POWER TRANSFORMER

OPERATION & MAINTENANCE

By
Isnan Hudaya Lubis

TRANSFORMER SHORT INTRODUCING…..

Schneider Electric - UMV – ENERGY - DTR 2

1
Transformer Delivers Electric Power between different
voltage system

Schneider Electric - UMV – ENERGY - DTR 3

Schneider Electric - UMV – ENERGY - DTR 4

2
Vin / Vout = N in / N out

Schneider Electric - UMV – ENERGY - DTR 5

Vin / Vout = N in / N out


Voltage V in creates Current Input I in
I in creates Flux on Core magnetic
Flux Induces Voltage V out
Voltage V out produces current I out

Schneider Electric - UMV – ENERGY - DTR 6

3
I in & I out creates Impedance + Copper Losses
Flux on Core Magnetic creates Core Losses

Schneider Electric - UMV – ENERGY - DTR 7

Core Losses + Copper Losses Creates Heat


Heat Dissipated by Oil + Tank + Radiator

Schneider Electric - UMV – ENERGY - DTR 8

4
TECHNICAL SPECIFICATION
MEDIUM TRANSFORMER

RATED POWER 8500 KVA 12000 KVA


COOLING MODE ON-AN ON-AN
HV VOLTAGE 13.8 KV +/- 2X 2.5% 13.8 KV +/-2 X 2.5%
LV VOLTAGE 2.4KV 2.4 KV
FREQUENCY 50 Hz 50 Hz
OIL/WINDING TEMP.RISE 50/55 50/55
TAP CHANGER TYPE OFF CIRCUIT OFF CIRCUIT
TERMINATION SIDE WALL SIDE WALL

Schneider Electric - UMV – ENERGY - DTR 9

TECHNICAL SPECIFICATION
DISTRIBUTION TRANSFORMER

RATED POWER 2500 KVA 1600 KVA 1250 KVA


COOLING ON-AN ON-AN ON-AN
HV VOLTAGE 2.4 KV +/- 2X 2.5% 2.4 KV +/-2 X 2.5% 2.4 KV +/-2 X 2.5%
LV VOLTAGE 0.48 KV 0.48 KV 0.48 KV
FREQUENCY 50 Hz 50 Hz 50 Hz
TEMP.RISE 50/55 50/55 50/55
TAP CHANGER OFF CIRCUIT OFF CIRCUIT OFF CIRCUIT
TYPE
TERMINATION SIDE WALL SIDE WALL SIDE WALL

Schneider Electric - UMV – ENERGY - DTR 10

5
FEATURES
KVA 1250 1600 2500 8500 12000
Porcelain Bushing
Off Circuit Tap Changer
Bucholz Relay
Oil Level Relay
Oil Temp. Relay
Winding Temp.
Over Press. Relay
Air Dehumidifier
Filling Valve
Draining Valve
Oil Sampling
Radiator + Valve
Earthing Terminal
CT LV Netral
Marshalling Kiosk
Arrester HV

Schneider Electric - UMV – ENERGY - DTR 11

OPERATION

Schneider Electric - UMV – ENERGY - DTR 12

6
OPERATION
VALVES POSITION
VALVE TYPE POSITION
Conservator Draining Valve CLOSED
Buchholz Isolating Valve OPENED
Oil Filling Valve CLOSED
Oil Draining Valve CLOSED
Oil Sampling Valve CLOSED
Radiator Isolating Valve OPENED

Schneider Electric - UMV – ENERGY - DTR 13

OPERATION
OFF CIRCUIT TAP CHANGER
1.OPEN TRANSFORMER INCOMING & OUTGOING BREAKER

2.CHECK THE INCOMING ACTUAL VOLTAGE

3.CHOOSE THE TAP MATCHED TO ACTUAL VOLTAGE

4.LIFT & TURN THE HANDWHEEL

5.RELEASE HANDWHEEL

Schneider Electric - UMV – ENERGY - DTR 14

7
OPERATION
OIL LEVEL INDICATOR

MAX Signal Switch : Limit oil expansion due to Overload


MIN signal switch: Warn if oil reduced

Schneider Electric - UMV – ENERGY - DTR 15

BUCHHOLZ RELAY

Gas indication switch : Indicate gas accumulation


due to overheat, or ageing

Flow indication switch : Indicate Oil Flow


due to arcing or short circuit

Schneider Electric - UMV – ENERGY - DTR 16

8
PRESSURE RELIEF DEVICE

Overpressure Switch : Release setting 7psi.


