Details

Plan Head
PROJECTID

ALLOCATION

Revised TDC
Short Name of Work

Expenditure upto March '16

Expenditure during 2016-2017

Outlay Modified for 2016-2017

Outlay Proposed 2017-2018

Expenditure upto date

Balance till Date

Throwforward 2017-2018

%age Phy. progress

Progress Reported by
PB Item (PB,LB,DRM)

Original Cost

Last Sanc Cost

Current Cost
Year of Sanction

Progress for Month


REMARKS
SN

Now Anticipated TDC


Executing Agency Rly

Design & Drawing Status

Tender Status
1 2 4 5 6 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27 30 32 33 34 35 36
3 12.02.16.06.2. 16 2006-2007 LB-18 Rajgangpur - Modification of station DRM/CKP DF(3) 17501 21763 21763 10769 0 8000 7500 10769 -4506 2994 30/06/2014 31/12/2016 Complete Complete 50 S&T: Revised plan worked out after joint NOV' Sr. DEN
51.001 yard 2016 (Co)/CKP
survey. Revised estimate sanctioned and
S&T: Contract awarded on 21.11.2016
for EI alteration. CRS application sent
on 22.11.2016. Work under completion.
TDC: 07.01.2017.

4 12.02.16.08.3. 16 2008-2009 LB-19 Noamundi- Barajamda :- IBS DRM/CKP DF(3) 4493 4493 4493 4247 0 246 0 4247 0 0 30/11/2012 19/06/2014 Complete Complete 100 Work completed. Final bill released. Work NOV' SDSTE/CKP
51.010 2016
to be dropped in FY 16-17.
5 12.02.16.09.1. 16 2009-2010 PB-39 Chakradharpur Division - DRM/CKP DF(3) 51500 51500 51500 31969 763 10000 9000 32732 531 9531 31/12/2013 31/01/2017 Complete Complete 80 NOMD, KLG, KXN and DIH: Works NOV' Sr. DEN
51.003 Simultaneous reception & despatch 2016 (Co)/CKP
facilities (8 stations)
completed. MMV and KNPS : Work
stopped due to third line sanctioned and
works not required. LPH : Work completed
in June'15. S&T: Contract awarded on
21.11.2016 for EI alteration. CRS
application sent on 22.11.2016. Work
under completion. TDC: 07.01.2017.
TRD. Agency available. (Progress 80%).

7 12.02.16.10.2. 16 2010-2011 LB-20 Rourkela - Construction of over run DRM/CKP DF(3) 12625 18165 18165 4368 0 2882 0 4368 10915 10915 31/12/2014 31/12/2016 Complete Complete 25 As intimated by S&T dept. this work will NOV' CPDE/SER
51.001 line / short shunting neck with 2016
provision of shunt signals for
require modification in RRI/ROU & is to be
simultaneous reception & despatch frozen till finalisation master plan by HQ.
facility. S&T & TRD: Contract short closed and will
be called after finalisation of SIP. S&T
works to be done by Sr.DSTE/CKP. New
SIP issued. However joint inspection done
at site. Due to replacement of heavy
shifting of cables, work is not feasible.
Work to be dropped vide works review
meeting minutes at HQ. Vide letter No.
DRM/CKP/Engg, Dtd. 22.04.16.

20 12.02.16.14.4. 16 2014-2015 - Provision of Shunt signal at the DRM/CKP DF(3) 419 416 416 0 0 67 0 0 349 349 31/03/2017 10% Complete 10 LOA issued on 11.07.16. Notesheet sent NOV' SDSTE/CKP
51.001 shunting neck of DPS progress 2016
to Sr.DOM/CKP for view.
24 12.02.16.15.3. 16 2015-2016 LB-17 Garposh - Construction of over run DRM/CKP Cap. 9314 9314 9314 0 383 50 6000 383 3264 9264 31/12/2016 Complete Complete Contract awarded on 26.05.16. Engg. Pre NOV' Sr. DEN
51.001 line/ sand hump for simultaneous 2016 (Co)/CKP
reception and dispatch of trains.
NI work completed. TRD: Tender opened
on 12.08.16 and under finalization. S&T:
S&T: Contract awarded on 21.11.2016
for EI alteration. CRS application sent
on 22.11.2016 Work under completion.

