This document appears to be a record of concrete piling using the DMC method, listing details such as pile numbers, lengths, reinforcement lengths and tonnages, dates of concrete pouring, theoretical and actual concrete consumption amounts, test results including compressive strength and eccentricity measurements, and whether load testing was required.
This document appears to be a record of concrete piling using the DMC method, listing details such as pile numbers, lengths, reinforcement lengths and tonnages, dates of concrete pouring, theoretical and actual concrete consumption amounts, test results including compressive strength and eccentricity measurements, and whether load testing was required.
This document appears to be a record of concrete piling using the DMC method, listing details such as pile numbers, lengths, reinforcement lengths and tonnages, dates of concrete pouring, theoretical and actual concrete consumption amounts, test results including compressive strength and eccentricity measurements, and whether load testing was required.
Reinforcement Total R/f Pile No. Bore Casting of Consumption Concrete Length Tonnage per Pile Length Pile Consumption Record Using DMC method of Pilling
% Difference in Concrete Eccentricity Pile Load Test
Cube for 7 Cube for Casing for Concrete Mix Days 28 days starting 8M Consumption Not X-Dir Y-Dir Required Required