT
CREDIT
subgrade
same
mechanically 6.2
6.2to
product be cleaned
liftedre-installed.
out allowing and then
Repair
for of the same
theindividual
subgrade product
PaveDrain Heat Island
Heat
re-installed.
to be blocks Island
can beEEaccomplished
Repair ect, Non
ect,
of Non Roof:
Roof:
individual 11 Point
Point
PaveDrain
without blocks can
removing the (mat) be

Stormwateraccomplished
Treatment:
CREDIT
Stormwater
Stormwater
cables. For 6.21 Point
Treatment:
Treatment:
without removing 1 Point
Point
1mats theon (mat) Reduce
cables. For heat
gomore islands
Heat Island
Reduceinformation
Reduce
detailed E ect,
heat islands
heat islandsNon
andon Roof:
these 1 Point
topics go&to
Implement cleaned
a andmore
stormwater
Stormwater
Implement then detailed
the same
management
Treatment:
a
information
stormwater 1 plan
Point
management
these
re-installed. topics
Repair
plan
to
ofwww.pavedrain.com
Reduce heat islands
select Installation MAINTENANCE
Implement a stormwater management plan
s
www.pavedrain.com
and then click on repair. and select Installation & MAINTENANCE and then click REPAIR.

o n n s
individual
that reduces impervious
Implement PaveDrain
cover, blocks
promotes
a impervious
stormwater can be accomplished
on-site
management MATERIALS
plan without &MATERIALS
RESOURCES:
i
that reduces
reduces impervious cover, promotes on-site MATERIALS && RESOURCES:
RESOURCES:
t i o
that cover, promotes on-site
filtration and eliminates
that
removing reduces
filtration contaminants.
and
theand
filtration impervious
(mat) eliminates
cables. For
eliminates cover, promotes
contaminants.
contaminants. • CREDIT
on-site 5.2
more detailed information•• CREDIT Regional
MATERIALS
CREDIT 5.2 Materials:
&
5.2 Regional 1 Point
RESOURCES:
Regional Materials: 11 Point
Materials: Point

t e r o l u l u t
Ste r SSoo l u t i o n s
a
filtration and eliminates contaminants. • CREDIT 5.2 Regional Materials: 1 Point
on these topics go to www.pavedrain.com and select

S t o r m
S two r m w
w a
a t e r
Maintenance andGuidelines
Repair
l e r m
Installation
Maintenance , and
andthen click onrepair.
Repair
Maintenance and Repair
The PaveDrainMaintenance and Repair
a i n a b i n a b l e
e S t o
S u s tSSuu ss tt aa i n a b l
The
The System
PaveDrainis easySystem
PaveDrain to maintain
System isis easy
easy using industrial
to maintain
to maintain using industrial
using industrial
The
vacuuming equipment, PaveDrain
vacuuming equipment,if System
needed. If
equipment, ifif needed.is
a easy to
significant maintain
amount
needed. IfIf aa significant using industrial
significant amount amount
vacuuming
•vacuuming
Initial installations showif aneeded. drastic reduction in the use of
of sediment accumulates
of sediment equipment,
in
sediment accumulates the aggregate
accumulates in bedding
in the
the aggregateIf a significant
aggregate bedding bedding amount
of deicing saltsaccumulates
over traditional asphalt and concrete surfaces.
stone, PaveDrain of sediment
stone, is the only system
PaveDrain thethat
is the incan
only the
systemaggregate
be can thatbecancanbedding
be can can be
be
stone,
• Installed PaveDrain is
with conventional only system
construction that be
equipment
mechanically stone,lifted PaveDrain
out
mechanically lifted
mechanically allowing is
lifted out the
for only
the
out allowing system
subgrade
allowing for that
for theto be can
the subgrade be
subgrade to can be
to be
be
•mechanically
Available in several lifted outcolor optionsfor the
allowing subgrade to be
cleaned and then cleaned the
cleaned and same
and then mats
then the re-installed.
the same same mats Repair
mats re-installed. of
re-installed. Repair Repair of of ELGIN Whirlwind® & Megawind® are registered
•cleaned
Fast, economical
and then installation
the same of intersection
mats re-installed. construction
Repair of or trademarks of Elgin Sweeper Co.
individual PaveDrain
individual blocks
individual PaveDrain can
PaveDrain blocks be accomplished
blocks can can be without
be accomplished
accomplished without without
retrofits of existing pavements
removing theindividual
(mat) cables.
removing
removing
PaveDrain
theFor
the (mat)
(mat) more blocks
cables.
cables. detailed canmore
For
For
be accomplished
information
more detailed information
detailed
without
information
•removing
No seamsthe to catch
(mat) on
cables. snow plows
Forand more detailed information
on these topics ongo
on to www.pavedrain.com
these
these topics
topics go to
go to www.pavedrain.com
www.pavedrain.com select and
and select
select
•on Available
these in
topics multiple
go to mat sizes
www.pavedrain.com for customized and applications
select
Installation Guidelines
Installation, and then
Installation GuidelinesGuidelinesclick on
,, and repair.
and then then clickclick onrepair.
on repair.
onrepair.
•Installation
Regional
PaveDrain manufacturing
Vac Head
Guidelines , and then supporting
click onlocal repair.economies
PaveDrain Vac Head
• Adaptable to small areas where retention ponds are
not
• Initial installations practical
show a drasticshow reduction in the use of in
•• Initial
Initial installations
installations show aa drastic
drastic reduction
reduction in the
the use
use ofof
deicing salts•over •Initial installations
traditional
Up to
deicing salts
deicing 5 LEED
salts over asphalt
Credits: show
Sustainable
over traditional a
and drastic
traditional asphalt concrete
Sites; reduction
Credit
asphalt and surfaces.
6.1, 6.2, in
5.1,
and concrete the
5.7 & use
concrete surfaces. of
surfaces.
Materials & Resources: Represented Locally and
Credit 5.1.equipment By; concrete
• Installed with••deicing
conventional salts
Installed with
Installed
over traditional
construction
with conventional
conventional construction asphalt
construction equipment equipment surfaces.
•••Installed
• Available in several
Initial installations
Availablecolor with options
in several
several
show a drasticconstruction
conventional color
reduction in the equipment
options
use of deicing salts
• Available in
over traditional asphaltcolor options
and concrete surfaces.
• Fast, economical••Availableinstallation
Fast,Installed in
economical several
of color
intersection
installation optionsofconstruction
intersection or
construction or
••Fast, economical by hand orinstallation
with conventional of intersection construction
construction equipment in all or
• Fast,
retrofits of existing economical
retrofitspavements
types ofofofweather
existing installation
for fast, of intersection
economical installations.
pavements construction or
retrofits existing pavements
• No seams to ••catch•retrofits
Available
No seams
No on
seams toof
snow existing
in multiple
plows
to catch
catch on pavements
mat
on snow sizes forplows
snow customized applications
plows