25 12.02.16.15.3. 16 2015-2016 LB-16 Gua:- Signals for line no 5 & 6. DRM/CKP Cap. 9481 9059 9059 0 0 1000 0 0 8059 8059 31/10/2017 50% 90% 10 Tender discharged due to high rates. NOV' SDSTE/CKP
51.002 progress progress 2016
New ToD: 04.11.2016 TC under
finalisation.
31 12.02.16.16.3. 16 2016-2017 - Adityapur- Provision of 200mts of DRM/CKP DF(3) 8725 0 8725 0 100 0 8625 8625 60% Nil Estimate under preparation. Budgetory quotation NOV' SDSTE/CKP
51.001 Shunting neck in ADTP yard at progress Progress of M/S Ansaldo awaiting for EI modification 2016
TISCO end.

39 12.02.29.12.3. 29 2012-2013 LB-110 KXN-KLG - Interlocking of LC gate DRM/CKP S.Fun 6563 6561 6561 4125 0 500 500 4125 1436 1936 31/12/2016 Complete Complete 10 Engg: Work awarded. TDC: 31.12.16. S&T: NOV' Sr. DEN
51.001 No.216 at Km 428/17-19 between. d 2016 (Co)/CKP
outdoor works LoA issued on 11/03/15.
Indoor Work (EI alteration):Tender 4 times
floated but no response. Tender opened on
29.12.15, Nil offer. Retendering done along
with JSG IB Work. TOD 08.04.16. under
TC finalisation.

Page 1 of 5 As on 09/12/2016
Details

Plan Head
PROJECTID

ALLOCATION

Revised TDC
Short Name of Work

Expenditure upto March '16

Expenditure during 2016-2017

Outlay Modified for 2016-2017

Outlay Proposed 2017-2018

Expenditure upto date

Balance till Date

Throwforward 2017-2018

%age Phy. progress

Progress Reported by
PB Item (PB,LB,DRM)

Original Cost

Last Sanc Cost

Current Cost
Year of Sanction

Progress for Month


REMARKS
SN

Now Anticipated TDC


Executing Agency Rly

Design & Drawing Status

Tender Status
1 2 4 5 6 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27 30 32 33 34 35 36
44 12.02.29.14.3. 29 2014-2015 LB-100 SSE/Sig/TATA - Integrated Power DRM/CKP S.Fun 5456 7360 7360 0 0 300 0 0 7060 7060 30/06/2017 50% Complete 10 S&T Stores: NSR for IPS-4 Nos Re-sub to NOV' SDSTE/CKP
51.001 Supply (IPS) and RTU at Mid-section d progress 2016
LC gate alongwith gate Goomty-04
HQ on 29.04.16.
Nos. S&T Contract awarded on 18.10.2016 to
Rajkumar Kejriwal, CKP.
Work will be executed after construction of
IPS & battery rooms.

45 12.02.29.14.3. 29 2014-2015 LB-103 SSE/Sig/CKP - Integrated Power DRM/CKP S.Fun 6776 9629 9629 0 0 300 0 0 9329 9329 30/06/2017 Not 50% 10 S&T Stores: NSR for IPS-6 Nos Re-sub to NOV' SDSTE/CKP
51.002 Supply (IPS) and RTU at Mid-section d Required progress 2016
LC gate alongwith gate Goomty-06
HQ on 29.04.16.
Nos. S&T Work: Contract awarded on
18.10.2016.
Execution work will start after construction
of IPS & battery room by Engg.

54 12.02.29.15.4. 29 2015-2016 - Provision of Sliding Boom at busy DRM/CKP S.Fun 1730 1672 1672 0 0 40 0 0 1632 1632 30/09/2016 Not Complete 10 Done: 6/6 work completed in NOV' SDSTE/CKP
51.002 L.C Gates (06 Nos). d Required 2016
November'2016.