Overpressure due to overloading

Schneider Electric - UMV – ENERGY - DTR 17

OIL TEMPERATURE INDICATOR

Overheat trip: 100 degree


Overheat alarm: 90 degree

Schneider Electric - UMV – ENERGY - DTR 18

9
WINDING TEMPERATURE INDICATOR

Overheat trip: 105 degree


Overheat alarm: 95 degree

Schneider Electric - UMV – ENERGY - DTR 19

MAINTENANCE STAGE

Schneider Electric - UMV – ENERGY - DTR 20

10
MAINTENANCE ASPECTS

Physical Checking

Protection Device Checking

Test & Measurement

Purpose of these Activity :


Ensure Reliability, Increase Lifetime, Avoid Failure

Schneider Electric - UMV – ENERGY - DTR 21

MAINTENANCE ASPECTS

Physical Checking

Schneider Electric - UMV – ENERGY - DTR 22

11
MAINTENANCE ASPECTS

CHECK PHYSICAL CONDITION OF TRANSFORMER


Abnormal Condition Periodic Action Tx Condition
Inspection
Rust on any metal parts Weekly Clean the rust by sandpaper immediately. ON, If Safe
Then apply Touch up Paint
Paint Crack on Metal parts Weekly Apply Touch Up Paint after clean up the ON, if Safe
surface from grease and dust.
Protection Device Broken Weekly Change with New Device if possible OFF

Grounding Monthly Retightening ON

Important :
1. Ensure physical condition is good before energizing

Schneider Electric - UMV – ENERGY - DTR 23

MAINTENANCE ASPECTS

Protection Device Checking

Protection Device show the condition inside Transformer Tank


The condition are :
1. Oil Level
2. Top Oil Temperature
3. Winding Temperature
4. Inside Pressure
5. Gas appearance

Schneider Electric - UMV – ENERGY - DTR 24

12
OIL LEVEL INDICATOR

Function : Show the Oil Level

Importance of Oil:
1. Heat Transfer from coil & Core to Radiator
2. Insulation component

Periodical Check :
Weekly, check the oil level
Yearly, check functionality of switch

Abnormal: Pointer reach MIN level, that activated switch for alarm

Schneider Electric - UMV – ENERGY - DTR 25

BUCHHOLZ RELAY

Function :
1 Gas Trap, if the gas volume reach limit, alarm will activated
2 Sudden Pressure Indicator. If Oil flow speed to conservator
reach the limit, trip contact will activated

Periodical Check:
Weekly, check cleanliness & gas accumulation
Yearly, check functionality of alarm & trip switches

Abnormal Condition:
1 Some Gas amount is trapped.
If this occur, release out the gas by open discharge cock

2 Oil overflow, indicate heavy failure inside Transformer.


If this occur, shut down the transformer for further investigation

Schneider Electric - UMV – ENERGY - DTR 26

13
BUCHHOLZ RELAY
Gas Indicator

Schneider Electric - UMV – ENERGY - DTR 27

BUCHHOLZ RELAY
Oil Flow

Schneider Electric - UMV – ENERGY - DTR 28

14
SILICA GEL/DEHUMIDIFIER

Periodic Inspection : Weekly, check the gels color

Function : Absorb moisture during air passage regarding to Transformer Oil expansion

Abnormal Condition :
The silica Gel color tends to be white, means the gels has been saturated & need normalization.

Normalization : Heat up the gels between 120 C – 150 C until the color return back

Schneider Electric - UMV – ENERGY - DTR 29

Transformer energizing creates Heat from Coil & Core Magnetic


Heat makes oil temperature increase & the oil expand to conservator
Air takes out from conservator
When Temperature cools down, oil volume decrease, conservator become Vacuum
Air take into conservator through Air Dryer

Schneider Electric - UMV – ENERGY - DTR 30

15
AIR DEHUMIDIFIER / SILICA GEL BREATHER

Pipe to Conservator

Silica Gel Chamber

Oil Sump

Schneider Electric - UMV – ENERGY - DTR 31

PRESSURE RELIEF DEVICE

Function : Release Overpressure inside tank

Periodic Inspection :
Yearly, check the functionality of trip switch
Abnormal condition :
Device release out pressure. Overpressure indicate
overheat inside transformer

Schneider Electric - UMV – ENERGY - DTR 32

16
OIL TEMPERATURE INDICATOR

Function : Oil Transformer thermometer

Periodic Inspection :
Weekly, see the Oil Temperature
Yearly, test functionality of Alarm & Trip switches
Abnormal condition :
1 Oil Temperature reach limit value, and activated alarm & trip switches
2 Alarm & Trip Switch not functioned

Oil Temperature rise design in technical spec : 50 C


If ambient Temperature 30 C
Limit Oil Temperature 80C

Schneider Electric - UMV – ENERGY - DTR 33

WINDING TEMPERATURE INDICATOR

Function : Average Winding Transformer Thermometer


Periodic Inspection :
Weekly, see the Temperature
Yearly, test functionality of Alarm & Trip switches, CT ratio

Abnormal condition :
1.Oil Temperature reach limit value, and activated alarm & trip switches
2. Alarm & Trip switch not functioned

Transformer design is Class A, means max insulation


temperature 105C

Schneider Electric - UMV – ENERGY - DTR 34

17
MAINTENANCE ASPECTS

Test & Measurement

This Maintenance need Shut down the Transformer

List of test & measurement:


1. Oil Breakdown Voltage
2. Gas Dissolved in Oil
3. Winding Ratio Measurement
4. Resistance Measurement
5. Torque Checking
6. Wiring Functional Test

Schneider Electric - UMV – ENERGY - DTR 35

TOOLS & EQUIPMENT

1. Resistance Test unit ( Megger)


2. Oil BDV test
3. Dissolved Gas Analyzer
4. Transformer Turn Ratio ( TTR)
5. Multimeter
6. As set of screw driver
7. Torque Wrench

Schneider Electric - UMV – ENERGY - DTR 36

18
OIL BREAKDOWN VOLTAGE

Procedure:
1. Take oil from sampling Point
2. Test Breakdown level in 2.5mm Sampling point
electrode distance

Schneider Electric - UMV – ENERGY - DTR 37

OIL BREAKDOWN VOLTAGE

TEST BOTTOM OIL ( kV )

1
2
3
4
5
Average

Acceptable Value : minimum 45kV


As per ASTM D1816

Schneider Electric - UMV – ENERGY - DTR 38

19
DISSOLVED GAS IN OIL
Purpose: Inspect Winding & Core Magnetic Condition based on Gas dissolved in Oil.

Analysis refer to IEC 567


Interpretation of the result refer to IEC 599 & IEEE C57 104-1991

Gasses involved in Oil Faults:


1. Hydrogen ( H2 )
2. Methane (CH4 )
3. Acetylene ( C2H2 )
4. Ethylene ( C2H4 )
5. Ethane ( C2H6 )
.
Gasses involved in paper insulation Faults:
1. Hydrogen ( H2 )
2. Methane (CH4 )
3. Carbon monoxide ( CO )
4. Carbondioxyde ( CO2 )

Schneider Electric - UMV – ENERGY - DTR 39

DISSOLVED GAS IN OIL


Investigation step

Schneider Electric - UMV – ENERGY - DTR 40

20
DISSOLVED GAS IN OIL
Total Gas analysis

Condition 1 : Transformer operate satisfactorily

Condition 2 : Gas level is greater than normal level. Any individual gas exceeding limit need more
investigation

Condition 3 : Indicate high level of decomposition, fault probably present

Condition 4 : Indicate Excessive decomposition. Continued operation could damage the TX

Schneider Electric - UMV – ENERGY - DTR 41

DISSOLVED GAS IN OIL


Combustible gas generation rate

Schneider Electric - UMV – ENERGY - DTR 42

21
DISSOLVED GAS IN OIL

Schneider Electric - UMV – ENERGY - DTR 43

DISSOLVED GAS IN OIL

Schneider Electric - UMV – ENERGY - DTR 44

22
DISSOLVED GAS IN OIL

Schneider Electric - UMV – ENERGY - DTR 45

DISSOLVED GAS IN OIL


Doenenberg Ratio method

Schneider Electric - UMV – ENERGY - DTR 46

23
DISSOLVED GAS IN OIL
Doenenberg Ratio method

Schneider Electric - UMV – ENERGY - DTR 47

DISSOLVED GAS IN OIL


Doenenberg Ratio method

Schneider Electric - UMV – ENERGY - DTR 48

24
OIL PURIFICATION FOR MAIN TANK

Valve Bucholz must closed

Schneider Electric - UMV – ENERGY - DTR 49

OIL PURIFICATION FOR CONSERVATOR

Valve Bucholz must closed

Schneider Electric - UMV – ENERGY - DTR 50

25
WINDING RESISTANCE TEST

The test must be done in each tap.


The Result compare with Factory Test Result

Schneider Electric - UMV – ENERGY - DTR 51

RESISTANCE MEASUREMENT

Schneider Electric - UMV – ENERGY - DTR 52

26
RATIO TEST

The Test must be done for each Tap.


The result should refer to Measurement at Factory Test

Schneider Electric - UMV – ENERGY - DTR 53

TORQUE INSPECTION

To ensure No Leakage occur


The Torque must inspected and meet standard as table below :

Schneider Electric - UMV – ENERGY - DTR 54

27
TORQUE INSPECTION

Schneider Electric - UMV – ENERGY - DTR 55

WIRING FUNCTIONAL CHECK

CHECK LIST FUNCTION TEST PROCEDURE

Heater Avoid panel from Check the function of Heater & Thermostat.
Humidity
Lighting Function Open the door, the Lamp must flash
automatically
Physical Check Indicate paint crack or 1.If paint crack appear, apply touch up paint
Dust appearance 2. Clean up dust inside panel or covering
ventilation

Schneider Electric - UMV – ENERGY - DTR 56

28
THANK YOU

For more question, contact:

isnan.lubis@schneider-electric.com
Isnan.hudaya@gmail.com

29

Vous aimerez peut-être aussi