••No
• Available in multiple Available
seams mat in several
tosizes color
catchforoncustomized options
snowsizes plows applications
Available
••Available in
in multiple
multiple mat
mat sizes for
for customized applications
customized applications
•PaveDrain,No
Available seams in to
LLC catch
multiple on steel
mat snow plow
sizes for blades.
customized applications
• Regional manufacturing
•••Regional
Regional
Increased
supporting
manufacturing
manufacturing
skid
local
resistance oversupporting
economies
supporting local economies
local
traditional pavements. economies
• Adaptable to•Global Regional
small
•••Adaptable
Adaptable
Water
areas Center
manufacturing
where
to small
to
Solar Reflectance small retention
Index areas
areas
supporting
where
where
(SRI) range ponds
ofWI are
retention
retention
36
local economies
ponds
ponds
– 41 for lighter areunits.
are
colored
247 Freshwater Way Milwaukee, 53204
not practical•(414) Adaptable
•not
notUnlike to small
traditional
practical
practical
423-6531 O catch
areas where retention
ce basins, varmints cannot enter drainage system.
ponds are
•not practical
www.pavedrain.com supporting local economies.
Regional manufacturing
• Represented
Adaptable to small areas (retrofits)
Locally
Represented By; where Locally retention
By; ponds are
©2011 PaveDrain, LLC AllRepresented Rights Reserved.Locally By;
outdated or not
PaveDrain System is a registered practical.
Represented trademark Locally By; LLC
of PaveDrain,
Represented Locally By:

PaveDrain, LLC PaveDrain, LLC


PaveDrain, LLC
Global Water Center
PaveDrain,
GlobalWater
Global LLC
WaterCenter
Center
247 Freshwater 247Way
Global
247 Milwaukee,
Water
Freshwater
Freshwater Center
Way
WayWIMilwaukee,
53204
Milwaukee, WI 53204
WI 53204
(414) 423-6531247 O
(414)
(888)
(414) ce
Freshwater
423-6531
575-5339
423-6531 OWay
O ceMilwaukee, WI 53204
Office
ce
www.pavedrain.com(414) 423-6531 O ce
www.pavedrain.com
www.pavedrain.com
www.pavedrain.com
©2011 PaveDrain, LLC AllPaveDrain,
©2011
©2011 Rights Reserved.
PaveDrain, LLC All
LLC All Rights
Rights Reserved.
Reserved. The PaveDrain System is protected by the following U.S. and Canadian
PaveDrain System©2011
is a registered trademark of PaveDrain, LLC of Patents; U.S. No. 8,251,607, No. D609,369, No. 8,366,343 & Canadian No.
PaveDrain System
PaveDrain,
PaveDrain System isis aaAll
LLC registered
Rights
registered trademark
Reserved.
trademark of PaveDrain,
PaveDrain, LLC
LLC
133082. Additional patents pending.
PaveDrain System is a registered trademark of PaveDrain, LLC

Vous aimerez peut-être aussi