56 12.02.29.16.3. 29 2016-2017 - CKP Division- Provision of Electrical DRM/CKP S.Fun 4580 5099 5099 0 1000 0 4099 4099 Nil 10% Detailed estimate sanctioned. Tender NOV' SDSTE/CKP
51.001 Lifting Barrier in existing LC gate. d Progress progress 2016
floated. No offer. (ToD: 07.12.2016).

73 12.02.29.16.4. 29 2016-2017 - Provision of Sliding Boom at L.C DRM/CKP S.Fun 1000 0 1000 0 100 0 900 900 Nil 40% Estimate sanctioned on 16.08.16. Tender NOV' Sr. DEN
51.001 Gates in CKP Division d Progress progress 2016 (Co)/CKP
opened on 04.10.16. Under TC
finalisation.

77 12.02.33.10.1. 33 2010-2011 PB- Chakradharpur Division - Repl of DRM/CKP DRF 25000 25000 25000 13709 0 0 0 13709 11291 11291 31/03/2013 31/12/2014 Not Complete 100 Work Completed. Final bill released. Work NOV' CPDE/SER
51.001 integrated power supply (15 stations) Required 2016
to be dropped in 17-18.

78 12.02.33.10.3. 33 2010-2011 LB-606 Chakradharpur division : Double AT's DRM/CKP DF(3) 9840 9840 9840 7038 0 500 0 7038 2302 2302 31/12/2013 28/02/2014 Not Complete 100 Work completed. Final bills of S&T passed NOV' SDSTE/CKP
51.002 & auto change over in Tata- Required 2016
Rajkharswan and Sini-Chandil auto
in April'2016, Elect/TRD (Final bill done)
sections. and Elect/G final bill pending due to
variation under process (Target =Dec.
2016).
79 12.02.33.11.2. 33 2011-2012 LB-604 Sipa-Jhinkpani-Tabu-Kendposi, DRM/CKP DF(3) 23153 23153 23153 7893 6213 6570 8000 14106 690 8690 30/06/2013 31/08/2016 Not Complete 90 Work under progress at NOMD-BJMD. NOV' CPDE/SER
51.001 Noamundi-Barajamda-Gua & Barabil- Required 2016
Bolanikhadan section - Provision of 6
Cable laying completed and jointing
quad cable under progress for Emergency socket
connection. BJMD-GX not yet started.
PO for 30.5Km cable awaited.

81 12.02.33.12.3. 33 2012-2013 LB-607 CKP Divn.:- Digital Axle Counter DRM/CKP DF(3) 7104 7104 7104 4311 0 1200 0 4311 1593 1593 31/03/2014 31/03/2014 Complete Complete 100 Work completed (Mar'14). Final variation NOV' SDSTE/CKP
51.003 Parallel to existing track circuit in the 2016
bridges at 5 locations.
under process.

Stores liability pending.

Cable 6 Quad- 3.5KM P.O.issued on Dt:-


15.12.15. DP expired on 25.04.16, and PO
canceled.Re-sub to HQ on 29.07.16.

82 12.02.33.12.4. 33 2012-2013 - Provision of maintenance free earth DRM/CKP DRF 2467 2467 2467 1994 0 200 0 1994 273 273 30/06/2016 Not Complete 95 Done: 118/125. Work under progress NOV' SDSTE/CKP
51.001 for Axle counters for TATA-JSG Required 2016
Section over CKP Divn.

83 12.02.33.12.4. 33 2012-2013 - Provision of maintenance free earth DRM/CKP DRF 2368 2368 2368 1994 0 200 0 1994 174 174 30/06/2016 Not Complete 100 Done: 120/120. Completed on 20.09.15. NOV' SDSTE/CKP
51.002 for Axle counters for RKSN -DPS- Required 2016
JRLI Section over CKP Divn.

Page 2 of 5 As on 09/12/2016
Details

Plan Head
PROJECTID

ALLOCATION

Revised TDC
Short Name of Work

Expenditure upto March '16

Expenditure during 2016-2017

Outlay Modified for 2016-2017

Outlay Proposed 2017-2018

Expenditure upto date

Balance till Date

Throwforward 2017-2018

%age Phy. progress

Progress Reported by
PB Item (PB,LB,DRM)

Original Cost

Last Sanc Cost

Current Cost
Year of Sanction

Progress for Month


REMARKS
SN

Now Anticipated TDC


Executing Agency Rly

Design & Drawing Status

Tender Status
1 2 4 5 6 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27 30 32 33 34 35 36
84 12.02.33.12.4. 33 2012-2013 - Provision of Railnet connection in DRM/CKP DF(3) 2929 2929 2929 0 0 470 0 0 2459 2459 30/09/2016 Not Complete 50 LOA issued on 09.11.2013. Done : 3 Nos NOV' SDSTE/CKP
51.006 the office of officers and incharge Required 2016
supervisors at Jharsuguda,
(JSG, BNDM , SNY) Letter no. S&T
Rajgangpur, Bondamunda, Sini, /CKP/OT/07/2013 Dated 29.06.15 has
Bimalg been issued to contractor for early
completion of residual works. Contract
terminated on 13.04.2016 due to poor
progress. Final measurement received
from site and bill is under processs. Again
tender opened on 04.11.16. TC under
finalisation.

85 12.02.33.13.3. 33 2013-2014 LB-609 CKP Divn.:- Shifting of starters DRM/CKP DRF 5969 5969 5969 463 0 3000 0 463 2506 2506 31/03/2015 30/04/2017 Not 40% 30 Done: 41/120. Tender discharged due to NOV' SDSTE/CKP
51.001 signal to 3 mts beyond insulation joint Required progress 2016
(for 120 Signals)
high rates in Sept 2014. Estimate revised.
No offer in Retendering 3 times.
Retendering being done. ToD: 23.08.2016.
No offer. Fresh ToD: 20.01.2017.

NS Req. 5844014004 Dt:- 23.04.14 for


Signalling cable 12 core Re-submitted to
HQ on 04.07.2016.

86 12.02.33.13.3. 33 2013-2014 LB-608 CKP Divn.:- Replacement of battery DRM/CKP DRF 5923 5923 5923 4738 0 1150 0 4738 35 35 31/03/2015 31/03/2016 Not Complete 50 Balance to be done : 08 Nos ( BNDM NOV' SDSTE/CKP
51.002 for existing IPS at 14 Stns. Required 2016
A/C-2, BNDM P/C-1, D/C-1, DJHR-1,
KRMD-1, JNK-2)

Stores: 03 PO issued to different firms.


(998 +200+132).out of them 998
+132=1130nos recd. DP for rest 200
Nos. is Expired. The firm was chased
but not responded. Written to COS and
HQ to drop PO to close the work.
Execution being done departmentally.
Work can be dropped in FY 2016-17.

87 12.02.33.13.4. 33 2013-2014 - Computerisation of DRM/CKP DF(3) 1696 1696 1696 581 0 200 0 581 915 915 30/09/2016 Not Complete 23 Done: SWRD 77/99 Nos, TBD 26/99 Nos, NOV' SDSTE/CKP
51.003 SWRD/IP/RCC/FPD diagrams in Required 2016
Auto CAD of CKP Divn.
FPD 6/84 Nos, RCC 0/84 Nos, Dog chart
0/18 & work under progress.
88 12.02.33.14.3. 33 2014-2015 LB-600 CKP Divn.:- IPS at 06 Stations ( LPH, DRM/CKP DF(4) 7197 7197 7197 5640 0 500 0 5640 1057 1057 30/06/2016 Not 80% 100 Done = 6/6.(GOL on 29.02.16, LPH on NOV' SDSTE/CKP
51.001 GOL, KLG, KXN, BMB & DIH). Required progress 2016
22.03.16, BMB on 06.05.16, DIH on
13.05.16, KXN on 17.05.16
, KLG on 19.05.16)
Work completed.
91 12.02.33.15.3. 33 2015-2016 LB-603 CKP Divn.:- Replacement of over DRM/CKP DRF 5871 5871 5871 0 0 3500 0 0 2371 2371 31/12/2016 Not 10% 10 Detailed estimate has been sanctioned on NOV' SDSTE/CKP
51.001 aged Batteries for OFC equipments Required progress 2016
at 49 stations.
08.09.15.
(1) NS Requisitions for 1008 Nos of 2v/120
AH Sub to HQ on 10.06.2016.
(2) NS Requisitions for 168 Nos of 2v/200
AH Sub. To Sr. DMM/CKP on 03.02.16.

92 12.02.33.15.3. 33 2015-2016 LB-602 Provision of IPS & RTU at 4 IBH DRM/CKP DF(4) 8544 8546 8546 0 0 50 0 0 8496 8496 31/03/2017 Not 40% 10 S&T: NSR for 04 Nos IPS Re-sub to HQ on NOV' SDSTE/CKP
51.002 alongwith Goomty under jurisdiction Required progress 2016
of SSE/S/CKP and SSE/S/JSG
29.04.16. Execution tender opened on:
31.03.16 but discharged due to high rates.
Retendering being done.

Engg: Goomty to be constructed.

Page 3 of 5 As on 09/12/2016
Details

Plan Head
PROJECTID

ALLOCATION

Revised TDC
Short Name of Work

Expenditure upto March '16

Expenditure during 2016-2017

Outlay Modified for 2016-2017

Outlay Proposed 2017-2018

Expenditure upto date

Balance till Date

Throwforward 2017-2018

%age Phy. progress

Progress Reported by
PB Item (PB,LB,DRM)

Original Cost

Last Sanc Cost

Current Cost
Year of Sanction

Progress for Month


REMARKS
SN

Now Anticipated TDC


Executing Agency Rly

Design & Drawing Status

Tender Status
1 2 4 5 6 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27 30 32 33 34 35 36
93 12.02.33.15.3. 33 2015-2016 LB-601 CKP Divn.:- Reliability improvement DRM/CKP DRF, 9853 9360 9360 0 0 2050 0 0 7310 7310 31/12/2016 Not Complete 10 Scope: ELD-50 Nos, Cable replacement- NOV' SDSTE/CKP
51.003 works for reducing signal failures. DF(4) Required 2016
40 km, LED Modified CR-600 Nos & Pin
brazing-(1450+2200)

Physical progress as on date:


ELD provided at 20/50 Nos. Balance will
be provided by Dec’16.
Works LOA issued on 01.01.16. for
trenching, cable laying and pin brazing
work. Progress slow.

Material: ELD and LED Modified CR NS


Requisitions:
(1) ELD-PO issued on 12.04.16, DP-
21.09.2016. (2) Modified CR: Requisition
resubmitted on 27.06.2016 to HQ.

94 12.02.33.15.4. 33 2015-2016 - Provision of class “C” SPDs in DRM/CKP DF(4) 1686 1669 1669 0 0 1200 0 0 469 469 31/12/2016 Not Complete 10 Done: 11/45 . Material supplied. Work NOV' SDSTE/CKP
51.001 common and differential mode in Required 2016
Integrated Power Supply (IPS) under
under progress.
SSE/Sig/JSG & SSE/Sig/CKP (45
Nos).

95 12.02.33.15.4. 33 2015-2016 - Provision of Mini Integrated Power DRM/CKP DF(4) 2350 2312 2312 0 0 1000 0 0 1312 1312 31/10/2016 Not 50% 10 (1) NSR of 1 IPS submitted to NOV' SDSTE/CKP
51.002 Supply (Mini IPS) & Remote Terminal Required progress 2016
Unit (RTU) at IBH in BRM-CKP
Sr.DMM/CKP on 20.05.16 after return from
section (01 No). HQ. P.O. issued on 24.11.2016
Execution tender discharged due to high
rates. Retendering being done.
Sub estimate of Engg and Elect sent to
Sr.DEN and Sr.DEE/G for provision of
goomty and Electrical supply.

96 12.02.33.15.4. 33 2015-2016 - Provision of Maintenance free earth DRM/CKP DF(4) 2342 2263 2263 0 553 1000 0 553 1263 1263 30/09/2016 Not Complete 10 Done: 20/99 , LOA issued 01.01.16. NOV' SDSTE/CKP
51.003 for stations in CKP division under Required 2016
SSE/Signal/JSG & SSE/Signal/CKP.
Material supplied. Work under progress.

97 12.02.33.15.4. 33 2015-2016 - Provision of Next Generation Fire DRM/CKP DF(3) 1570 1570 1570 0 0 800 0 0 770 770 30/09/2016 Not 30% 10 Tender opened on 31.03.2016. LOA issued NOV' SDSTE/CKP
51.004 wall with AVC (Application Visibility Required progress 2016
and Control) & Web security for
on 07.06.2016. Materials received at
existing Railnet network in CKP SSE/Tele/store/CKP. Work is under
Division progress.

99 12.02.33.15.6. 33 2015-2016 - Provision of Class-A lightning DRM/CKP DF(3) 2867 2867 2867 0 0 1300 0 0 1567 1567 31/03/2017 Not Complete 10 Done: 9/20, LOA issued on 06.04.16. Work NOV' SDSTE/CKP
51.002 protection over TATA-JSG Section in Required 2016
CKP Division
under progress at 11 stations.

102 12.02.33.16.3. 33 2016-2017 - CKP Divn.:- Repl. of existing LVCD DRM/CKP DF(4) 5275 0 5275 0 2000 0 3275 3275 Complete Nil Detailed estimate sanctioned on NOV' CPDE/SER
51.001 by High Availability SSDAC. Progress 2016
30.09.2016. ToD: 07.12.2016. No offer.
103 12.02.33.16.4. 33 2016-2017 - Provision of protection of filed DRM/CKP DF(4) 884 998 998 0 270 0 728 728 31/12/2017 Not 10% 0 Estimate sanctioned on 24.08.2016. NOV' SDSTE/CKP
51.001 connection of TLJBs with rail for DC Required progress 2016
track circuit.
ToD: 20.01.2017

104 12.02.33.16.4. 33 2016-2017 - Provision of LAN wiring for IPAS at DRM/CKP DF(4) 1200 1198 1198 0 350 0 848 848 Not 40% 0 Estimate sanctioned on 14.07.2016. NOV' SDSTE/CKP
51.002 the Sr. DPO's PRIME Cell, Sr. DFM''s Required progress 2016
office and for e-tendering at the
ToD: 17.10.2016.
concerned branch officer CS vetted TC under finalisation.

105 12.02.33.16.4. 33 2016-2017 - Provision of Air-Conditioner at DRM/CKP DF(4) 1989 1987 1987 0 550 0 1437 1437 31/12/2018 Not 40% 0 Estimate sanctioned on 02.09.2016 NOV' SDSTE/CKP
51.003 PI/EI/RRI stations and CCTV server Required progress 2016
room of CKP Division.
No S&T work (Electrical cost only).

106 12.02.33.16.4. 33 2016-2017 - Replacement of Old control cum DRM/CKP DRF 599 599 599 0 599 0 0 0 31/03/2018 Not 40% 0 Estimate sanctioned on 27.07.2016. NOV' SDSTE/CKP
51.004 indication panel of CKP Division. Required progress 2016
Materials intensive approval from
DRM/CKP being obtained.

107 12.02.33.16.4. 33 2016-2017 - Replacement of defective Operating DRM/CKP DRF 1401 1402 1402 0 560 0 842 842 31/12/2018 Not 40% 0 Requisition placed. NOV' SDSTE/CKP
51.005 PC for EI/ Maintenance terminal Required progress 2016
(Multipurpose) in CKP Division..

120 12.02.53.10.4. 53 2010-2011 DB-293 JSG:-Provision of LED based CGS DRM/CKP DF(1) 9124 9124 9124 6395 0 0 0 6395 2729 2729 31/12/2012 06/09/2013 Not Complete 100 Commissioned. Final bill is under process. NOV' SDSTE/CKP
51.015 Required 2016

Page 4 of 5 As on 09/12/2016
Details

Plan Head
PROJECTID

ALLOCATION

Revised TDC
Short Name of Work

Expenditure upto March '16

Expenditure during 2016-2017

Outlay Modified for 2016-2017

Outlay Proposed 2017-2018

Expenditure upto date

Balance till Date

Throwforward 2017-2018

%age Phy. progress

Progress Reported by
PB Item (PB,LB,DRM)

Original Cost

Last Sanc Cost

Current Cost
Year of Sanction

Progress for Month


REMARKS
SN

Now Anticipated TDC


Executing Agency Rly

Design & Drawing Status

Tender Status
1 2 4 5 6 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27 30 32 33 34 35 36
121 12.02.53.10.4. 53 2010-2011 DB-292 ROU:-Provision of LED based CGS DRM/CKP DF(1) 9042 9042 9042 7042 0 0 0 7042 2000 2000 31/01/2012 30/12/2012 Not Complete 100 Commissioned. Final bill sent to Account NOV' SDSTE/CKP
51.017 at Required 2016
on October 2016.
126 12.02.53.12.4. 53 2012-2013 - provision of large berth availability DRM/CKP DF(1) 2314 2314 2314 0 0 500 0 0 1814 1814 30/06/2016 Not Complete 10 LOA issued 01.01.16. TV installed and NOV' SDSTE/CKP
51.009 digital board at PRS centers of Required 2016
Tatanagar, Chakradharpur, Rourkela
commissioned at TATA and ROU. Work is
and Jharsuguda. in progress at CKP & JSG. Software
configuration pending from being
chased for completion.
146 12.02.53.15.3. 53 2015-2016 LB-799 TATA, Rourkela and jharsuguda: DRM/CKP DF(1) 17147 14679 14679 0 0 1000 0 0 13679 13679 31/03/2017 Not Complete 10 Scope: CIB at all Balance PF of TATA, NOV' SDSTE/CKP
51.001 Installation of CIB, TIB, and At a Required 2016
glance board etc.
CKP, ROU & JSG and some TIBs.
Status: LOA issued on 01.01.2016. RDSO
inspection of materials done in June and
all materials received by SSE/Tele/ROU.
CIBs & AGDB are installed at P.F No. 2 & 5
at TATA. Work is in progress at ROU &
JSG.

148 12.02.53.15.3. 53 2015-2016 LB-800 ADTP: Extension of UP platform & DRM/CKP DF(1) 12678 12678 12678 0 0 500 6000 0 6178 12178 Complete Complete 10 Contract awarded on 23.06.16. Work is in NOV' Sr. DEN
51.003 DN platform. 2016 (Co)/CKP
progress. TRD: Contract awarded on
13.04.16. S&T: Tender opened on 29.12.15
and discharged. ToD: 17.10.2016, under
TC.
154 12.02.53.15.4. 53 2015-2016 - TATA:- Extension of PF no. -1 DRM/CKP DF(1) 6984 6984 6984 0 0 400 4000 0 2584 6584 Complete Complete 40 ToD: 29.12.15 NOV' Sr. DEN
51.003 towards CKP end at TATA to 2016 (Co)/CKP
accommodate 24 coaches trains.
Tender discharged due to high rates.
Retendering done, ToD: 17.10.2016.
TC under finalisation.
186 12.02.53.16.4. 53 2016-2017 - Tatanagar~~Jharsuguda~~Provision DRM/CKP DF(1) 6700 0 6700 0 500 0 6200 6200 Nil Nil TOD: 07.12.2016. NOV' DRM/CKP
51.006 of LED Based TIB, AGDB at TATA, Progress Progress 2016
CKP, ROU & JSG Railway Stations of
Briefing note under preparation.
Chakradharpur Division

Page 5 of 5 As on 09/12/2016